About this opportunity

The U.S. Army Corps of Engineers, St. Louis District, is seeking a qualified contractor to perform lock foundation and site preparation work for Lock and Dam 25 as part of the Navigation Ecosystem Sustainability Program (NESP) located in Winfield, Missouri. The work encompasses excavation and disposal of existing scour protection riprap, dredging and placement of sand fill for foundation material, construction of a sheet pile separator wall with bracing piles, installation of a downstream deflector wall, placement of riprap protection berms, site preparation including staging area fill placement, and installation of a sanitary outfall pipe. This is a firm fixed price contract using a best value trade-off evaluation methodology with four equally-weighted factors: Construction Approach (50 pages maximum), Past Performance (50 pages maximum), Small Business Participation (20 pages maximum), and Price, with Factors 1 and 2 being more important than Factor 3, and combined Factors 1-3 equal in importance to Factor 4. All proposals must achieve a minimum "Marginal" rating on non-cost factors to be eligible for award, and a Project Labor Agreement compliant with FAR 52.222-33 is mandatory. The proposal due date is April 24, 2026, at 10:00 AM CST, with inquiries due by April 3, 2026, at 4:00 PM CST, and an organized site visit was held on March 11, 2026.

This is a full and open competition with no set-aside designation under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with a small business size standard of $45,000,000. There are no identified incumbent contractors mentioned in the solicitation documents. The contract includes an estimated 365 calendar days for site preparation work and 548 calendar days for lock foundation work, with a non-binding assumed contract award date of June 16, 2026, and construction Notice to Proceed of August 14, 2026. Key quantities include 65,000 cubic yards of staging area fill, 255 linear feet of 48-inch diameter steel pipe piles, 80,720 square feet of separator wall furnishing and 24,050 square feet of separator wall installation, and up to 145,000 cubic yards of dredge material placement. A mandatory minimum 25% small business subcontracting participation target is required with quarterly reporting, and liquidated damages are assessed at $5,380 per calendar day of delay. All work is to be performed at Lock and Dam 25 near Winfield, Missouri 63389, with the contractor required to maintain coordination with active lock operations and environmental protections throughout contract execution.

Notice text

7 versions

Update #7 · Latest ·

***Amendment 0006

The purpose of this amendment is to incorporate tax exemption language. All other terms and changes remain unchanged.

***Amendment 0005

The purpose of this amendment is to remove FAR clause 52.236-16 and replace it with FAR 52.236-16 Alternate 1. This amendment also incorporates updated drawing sheets
GI002 and CG203. All other terms and conditions remain unchanged.

***Amendment 0004

This amendment is issued to provide replies to ProjNet Bidder Inquiries as of 8 Aprio, and make all resulting changes. See attachments for full details of Amendment 0004.

***Amendment 0003
This amendment is issued to provide replies to ProjNet Bidder Inquiries, and make all resulting changes. ProjNet Bidder Inquiries is re-opened through 4:00pm CST, 3 April 2026. There are some attachments that must be requested in order to be provided via DoD SAFE. See attachments for full details of amendment 0003.

***Amendment 0002

This amendment is hereby issued to make administrative updates to the above-referenced solicitation in accordance with the Government Responses to ProjNet Bidder Inquiries as of 4 March 2026:

***Amendment 0001

This amendment is issued to make administrative updates to the solicitation.

***Proposal will be submitted via EMAIL  Angie Grimes at angie.l.grimes@usace.army.mil and Whitney Dee at whitney.r.dee@usace.army.mil

The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work.  The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall.   For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed.

Update #6 ·

***Amendment 0005

The purpose of this amendment is to remove FAR clause 52.236-16 and replace it with FAR 52.236-16 Alternate 1. This amendment also incorporates updated drawing sheets
GI002 and CG203. All other terms and conditions remain unchanged.

***Amendment 0004

This amendment is issued to provide replies to ProjNet Bidder Inquiries as of 8 Aprio, and make all resulting changes. See attachments for full details of Amendment 0004.

***Amendment 0003
This amendment is issued to provide replies to ProjNet Bidder Inquiries, and make all resulting changes. ProjNet Bidder Inquiries is re-opened through 4:00pm CST, 3 April 2026. There are some attachments that must be requested in order to be provided via DoD SAFE. See attachments for full details of amendment 0003.

***Amendment 0002

This amendment is hereby issued to make administrative updates to the above-referenced solicitation in accordance with the Government Responses to ProjNet Bidder Inquiries as of 4 March 2026:

***Amendment 0001

This amendment is issued to make administrative updates to the solicitation.

***Proposal will be submitted via EMAIL  Angie Grimes at angie.l.grimes@usace.army.mil and Whitney Dee at whitney.r.dee@usace.army.mil

The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work.  The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall.   For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed.

Update #5 ·

***Amendment 0004

This amendment is issued to provide replies to ProjNet Bidder Inquiries as of 8 Aprio, and make all resulting changes. See attachments for full details of Amendment 0004.

***Amendment 0003
This amendment is issued to provide replies to ProjNet Bidder Inquiries, and make all resulting changes. ProjNet Bidder Inquiries is re-opened through 4:00pm CST, 3 April 2026. There are some attachments that must be requested in order to be provided via DoD SAFE. See attachments for full details of amendment 0003.

***Amendment 0002

This amendment is hereby issued to make administrative updates to the above-referenced solicitation in accordance with the Government Responses to ProjNet Bidder Inquiries as of 4 March 2026:

***Amendment 0001

This amendment is issued to make administrative updates to the solicitation.

***Proposal will be submitted via EMAIL  Angie Grimes at angie.l.grimes@usace.army.mil and Whitney Dee at whitney.r.dee@usace.army.mil

The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work.  The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall.   For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed.

Update #4 ·

***Amendment 0003
This amendment is issued to provide replies to ProjNet Bidder Inquiries, and make all resulting changes. ProjNet Bidder Inquiries is re-opened through 4:00pm CST, 3 April 2026. There are some attachments that must be requested in order to be provided via DoD SAFE. See attachments for full details of amendment 0003.

***Amendment 0002

This amendment is hereby issued to make administrative updates to the above-referenced solicitation in accordance with the Government Responses to ProjNet Bidder Inquiries as of 4 March 2026:

***Amendment 0001

This amendment is issued to make administrative updates to the solicitation.

***Proposal will be submitted via EMAIL  Angie Grimes at angie.l.grimes@usace.army.mil and Whitney Dee at whitney.r.dee@usace.army.mil

The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work.  The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall.   For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed.

Update #3 ·

***Amendment 0002

This amendment is hereby issued to make administrative updates to the above-referenced solicitation in accordance with the Government Responses to ProjNet Bidder Inquiries as of 4 March 2026:

***Amendment 0001

This amendment is issued to make administrative updates to the solicitation.

***Proposal will be submitted via EMAIL  Angie Grimes at angie.l.grimes@usace.army.mil and Whitney Dee at whitney.r.dee@usace.army.mil

The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work.  The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall.   For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed.

Update #2 ·

***Amendment 0001

This amendment is issued to make administrative updates to the solicitation.

***Proposal will be submitted via EMAIL  Angie Grimes at angie.l.grimes@usace.army.mil and Whitney Dee at whitney.r.dee@usace.army.mil

The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work.  The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall.   For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed.

Update #1 ·

***Proposal will be submitted via EMAIL  Angie Grimes at angie.l.grimes@usace.army.mil and  Whitney Dee at whitney.r.dee@usace.army.mil

The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work.  The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall.   For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed.

Files

File Type Posted
Solicitation Amendment W912P926RA0010006 SF 30.pdf PDF
Solicitation Amendment W912P926RA0010005 SF 30.pdf PDF
B3MRLD25202402-PLAN_SET_AMND-2026-04-14-Amendment 0005 Plans.pdf PDF
Amendment 0004 00 00 10 Pricing Schedule.pdf PDF
Solicitation Amendment W912P926RA0010004 SF 30.pdf PDF
B3MRLD25202402-PLAN_SET_AMND-2026-04-08-Amendment 0004 Plans.pdf PDF
Amendment 0004 Specifications.pdf PDF
ProjNet Bidder Inquiries and Replies as of 8 April.pdf PDF
Solicitation Amendment W912P926RA0010003 SF 30.pdf PDF
Pre Bid Site Visit Sign In Sheet.pdf PDF
EVALUATION FACTORS FOR AWARD Amd 0003.pdf PDF
Amendment 0003 00 00 10 Pricing Schedule.docx DOCX document
ProjNet Bidder Inquiries and Government Replies as of 27 Mar 2026.pdf PDF
PROPOSAL SUBMISSION INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS Amd 0003.pdf PDF
B3MRLD25202402-PLAN_SET_AMND-2026-03-27-Amendment 0003 Plans.pdf PDF
Amendment 0003 Specifications.pdf PDF
Solicitation Amendment W912P926RA0010002 SF 30.pdf PDF
PROPOSAL SUBMISSION INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS Amd 0002.pdf PDF
Solicitation Amendment W912P926RA0010001 SF 30.pdf PDF
W912P926RA001 Attachment 0003 PROPOSAL SUBMISSION INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
W912P926RA001 Attachment 0004 - EVALUATION FACTORS FOR AWARD.pdf PDF
W912P926RA001 Solicitation.pdf PDF
W912P926RA001 Attachment 0004 - EVALUATION FACTORS FOR AWARD.pdf PDF
W912P926RA001 Attachment 0006 - Appendix A Past Performance Questionnaire.pdf PDF
W912P926RA001 Attachment 0008 - Appendix C Small Business Participation Commitment Document.pdf PDF
W912P926RA001 Attachment 0010 - Appendix E DoD Checklist for Reviewing Subcontracting Plans.pdf PDF
W912P926RA001 Attachment 0011 - Appendix F Small Business Participation Commitment Progress Quarterly Report.pdf PDF
W912P926RA001 Attachment 0005 - 00 00 10 Scour Repair Advance Bid Schedule.pdf PDF
W912P926RA001 Attachment 0001 - Lock Foundation and Site Prep As-Advertised Specs.pdf PDF
W912P926RA001 Attachment 0003 - PROPOSAL SUBMISSION INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
W912P926RA001 Attachment 0007 - Appendix B Subcontractor Consent.pdf PDF
W912P926RA001 Attachment 0009 - Appendix D Subcontractor Letter of Commitment.pdf PDF
W912P926RA001 Attachment 0012 - Wage Determination.pdf PDF
Show all 33

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Lock and DAM 25 new 1, 200 FT lock navigation and ecosystem sustainability program (nesp) Lock and Dam 25 Site, 10 Sandy Slough Road, Winfield, Missouri 63389 63389 · NAICS 237990 ENDIST St Louis No set-aside
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement Cascade Locks, Oregon 97014, United States · NAICS 237310 ENDIST Portland Total Small Business
Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 1-2025. Specification No. OM25135 Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge No. 5-2025 New Orleans, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM25011) Plaquemine, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity