Amendment 0003 00 00 10 Pricing Schedule.docx

DOCX document 39 KB Posted

Attached to
LOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
Solicitation number
W912P926RA001
Issued by

About this file

This is a Pricing Schedule for Amendment 0003 of a lock foundation and site preparation construction project for Lock and Dam 25. The schedule requires contractors to provide unit prices and extended amounts for all base and optional line items. The base schedule encompasses 19 line items divided into two categories: Site Preparation (items 0001-0006) and Lock Foundation (items 0007-0019). Site preparation work includes mobilization/demobilization, erosion and sediment control, staging area fill (65,000 cubic yards), rip rap slope protection, sanitary outfall pipe installation, and land-based site work. Lock foundation work includes deflector wall installation, steel pipe piles (330 linear feet of 48-inch diameter), separator wall furnishing (80,720 square feet) and installation (24,050 square feet), articulating fabric formed concrete mattress, dredge material placement (145,000 cubic yards total with tiered quantities), alluvium excavation (25,000 cubic yards), rip rap excavation (47,500 cubic yards with tiered quantities), and placement of various stone scour protection materials (41,250 tons total). The optional schedule (Option 1) includes three line items for assist vessel mobilization/demobilization, 90-day vessel assistance, and 30-day vessel standby.

Contractors must submit unit prices and extended amounts for all items, with the government retaining the right to determine unit prices by dividing total quoted prices by estimated quantities if only lump sum amounts are provided. All quantities are estimated except those designated as "JOB." The pricing schedule notes specify that extensions will be verified by the government, unit prices take precedence over extensions in case of variation, and failure to submit prices on all items constitutes good cause for proposal disqualification. Optional line items (1001-1003) will only be performed when directed by the Contracting Officer, and payment is made solely for work actually requested and performed to the government's satisfaction. The U.S. Army Corps of Engineers, St. Louis District, is the contracting agency, and proposals should be submitted via email to Angie Grimes and Whitney Dee.

View the file

Other files

File Type Posted
Solicitation Amendment W912P926RA0010006 SF 30.pdf PDF
B3MRLD25202402-PLAN_SET_AMND-2026-04-14-Amendment 0005 Plans.pdf PDF
Solicitation Amendment W912P926RA0010005 SF 30.pdf PDF
ProjNet Bidder Inquiries and Replies as of 8 April.pdf PDF
Amendment 0004 00 00 10 Pricing Schedule.pdf PDF
Solicitation Amendment W912P926RA0010004 SF 30.pdf PDF
B3MRLD25202402-PLAN_SET_AMND-2026-04-08-Amendment 0004 Plans.pdf PDF
Amendment 0004 Specifications.pdf PDF
B3MRLD25202402-PLAN_SET_AMND-2026-03-27-Amendment 0003 Plans.pdf PDF
Amendment 0003 Specifications.pdf PDF
Solicitation Amendment W912P926RA0010003 SF 30.pdf PDF
Pre Bid Site Visit Sign In Sheet.pdf PDF
EVALUATION FACTORS FOR AWARD Amd 0003.pdf PDF
ProjNet Bidder Inquiries and Government Replies as of 27 Mar 2026.pdf PDF
PROPOSAL SUBMISSION INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS Amd 0003.pdf PDF
PROPOSAL SUBMISSION INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS Amd 0002.pdf PDF
Solicitation Amendment W912P926RA0010002 SF 30.pdf PDF
Solicitation Amendment W912P926RA0010001 SF 30.pdf PDF
W912P926RA001 Attachment 0003 PROPOSAL SUBMISSION INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
W912P926RA001 Attachment 0004 - EVALUATION FACTORS FOR AWARD.pdf PDF
W912P926RA001 Attachment 0001 - Lock Foundation and Site Prep As-Advertised Specs.pdf PDF
W912P926RA001 Attachment 0003 - PROPOSAL SUBMISSION INSTRUCTIONS CONDITIONS AND NOTICES TO OFFERORS.pdf PDF
W912P926RA001 Attachment 0007 - Appendix B Subcontractor Consent.pdf PDF
W912P926RA001 Attachment 0009 - Appendix D Subcontractor Letter of Commitment.pdf PDF
W912P926RA001 Attachment 0012 - Wage Determination.pdf PDF
W912P926RA001 Solicitation.pdf PDF
W912P926RA001 Attachment 0004 - EVALUATION FACTORS FOR AWARD.pdf PDF
W912P926RA001 Attachment 0006 - Appendix A Past Performance Questionnaire.pdf PDF
W912P926RA001 Attachment 0008 - Appendix C Small Business Participation Commitment Document.pdf PDF
W912P926RA001 Attachment 0010 - Appendix E DoD Checklist for Reviewing Subcontracting Plans.pdf PDF
W912P926RA001 Attachment 0011 - Appendix F Small Business Participation Commitment Progress Quarterly Report.pdf PDF
W912P926RA001 Attachment 0005 - 00 00 10 Scour Repair Advance Bid Schedule.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Schedule

0001.Mobilization and
Demobilization1JOB_ ___________

Site Preparation:

0002. Erosion and Sediment Control 1 JOB _ ___ ________

0003. Staging Area Fill 65,000 CY _ ___ ________

0004.New Rip Rap Slope
Protection (Land)1JOB_ ___________

0005. Sanitary Outfall Pipe 1 JOB _ ___ ________

0006. Land Based Site Work 1 JOB _ ___ ________

Lock Foundation:

0007.Deflector Wall Installation –
Dam Apron1JOB_ ___________
0008.Steel Pipe Piles – 48 Inch330LF_ ___________
Diameter

0009. Furnish Separator Wall 80,720 SF _ ___ ________

0010. Install Separator Wall 24,050 SF _ ___ ________

0011.Articulating Fabric Formed
Concrete Mattress1JOB_ ___________

0012. Dredge Material Placement – Lock Floor

A. First 105,000 CY 105,000 CY _ ___ ________

B. All Over 105,000 CY 40,000 CY _ ___ ________

0013. Alluvium Excavation 25,000 CY _ ___ ________

0014. Rip Rap Excavation

A. First 39,500 CY 39,500 CY _ ___ ________

B. All Over 39,500 CY 8,000 CY _ ___ ________

0015. R5000 Scour Protection 27,500 TN _ ___ ________

0016. Graded B-Stone Scour Protection 5,000 TN _ ___ ________

0017. Graded C-Stone Scour Protection 8,750 TN _ ___ ________

0018. Timber Cribbing & Mattress Demo 1 JOB _ ___ ________

0019. Site Monitoring 1 JOB _ ___ ________

TOTAL Base SCHEDULE PRICE $ _________

Option 1 Schedule

1001.Assist Vessel Mobilization and1JOB_ ___________
Demobilization

1002. Assist Vessel 90 DAY _ ___ ________

1003. Assist Vessel Standby 30 DAY _ ___ ________

TOTAL Option 1 SCHEDULE PRICE $ _________

TOTAL BASE and OPTION 1 SCHEDULE PRICES $ _________

ABBREVIATIONS

JOBJob
CYCubic Yards
TNTon
LFLinear Feet
SFSquare Feet
DAYDays

(See PRICING SCHEDULE NOTES)

PRICING SCHEDULE

Item Estimated Unit Extended No. Description Quantity Unit Price Amount _

00 00 10-3

PRICING SCHEDULE NOTES

1. All quantities shown on the PRICING SCHEDULE are estimated quantities except when the unit is shown as job "JOB".

2. When proposals are solicited on a unit price basis, offerors shall insert in the spaces provided therefore in the SCHEDULE both the "unit price" and the "estimated amount" resulting from applying the said unit price to the estimated quantity shown. In event the offeror quotes only a total price ("estimated amount") in its bid and fails to quote the unit price, the Government will determine such unit price by dividing the total price quoted by the quantity of the item set out in the SCHEDULE. The offeror agrees that the unit price so determined shall be used for the purpose of price evaluation, award and all payments to the Contractor including final payment.

3. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer and the extension will be corrected accordingly.

4. If a modification to a proposal based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the price schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the price schedule.

5. Offerors are required to submit a price on all items listed on the Pricing Schedule in addition to inserting a total quoted price in the appropriate space provided. Failure to do so will be considered good cause to disqualify the proposal.

6. OPTIONAL LINE ITEMS. Line Item Nos. 1001 through 1003 are OPTIONAL ITEMS. Upon the review of inspection at the site, the Contracting Officer, in accordance with the specifications and drawings, will direct the optional line item work as needed. The Contractor shall perform the appropriate work ONLY when directed by the Contracting Officer. The Government is not obligated to request any work under any optional item(s). The prices for each optional item shall represent your firm price to perform that service. Payment will be made ONLY for work actually requested and performed to the Government’s satisfaction.

Optional work is detailed in Specification Section 00 08 00.