Lock and DAM 25 new 1,200 FT lock navigation and ecosystem sustainability program (NESP)

Open Solicitation Posted

Solicitation number
W912P926RA004
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Lock and Dam 25 Site, 10 Sandy Slough Road, Winfield, Missouri 63389 63389

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, St. Louis District, is soliciting construction of a new 1,200-foot lock at Lock and Dam 25 under the Navigation and Ecosystem Sustainability Program (NESP), with proposals due December 9, 2026. No set-aside is used.

Place of performance is 10 Sandy Slough Rd, Winfield, MO 63389. The scope includes a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock remains in place and, once the new lock is operational, becomes an auxiliary chamber used primarily by recreation traffic or when the 1,200-foot lock is out of service.

Attachment 0004 (Plans, Volumes 1-7) and Attachment 0005 (Navisworks Federated Model) must be requested by email from Contract Specialist Whitney Dee at whitney.r.dee@usace.army.mil and are delivered via DoD SAFE. Amendments 0001, 0002, and 0003 have been posted, with 0003 covering ProjNet bidder inquiries and government responses through 5 October 2026, and further amendments forthcoming. The update labeled 0817 provides details of an upcoming pre-proposal site visit. The notice carries NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Y1PZ, Construction of Other Non-Building Facilities.

Notice text

8 versions

Update #8 · Latest ·

NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of service. ------------ SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. --------- Attachment 0004 Plans (Volume 1-7) and Attachment 0005 Navisworks Federated Model must be requested via email to Contract Specialist, Whitney Dee at whitney.r.dee@usace.army.mil. Upon request they will be sent via DoD SAFE, since the files are too large to attach within PIEE or send via email. ------ SEE UPDATE LABELED 0817 FOR FULL DETAILS OF UPCOMING PRE-PROPOSAL SITE VISIT. -------------------- AMENDMENT 0001 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 31 August 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0002 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 15 September 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0003 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 5 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0004 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 20 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0005 extends the proposal due date to 10:00AM CST, Wednesday, December 9, 2026. See all attachments for full details..-------------------- AMENDMENT 0006 provides updates in accordance with the final set of ProjNet Bidder Inquiries and Government Responses. See all attachments for full details.

Update #7 ·

NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of service. ------------ SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. --------- Attachment 0004 Plans (Volume 1-7) and Attachment 0005 Navisworks Federated Model must be requested via email to Contract Specialist, Whitney Dee at whitney.r.dee@usace.army.mil. Upon request they will be sent via DoD SAFE, since the files are too large to attach within PIEE or send via email. ------ SEE UPDATE LABELED 0817 FOR FULL DETAILS OF UPCOMING PRE-PROPOSAL SITE VISIT. -------------------- AMENDMENT 0001 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 31 August 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0002 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 15 September 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0003 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 5 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0004 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 20 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0005 extends the proposal due date to 10:00AM CST, Wednesday, December 9, 2026. See all attachments for full details.

Update #6 ·

NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of service. ------------ SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. --------- Attachment 0004 Plans (Volume 1-7) and Attachment 0005 Navisworks Federated Model must be requested via email to Contract Specialist, Whitney Dee at whitney.r.dee@usace.army.mil. Upon request they will be sent via DoD SAFE, since the files are too large to attach within PIEE or send via email. ------ SEE UPDATE LABELED 0817 FOR FULL DETAILS OF UPCOMING PRE-PROPOSAL SITE VISIT. -------------------- AMENDMENT 0001 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 31 August 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0002 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 15 September 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0003 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 5 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0004 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 20 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.

Update #5 ·

NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of service. ------------ SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. --------- Attachment 0004 Plans (Volume 1-7) and Attachment 0005 Navisworks Federated Model must be requested via email to Contract Specialist, Whitney Dee at whitney.r.dee@usace.army.mil. Upon request they will be sent via DoD SAFE, since the files are too large to attach within PIEE or send via email. ------ SEE UPDATE LABELED 0817 FOR FULL DETAILS OF UPCOMING PRE-PROPOSAL SITE VISIT. -------------------- AMENDMENT 0001 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 31 August 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0002 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 15 September 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0003 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 5 October 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.

Update #4 ·

NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of service. ------------ SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. --------- Attachment 0004 Plans (Volume 1-7) and Attachment 0005 Navisworks Federated Model must be requested via email to Contract Specialist, Whitney Dee at whitney.r.dee@usace.army.mil. Upon request they will be sent via DoD SAFE, since the files are too large to attach within PIEE or send via email. ------ SEE UPDATE LABELED 0817 FOR FULL DETAILS OF UPCOMING PRE-PROPOSAL SITE VISIT. -------------------- AMENDMENT 0001 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 31 August 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.-------------------- AMENDMENT 0002 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 15 September 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.

Update #3 ·

NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of service. ------------ SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. --------- Attachment 0004 Plans (Volume 1-7) and Attachment 0005 Navisworks Federated Model must be requested via email to Contract Specialist, Whitney Dee at whitney.r.dee@usace.army.mil. Upon request they will be sent via DoD SAFE, since the files are too large to attach within PIEE or send via email. ------ SEE UPDATE LABELED 0817 FOR FULL DETAILS OF UPCOMING PRE-PROPOSAL SITE VISIT. -------------------- AMENDMENT 0001 provides updates in accordance with some of the ProjNet Bidder Inquiries and Government Responses posted through 31 August 2026. Additional questions and answers and updates will be provided in forthcoming amendments. See all attachments for full details.

Update #2 ·

NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of service. ------------ SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. --------- Attachment 0004 Plans (Volume 1-7) and Attachment 0005 Navisworks Federated Model must be requested via email to Contract Specialist, Whitney Dee at whitney.r.dee@usace.army.mil. Upon request they will be sent via DoD SAFE, since the files are too large to attach within PIEE or send via email. ------ SEE UPDATE LABELED 0817 FOR FULL DETAILS OF UPCOMING PRE-PROPOSAL SITE VISIT.

Update #1 ·

NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of service. ------------ SEE ATTACHMENT FOR FULL DETAILS OF UPCOMING REQUIREMENT SOLICITATION. --------- Attachment 0004 Plans (Volume 1-7) and Attachment 0005 Navisworks Federated Model must be requested via email to Contract Specialist, Whitney Dee at whitney.r.dee@usace.army.mil. Upon request they will be sent via DoD SAFE, since the files are too large to attach within PIEE or send via email.

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Thomas J O Brien Lock and Dam Major Rehabilitation - Construction, Chicago, Cook County, Illinois United States of America, Chicago, Cook County, Illinois · NAICS 237990 ENDIST Chicago No set-aside
Bonneville Powerhouse II Unwatering Pump Replacement United States · NAICS 237990 ENDIST Portland Total Small Business
Navigation lock tainter valve (TV) repair, TV1 The Dalles Dam (Washington side), Lyle, WA 98635. 98635 · NAICS 237990 ENDIST Portland No set-aside
Sources Sought for Geotechnical Exploration for U.S. Army Corps of Engineers, St. Louis District Within U.S. Army Corps of Engineers, St. Louis District, Area of Responsibility · NAICS 541380 ENDIST St Louis No set-aside
Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge No. 5-2025 New Orleans, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors