B3MRLD25202402-PLAN_SET_AMND-2026-03-27-Amendment 0003 Plans.pdf
PDF 16 MB Posted
- Attached to
- LOCK FOUNDATION AND SITE PREPARATION FOR LOCK and DAM 25 NAVIGATION ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
- Solicitation number
- W912P926RA001
About this file
Summary
This is a set of construction design drawings for the Upper Mississippi River Navigation Ecosystem Sustainability Project (NESP) Lock and Dam No. 25, issued by the U.S. Army Corps of Engineers, St. Louis District. The drawings cover lock foundation and site preparation work with a contract number W912P9-26-R-A001 and solicitation number W912P9-XX-X-XXXX, dated January 2026 with an amendment (AMDT 0003) issued in March 2026.
The project involves comprehensive site preparation and lock foundation work including demolition of existing structures (riprap removal, concrete sidewalks, handrails, and sanitary outfall pipes), riprap excavation in two phases, installation of a sheet pile separator wall with deflector panels and pipe piles, dredging operations, grading and site preparation, and placement of protective riprap berms and dredged sand fill. Key work phases include full-depth riprap excavation and alluvium removal, installation of a separator wall with an estimated top elevation of 433.6 feet and minimum 20-foot embedment depth, and backfill with riprap scour protection and dredged sand materials. The drawings include site plans, demolition plans, typical sections, profile details, structural details for the deflector wall system, geotechnical boring logs, hydrographic data, instrumentation locations, and material gradation test results for dredged sand and spoil materials. Access to work limits in the river must follow Navigation and Coast Guard regulations, and the marine access area will be improved as required during construction within the waters of the U.S. The contractor work limits encompass the main lock structure and downstream areas extending approximately 11,000 linear feet along the river corridor.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IN
L A
N D
N A
V
IG
A T
IO
N
D E
S
IG
N C
E N
T E
R
P L O
T D
A T
E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A N
S I D
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S
IZ
E
SHEET ID
S T
L O
U
IS
D
IS
T R
IC
T
S
P R
U C
E S
T R
E E
T
S
L O
U
IS
M
IS
S
O U
R I
2 3 4 5 6 7 8 9 10 11 12 16151413 17 18 19 20
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E of Engineers US Army Corps
A S
-A D
V E
R T
IS
E
D
U .S
A
R M
Y C
O R
P S
O F
N G
IN
E
E R
L O
U
IS
D
IS
T R
IC
T
/2
/2
:1
:5
P
M
IN
D
E X
O F
D R
A W
IN
G
S
GI002
J A
N U
A R
Y
W P
-X
X -X
-X X
X X
B D
IR
K
S P
.E
T D
IE
C
K M
A N
N
T D
IE
C
K M
A N
N
K D
O R
S C
H P
.E
U P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R N
A V
IG
A
T
IO
N E
C O
S Y
S T
E M
S U
S T
A
IN
A B
IL
IT
Y P
R O
J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N W
P
-2
-R
-A
SHEET ID DRAWING TITLE SHEET NO SHEET ID DRAWING TITLE SHEET NO
CG304 CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL 84
CG303 CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL 83
CG302 CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL 82
CG301 CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL 81
CG208 PROFILE - SANITARY OUTFALL 80
CG207 PROFILE - FOUNDATION PREPARATION LOCK CENTERLINE 79
CG206 PROFILE - FOUNDATION PREPARATION LOCK CENTERLINE 78
CG205 PROFILE - FOUNDATION PREPARATION LOCK CENTERLINE 77
CG204 PROFILE - SEPARATOR WALL 76
CG203 PROFILE - SEPARATOR WALL 75
CG202 PROFILE - RIPRAP EXCAVATION 74
CG201 PROFILE - RIPRAP EXCAVATION 73
CG109 GRADING PLAN - FOUNDATION PREPARATION 72
CG108 GRADING PLAN - FOUNDATION PREPARATION 71
CG107 GRADING PLAN - FOUNDATION PREPARATION 70
CG106 GRADING PLAN - SEPARATOR WALL RIPRAP EXCAVATION PHASE 2 69
CG105 GRADING PLAN - SEPARATOR WALL RIPRAP EXCAVATION PHASE 2 68
CG104 GRADING PLAN - RIPRAP EXCAVATION PHASE 1 67
CG103 GRADING PLAN - RIPRAP EXCAVATION PHASE 1 66
CG102 GRADING PLAN - LAND SITE 65
CG101 GRADING PLAN - LAND SITE 64
CG100 OVERALL GRADING PLAN 63
CS501 SITE DETAILS 62
CS109 SITE PLAN - FOUNDATION PREPARATION 61
CS108 SITE PLAN - FOUNDATION PREPARATION 60
CS107 SITE PLAN - FOUNDATION PREPARATION 59
CS106 SITE PLAN - SEPARATOR WALL AND RIPRAP EXCAVATION PHASE 2 58
CS105 SITE PLAN - SEPARATOR WALL AND RIPRAP EXCAVATION PHASE 2 57
CS104 SITE PLAN - RIPRAP EXCAVATION PHASE 1 56
CS103 SITE PLAN - RIPRAP EXCAVATION PHASE 1 55
CS102 SITE PLAN - LAND SITE 54
CS101 SITE PLAN - LAND SITE 53
CS100 OVERALL SITE PLAN 52
CD501 DEMOLITION PHOTOGRAPHS 51
CD102 DEMOLITION PLAN 50
CD101 DEMOLITION PLAN 49
CD100 OVERALL DEMOLITION PLAN 48
CIVIL
BI601 EXISTING INSTRUMENTATION TABLE 47
BI104 EXISTING INSTRUMENTATION PLAN SHEET 3 OF 3 46
BI103 EXISTING INSTRUMENTATION PLAN SHEET 2 OF 3 45
BI102 EXISTING INSTRUMENTATION PLAN SHEET 1 OF 3 44
BI101 CONTROL MONUMENTS PLAN 43
BB208 BORING LOGS 42
BB207 BORING LOGS 41
BB206 BORING LOGS 40
BB205 BORING LOGS 39
BB204 BORING LOGS 38
BB203 BORING LOGS 37
BB202 BORING LOGS 36
BB201 BORING LOGS 35
BB104 BORING LOCATION PLAN SHEET 3 OF 3 34
BB103 BORING LOCATION PLAN SHEET 2 OF 3 33
BB102 BORING LOCATION PLAN SHEET 1 OF 3 32
BB101 OVERALL BORING LOCATION PLAN 31
BB001 SOIL AND ROCK LEGEND 30
GEOTECHNICAL
VH606 ELEVATION DURATION PLOTS - MONTHLY AND QUARTERLY 29
VH605 ELEVATION - FLOW CURVES 28
VH604 ELEVATION DURATION AND FREQUENCY CURVES (1952-2022) 27
VH603 HYDROGRAPHS 2013 TO 2023 26
VH602 HYDROGRAPHS 1998 TO 2013 25
VH601 HYDROGRAPHS 1983 TO 1998 24
VS108 EXISTING CONDITIONS - HYDROSURVEY 2024 23
VS107 EXISTING CONDITIONS - HYDROSURVEY 2024 22
VS106 EXISTING CONDITIONS - HYDROSURVEY 2024 21
VS105 EXISTING CONDITIONS - AVERAGE SURVEYED RIVER BOTTOM 20
VS104 EXISTING CONDITIONS - AVERAGE SURVEYED RIVER BOTTOM 19
VS103 EXISTING CONDITIONS - AVERAGE SURVEYED RIVER BOTTOM 18
VS102 EXISTING CONDITIONS - LAND SITE 17
VS101 EXISTING CONDITIONS - LAND SITE 16
VS100 OVERALL EXISTING CONDITIONS 15
VF101 CONTROL POINT LOCATION PLAN 14
VA101 AERIAL PHOTOGRAPH 13
SURVEY
GC105 CONTRACTOR WORK LIMITS 12
GC104 CONTRACTOR WORK LIMITS 11
GC103 CONTRACTOR WORK LIMITS 10
GC102 CONTRACTOR WORK LIMITS 9
GC101 CONTRACTOR WORK LIMITS 8
GC100 OVERALL CONTRACTOR WORK LIMITS 7
GC003 GENERAL INFORMATION 6
GC002 VICINITY MAP AND LEGENDS 5
GC001 LOCATION AND VICINITY MAPS 4
GI003 GENERAL ABBREVIATIONS 3
GI002 INDEX OF DRAWINGS 2
GI001 COVER SHEET 1
GENERAL
SURFACE SAMPLE LOCATION MAP AND GRADATION DATA
HISTORICAL INSTRUMENTATION DATA
APPENDIX B - INSTRUMENTATION THRESHOLDS
APPENDIX B - INSTRUMENTATION LOCATIONS
APPENDIX A - INSTRUMENTATION INVENTORY
2022 - LOCK AND DAM 25 DOWNSTREAM GUIDE WALL SILT REMOVAL
2012 - LOCK AND DAM 25 DOWNSTREAM MAIN LOCK SCOUR REPAIR PHASE 2
2012 - LOCK AND DAM 25 DOWNSTREAM MAIN LOCK SCOUR REPAIR PHASE 1
1935 - LOCK AND DAM 25 LOCK ORIGINAL AS-BUILTS
REFERENCE DRAWINGS
SB504 PIPE PILES DETAILS 121
SB503 SHEET PILE DEFLECTOR PANEL DETAILS 120
SB502 SHEET PILE DEFLECTOR PANEL DETAILS 119
SB501 SHEET PILE DEFLECTOR PANEL DETAILS 118
SB301 SHEET PILE DEFLECTOR PANEL SECTIONS 117
SB203 SHEET PILE DEFLECTOR PANEL ELEVATIONS 116
SB202 SHEET PILE DEFLECTOR PANEL ELEVATIONS 115
SB201 SHEET PILE DEFLECTOR PANEL ELEVATION 114
SB102 SHEET PILE SEPARATOR WALL ENLARGED PLAN 113
SB101 SHEET PILE SEPARATOR WALL OVERALL PLAN 112
SB001 GENERAL STRUCTURAL NOTES 111
STRUCTURAL
CN104 DREDGING PLAN 110
CN103 DREDGING PLAN 109
CN102 DREDGING PLAN 108
CN101 DREDGING PLAN 107
CN100 OVERALL DREDGING PLAN 106
CG402 TYPICAL SECTIONS - SITE PREPARATION 105
CG401 TYPICAL SECTIONS - FOUNDATION PREPARATION 104
CG323 CROSS SECTIONS - FOUNDATION PREPARATION 103
CG322 CROSS SECTIONS - FOUNDATION PREPARATION 102
CG321 CROSS SECTIONS - FOUNDATION PREPARATION 101
CG320 CROSS SECTIONS - FOUNDATION PREPARATION 100
CG319 CROSS SECTIONS - FOUNDATION PREPARATION 99
CG318 CROSS SECTIONS - FOUNDATION PREPARATION 98
CG317 CROSS SECTIONS - FOUNDATION PREPARATION 97
CG316 CROSS SECTIONS - FOUNDATION PREPARATION 96
CG315 CROSS SECTIONS - FOUNDATION PREPARATION 95
CG314 CROSS SECTIONS - FOUNDATION PREPARATION 94
CG313 CROSS SECTIONS - FOUNDATION PREPARATION 93
CG312 CROSS SECTIONS - FOUNDATION PREPARATION 92
CG311 CROSS SECTIONS - FOUNDATION PREPARATION 91
CG310 CROSS SECTIONS - FOUNDATION PREPARATION 90
CG309 CROSS SECTIONS - FOUNDATION PREPARATION 89
CG308 CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL 88
CG307 CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL 87
CG306 CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL 86
CG305 CROSS SECTIONS - RIPRAP EXCAVATION AND SEPARATOR WALL 85
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
M A
R
A1
SCALE: 1"=30'
DEMOLITION PLAN
435' 435' 435'
440' 440'
440'
445'
445'
445'
445'
445'
445'
440'
440' 440'
435'
435'
430'
430'
430'
5'
425'
CONCRETE SIDEWALK
CONCRETE S
IDEWALK
39" D.B.H.
REMOVE
16" D.B.H.
REMOVE
47" D.B.H.
REMOVE
425 425
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A S
-A D
V E
R T
IS
E
D
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
B
D
IR
K S
P
.E
S T
L
O U
IS
D
IS
T
R
IC
T
E N
G
IN
E E
R S
U .S
A
R M
Y C
O R
P S
O F
IN
L
A N
D N
A V
IG
A
T
IO
N D
E S
IG
N
C E
N T
E R
GENERAL SHEET NOTES
SHEET KEYNOTES
KEYMAP
RIPRAP REMOVAL
LINEAR ITEM REMOVAL
INDIVIDUAL ITEM REMOVALX
CONTRACTOR WORK LIMT
CONCRETE PAVEMENT REMOVAL
CLEARING AND GRUBBING, SEE NOTE 3.
LEGEND
FINAL SEEDING AREAS.
STRIPPED TOP SOIL SHALL BE STOCKPILED FOR USE ON
MIN. 6", IN ACCORDANCE WITH SECTION 31 22 03.
4. EXISTING TURF AREAS SHALL BE STRIPPED OF TOPSOIL,
REQUIREMENTS, SEE SPECIFICATION SECTION 01 11 30.
OCTOBER 31. FOR ADDITIONAL TREE PROTECTION
HEIGHT, SHALL BE CUT DOWN BETWEEN APRIL 1 AND
3. NO TREES GREATER THAN 3" DIAMETER AT BREAST
2. FOR CLEARING AND GRUBBING, SEE SECTION 31 11 00.
CLEARING, GRUBBING, OR DEMOLITION.
1. INSTALL EROSION CONTROL MEASURES PRIOR TO ANY
5. RIPRAP STOCKPILE AREA, SEE SHEET CD100 FOR COORDINATES.
4. REMOVE CONCRETE SIDEWALK/RAMP
3. REMOVE HANDRAIL.
OF EXISTING PIPE APPROXIMATELY 90 LF.
MINIMIZE UTILITY DOWNTIME. PLUG AND CAP END
2. REMOVE SANITARY OUTFALL PIPE AND HEADWALL.
AND STOCKPILE FOR REUSE.
1. REMOVE RIPRAP (12 INCH R90 STONCE OVER 9 INCH BEDDING)
STOCKPILE AREA
TREE
D.B.H. OR 4.5 FT. ABOVE GROUND.
DIAMETER AT BREAST HEIGHT
D E
M O
L
IT
IO
N
P L
A
CD101
U P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R
N A
V
IG
A T
IO
N
E C
O S
Y S
T E
M S
U S
T A
IN
A
B
IL
IT
Y
P R
O J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N
K D
O R
S C
H P
.E
B S
A Y
L O
R
A
C O
M B
S
P .E
S I
D
J A
N U
A R
Y
W
P
-2
-R -A
W P
-X
X -X
-X X
X
L
O U
IS
D
IS
T
R
IC
T
S P
R U
C E
S T
R E
E T
S T
L
O U
IS
M
IS
S O
U R
I
B
M R
L D
L o c k s a n d
D a m
W in fi e ld
\B
M R
L D
L o c k
F o u n d a ti o n a n d S it e P re p a ra ti o n
\B
M
R L
D
-C
A D
S
H E
E T
-2
-0
-1
-C -C
D
S
H T
.d g n
D S
A
E C
S c re e n F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:0
:5
A
M
/2 /2
NORTH
PLAN
30' 60'0
M A
T C
H L
IN
E
S E
E S
H E
E T
C D
M A
R
R E
V
IS
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
STORAGE
SAND
SIDEWALK
CONCRETE
STORAGE
SAND
CONCRETE LID
FL=423.89
4" STEEL
INV. STUC.=440.23
TOP=442.93
GRATE INLET
TOP=442.92
GRATE INLET
STATION
COMFORT
20FT CONNEX
KEYPAD
TRANSFORMER
MOUNTED
PAD
BLOCK WALL
MOVABLE
32" D.B.H.
16" D.B.H.
DEMOLITION PLAN
445'
445'
440'
435'
430'
425'
430'
425'
FFE = 444.4
435'
435'
440'
440'
EP
C
CO
WELL
CP
CO
CI CI
U
U
U
M-119M-111
ASPHALT
ASPHALT
GRAVEL
GRAVEL
GRAVEL
A S
P H
A L
T
CONCRETE S
IDEWALK
ASPHALT
GRAVEL
GRAVEL
CONCRETE S
IDEWALK
47" D.B.H.
REMOVE
57" D.B.H.
REMOVE
39" D.B.H.
REMOVE
41" D.B.H
REMOVE
16" D.B.H.
REMOVE
68" D.B.H.
REMOVE
51" D.B.H.
REMOVE
43" D.B.H.
REMOVE
56" D.B.H.
REMOVE
44" D.B.H.
REMOVE
52" D.B.H.
REMOVE
42" D.B.H.
REMOVE
60" D.B.H.
REMOVE
42" D.B.H.
REMOVE
52" D.B.H.
REMOVE
48" D.B.H.
REMOVE
ABANDON IN PLACE
AT REMOVAL LOCATION
PLUG AND CAP PIPE
415 415 415
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A S
-A D
V E
R T
IS
E
D
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
B
D
IR
K S
P
.E
S T
L
O U
IS
D
IS
T
R
IC
T
E N
G
IN
E E
R S
U .S
A
R M
Y C
O R
P S
O F
IN
L
A N
D N
A V
IG
A
T
IO
N D
E S
IG
N
C E
N T
E R
GENERAL SHEET NOTES
SHEET KEYNOTES
KEYMAP
RIPRAP REMOVAL
LINEAR ITEM REMOVAL
INDIVIDUAL ITEM REMOVALX
CONTRACTOR WORK LIMT
CONCRETE PAVEMENT REMOVAL
CLEARING AND GRUBBING, SEE NOTE 3.
LEGEND
FINAL SEEDING AREAS.
STRIPPED TOP SOIL SHALL BE STOCKPILED FOR USE ON
MIN. 6", IN ACCORDANCE WITH SECTION 31 22 03.
4. EXISTING TURF AREAS SHALL BE STRIPPED OF TOPSOIL,
REQUIREMENTS, SEE SPECIFICATION SECTION 01 11 30.
OCTOBER 31. FOR ADDITIONAL TREE PROTECTION
HEIGHT, SHALL BE CUT DOWN BETWEEN APRIL 1 AND
3. NO TREES GREATER THAN 3" DIAMETER AT BREAST
2. FOR CLEARING AND GRUBBING, SEE SECTION 31 11 00.
CLEARING, GRUBBING, OR DEMOLITION.
1. INSTALL EROSION CONTROL MEASURES PRIOR TO ANY
5. RIPRAP STOCKPILE AREA, SEE SHEET CD100 FOR COORDINATES.
4. REMOVE CONCRETE SIDEWALK/RAMP
3. REMOVE HANDRAIL.
OF EXISTING PIPE APPROXIMATELY 90 LF.
MINIMIZE UTILITY DOWNTIME. PLUG AND CAP END
2. REMOVE SANITARY OUTFALL PIPE AND HEADWALL.
AND STOCKPILE FOR REUSE.
1. REMOVE RIPRAP (12 INCH R90 STONCE OVER 9 INCH BEDDING)
STOCKPILE AREA
TREE
D.B.H. OR 4.5 FT. ABOVE GROUND.
DIAMETER AT BREAST HEIGHT
D E
M O
L
IT
IO
N
P L
CD102
P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R
N A
V
IG
A T
IO
N
E C
O S
Y S
T E
M S
U S
T A
IN
A
B
IL
IT
Y
P R
O J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N
K D
O R
S C
H P
.E
B S
A Y
L O
R
A
C O
M B
S
P
S I
D
J A
N U
A R
Y
W
P
-2
-R -A
W P
-X
X -X
-X X
L
O U
IS
D
IS
T
R
IC
T
S P
R U
C E
S T
R E
E T
S T
L
O U
IS
M
IS
S O
U R
I
B
M R
L D
L o c k s a n d
D a m
W in fi e ld
\B
M R
L D
L o c k
F o u n d a ti o n a n d S it e P re p a ra ti o n
\B
M
R L
D
-C
A D
S
H E
E T
-2
-0
-1
-C -C
D
S
H T
.d g n
D S
A
E C
S c re e n F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:0
:0
A
M
/2 /2
30' 60'0
M A
T C
H L
IN
E
S E
E S
H E
E T
C D
E
V
IS
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
M A
R
NTS
DEMOLITION PHOTOGRAPHS - EXISTING STAGING AREA
NOTE:
RIPRAP SLOPE PROTECTION TO BE STOCKPILED
AND REUSED ON NEW FILL SLOPE.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A S
-A D
V E
R T
IS
E
D
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
B
D
IR
K S
P
.E
S T
L
O U
IS
D
IS
T
R
IC
T
E N
G
IN
E E
R S
U .S
A
R M
Y C
O R
P S
O F
IN
L
A N
D N
A V
IG
A
T
IO
N D
E S
IG
N
C E
N T
E R
D E
M O
L
IT
IO
N
D E
T A
IL
CD501
P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R
N A
V
IG
A T
IO
N
E C
O S
Y S
T E
M S
U S
T A
IN
A
B
IL
IT
Y
P R
O J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N
K D
O R
S C
H P
.E
B
S A
Y L
O R
A
C O
M B
S
P .E
A N
S I
D
J A
N U
A R
Y
W
P
-2
-R -A
W
P
-X X
-X -X
X
L
O U
IS
D
IS
T
R
IC
T
S
P R
U C
E S
T R
E E
T
S T
L
O U
IS
M
IS
S O
U R
I
B
M R
L D
L o c k s a n d
D a m
W in fi e ld
\B
M R
L D
L o c k
F o u n d a ti o n a n d S it e P re p a ra ti o n
\B
M
R L
D
-C
A D
S
H E
E T
-2
-0
-1
-C -D
E T
S
H T
.d g n
D S
A
E C
S c re e n
F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:0
:1
A
M
/2
/2
M
R
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
D T
SITE PLAN - LAND SITE
CONCRETE SIDEWALK
435' 435' 435'
440' 440'
440'
445'
445'
445'
445'
445'
445'
440'
440' 440'
435'
435'
430'
430'
430'
5'
425'
425 425 425
0 2
P O
B
S
.0
N
,1
,6
.9
E
,2
.8
STA. 1+80.00
BEGIN FILL "A"
TYPICAL SECTION
A1 - SHEET CG402
BL SITE PREARATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A S
-A D
V E
R T
IS
E
D
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
B
D
IR
K S
P
.E
S T
L
O U
IS
D
IS
T
R
IC
T
E N
G
IN
E E
R S
U .S
A
R M
Y C
O R
P S
O F
IN
L
A N
D N
A V
IG
A
T
IO
N D
E S
IG
N
C E
N T
E R
EXISTING RIPRAP
GRADING PLAN.
7. SEE SHEETS CG101 AND CG102 FOR FILL ELEVATIONS AND
EARTHWORK.
REQUIREMENTS OF SECTION 31 22 03 LAND BASED
COMMERCIAL FILL IF USED SHALL MEET THE 6.
REQUIREMENTS OF SECTION 35 20 23 DREDGING.
5. UPLAND DISPOSAL OF DREDGE MATERIAL SHALL MEET THE
CONSISTS OF SILTY CLAY WITH MINIMAL COMPACTION.
FILL MATERIAL PLACED IN 2023. MATERIAL PLACED 4.
BEYOND PLAN WITHOUT PRIOR APPROVAL.
MINIMIZE FILL INTO SLOUGH. FILL LIMITS SHALL NOT EXTEND3.
FREQUENCY CHARTS ON VH SHEETS.
PROJECT SITE IS PRONE TO FLOODING. SEE RIVER2.
UNITS ARE U.S. SURVEY FEET.1.
7. BLOCK WALL AND SAND STORAGE, DO NOT DISTURB.
6. UNDERGROUND POWER, DO NOT DISTURB.
5. CONCRETE HEADWALL, SEE DETAIL A13, SHEET CS501.
UTILITY DOWNTIME.
CONNECT TO EXISTING TREATMENT UNIT OUTLET. MINIMIZE
4. NEW 6 INCH PVC OUTLET LINE TO REPLACE EXISTING LINE.
FILL LIMITS, SEE GENERAL SHEET NOTE 3.3.
GENERAL SHEET NOTE 4.
EXISTING FILL AND GRAVEL SURFACE PLACED IN 2023. SEE 2.
FILL SLOPE 3H:1V TOPPED WITH RIPRAP.1.
RIPRAP FILL SLOPE
GENERAL SHEET NOTES
SHEET KEYNOTES
LEGEND
KEYMAP
FILL LIMIT
CONTRACTOR WORK LIMITS
DREDGED SAND OR COMMERCIAL BORROW
LAND - BASED FILL AREA
S
IT
E P
L A
N
L A
N D
S
IT
CS101
P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R
N A
V
IG
A T
IO
N
E C
O S
Y S
T E
M S
U S
T A
IN
A
B
IL
IT
Y
P R
O J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N
K D
O R
S C
H P
.E
B S
A Y
L O
R
A
C O
M B
S
P
S I
D
J A
N U
A R
Y
W
P
-2
-R -A
W P
-X
X -X
-X X
L
O U
IS
D
IS
T
R
IC
T
S P
R U
C E
S T
R E
E T
S T
L
O U
IS
M
IS
S O
U R
I
B M
R L
D
L o c k s a n d D a m
W in fi e ld
\B
M
R L
D
L o c k F o u n d a ti o n a n d S it e P re p a ra ti o n
\B
M
R L
D -C
A D
S
H E
E T
-2 -0
-1
-C
-C S
S
H T
.d g n
D S
A
E C
S c re e n F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:0
:4
A
M
/2 /2
M A
T C
H L
IN
E
S E
E S
H E
E T
C S
30' 60'0
R E
V
IS
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
A
R
SITE PLAN - LAND SITE
CP
CP
CO
CI CI
U
U
ASPHALT
ASPHALT
GRAVEL
GRAVEL
GRAVEL
A S
P H
A L
T
CONCRETE S
IDEWALK
CONCRETE
SIDEWALK
ASPHALT
GRAVEL
GRAVEL
CONCRETE S
IDEWALK
445'
445'
440'
435'
430'
425'
430'
425'
FFE = 444.4
435'
435'
440'
440'
EP
C
CO
WELL
0 9
P O
E
S
.2
N
,1
,6
.8
E
,9
.9
STA. 8+18.00
OFFSET 106' RT.
STA. 11+73.67
OFFSET 132.8' RT.
STA. 8+18.00
BEGIN TYPICAL SECTION
H1 - SHEET CG402
BL SITE PREPARATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A S
-A D
V E
R T
IS
E
D
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
B
D
IR
K S
P
.E
S T
L
O U
IS
D
IS
T
R
IC
T
E N
G
IN
E E
R S
U .S
A
R M
Y C
O R
P S
O F
IN
L
A N
D N
A V
IG
A
T
IO
N D
E S
IG
N
C E
N T
E R
EXISTING RIPRAP
GRADING PLAN.
7. SEE SHEETS CG101 AND CG102 FOR FILL ELEVATIONS AND
EARTHWORK.
REQUIREMENTS OF SECTION 31 22 03 LAND BASED
COMMERCIAL FILL IF USED SHALL MEET THE 6.
REQUIREMENTS OF SECTION 35 20 23 DREDGING.
5. UPLAND DISPOSAL OF DREDGE MATERIAL SHALL MEET THE
CONSISTS OF SILTY CLAY WITH MINIMAL COMPACTION.
FILL MATERIAL PLACED IN 2023. MATERIAL PLACED 4.
BEYOND PLAN WITHOUT PRIOR APPROVAL.
MINIMIZE FILL INTO SLOUGH. FILL LIMITS SHALL NOT EXTEND3.
FREQUENCY CHARTS ON VH SHEETS.
PROJECT SITE IS PRONE TO FLOODING. SEE RIVER2.
UNITS ARE U.S. SURVEY FEET.1.
7. BLOCK WALL AND SAND STORAGE, DO NOT DISTURB.
6. UNDERGROUND POWER, DO NOT DISTURB.
5. CONCRETE HEADWALL, SEE DETAIL A13, SHEET CS501.
UTILITY DOWNTIME.
CONNECT TO EXISTING TREATMENT UNIT OUTLET. MINIMIZE
4. NEW 6 INCH PVC OUTLET LINE TO REPLACE EXISTING LINE.
FILL LIMITS, SEE GENERAL SHEET NOTE 3.3.
GENERAL SHEET NOTE 4.
EXISTING FILL AND GRAVEL SURFACE PLACED IN 2023. SEE 2.
FILL SLOPE 3H:1V TOPPED WITH RIPRAP.1.
RIPRAP FILL SLOPE
GENERAL SHEET NOTES
SHEET KEYNOTES
LEGEND
KEYMAP
FILL LIMIT
CONTRACTOR WORK LIMITS
DREDGED SAND OR COMMERCIAL BORROW
LAND - BASED FILL AREA
S
IT
E P
L A
N
L A
N D
S
IT
CS102
P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R
N A
V
IG
A T
IO
N
E C
O S
Y S
T E
M S
U S
T A
IN
A
B
IL
IT
Y
P R
O J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N
K D
O R
S C
H P
.E
B S
A Y
L O
R
A
C O
M B
S
P
S I
D
J A
N U
A R
Y
W
P
-2
-R -A
W P
-X
X -X
-X X
L
O U
IS
D
IS
T
R
IC
T
S P
R U
C E
S T
R E
E T
S T
L
O U
IS
M
IS
S O
U R
I
B M
R L
D
L o c k s a n d D a m
W in fi e ld
\B
M
R L
D
L o c k F o u n d a ti o n a n d S it e P re p a ra ti o n
\B
M
R L
D -C
A D
S
H E
E T
-2 -0
-1
-C
-C S
S
H T
.d g n
D S
A
E C
S c re e n F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:0
:5
A
M
/2 /2
30' 60'0
M A
T C
H L
IN
E
S E
E S
H E
E T
C S
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
D T
M A
R
34'
SITE PLAN - RIPRAP EXCAVATION PHASE 1
U U
U
U
UU
U
U
UU
UU
U
U
U
U
204 205 206 207
209 210
212 213 214 215 216 217 218 219 220 221 222 223 224 225
302 303 304
306 307 308
P O
B
S
.0
N
,1
,4
.9
E
,5
.2
1 1
7 8
STA 1+04.00
END OF EXISTING LOCK FLOOR
STA 2+14
STA 2+38
CL SEPARATOR WALL
EXCAVATION
START RIPRAP
STA. 1+46.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A S
-A D
V E
R T
IS
E
D
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
B
D
IR
K S
P
.E
S T
L
O U
IS
D
IS
T
R
IC
T
E N
G
IN
E E
R S
U .S
A
R M
Y C
O R
P S
O F
IN
L
A N
D N
A V
IG
A
T
IO
N D
E S
IG
N
C E
N T
E R
EXISTING RIPRAP
PLACEMENT OF RIPRAP AND DREDGED SAND.
SEPARATOR WALL WHILE OPERATING VESSELS DURING
CONTRACTOR MUST TAKE CARE TO AVOID DAMAGE TO THE 7.
SECTION 35 23 20 UNDERWATER EXCAVATION FOR REQUIREMENTS.
RIPRAP MUST BE REMOVED WITHIN THE LIMITS INDICATED. SEE
HISTORIC AS-BUILTS AND COULD VARY FROM THOSE SHOWN. ALL
DEPTH AND THICKNESS OF EXISTING RIPRAP IS BASED ON 6.
EXISTING DERRICK STONE IS ASSUMED TO BE 1 TON, OR 34" STONE.5.
FOOTPRINT AS SHOWN ON THE PLANS.
BE BASED ON REMOVAL OF ALL RIPRAP WITHIN THE LOCK
REQUIREMENT FOR MEASUREMENT AND PAYMENT. PAYMENT WILL
BIDDING PURPOSES AND SHOULD NOT BE CONSTRUED AS A
THE TYPICAL SECTION FOR PHASE 1 EXCAVATION IS DEPICTED FOR
HISTORIC SCOUR PROTECTION PLANS.
AND STONE THICKNESS. SEE REFERENCE DRAWINGS FOR
PROFILE SHEETS CG201 AND CG202 FOR DEPTH OF EXCAVATION
EXCAVATE RIPRAP PHASE 1 TO INSTALL THE SEPARATOR WALL.SEE 4.
35 23 20.
ALONG THE SEPARATOR WALL ALIGNMENT. SEE SPECIFICATION
LIMIT THE AMOUNT OF OPEN EXCAVATION OF EXISTING RIPRAP 3.
BE IN-RIVER. SEE CN-SHEETS FOR DISPOSAL AREAS.
REMOVE ALUVIUM PRIOR TO RIPRAP EXCAVATION DISPOSAL SHALL 2.
UNITS ARE U.S. SURVEY FEET.1.
SECTIONS. 5,000LB RIPRAP ON 2FT GRADED C-STONE.
EXCAVATE RIPRAP. TOTAL THICKNESS VARIES. SEE CROSS 9.
1,000LB RIPRAP ON 3FT OF GRADED C-STONE.
EXCAVATE RIPRAP. ESTIMATED TOTAL THICKNESS 7FT. 4FT OF 8.
THICKNESS 2.5FT.
EXCAVATE PROTECTION STONE AND MATTRESS. ESTIMATED 7.
BELOW THE DISPOSAL BERM, C-STONE IS NOT REQUIRED.
DISPOSAL BERM. WHERE THERE IS EXISTING RIPRAP REMAINING
PLACE 3FT C-STONE ON RIVER BOTTOM BEFORE PLACING RIPRAP 6.
DISPOSAL IN-RIVER.
REMOVE ALLUVIUM ON TOP OF EXISTING RIPRAP AND LOCK FLOOR. 5.
CONFIGURATION, TO THE MAXIMUM EXTENT POSSIBLE.
BERM TO MATCH GEOMETRY OF FINAL SCOUR BERM
PLACE EXCAVATED RIPRAP IN DISPOSAL BERM. BUILD DISPOSAL 4.
TO REMAIN.
DISTURB DAM SILL OR ADJACENT TIMBER MATTRESS
MATTRESS. ESTIMATED THICKNESS 4.5FT. DO NOT
EXCAVATE DERRICK STONE AND DEMOLISH TIMBER3.
RIPRAP EXCAVATION LIMITS, PHASE 1.2.
FULL DEPTH RIPRAP EXCAVATION, PHASE 1.1.
IN DISPOSAL BERM
PLACE EXCAVATED RIPRAP
GENERAL SHEET NOTES
SHEET KEYNOTES
LEGEND
KEYMAP
FULL DEPTH RIPRAP EXCAVATION LIMITS
RIPRAP EXCAVATION LIMIT, PHASE 1
ALLUVIUM EXCAVATION LIMITS
CONTRACTOR WORK LIMITS
PLACE C-STONE PRIOR TO DISPOSAL BERM
DEMOLISH
REMOVE ALLUVIUM
S
IT
E P
L A
N
R
IP
R A
P E
X C
A V
A T
IO
N
P H
A S
CS103
P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R
N A
V
IG
A T
IO
N
E C
O S
Y S
T E
M S
U S
T A
IN
A
B
IL
IT
Y
P R
O J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N
A
C O
M B
S
P .E
B S
A Y
L O
R
K D
O R
S C
H P
S I
D
J A
N U
A R
Y
W
P
-2
-R -A
W P
-X
X -X
-X X
L
O U
IS
D
IS
T
R
IC
T
S P
R U
C E
S T
R E
E T
S T
L
O U
IS
M
IS
S O
U R
I
B M
R L
D
L o c k s a n d D a m
W in fi e ld
\B
M
R L
D
L o c k F o u n d a ti o n a n d S it e P re p a ra ti o n
\B
M
R L
D -C
A D
S
H E
E T
-2 -0
-1
-C
-C S
S
H T
.d g n
D S
A
E C
S c re e n F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:0
:5
A
M
/2 /2
30' 60'0
M A
T C
H L
IN
E
S E
E S
H E
E T
C S
R E
V
IS
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
M
A R
NAVIGATION CHANNEL SAILING LINE
SITE PLAN - RIPRAP EXCAVATION PHASE 1
226 227 228 229
P O
E
S
.0
N
,1
,5
.8
E
,0
.4
CL SEPARATOR WALL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A S
-A D
V E
R T
IS
E
D
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
B
D
IR
K S
P
.E
S T
L
O U
IS
D
IS
T
R
IC
T
E N
G
IN
E E
R S
U .S
A
R M
Y C
O R
P S
O F
IN
L
A N
D N
A V
IG
A
T
IO
N D
E S
IG
N
C E
N T
E R
EXISTING RIPRAP
PLACEMENT OF RIPRAP AND DREDGED SAND.
SEPARATOR WALL WHILE OPERATING VESSELS DURING
CONTRACTOR MUST TAKE CARE TO AVOID DAMAGE TO THE 7.
SECTION 35 23 20 UNDERWATER EXCAVATION FOR REQUIREMENTS.
RIPRAP MUST BE REMOVED WITHIN THE LIMITS INDICATED. SEE
HISTORIC AS-BUILTS AND COULD VARY FROM THOSE SHOWN. ALL
DEPTH AND THICKNESS OF EXISTING RIPRAP IS BASED ON 6.
EXISTING DERRICK STONE IS ASSUMED TO BE 1 TON, OR 34" STONE.5.
FOOTPRINT AS SHOWN ON THE PLANS.
BE BASED ON REMOVAL OF ALL RIPRAP WITHIN THE LOCK
REQUIREMENT FOR MEASUREMENT AND PAYMENT. PAYMENT WILL
BIDDING PURPOSES AND SHOULD NOT BE CONSTRUED AS A
THE TYPICAL SECTION FOR PHASE 1 EXCAVATION IS DEPICTED FOR
HISTORIC SCOUR PROTECTION PLANS.
AND STONE THICKNESS. SEE REFERENCE DRAWINGS FOR
PROFILE SHEETS CG201 AND CG202 FOR DEPTH OF EXCAVATION
EXCAVATE RIPRAP PHASE 1 TO INSTALL THE SEPARATOR WALL.SEE 4.
35 23 20.
ALONG THE SEPARATOR WALL ALIGNMENT. SEE SPECIFICATION
LIMIT THE AMOUNT OF OPEN EXCAVATION OF EXISTING RIPRAP 3.
BE IN-RIVER. SEE CN-SHEETS FOR DISPOSAL AREAS.
REMOVE ALUVIUM PRIOR TO RIPRAP EXCAVATION DISPOSAL SHALL 2.
UNITS ARE U.S. SURVEY FEET.1.
SECTIONS. 5,000LB RIPRAP ON 2FT GRADED C-STONE.
EXCAVATE RIPRAP. TOTAL THICKNESS VARIES. SEE CROSS 9.
1,000LB RIPRAP ON 3FT OF GRADED C-STONE.
EXCAVATE RIPRAP. ESTIMATED TOTAL THICKNESS 7FT. 4FT OF 8.
THICKNESS 2.5FT.
EXCAVATE PROTECTION STONE AND MATTRESS. ESTIMATED 7.
BELOW THE DISPOSAL BERM, C-STONE IS NOT REQUIRED.
DISPOSAL BERM. WHERE THERE IS EXISTING RIPRAP REMAINING
PLACE 3FT C-STONE ON RIVER BOTTOM BEFORE PLACING RIPRAP 6.
DISPOSAL IN-RIVER.
REMOVE ALLUVIUM ON TOP OF EXISTING RIPRAP AND LOCK FLOOR. 5.
CONFIGURATION, TO THE MAXIMUM EXTENT POSSIBLE.
BERM TO MATCH GEOMETRY OF FINAL SCOUR BERM
PLACE EXCAVATED RIPRAP IN DISPOSAL BERM. BUILD DISPOSAL 4.
TO REMAIN.
DISTURB DAM SILL OR ADJACENT TIMBER MATTRESS
MATTRESS. ESTIMATED THICKNESS 4.5FT. DO NOT
EXCAVATE DERRICK STONE AND DEMOLISH TIMBER3.
RIPRAP EXCAVATION LIMITS, PHASE 1.2.
FULL DEPTH RIPRAP EXCAVATION, PHASE 1.1.
IN DISPOSAL BERM
PLACE EXCAVATED RIPRAP
GENERAL SHEET NOTES
SHEET KEYNOTES
LEGEND
KEYMAP
FULL DEPTH RIPRAP EXCAVATION LIMITS
RIPRAP EXCAVATION LIMIT, PHASE 1
ALLUVIUM EXCAVATION LIMITS
CONTRACTOR WORK LIMITS
PLACE C-STONE PRIOR TO DISPOSAL BERM
DEMOLISH
REMOVE ALLUVIUM
S
IT
E P
L A
N
R
IP
R A
P E
X C
A V
A T
IO
N
P H
A S
CS104
P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R
N A
V
IG
A T
IO
N
E C
O S
Y S
T E
M S
U S
T A
IN
A
B
IL
IT
Y
P R
O J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N
A
C O
M B
S
P .E
B S
A Y
L O
R
K D
O R
S C
H P
S I
D
J A
N U
A R
Y
W
P
-2
-R -A
W P
-X
X -X
-X X
L
O U
IS
D
IS
T
R
IC
T
S P
R U
C E
S T
R E
E T
S T
L
O U
IS
M
IS
S O
U R
I
B M
R L
D
L o c k s a n d D a m
W in fi e ld
\B
M
R L
D
L o c k F o u n d a ti o n a n d S it e P re p a ra ti o n
\B
M
R L
D -C
A D
S
H E
E T
-2 -0
-1
-C
-C S
S
H T
.d g n
D S
A
E C
S c re e n F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:0
:5
A
M
/2 /2
30' 60'0
M A
T C
H L
IN
E
S E
E S
H E
E T
C S
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
D T
M A
R
5'
68'
24'
SITE PLAN - SEPARATOR WALL AND RIPRAP EXCAVATION PHASE 2
5 3
U
U U
U
U
UU
U
U
UU
UU
U
U
U
U
204 205 206 207
209 210
212 213 214 215 216 217 218 219 220 221 222 223 224 225
302 303 304
306 307 308
P O
B
S
.0
N
,1
,4
.9
E
,5
.2
3 3
6 77
S T
A
.5
O F
F S
E T
.5
R
S T
A
.2
O F
F S
E T
.5
R
S T
A
.5
O F
F S
E T
.5
R S
E P
A R
A T
O R
W A
L L
B E
G
IN
S T
A
.5
0+00.00 STA
START WIDTH AND SLOPE TRANSITION
STA 2+14, OFF 15' L
END WIDTH AND SLOPE TRANSITION
STA 2+38, OFF 10' L
RIPRAP EXCAVATION - PHASE 1
RIPRAP EXCAVATION - PHASE 1
RIPRAP EXCAVATION
- PHASE 1
1A
1A 1B 1B 1B
12 12
2 2
CL SEPARATOR WALL
CL RIVER WALL CL RIVER WALL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A S
-A D
V E
R T
IS
E
D
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
B
D
IR
K S
P
.E
S T
L
O U
IS
D
IS
T
R
IC
T
E N
G
IN
E E
R S
U .S
A
R M
Y C
O R
P S
O F
IN
L
A N
D N
A V
IG
A
T
IO
N D
E S
IG
N
C E
N T
E R
PARAGRAPH 3.1.4 FOR RESTRICTIONS.
TIMBER CRIBBING REMOVAL - SEE SECTION 35 23 20,5.
SHEET PILE CUTOFF WALL. SEE SECTION 35 23 20.
REMOVED IN THIS AREA FOR FUTURE INSTALLATION OF
THE CONTRACTOR MUST VERIFY THAT ALL RIPRAP IS 4.
SEE SECTION XXXX FOR DETAILS.
WASH ON THE SEPARATOR WALL DURING INITIAL BACKFILL.
THE CONTRACTOR MUST TAKE CARE TO LIMIT PROPELLER 3.
DERRICK STONE IS ASSUMED TO BE 1 TON, OR 34" STONE.2.
UNITS ARE U.S. SURVEY FEET.1.
SEE GENERAL NOTE 4.
FULL DEPTH RIPRAP REMOVAL AND VERIFICATION AREA.12.
MATTRESS.
THICK ARTICULATING FABRIC FORMED CONCRETE
11. PROVIDE 5.5FT THICK 5,000LB RIPRAP ON 8 TO 12 INCH
WITH COMBI-WALL FACE.
DO NOT DISTURB. EXISTING 5FT THICK CONCRETE APRON 10.
ESTIMATED THICKNESS 8FT. SEE GENERAL NOTE 5.
DEMOLISH EXISTING TIMBER CRIB FILLED WITH RIPRAP. 9.
SECTIONS. 5,000LB RIPRAP ON 2FT GRADED C-STONE.
EXCAVATE RIPRAP. TOTAL THICKNESS VARIES. SEE CROSS 8.
OF 1,000LB RIPRAP ON 3FT OF GRADED C-STONE.
EXCAVATE RIPRAP. ESTIMATED TOTAL THICKNESS 7FT. 4FT 7.
THICKNESS 2.5FT
EXCAVATE PROTECTION STONE AND MATTRESS. ESTIMATED 6.
EXCAVATE DERRICK STONE. ESTIMATED THICKESS 3FT.5.
POSSIBLE.
BERM CONFIGURATION, TO THE MAXIMUM EXTENT
DISPOSAL BERM TO MATCH GEOMETRY OF FINAL SCOUR
PLACE EXCAVATED RIPRAP IN DISPOSAL BERM. BUILD 4.
FULL DEPTH RIPRAP EXCAVATION LIMITS, PHASE 2. 3.
STONE IMMEDIATELY AFTER INSTALLING THE SHEET PILE.
SEPARATOR WALL IS CONSTRUCTED, PLACE 6FT OF C-
THE RIVERWARD SIDE OF THE SEPARATOR WALL. AS THE
PLACE INITIAL RIPRAP SCOUR PROTECTION BERM AGAINST 2.
1B. SEPARATOR WALL CENTERLINE. SEE STRUCTURAL SHEETS.
SHEETS.
DEFLECTOR PANEL AND PIPE PILES. SEE STRUCTURAL 1A.
GENERAL SHEET NOTES
SHEET KEYNOTES
KEYMAP
EXISTING RIPRAP
NEW OR RELOCATED RIPRAP
LEGEND
FULL DEPTH RIPRAP EXCAVATION LIMITS
DISTURB LIMITS
CONTRACTOR WORK LIMITS
DEMOLISH
SEE GENERAL NOTE 4.
RIPRAP VERIFICATION AREA.
S
IT
E P
L A
N
S E
P A
R A
T O
R W
A L
L A
N D
R
IP
R A
P E
X C
A V
A T
IO
N
P H
A S
CS105
P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R
N A
V
IG
A T
IO
N
E C
O S
Y S
T E
M S
U S
T A
IN
A
B
IL
IT
Y
P R
O J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N
A
C O
M B
S
P .E
B S
A Y
L O
R
K D
O R
S C
H P
S I
D
J A
N U
A R
Y
W
P
-2
-R -A
W P
-X
X -X
-X X
L
O U
IS
D
IS
T
R
IC
T
S P
R U
C E
S T
R E
E T
S T
L
O U
IS
M
IS
S O
U R
I
B M
R L
D
L o c k s a n d D a m
W in fi e ld
\B
M
R L
D
L o c k F o u n d a ti o n a n d S it e P re p a ra ti o n
\B
M
R L
D -C
A D
S
H E
E T
-2 -0
-1
-C
-C S
S
H T
.d g n
D S
A
E C
S c re e n F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:0
:0
A
M
/2 /2
30' 60'0
M A
T C
H L
IN
E
S E
E S
H E
E T
C S
E
V
IS
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
M A
R
5'
5'
NAVIGATION CHANNEL SAILING LINE
SITE PLAN - SEPARATOR WALL AND RIPRAP EXCAVATION PHASE 2
226 227 228 229
P O
E
S
.0
N
,1
,5
.8
E
,0
.4
E N
D W
A L
L
S T
A
.4
O F
F S
E T
.7
R
0+00.00 STA
1B 1B 1B
2 2
DISTURB LIMIT
DISTURB LIMIT
CL SEPARATOR WALL
CL RIVER WALL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A S
-A D
V E
R T
IS
E
D
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
B
D
IR
K S
P
.E
S T
L
O U
IS
D
IS
T
R
IC
T
E N
G
IN
E E
R S
U .S
A
R M
Y C
O R
P S
O F
IN
L
A N
D N
A V
IG
A
T
IO
N D
E S
IG
N
C E
N T
E R
PARAGRAPH 3.1.4 FOR RESTRICTIONS.
TIMBER CRIBBING REMOVAL - SEE SECTION 35 23 20,5.
SHEET PILE CUTOFF WALL. SEE SECTION 35 23 20.
REMOVED IN THIS AREA FOR FUTURE INSTALLATION OF
THE CONTRACTOR MUST VERIFY THAT ALL RIPRAP IS 4.
SEE SECTION XXXX FOR DETAILS.
WASH ON THE SEPARATOR WALL DURING INITIAL BACKFILL.
THE CONTRACTOR MUST TAKE CARE TO LIMIT PROPELLER 3.
DERRICK STONE IS ASSUMED TO BE 1 TON, OR 34" STONE.2.
UNITS ARE U.S. SURVEY FEET.1.
SEE GENERAL NOTE 4.
FULL DEPTH RIPRAP REMOVAL AND VERIFICATION AREA.12.
MATTRESS.
THICK ARTICULATING FABRIC FORMED CONCRETE
11. PROVIDE 5.5FT THICK 5,000LB RIPRAP ON 8 TO 12 INCH
WITH COMBI-WALL FACE.
DO NOT DISTURB. EXISTING 5FT THICK CONCRETE APRON 10.
ESTIMATED THICKNESS 8FT. SEE GENERAL NOTE 5.
DEMOLISH EXISTING TIMBER CRIB FILLED WITH RIPRAP. 9.
SECTIONS. 5,000LB RIPRAP ON 2FT GRADED C-STONE.
EXCAVATE RIPRAP. TOTAL THICKNESS VARIES. SEE CROSS 8.
OF 1,000LB RIPRAP ON 3FT OF GRADED C-STONE.
EXCAVATE RIPRAP. ESTIMATED TOTAL THICKNESS 7FT. 4FT 7.
THICKNESS 2.5FT
EXCAVATE PROTECTION STONE AND MATTRESS. ESTIMATED 6.
EXCAVATE DERRICK STONE. ESTIMATED THICKESS 3FT.5.
POSSIBLE.
BERM CONFIGURATION, TO THE MAXIMUM EXTENT
DISPOSAL BERM TO MATCH GEOMETRY OF FINAL SCOUR
PLACE EXCAVATED RIPRAP IN DISPOSAL BERM. BUILD 4.
FULL DEPTH RIPRAP EXCAVATION LIMITS, PHASE 2. 3.
STONE IMMEDIATELY AFTER INSTALLING THE SHEET PILE.
SEPARATOR WALL IS CONSTRUCTED, PLACE 6FT OF C-
THE RIVERWARD SIDE OF THE SEPARATOR WALL. AS THE
PLACE INITIAL RIPRAP SCOUR PROTECTION BERM AGAINST 2.
1B. SEPARATOR WALL CENTERLINE. SEE STRUCTURAL SHEETS.
SHEETS.
DEFLECTOR PANEL AND PIPE PILES. SEE STRUCTURAL 1A.
GENERAL SHEET NOTES
SHEET KEYNOTES
KEYMAP
EXISTING RIPRAP
NEW OR RELOCATED RIPRAP
LEGEND
FULL DEPTH RIPRAP EXCAVATION LIMITS
DISTURB LIMITS
CONTRACTOR WORK LIMITS
DEMOLISH
SEE GENERAL NOTE 4.
RIPRAP VERIFICATION AREA.
S
IT
E P
L A
N
S E
P A
R A
T O
R W
A L
L A
N D
R
IP
R A
P E
X C
A V
A T
IO
N
P H
A S
CS106
P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R
N A
V
IG
A T
IO
N
E C
O S
Y S
T E
M S
U S
T A
IN
A
B
IL
IT
Y
P R
O J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N
A
C O
M B
S
P .E
B S
A Y
L O
R
K D
O R
S C
H P
S I
D
J A
N U
A R
Y
W
P
-2
-R -A
W P
-X
X -X
-X X
L
O U
IS
D
IS
T
R
IC
T
S P
R U
C E
S T
R E
E T
S T
L
O U
IS
M
IS
S O
U R
I
B M
R L
D
L o c k s a n d D a m
W in fi e ld
\B
M
R L
D
L o c k F o u n d a ti o n a n d S it e P re p a ra ti o n
\B
M
R L
D -C
A D
S
H E
E T
-2 -0
-1
-C
-C S
S
H T
.d g n
D S
A
E C
S c re e n F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:0
:0
A
M
/2 /2
T C
H L
IN
E
S E
E S
H E
E T
C S
NORTH
30' 60'0
E
V
IS
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
M A
R
SCALE: 1"=20' HORZ. 1"=10' VERT.
PROFILE - SEPARATOR WALL
1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00 4+20 4+40 4+60 4+80 5+00 5+20 5+40 5+60 5+80 6+00 6+20
280 280
290 290
300 300
310 310
320 320
330 330
340 340
350 350
360 360
370 370
380 380
390 390
400 400
410 410
420 420
430 430
440 440
450 450
EL. 433.6
TOP OF WALL
SEPARATOR WALL
SHEET PILE
BOTTOM OF WALL
EL 324.6
APPROXIMATE BEDROCK
EL 324.6
APPROXIMATE BEDROCK
ELEV. 434.6
DEFLECTOR WALL
NOTE:
1. SEPARATOR WALL TIP ELEVATION IS ESTIMATED BASED ON EXCAVATED RIVER
BOTTOM AND MINIMUM SURVEYED RIVER BOTTOM.
2. THE CONTRACTOR SHALL SURVEY THE RIVER BOTTOM PRIOR TO INSTALLATION
AND SUBMIT TO THE GOVERNMENT. THE GOVERNMENT WILL PROVIDE ACTUAL
SHEET PILE TIP ELEVATIONS AFTER RECEIPT OF THE SURVEY AND ANY REQUIRED
ANALYSIS OF THE SHEET PILE WALL STABILITY.
3. THE MINIMUM EMBEDMENT IS 20.0 FEET AND THE SHEET PILE TIP ELEVATION
MUST BE DEEPER THAN EL 370.0
0.00%GRADE =
0.00%GRADE =
0.00%GRADE =
0.00%GRADE =
0.00%GRADE =
0.00%GRADE =
0.00%GRADE =
.0
E
L E
V
.1
S
P
V I 3 .0
E
L E
V
.0
S
I
.0
E
L E
V
.5
S
I
.0
E
L E
V
.4
S
I
.0
E
L E
V
.7
S
I
.0
E
L E
V
.1
S
I
E L
E V
.0
S T
A
.1
P
V I
EL 407
LANDSIDE OF SEPARATOR WALL
SAND FILL
EL 407
LANDSIDE OF SEPARATOR WALL
SAND FILL
399.00 BOTTOM EL
2+14.00 STA
START ARTICULATING MATTRESS
405.50 TOP EL
2+14.00 STA
R5000
399.60 TOP EL
2+38.00 STA
R5000
405.50 TOP EL
1+46.00 STA
START R5000
399.00 BOTTOM EL
1+46.00 STA
START ARTICULATING MATTRESS
391.00 BOTTOM EL
2+38.00 STA
START C-STONE INITIAL BACKFILL
END ARTICULATING MATTRESS
DAM END SILL
EXISTING
BASIN, GATE 1
DAM SILLING
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A S
-A D
V E
R T
IS
E
D
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
B
D
IR
K S
P
.E
S T
L
O U
IS
D
IS
T
R
IC
T
E N
G
IN
E E
R S
U .S
A
R M
Y C
O R
P S
O F
IN
L
A N
D N
A V
IG
A
T
IO
N D
E S
IG
N
C E
N T
E R
P R
O F
IL
E
S
E P
A R
A T
O R
W A
CG203
P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R
N A
V
IG
A T
IO
N
E C
O S
Y S
T E
M S
U S
T A
IN
A
B
IL
IT
Y
P R
O J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N
A
C O
M B
S
P .E
B S
A Y
L O
R
K D
O R
S C
H P
S I
D
J A
N U
A R
Y
W
P
-2
-R -A
W P
-X
X -X
-X X
L
O U
IS
D
IS
T
R
IC
T
S P
R U
C E
S T
R E
E T
S T
L
O U
IS
M
IS
S O
U R
I
B
M R
L D
L o c k s a n d
D a m
W in fi e ld
\B
M R
L D
L o c k
F o u n d a ti o n a n d S it e P re p a ra ti o n
\B
M
R L
D
-C
A D
S
H E
E T
-2
-0
-1
-C -C
G
S
H T
.d g n
D S
A
E C
S c re e n F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:0
:4
A
M
/2 /2
T C
H L
IN
E
S E
E S
H E
E T
C G
20' 40'0
HORZ.
10' 20'0
VERT.
E
V
IS
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
M A
R
RIVER BOTTOM
AVERAGE SURVEYED
RIVER BOTTOM
MINIMUM SURVEYED
BOTTOM
RIPRAP EXCAVATION
BOTTOM
RIPRAP EXCAVATION
20'
95'
25'
5' 20'
TYPICAL SECTION - FOUNDATION PREPARATION LOCK CENTERLINE (STA. 1+04 TO 14+04.50)
H1
TYPICAL SECTION - RIPRAP EXCAVATION (STA. 1+46.00 TO 6+97.00) AND SEPARATOR WALL (STA. 1+46.00 TO 11+06)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A S
-A D
V E
R T
IS
E
D
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
B
D
IR
K S
P
.E
S T
L
O U
IS
D
IS
T
R
IC
T
E N
G
IN
E E
R S
U .S
A
R M
Y C
O R
P S
O F
IN
L
A N
D N
A V
IG
A
T
IO
N D
E S
IG
N
C E
N T
E R
TOP EL 433.6' NAVD88
SEPARATOR WALL
EMBEDMENT DEPTH 20'
EXCAVATION PHASE 2
EXISTING RIPRAP
EXCAVATION PHASE 1
SEPARATOR WALL
BASELINE
LOCK
CENTERLINE
RIVERWALL
CENTERLINE
TIMBER CRIBBING
REMOVE RIPRAP AND
EXISTING INTERMEDIATE WALL
RIVER BOTTOM
AVERAGE SURVEYED
RIPRAP DISPOSAL BERM
ALLUVIUM
RIPRAP BERM EL 373'
MAX
2H :1V
2H:1V
2H :1V
3 5 FT AWAY FROM CRIBBING
STOP RIPRAP EXCAVATION
OF TIMBER PILES
LIMIT EXPOSURE
EXISTING INTERMEDIATE WALL
LOCK
CENTERLINE
RIVERWALL
CENTERLINE
SEPARATOR WALL
BASELINE
RIPRAP BERM EL 399.6'
APPROXIMATELY 30' WIDE AT EL 373'
REQUIRED RIPRAP BERM
MIN EL 407.0
DREDGE SAND FILL
2H :1V
DISPOSAL BERM
EXCAVATED RIPRAP
25' 70'
30'
10'
MIN TW 418.1
SCOUR PROTECTION
EXISTING RIPRAP
2H :1V
F O
U N
D A
T
IO
N P
R E
P A
R A
T
IO
CG401
P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R
N A
V
IG
A T
IO
N
E C
O S
Y S
T E
M S
U S
T A
IN
A
B
IL
IT
Y
P R
O J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N
A
C O
M B
S
P .E
B S
A Y
L O
R
K D
O R
S C
H P
S I
D
J A
N U
A R
Y
W
P
-2
-R -A
W P
-X
X -X
-X X
L
O U
IS
D
IS
T
R
IC
T
S P
R U
C E
S T
R E
E T
S T
L
O U
IS
M
IS
S O
U R
I
B
M R
L D
L o c k s a n d
D a m
W in fi e ld
\B
M R
L D
L o c k
F o u n d a ti o n a n d S it e P re p a ra ti o n
\B
M
R L
D
-C
A D
S
H E
E T
-2
-0
-1
-C -C
G
S
H T
.d g n
D S
A
E C
S c re e n F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:0
:0
A
M
/2 /2
T Y
P
IC
A L
S E
C T
IO
N
S
SCOUR PROTECTION BERM.
11. 3' THICK C-STONE. PLACE BETWEEN NATURAL RIVER BOTTOM AND RIPRAP
B-STONE STA. 7+50 TO 11+06 MIN. 6.25' THICK.
R5000 STONE STA. 1+04 TO 7+50. GEOMETRY PER CROSS SECTIONS.
10. RIPRAP SCOUR PROTECTION BERM. SEE SECTION 31 37 00 STONE PROTECTION.
9. RIPRAP BACKFILL. R5000 STONE. SEE SECTION 31 37 00 STONE PROTECTION.
8. DREDGED SAND BACKFILL. SEE SECTION 35 20 23.
WITH SAND AS REMOVAL PROGRESSES.
LIMIT REMOVAL TO 100 LINEAR FEET ALONG THE WALL. BACKFILL
7. TIMBER CRIBBING REMOVAL, SEE SECTION 02 41 00 AND 35 23 20.
INSTALLATION PROGRESSES. 6' THICK C-STONE.
6. INITIAL RIPRAP BACKFILL TO BE IN STALLED AS SEPARATOR WALL
5. SEPARATOR WALL TO BE INSTALLED AS EXCAVATION PROGRESSES.
2. SEE SECTIONS 35 20 23 FOR BACKFILL REQUIREMENTS.
SIDE OF THE WALL.
SHALL NOT EXCEED FIVE (5) FEET ABOVE THE TOP ELEVATION OF RIPRAP ON THE OPPOSITE
D. FOR SAND PLACEMENT, EACH SUBSEQUENT LIFT SHALL NOT EXCEED TEN (10) FEET AND
THE OPPOSITE SIDE OF THE WALL.
SHALL NOT EXCEED 5 FEET ABOVE THE TOP ELEVATION OF DREDGED SAND ON
C. FOR RIPRAP PLACEMENT, EACH SUBSEQUENT LIFT SHALL NOT EXCEED TEN (10) FEET AND
TOP ELEVATION OF RIPRAP ON THE OPPOSITE SIDE OF THE WALL.
EXCEED NINE (9) FEET IN HEIGHT AND SHALL NOT EXCEED FIVE (5) FEET ABOVE THE
B. FOLLOWING RIPRAP PLACEMENT, THE FIRST LIFT OF DREDGED SAND SHALL NOT
A. THE FIRST LIFT OF RIPRAP SHALL NOT EXCEED SIX (6) FEET IN HEIGHT.
EXCEEDING THE FOLLOWING REQUIREMENTS.
ALONG THE SEPARATOR WALL. RIPRAP AND DREDGED SAND SHALL BE PLACED IN LIFTS NOT
1. CONTRACTOR SHALL LIMIT THE HEIGHT OF FILL PLACEMENT (RIPRAP OR DREDGED SAND)
BACKFILL NOTES:
PROTECTION BERM ALONG SEPARATOR WALL. SEE SECTION 35 23 20.
4. EXCAVATED MATERIAL DISPOSAL TO BE USED FOR FINAL SCOUR
PRIOR TO SAND BACKFILL. SEE SECTION 35 23 20.
3. EXCAVATION REQUIRED AFTER SEPARATOR WALL IS INSTALLED AND
SEE SECTION 35 23 20.
2. EXCAVATION REQUIRED FOR INSTALLATION OF SEPARATOR WALL.
CONTRACTOR EXCAVATION PLAN SUBMITTAL.
1. ALLUVIUM EXCAVATION REQUIRED. SEE SECTION 35 23 20
KEYNOTES:
R E
V
IS
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
M
A R
102'VARIES (106' - 132.8')
210'
VARIES
TYPICAL SECTION - SITE PREPARATION
H1
TYPICAL SECTION - SITE PREPARATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
A S
-A D
V E
R T
IS
E
D
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
B
D
IR
K S
P
.E
S T
L
O U
IS
D
IS
T
R
IC
T
E N
G
IN
E E
R S
U .S
A
R M
Y C
O R
P S
O F
IN
L
A N
D N
A V
IG
A
T
IO
N D
E S
IG
N
C E
N T
E R
BASELINE CL SEE CG102 FOR ELEVATIONS
FILL BASELINE GRADE POINT
CIRCA 2023
FILL BY OTHERS
PRIOR TO 2023 FILL
EXISTING GROUND
PIPE OUTFALL TO BE ABANDONED
EXISTING SANITARY
TO BE DEMOED
EXISTING HEADWALL
AND CONCRETE HEADWALL
PIPE OUTFALL 6" PVC
NEW SANITARY
RIPRAP OVER 6" BEDDING
18" R90 STONE OR STOCKPILED
RIPRAP SLOPE PROTECTION
2%
EX CLEANOUT
GEOTEXTILE
NON-WOVEN
EXISTING RIPRAP
REMOVE AND STOCKPILE
PLUG AND CAP THE END
THE OUTFALL PIPE,
REMOVE A PORTION OF
FOR ELEVATIONS
SEE GRADING PLAN
GRADE POINT
DREDGED FILL MATERIAL
NON-WOVEN GEOTEXTILE
2%
RIPRAP OVER 6" BEDDING
18" R90 STONE OR STOCKPILED
RIPRAP SCOUR PROTECTION
RIVERSIDE SLOUGH
1%
BASELINE CL
S
IT
E P
R E
P A
R A
T
IO
CG402
P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R
N A
V
IG
A T
IO
N
E C
O S
Y S
T E
M S
U S
T A
IN
A
B
IL
IT
Y
P R
O J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N
K D
O R
S C
H P
.E
B S
A Y
L O
R
A
C O
M B
S
P
S I
D
J A
N U
A R
Y
W
P
-2
-R -A
W P
-X
X -X
-X X
L
O U
IS
D
IS
T
R
IC
T
S P
R U
C E
S T
R E
E T
S T
L
O U
IS
M
IS
S O
U R
I
B
M R
L D
L o c k s a n d
D a m
W in fi e ld
\B
M R
L D
L o c k
F o u n d a ti o n a n d S it e P re p a ra ti o n
\B
M
R L
D
-C
A D
S
H E
E T
-2
-0
-1
-C -C
G
S
H T
.d g n
D S
A
E C
S c re e n F u ll
S iz e .d s c ri p t
P D
A
E C p d f.
p lt c fg
:0
:0
A
M
/2 /2
T Y
P
IC
A L
S E
C T
IO
N
S
R E
V
IS
E D
I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
M
A R
SB201
A1
SB301
EXISTING RIVER WALL
PARALLEL DEFLECTOR PANEL
48" x 1" THICK
STEEL PIPE PILE
SB503
A1
FLOW
SB501
A1
EXISTING DAM SILL
A11
SB301
A6
SB301
A1
SB203
A16
SB301
SB503
G1
PARALLEL DEFLECTOR PANEL
UPSTREAM DEFLECTOR
PANEL
15'
1/
2"
EXISTING BAFFLE BLOCK,
TYP
EXISTING TIMBER PILE,
TYP
EXISTING SHEET PILE CUTOFF
(BELOW DAM APRON)
EXISTING END SILL
CL PIPE PILES
/1
CLAMP ASSEMBLY
SB502
J11
EXISTING
GUARDRAIL, TYP
EXISTING
LADDER RECESS
S T
A
.5
B
O F
F S
E T
.5
R
S T
A
.2
B
O F
F S
E T
.5
R
S T
A
.5
B
O F
F S
E T
.5
R
EXISTING TIMBER
CRIBBING, TYP
IN
L A
N D
N A
V
IG
A T
IO
N
D E
S
IG
N C
E N
T E
R
P L O
T D
A T
E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A N
S I D
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S
IZ
E
SHEET ID
S T
L O
U
IS
D
IS
T R
IC
T
S
P R
U C
E S
T R
E
L O
U
IS
M
IS
S
O U
R I
2 3 4 5 6 7 8 9 10 11 12 16151413 17 18 19 20
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E of Engineers US Army Corps
A S
-A D
V E
R T
IS
E
D
U .S
A
R M
Y C
O R
P S
G
IN
E
E
L O
U
IS
D
IS
T R
IC
T
/2
/2
:2
:5
P
M
S H
E E
T P
IL
E
D E
F L E
C T
O R
P A
N E
L E
N L A
R G
E D
P L A
N
SB102
J A
N U
A R
Y
W P
-X
X -X
-X X
X X
B D
IR
K
S P
.E
S H
O U
J S
T O
U F
F E
R P
.E
I.
E
S Q
U
IL
IN
-D
IA
Z
U P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R N
A V
IG
A
T
IO
N E
C O
S Y
S T
E M
S U
S T
A
IN
A B
IL
IT
Y P
R O
J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N W
P
-2
-R
-A
SCALE: 3/8" = 1'-0"
A1
SEPARATOR WALL DEFLECTOR ENLARGED PLAN
PLAN
NORTH
1' 2' 4' 6'
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
M A
R
1 1
SB301
3/8" SKIN PLATE W12x40, TYP
EXISTING STILLING
BASIN APRON
1' - 10" 4' - 6" 4' - 9" 4' - 6" 3' - 0" 4' - 0" 4' - 6" 4' - 0" 4' - 3" 4' - 3" 4' - 3" 3' - 1"
NEOPRENE PAD
1/2" x 3", TYP
A6
SB301
3' - 1"
SB202
H1
SB202
A1
T O
P P
A N
E L
M
ID
D L E
P A
N E
L
M
ID
D L E
P A
N E
L
B O
T T
O M
P A
N E
L
EL 402.60'
EL 434.60'
EXISTING BAFFLE BLOCK
PZ-27W30x132
CL PIPE PILE CL PIPE PILE CL PIPE PILE
SB503
A15
ONLY SHEETS BELOW
DEFLECTOR PANEL, TOP OF
PILE ELEVATION 402.6'
IN
L A
N D
N A
V
IG
A T
IO
N
D E
S
IG
N C
E N
T E
R
P L O
T D
A T
E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A N
S I D
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S
IZ
E
SHEET ID
S T
L O
U
IS
D
IS
T R
IC
T
S
P R
U C
E S
T R
E
L O
U
IS
M
IS
S
O U
R I
2 3 4 5 6 7 8 9 10 11 12 16151413 17 18 19 20
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E of Engineers US Army Corps
A S
-A D
V E
R T
IS
E
D
U .S
A
R M
Y C
O R
P S
G
IN
E
E
L O
U
IS
D
IS
T R
IC
T
/2
/2
:0
:1
A
M
S H
E E
T P
IL
E
D E
F L E
C T
O R
P A
N E
L E
L E
V A
T
IO
N
SB201
J A
N U
A R
Y
W P
-X
X -X
-X X
X X
B D
IR
K
S P
.E
S H
O U
J S
T O
U F
F E
R P
.E
I.
E
S Q
U
IL
IN
-D
IA
Z
U P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R N
A V
IG
A
T
IO
N E
C O
S Y
S T
E M
S U
S T
A
IN
A B
IL
IT
Y P
R O
J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N W
P
-2
-R
-A
SB102
A1 PARALLEL DEFLECTOR WALL SECTION
SCALE: 3/8" = 1'-0"
A1 0 2' 4' 8'
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
M A
R
GENERAL SHEET NOTE
1. THE CONTRACTOR TO FIELD VERIFY DIMENSIONS AND LOCATIONS PRIOR TO
FABRICATION AND TO INFORM THE GOVERNMENT OF ANY DISCREPANCIES
PRIOR TO FABRICATION. ANY CHANGES WILL BE ADMINISTERED THROUGH
THE DIFFERING SITE CONDITIONS CLAUSE. THE CONTRACTOR IS REQUIRED
TO ACCOUNT FOR MINOR SURFACE DEVIATIONS. A PERFECT SEAL IS NOT
REQUIRED. THE INTENT OF THE DEFLECTOR WALL IS DEFLECT WATER
DISCHARGING FROM THE DAM AWAY FROM THE LOCK. SOME MINOR FLOW IS
ACCEPTABLE.
A11
SB301
A16
SB301
8 3/8" 3' - 7 1/2" 4' - 0" 4' - 0" 3' - 6"
SB203
G9
SB203
A9
3' - 6" 1' - 3"
T O
P P
A N
E L
M
ID
D L E
P A
N E
L
M
ID
D L E
P A
N E
L
B O
T T
O M
P A
N E
L
17' - 0 7/8"
EL 433.60'
EL 402.60'
CL PIPE PILE
S K
IN
P
L A
T E
3/4" LIGTING LUG
PLATE, TYP
NEOPRENE
PAD
1/4" STIFFENER
PLATE, TYP
1/4" DIAPHRAGM
PLATE, TYP
1/2" VERTICAL
STIFFENER PLATE, TYP
1/2" TOP PLATE
1/2" END PLATE W12x40 1/2" BOTTOM PLATE 3/8" SKIN PLATE
SB502
J1
G17
SB203
S K
IN
P
L A
T E
3/4" LIFTING LUG
PLATE, TYP
1/4" STIFFENER
PLATE, TYP
1/2" END PLATE
1/2" VERTICAL
STIFFENER PLATE, TYP
3/8" SKIN PLATE
1/4" DIAPHRAGM
PLATE, TYP 1/2" TOP PLATE
W12x40
SB501
A8
NEOPRENE PAD
A17
SB203
6"6"
PL 1/2
END PLATE
PL 3/8
SKIN PLATE
W12x40
1" DIA F1554 GR 55
EPOXY ANCHOR
ROD, TYP
3/16
3/16
3/16
W12x40
3/16
PL 1/2
END PLATE
PL 3/8
SKIN PLATE
1" DIA F1554 GR 55
EPOXY ANCHOR
ROD, TYP
3/16
3/16
3/16
W12x40
3/16
6"6"
W12x40
IN
L A
N D
N A
V
IG
A T
IO
N
D E
S
IG
N C
E N
T E
R
P L O
T D
A T
E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A N
S I D
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S
IZ
E
SHEET ID
S T
L O
U
IS
D
IS
T R
IC
T
S
P R
U C
E S
T R
E
L O
U
IS
M
IS
S
O U
R I
2 3 4 5 6 7 8 9 10 11 12 16151413 17 18 19 20
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E of Engineers US Army Corps
A S
-A D
V E
R T
IS
E
D
U .S
A
R M
Y C
O R
P S
G
IN
E
E
L O
U
IS
D
IS
T R
IC
T
/2
/2
:2
:5
P
M
S H
E E
T P
IL
E
D E
F L E
C T
O R
P A
N E
L E
L E
V A
T
IO
N S
SB203
J A
N U
A R
Y
W P
-X
X -X
-X X
X X
B D
IR
K
S P
.E
S H
O U
J S
T O
U F
F E
R P
.E
I.
E
S Q
U
IL
IN
-D
IA
Z
U P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R N
A V
IG
A
T
IO
N E
C O
S Y
S T
E M
S U
S T
A
IN
A B
IL
IT
Y P
R O
J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N W
P
-2
-R
-A
SB102
A1 DEFLECTOR WALL SECTION
SCALE: 3/8" = 1'-0"
A1 0 1' 2' 4' 6'
SCALE: 1/2" = 1'-0"
G9
UPSTREAM DEFLECTOR PANEL - TOP
SCALE: 1/2" = 1'-0"
A9
UPSTREAM DEFLECTOR PANEL - BOTTOM / MIDDLE
0 1' 2' 4'
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
M A
R
SCALE: 1/2" = 1'-0"
G17
DETAIL
0 1' 2' 4'
0 1' 2' 4'
SCALE: 1/2" = 1'-0"
A17
DETAIL
0 1' 2' 4'
/2
W12x40
1" DIA F1554 GR 55 EPOXY
ANCHOR ROD, TYP
1/2" END SILL
COVER PLATE
1" THICK
NEOPRENE PAD
1' - 0"1' - 11 1/2"2 7/8"
2' - 11 1/2"
W12x40
A10
SB502
A15
SB502
/2
1' - 0"4' - 3 1/8"
9"
3/16
3/16
TYP
CJP
TYP
6"
W12x40
1/2" DIAPHRAGM PLATE
1/2" VERTICAL
STIFFENER PLATE
1/2" BOTTOM PLATE
NEOPRENE PAD
VERTICAL STIFFNERS
7 1/2"
5"
1/4" DIAPHRAGM PLATE
1/2" VERTICAL
STIFFENER PLATE
3" 3"
3/8" SKIN PLATE
1/2" END SILL
COVER PLATE
1/2" BOTTOM PLATE
NEOPRENE PAD
W12x40
6 7/8" 6"
/2
F1554 GR 55 EPOXY
ANCHOR ROD, TYP
3/16
1' - 8 3/8"
1' - 4 3/8" 4"
4"
3/16
3/16
TYP
5 1/2" 9" 5 7/8"
3/8" COUNTERSINK, TYP
1" x 3" NEOPRENE PAD
3"
1' - 8 3/8"
SKIN PLATE
1/2" VERTICAL
STIFFENER PLATE
W30x132
FABRICATED CONNECTORPZ-27T-CONNECTOR WITH
SPACING 20FT OC
4' - 2 1/4" MAX 4' - 0 5/8" MAX
IN
L A
N D
N A
V
IG
A T
IO
N
D E
S
IG
N C
E N
T E
R
P L O
T D
A T
E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A N
S I D
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S
IZ
E
SHEET ID
S T
L O
U
IS
D
IS
T R
IC
T
S
P R
U C
E S
T R
E
L O
U
IS
M
IS
S
O U
R I
2 3 4 5 6 7 8 9 10 11 12 16151413 17 18 19 20
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E of Engineers US Army Corps
A S
-A D
V E
R T
IS
E
D
U .S
A
R M
Y C
O R
P S
G
IN
E
E
L O
U
IS
D
IS
T R
IC
T
/2
/2
:2
:0
P
M
S H
E E
T P
IL
E
D E
F L E
C T
O R
P A
N E
L D
E T
A
IL
S
SB502
J A
N U
A R
Y
W P
-X
X -X
-X X
X X
B D
IR
K
S P
.E
S H
O U
J S
T O
U F
F E
R P
.E
I.
E
S Q
U
IL
IN
-D
IA
Z
U P
P E
R M
IS
S
IS
S
IP
P
I R
IV
E
R N
A V
IG
A
T
IO
N E
C O
S Y
S T
E M
S U
S T
A
IN
A B
IL
IT
Y P
R O
J E
C T
N
E S
P
L O
C K
A N
D D
A M
N O
L O
C K
F O
U N
D A
T
IO
N A
N D
S
IT
E P
R E
P A
R A
T
IO
N W
P
-2
-R
-A
SB202
A1 DETAIL
SCALE: 1 1/2" = 1'-0"
A1
SB202
H1 DETAIL
SCALE: 1 1/2" = 1'-0"
J1
SB502
A1 SECTION
SCALE: 1 1/2" = 1'-0"
A10
SB502
A1 SECTION
SCALE: 3" = 1'-0"
A15 0 0.125' 0.25' 0.5' 0.75'0 0.25' 0.5' 1' 1.5' 0 0.25' 0.5' 1' 1.5'
0 0.25' 0.5' 1' 1.5' 0 0.5' 1' 2'
GENERAL SHEET NOTES
1. INSTALLATION SEQUENCE FOR CONCRETE ANCHORS ASSUMES HOLES ARE
DRILLED FIRST USING A TEMPLATE.
2. CONTRACTOR MAY SUBMIT FOR APPROVAL A PROPOSAL TO USE SHORT
SLOTTED HOLES FOR CONCRETE ANCHORS. HOLES MUST BE ALIGNED
VERTICALLY.
SB102
A1 SHEET PILE SEPARATOR WALL DETAIL
SCALE: 1" = 1'-0"
J11
R
E V
IS
E
D I N
A C
C O
R D
A N
C E
W
IT
H A
M D
T
M A
R
REFERENCE DRAWINGS
P C
P C
P C
P C
P C
P C
P
D
P D
P D
P D
P D
P C
A
FLOW
MAIN LOCK
Open System Piezometers (PA, PB, PC, PD, PS)
LOCK & DAM NO. 25
INSTRUMENT LOCATIONS
N
DISCLAIMER - While the United States Army Corps of Engineers, (hereinafter referred to USACE) has made a reasonable effort to insure the accuracy of the maps and associated data, its should be explicitly noted that USACE makes no warranty, representation or guaranty, either express or implied, as to the content, sequence, accuracy, timeliness or completeness of any of the data provided herein. The USACE, its officers, agents, employees, or servants shall assume no liability of any nature for any errors, omissions, or inaccuracies in the information provided regardless of how caused.
The USACE, its officers, agents, employees or servants shall assume no liability for any decisions made or actions taken or not taken by the user of the maps and associated data in reliance upon any information or data furnished here. By using these maps and associated data the user does so entirely at their own risk and explicitly acknowledges that he/she is aware of and agrees to be bound by this disclaimer and agrees not to present any claim or demand of any nature against the USACE, its officers, agents, employees or servants in any forum whatsoever for any damages of any nature whatsoever that may result from or may be caused in any way by the use of the maps and associated data.
REFERENCE D
RAW
IN
GS
Lo ck a nd
D am
O pe n Sy st em
P ie zo m et er s D am P ie rs
(O th er
U.S. Army Corps of Engineers St. Louis District
Sheet Identification
E-2-## Jan-2016 Jan-2017 Jan-2018 Jan-2019 Jan-2020 Jan-2021 Jan-2022 Jan-2023 Jan-2024 Jan-2025 Jan-2026
PI
EZ
O M
ET
R
IC
E
LE
VA
TI
O
N (F
T- N
G
VD
INSTRUMENT NOTES
Pool Tail
PD-02
PD-03
PD-04
PD-05
INSTR. DAM TIP RISER TIP
NO. STA. OFFSET ELEV. ELEV. MAT. PIER
PD-02 0+64 D/S 54 396.4 468.0 RIVER SAND 2
PD-03 1+32 D/S 54 397.7 468.0 RIVER SAND 3
PD-04A 1+99 D/S 54 384.1 468.0 RIVER SAND 4
PD-05 2+68 D/S 54 397.8 468.0 RIVER SAND 5
Particle Size Distribution Report
PE
R C
EN
T
FI
N
ER
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" Coarse
% Gravel
Fine Coarse Medium
% Sand
Fine Silt
% Fines
Clay
0.0 0.0 0.8 6.1 73.5 19.6 0.0 0.0 in in in
1½ in in
¾ in
½ in
3/ in
#4 #1
#2
#3
#4
#6
#1
#1
#2
Test Results (ASTM D 6913 & ASTM D 1140)
Opening Percent Spec.* Pass?
Size Finer (Percent) (X=Fail)
Material Description
Atterberg Limits (ASTM D 4318)
Classification
Coefficients
Date Received: Date Tested:
Tested By:
Checked By:
Title:
Date Sampled:Location: 243.0 UMR Sample Number: PF019
Client:
Project:
Project No: Figure
River Sediment
3/4 #4 #10 #40 #70
#100 #200 #230
100.0 100.0
99.2 93.1 19.6
0.8 0.1 0.0 0.0
NP NV NP
SP A-1-b
1.7934 1.5570 0.9258
0.7717 0.5312 0.3798
0.3291 2.81 0.93
7/19/2021 7/19/2021
JNR
JC
7/15/2021
EC-EQ
Upper Mississippi River Sample
PL= LL= PI=
USCS (D 2487)= AASHTO (M 145)=
D90= D85= D60= D50= D30= D15= D10= Cu= Cc=
Remarks
* (no specification provided)
US ARMY
CORPS OF ENGINEERS
ST. LOUIS
9/32
Keynote 01
REFE
RENCE D
RAW
IN
G
Tested By: JPC Checked By: JPC
US ARMY
CORPS OF ENGINEERS
ST. LOUIS
5/24/22
(no specification provided)
PL= LL= PI=
D90= D85= D60= D50= D30= D15= D10= Cu= Cc=
USCS= AASHTO=
3/4 3/8 #4 #10 #40 #70
#100 #200 #230
100.0 100.0
95.7 94.2 51.4
4.0 0.4 0.1 0.1
NP NV NV
1.1315 0.8799 0.4839
0.4165 0.3217 0.2617
0.2407 2.01 0.89
SP A-3
WASH #230 INSTEAD OF #200
USACE STL Dist. EC-EQ
Dredge Samples 2022
Soil Description
Atterberg Limits
Coefficients
Classification
Remarks
Source of Sample: UMR Sample Number: Mile 243 Date:
Client:
Project:
Project No: Figure
SIEVE PERCENT SPEC.* PASS?
SIZE FINER PERCENT (X=NO)
P E
R C
E N
T
FI
N E
R
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" Coarse
% Gravel
Fine Coarse Medium
% Sand
Fine Silt
% Fines
Clay
0.0 0.0 4.3 1.5 42.8 51.3 0.1 in in in
1½ in in
¾ in
½ in
3/ in
#4 #1
#2
#3
#4
#6
#1
#1
#2
Particle Size Distribution Report
6/32
Keynote 02
REFE
RENCE D
RAW
IN
R C
EN
T
FI
N
ER
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" Coarse
% Gravel
Fine Coarse Medium
% Sand
Fine Silt
% Fines
Clay
0.0 0.0 0.5 0.9 48.0 49.6 1.0 in in in
1½ in in
¾ in
½ in
3/ in
#4 #1
#2
#3
#4
#6
#1
#1
#2
TEST RESULTS
Opening Percent Spec.* Pass?
Size Finer (Percent) (X=Fail)
Material Description
Atterberg Limits (ASTM D 4318)
Classification
Coefficients
Date Received: Date Tested:
Tested By:
Checked By:
Title:
Date Sampled:Source of Sample: Dredge 2019 Depth: 8' Sample Number: 242.9
Client:
Project:
Project No: Figure
3/4 #4 #10 #40 #70
#100 #230
100.0 99.5 98.6 50.6
4.8 1.3 0.9
NP NV
SP A-3
1.0325 0.8565 0.4904
0.4211 0.3228 0.2604
0.2382 2.06 0.89
JC
JC
PL= LL= PI=
USCS (D 2487)= AASHTO (M 145)=
D90= D85= D60= D50= D30= D15= D10= Cu= Cc=
Remarks
* (no specification provided)
US ARMY
CORPS OF ENGINEERS
ST. LOUIS
11/32
Keynote 03
REFE
RENCE D
RAW
IN
CORPS OF ENGINEERS
ST. LOUIS
(no specification provided)*
PL= LL= PI=
USCS (D 2487)= AASHTO (M 145)=
D90= D85= D60= D50= D30= D15= D10= Cu= Cc=
Remarks
3/4 #4 #10 #40 #70
#100 #230
100.0 99.7 97.2 45.3
3.2 0.1 0.0
NP NV NP
SP A-1-b
1.2305 1.0060 0.5424
0.4569 0.3412 0.2723
0.2488 2.18 0.86
F.M.=2.27
6-30-17
MB
SO
6-23-17
Material Description
Atterberg Limits (ASTM D 4318)
Classification
Coefficients
Date…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .