This document provides details for a Multiple Award Construction Contract solicitation for Joint Base Andrews and Joint Base Anacostia-Bolling. The solicitation seeks proposals for a broad range of maintenance, repair, and minor construction services including demolition, site work, concrete, masonry, structural steel, electrical, mechanical, painting, carpentry, roofing, and road repair. The estimated ceiling value is $700 million over a seven-year period from one twelve-month base period and six one-year option periods. The North American Industry Classification System code is 236220 for construction of other new nonresidential structures with a size standard of $39.5 million. Proposals are due by August 1, 2020 and awards will be made to all qualifying offerors. The solicitation is a 100% small business set-aside for 8(a) entities within the Mid-Atlantic region.

View the file

Other files

File Type Posted
Solicitation Amendment FA286020R00450005 SF 30.pdf PDF
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
MACC REQUEST FOR INFORMATION 24 AUGUST - 1 SEPTEMBER UPDATE.pdf PDF
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
Attachment 18_SECTION M - EVALUATION FACTORS FOR AWARD.pdf PDF
Solicitation Amendment FA286020R00450004 SF 30.pdf PDF
MACC REQUEST FOR INFORMATION 24 AUGUST.pdf PDF
Attachment 16_Present Past Performance Information PPPI.docx DOCX document
Attachment 15 - MACC Past Performance Questionnaire.docx DOCX document
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
Solicitation Amendment FA286020R00450003 SF 30 (1).pdf PDF
Attachment 19_FA286020R0045 MACC Site Visit Minutes.pdf PDF
MACC REQUEST FOR INFORMATION 11 August.pdf PDF
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
Solicitation Amendment FA286020R00450001 SF 30(s).pdf PDF
Attachment 17_SECTION L - INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
Attachment 18_SECTION M - EVALUATION FACTORS FOR AWARD.pdf PDF
Attachment 9 - MACC Fire Protection Standards.pdf PDF
MACC Solicitation - FA286020R0045.pdf PDF
Attachment 8 - MACC Mechanical Sys Standard Requirements.pdf PDF
Attachemnt 1 - MACC SOW Mar2020.pdf PDF
Attachment 6- MACC JBA Environmental Standards.pdf PDF
Attachment 3 - Task Order Procedured May2020.pdf PDF
Attachment 2 - MACC General Requirements.pdf PDF
Attachment 11 - MACC JBA Architectural Guideline.pdf PDF
Attachment 13 - MACC JBA Section 01 45 35 Special Conditions.pdf PDF
Attachment 16_Present Past Performance Information PPPI.pdf PDF
Attachment 5- MACC Electrical Standard Requirements 2019.pdf PDF
Attachment 14 - MACC JBA Section 01 14 00 Work Restrictions.pdf PDF
Attachment 4 - On Ramp Off Ramp Procedures April2020.pdf PDF
Attachment 12 - MACC Section 01 33 00 Submittal Procedures.pdf PDF
Attachment 10 - MACC Communications Site Specific Standard.pdf PDF
Attachment 7- MACC JBAB Environmental Standards.pdf PDF
Attachment 15 - MACC Past Performance Questionnaire.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to The Purpose of This Amendment Is:

1) Update the solicitation based on discrepancies identified between this SF 1442 and requirement attachments

2) Clarify requirement information found in Section H and Section L (Attachment 17)

3) Post Site Visit minutes from the 11 August 2020 site visit

4) Post answers to the 01 August 2020 RFIs

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Contract Description

1) This is a Request for Proposal for a Multiple Award Construction Contract (MACC) for Joint Base Andrews, MD and Joint Base Anacostia Bolling, Washington, D.C.\n2) This acquisition is being issues as 100% Set-Aside for certified Small Business Administration (SBA) 8(a) entities and 8(a) Joint Ventures within the Mid-Atlantic Region (Delaware, District of Columbia, Maryland, Pennsylvania, Virginia, and West Virginia); FAR Part 15 Source Selection Procedures\n3) Applicable North American Industry Classification (NAICS) Code: 236220-Size Standard $39.5M\n4) Award of solicitation will result in a Firm Fixed Price, Multiple Award Indefinite Delivery, Indefinite Quantity (IDIQ) contract.\n5) Award will be made to all qualifying offerors\n6) See Schedule; Offerors are required to complete and return SF 1442 (Section B through K)\n7) Period of Performance: One (1) 12 month base year and six (6) years option periods. Total of seven (7) Years.\n8) The total contract value including all options is not to exceed (NTE) $700,000,000.00. Funding against an IDIQ contract will be cited on each individual task order as stated in Section G.\n9) A Pre-Proposal Conference and Site Visit is planned on or around 11 August 2020. See Section L, Provision 52.236-27 Alt- I for further information. \n10) In Block 11, the number of calendar days for the "performance begins" and "completed within" shall be determined at the issuance of each task order.\n11) Contractors will be required to submit proposals on all Task Orders issued under the IDIQ.\n12) Questions regarding the solicitation must be submitted in writing in Microsoft Word format to 316CONS.

MACC.ORG@us.af.mil no later than (NLT) 1 August 2020, 12:00 PM EST.\n\n

1) This is a Request for Proposal for a Multiple Award Construction Contract (MACC) for Joint Base Andrews, MD and Joint Base Anacostia Bolling, Washington, D.C.\n2) This acquisition is being issues as 100% Set-Aside for certified Small Business Administration (SBA) 8(a) entities and 8(a) Joint Ventures within the Mid-Atlantic Region (Delaware, District of Columbia, Maryland, Pennsylvania, Virginia, and West Virginia); FAR Part 15 Source Selection Procedures\n3) Applicable North American Industry Classification (NAICS) Code: 236220-Size Standard $39.5 M\n4) Award of solicitation will result in a Firm Fixed Price, Multiple Award Indefinite Delivery, Indefinite Quantity (IDIQ) contract.\n5) Award will be made to all qualifying offerors\n6) See Schedule; Offerors are required to complete and return SF 1442 (Only applicable information in Section B through K). Note: no pricing information is requested in Section B.\n7) Period of Performance: One (1) 12 month base year and six (6) years option periods. Total of seven (7) Years.\n8) The total contract value including all options is not to exceed (NTE) $700,000,000.00. Funding against an IDIQ contract will be cited on each individual task order as stated in Section G.\n9) A Pre-Proposal Site Visit is planned on 11 August 2020. See Section L, Provision 52.236-27 Alt- I for further information. \n10) In Block 11, the number of calendar days for the "performance begins" and "completed within" shall be determined at the issuance of each task order.

\n11) Contractors will be required to submit proposals on a minimum of one (1) effort per twelve (12) consecutive Requests for Proposal or at least one (1) per six-month period; Whichever comes later. In accordance with Attachment 4, On Ramp Off Ramp Procedures.\n12) Questions regarding the solicitation must be submitted in writing in Microsoft Word format to 316CONS.MACC.

ORG@us.af.mil no later than (NLT) 1 August 2020, 12:00 PM EST.\n\n

Accept Within Days

120 180

Section H - Special Contract Requirements

Miscellaneous text in this section has been modified to:

Section H - Special Contract Requirements General Information Multiple Award Construction Contract (MACC)

1. A separate Notice to Proceed (NTP) will be issued on each task order.

FA286020R00450002

2. Reference Block 11: Performance periods will be negotiated on each task order.

3. Reference Block 12: Performance and Payment Bonds will be required on each individual task order.

4. Each task order will be funded separately.

SPECIAL CONTRACT REQUIREMENTS

H-1 BASE ACCESS

Occasionally it is necessary to require either early release of JBA and JBAB personnel, late reporting, or even total base closure when weather conditions make normal travel unsafe. When weather conditions cause one of the above situations, contractor personnel will be denied access to the base unless they have been notified that their contract service has been determined essential. For base closure or late reporting during inclement weather, listen to radio stations, watch television stations, visit the OPM website or download the OPM Alert smart phone application.

H-2 REQUIRED INSURANCE (IAW FAR 28.306(b)) Reference FAR clause 52.228-5 Insurance -- Work on a Government Installation-The Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.

a. Workmen's Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen's Compensation insurance shall extend to cover employer's liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.

b. General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.

c. Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.

Before commencing work under this contract, the Contractor shall certify to the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribed or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

H-3 Bonds

a. Performance and Payment Bonds. The contractor will be required to furnish a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25-A), each with good and sufficient surety or sureties, acceptable to the Government for each task order within 14 calendar days after task order award.

H-4 RECEIPT OF PROPOSALS

Task Order Proposals will not be considered "received" until delivered to e-mail address of the Contract Specialist and Contracting Officer listed on individual task orders.

H-5 PREPARATION OF PROGRESS SCHEDULES AND REPORTS

The reports contemplated by the clause 52.236-15 -- Schedules for Construction Contracts, shall be accomplished on and in accordance with instructions pertaining to AF Form 3064, Contract Progress Schedule, and AF Form 3065, Contract Progress Report. The AF Form 3064 shall be provided to the Contracting Officer not later than 15 calendar days after issuance of the Notice to Proceed. (Mandatory when performance is 60 or more days)

H-6 MATERIAL APPROVAL SUBMITTAL

All material and articles requiring approval, as contemplated by 52.236-5 -- Materials and Workmanship Clause, shall be submitted by the contractor using a web based submittal application. The web based application is TBD and will be confirmed prior to award of the MACC. In addition, the contractor is reminded that the certification on the AF Form 3000 must be signed by an individual within the company who has authority to make the certification.

H-7 UTILITY SERVICES

The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets are available. The contractor is responsible for installing temporary service outlets, as necessary, and charges will be made in accordance with the clause 52.236-14 -- Availability and Use of Utility Services.

Damage to Utilities

a. In the event of a contractor caused utility failure/disruption, the contractor will first make the area safe, then immediately contact the Base Civil Engineer Customer Service and Contracting Officer.

b. Repairs to contractor damaged utilities will be performed in a timely manner and at no additional cost to the Government.

H-8 AS-BUILT DRAWINGS

The contractor shall maintain one set of drawings at the work site and record all changes and any hidden or subsurface data discovered during construction. The contractor shall provide a marked by blue line copy with all changes, which transpired during the contract.

IDCode:
Page: 1
Pages: 4
AmendNo: 0002
EffDate: 8/13/2020
ReqNo: A007807
ProjNo: TBD
IssCode: FA2860
AdmCode:
IssuedBy: FA2860 11 CONS LGC

1349 LUTMAN DR

CP 240 612 5675

JB ANDREWS, MD 20762-7001

United States Sara Strange, Email: sara.strange@us.af.mil Telephone: 240-612-5685

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA286020R0045
SolDate: 7/15/2020
AwardChg:
AwardNo:
AwardDate:
Amended: 1
OffrExt:
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd:
ChgeOrder:
Modify:
SuppAgre:
SuppAuth:
ModOthr:
OthrSpec:
NoReq: 1
Require:
Copies:
Descript:

SEE CONTINUATION PAGE

ContNameTitle:
CoNameTitle: Michael Carmody

Email: michael.carmody.2@us.af.mil Telephone: 240-612-5622

ContDate:
CODate:

File details come from the government source that posted it. Updated .