This is a Pricing Schedule for a federal construction contract involving lock foundation and site preparation work. The document is organized into a Base Schedule with 20 line items and an Option 1 Schedule with 3 line items, requiring offerors to provide unit prices and extended amounts for all items.
The Base Schedule encompasses mobilization and demobilization, site preparation activities including erosion control and staging area fill totaling 65,000 cubic yards, and lock foundation work such as steel pipe pile installation (255 linear feet of 48-inch diameter pipe), separator wall furnishing and installation (80,720 and 24,050 square feet respectively), and dredge material placement up to 145,000 cubic yards. Additional base work includes alluvium excavation (25,000 cubic yards), rip rap excavation (47,500 cubic yards total), scour protection materials (27,500 tons of R5000, 5,000 tons of Graded B-Stone, and 8,750 tons of Graded C-Stone), timber cribbing demolition, site monitoring, and separator wall backfill (1,100 cubic yards). The Option 1 Schedule covers assist vessel services including mobilization/demobilization, 90 days of active vessel assistance, and 30 days of vessel standby. The pricing schedule notes specify that all quantities are estimated except job items, require unit prices and extended amounts for all line items, and that optional line items 1001-1003 are only billable if directed by the Contracting Officer and detailed in Specification Section 00 08 00. Offerors must submit prices on all items or face disqualification.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING SCHEDULE
Item Estimated Unit Extended
NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT _
00 00 10-1
Base Schedule
0001. Mobilization and Demobilization 1 JOB _ ___ ________
Site Preparation:
0002. Erosion and Sediment Control 1 JOB _ ___ ________
0003. Staging Area Fill 65,000 CY _ ___ ________
0004. New Rip Rap Slope Protection (Land) 1 JOB _ ___ ________
0005. Sanitary Outfall Pipe 1 JOB _ ___ ________
0006. Land Based Site Work 1 JOB _ ___ ________
Lock Foundation:
0007. Deflector Wall Installation – Dam Apron 1 JOB _ ___ ________
0008. Steel Pipe Piles – 48 Inch 255 LF _ ___ ________ Diameter
0009. Furnish Separator Wall 80,720 SF _ ___ ________
0010. Install Separator Wall 24,050 SF _ ___ ________
0011. Articulating Fabric Formed Concrete Mattress 1 JOB _ ___ ________
0012. Dredge Material Placement – Lock Floor
A. First 105,000 CY 105,000 CY _ ___ ________
B. All Over 105,000 CY 40,000 CY _ ___ ________
0013. Alluvium Excavation 25,000 CY _ ___ ________
0014. Rip Rap Excavation
A. First 39,500 CY 39,500 CY _ ___ ________
B. All Over 39,500 CY 8,000 CY _ ___ ________
0015. R5000 Scour Protection 27,500 TN _ ___ ________
0016. Graded B-Stone Scour Protection 5,000 TN _ ___ ________
PRICING SCHEDULE
Item Estimated Unit Extended
NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT _
00 00 10-2
0017. Graded C-Stone Scour Protection 8,750 TN _ ___ ________
0018. Timber Cribbing & Mattress Demo 1 JOB _ ___ ________
0019. Site Monitoring 1 JOB _ ___ ________
0020. Separator Wall Backfill 1100 CY _ ___ ________
TOTAL Base SCHEDULE PRICE $ _________
Option 1 Schedule
1001. Assist Vessel Mobilization and 1 JOB _ ___ ________ Demobilization
1002. Assist Vessel 90 DAY _ ___ ________
1003. Assist Vessel Standby 30 DAY _ ___ ________
TOTAL Option 1 SCHEDULE PRICE $ _________
TOTAL BASE and OPTION 1 SCHEDULE PRICES $ _________
ABBREVIATIONS
JOB Job CY Cubic Yards TN Ton LF Linear Feet SF Square Feet DAY Days
(See PRICING SCHEDULE NOTES)
00 00 10-3
PRICING SCHEDULE NOTES
1. All quantities shown on the PRICING SCHEDULE are estimated quantities except when the unit is shown as job "JOB".
2. When proposals are solicited on a unit price basis, offerors shall insert in the spaces provided therefore in the SCHEDULE both the "unit price" and the "estimated amount" resulting from applying the said unit price to the estimated quantity shown. In event the offeror quotes only a total price ("estimated amount") in its bid and fails to quote the unit price, the Government will determine such unit price by dividing the total price quoted by the quantity of the item set out in the SCHEDULE. The offeror agrees that the unit price so determined shall be used for the purpose of price evaluation, award and all payments to the Contractor including final payment.
3. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer and the extension will be corrected accordingly.
4. If a modification to a proposal based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the price schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the price schedule.
5. Offerors are required to submit a price on all items listed on the Pricing Schedule in addition to inserting a total quoted price in the appropriate space provided. Failure to do so will be considered good cause to disqualify the proposal.
6. OPTIONAL LINE ITEMS. Line Item Nos. 1001 through 1003 are OPTIONAL ITEMS. Upon the review of inspection at the site, the Contracting Officer, in accordance with the specifications and drawings, will direct the optional line item work as needed. The Contractor shall perform the appropriate work ONLY when directed by the Contracting Officer. The Government is not obligated to request any work under any optional item(s). The prices for each optional item shall represent your firm price to perform that service.
Payment will be made ONLY for work actually requested and performed to the Government’s satisfaction.
Optional work is detailed in Specification Section 00 08 00.