LBNF Argon Distribution Equipment IDIQ

Closed Solicitation Posted

Solicitation number
LBNF-355802-JD
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Lead, South Dakota, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Energy's Fermi National Accelerator Laboratory is seeking an Indefinite Delivery/Indefinite Quantity (IDIQ) subcontract for Argon Distribution Equipment to support the Long-Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE) project. The contract requires engineering, manufacturing, delivery, installation, and testing of vacuum-jacketed and uninsulated pipes, valves, and associated equipment to transfer gaseous and liquid argon throughout the underground portion of the facility located 4,850 feet below the surface at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. Proposals are due by February 14, 2025, at 5:00 PM CST, with a mandatory site visit having been conducted in early November 2024. Evaluation criteria will likely include technical capability, past performance, safety record, and quality assurance processes. Offerors must demonstrate relevant experience in cryogenic equipment manufacturing and underground installation capabilities.

The solicitation is not set aside for any specific small business category and will utilize standard competitive bidding processes. The contract period of performance spans from December 18, 2025, through April 30, 2030, with two initial delivery orders to be issued concurrently. The total project involves supporting four massive neutrino detectors requiring approximately 70,000 tons of liquid argon (about 17,500 tons per cryostat). The estimated contract value is not explicitly stated, but the complexity of the equipment and installation suggests a significant multi-million dollar procurement. Contractors will be responsible for providing all necessary engineering, manufacturing, delivery, installation, and testing services for the argon distribution system, including vacuum-jacketed pipes, uninsulated pipes, valves, instrumentation, and support structures. The work will be performed primarily underground at the SURF facility, with strict requirements for safety, quality control, and technical precision.

Notice text

Please see the attached RFP and Statement of Work for complete information.  In short, the Argon Distribution Equipment serves:

  • To transfer gaseous and liquid argon throughout the underground portion of the LBNF, housed 4850 ft (1478 m) below the surface level of the Sanford Underground Research Facility (SURF).
  • To transfer, in limited capacity, gaseous and liquid nitrogen (for regeneration) throughout the underground portion of the LBNF.
  • As a connection between the various other argon subsystems at the LBNF for the ultimate purpose of building and maintaining a clean reservoir of LAr within the LBNF cryostats.
  • To install hardware and equipment delivered by partners as In-Kind Contributions (IKC).
  • To provide dry Nitrogen gas to the cryostat insulation space.
  • To provide the capability of injecting xenon gas from cylinders into the manifold containing argon vent gas from cryostat feedthroughs, heading to argon condensing.
  • As a connection between the LAr Purification and Purity Monitors.

To analyze GN2 content of GAr from the surface during cryostat filling.

LBNF Project Background: 

LBNF (http:/lbnf-dune.fnal.gov/) will provide the infrastructure necessary to support the massive neutrino detectors located deep underground at the Sanford Underground Research Facility (SURF) in Lead, SD. The Deep Underground Neutrino Experiment (DUNE) will employ four (4) such detectors, housed in cryostats requiring almost 70,000 tons of liquid argon (LAr), about 17,500 tons for each cryostat. DUNE (http://www.dunescience.org/) is expected to achieve transformative discoveries, making definitive determinations of neutrino properties, examining the dynamics of supernovae that produced the heavy elements necessary for life, and probing the possibility of proton decay.

Files

File Type Posted
Amendment 06--RFP LBNF-355802-JD.pdf PDF
Amendment 05--RFP LBNF-355802-JD.pdf PDF
Amendment 04--RFP LBNF-355802-JD_Final.pdf PDF
J-1 FFDG General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (01.2025).pdf PDF
J-2 2025 INSURANCE REQUIREMENTS FOR FFDG SUBCONTRACTED WORK AT SURF Risk category 4 (Rev 01.pdf PDF
Amendment 03--RFP LBNF-355802-JD_Final.pdf PDF
Amendment 02--RFP LBNF-355802-JD 11-26-2024.pdf PDF
Amendment 01--RFP LBNF-355802-JD 10-05-2024.pdf PDF
J-4 - SOW Appendix B - Instructions for Downloading.docx DOCX document
J-1 General Terms and Conditions - Supplies and Services at SURF 10-23.pdf PDF
J-4 - Delivery Order 2 - Argon Distribution Uninsulated Pipes Valves SOW (1).pdf PDF
J-4 - IDIQ Task Order 1 and 2 - Appendix A - FORM_2_Rev_B.3_load_envelopes.pdf PDF
J-4 - SOW Appendice C - Instructions for Downloading.docx DOCX document
J-7 - Section 013300 Submittals_02-14-2024.pdf PDF
J-8 - Section 014100 Cryo Quality Requirements_2-16-2024.pdf PDF
Mandatory Site Visit Registration Questionnaire Sept 2024.docx DOCX document
J-13 - Section 01320 Project Schedule_Final 02-14-2024.pdf PDF
J-14 Wage Determination 2015-5377 Rev 26 07-22-2024.pdf PDF
RFP LBNF-355802-JD Final 09-27-2024.pdf PDF
J-2 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 4 (Rev 2-2018)A.pdf PDF
J-4 - Delivery Order 1 - Argon Distribution VJ Pipes Valves SOW (2) (1).pdf PDF
J-5-Exhibit A.pdf PDF
FRA Safety Questionnaire (Rev. 08-17).pdf PDF
J-3 SDSTA Risk Transfer Protocols with Exhibits Final.pdf PDF
J-4 - IDIQ - Argon Distribution Equipment SOW.pdf PDF
J-6 Section 010010 General Requirements Installation_Feb 2024.pdf PDF
J-15 Fixed Prices for Orders-04-25-2024 (1).xlsx XLSX spreadsheet
SMALL BUSINESS SUBCONTRACTING PLAN template Far 52.219-9.docx DOCX document
Show all 28

Similar open opportunities

Opportunity Agency Set-aside Responses due
LBNF/DUNE-US South Dakota Scaffolding Services Lead, South Dakota, United States · NAICS 332323 Fermi National Accelerator Laboratory No set-aside
PIP-II f-37 building LWC pump room piping system installation Batavia, Illinois 60510, United States · NAICS 23822 Fermi National Accelerator Laboratory No set-aside
PIP-II ssrs and LB650 vacuum gauge and readout Illinois 60510, United States · NAICS 334513 Fermi National Accelerator Laboratory No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity