Amendment 06--RFP LBNF-355802-JD.pdf

PDF 101 KB Posted

Attached to
LBNF Argon Distribution Equipment IDIQ
Solicitation number
LBNF-355802-JD
Issued by

About this file

This is Amendment 06 to RFP LBNF-355802-JD for the Long-Baseline Neutrino Facility Argon Distribution IDIQ contract issued by Fermi Forward Discovery Group, LLC on February 6, 2025.

The amendment extends the proposal due date to February 14, 2025 at 5:00 PM CST and provides an additional proposal submission method via a secure Fermilab Box portal for files exceeding 20MB (otherwise proposals should be emailed to jeremyd@fnal.gov). The amendment also adds new standardized file naming requirements for the mandatory two-part submission (Technical Proposal and Price/Contractual Proposal). Offerors must acknowledge the amendment either by completing the Subcontractor Annual Representations and Certifications or by separate communication. The underlying project involves argon distribution equipment for transferring gaseous and liquid argon throughout the underground facility at SURF, connecting various argon subsystems, and supporting massive neutrino detectors requiring approximately 70,000 tons of liquid argon.

View the file

Other files

File Type Posted
Amendment 05--RFP LBNF-355802-JD.pdf PDF
J-1 FFDG General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (01.2025).pdf PDF
J-2 2025 INSURANCE REQUIREMENTS FOR FFDG SUBCONTRACTED WORK AT SURF Risk category 4 (Rev 01.pdf PDF
Amendment 04--RFP LBNF-355802-JD_Final.pdf PDF
Amendment 03--RFP LBNF-355802-JD_Final.pdf PDF
Amendment 02--RFP LBNF-355802-JD 11-26-2024.pdf PDF
Amendment 01--RFP LBNF-355802-JD 10-05-2024.pdf PDF
J-4 - SOW Appendix B - Instructions for Downloading.docx DOCX document
RFP LBNF-355802-JD Final 09-27-2024.pdf PDF
J-2 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 4 (Rev 2-2018)A.pdf PDF
J-4 - Delivery Order 1 - Argon Distribution VJ Pipes Valves SOW (2) (1).pdf PDF
J-5-Exhibit A.pdf PDF
FRA Safety Questionnaire (Rev. 08-17).pdf PDF
J-13 - Section 01320 Project Schedule_Final 02-14-2024.pdf PDF
J-14 Wage Determination 2015-5377 Rev 26 07-22-2024.pdf PDF
J-3 SDSTA Risk Transfer Protocols with Exhibits Final.pdf PDF
J-4 - IDIQ - Argon Distribution Equipment SOW.pdf PDF
J-6 Section 010010 General Requirements Installation_Feb 2024.pdf PDF
J-15 Fixed Prices for Orders-04-25-2024 (1).xlsx XLSX spreadsheet
SMALL BUSINESS SUBCONTRACTING PLAN template Far 52.219-9.docx DOCX document
J-1 General Terms and Conditions - Supplies and Services at SURF 10-23.pdf PDF
J-4 - Delivery Order 2 - Argon Distribution Uninsulated Pipes Valves SOW (1).pdf PDF
J-4 - IDIQ Task Order 1 and 2 - Appendix A - FORM_2_Rev_B.3_load_envelopes.pdf PDF
J-4 - SOW Appendice C - Instructions for Downloading.docx DOCX document
J-7 - Section 013300 Submittals_02-14-2024.pdf PDF
J-8 - Section 014100 Cryo Quality Requirements_2-16-2024.pdf PDF
Mandatory Site Visit Registration Questionnaire Sept 2024.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT TO SOLICITATION

AMENDMENT NO.

DATE OF AMENDMENT:

February 6, 2025

SOLICITATION NO.

RFP LBNF-355802-JD

DATE ISSUED:

February 6, 2025

PROJECT NO.

N/A

PROPOSAL DUE DATE:

February 14, 2025

TITLE OF PROJECT:

LONG-BASELINE NEUTRINO FACILITY ARGON DISTRIBUTION IDIQ

Offerors must acknowledge this Addendum prior to the hour and date set forth in the solicitation by one of the following methods:

1. By completing the Subcontractor Annual Representations and Certifications (SARC), or

2. By separate fax, letter, or email.

If by virtue of this Addendum you desire to change a proposal already submitted, such change may be made by email, provided such email clearly references the Solicitation number and this Amendment number and is received prior to the proposal due date.

Amendment No. 6 is issued to extend the offer closing date and provide an additional mechanism for proposal delivery as follows:

(1) THE OFFER CLOSING DATE IS HEREBY CHANGED TO February 14, 2025 AT 5:00 P.M.

CENTRAL STANDARD TIME (CST-CHICAGO).

(2) Section L of RFP LBNF-355802-JD specifies that proposals shall be emailed to jeremyd@fnal.gov If proposal files exceed 20 MB, offerors may now utilize the following alternate delivery method:

Secure upload to Fermilab Box portal:

https://fermilab.app.box.com/f/5add4475409c4006914ba4ec6f47a5f0

(3) Regardless of the method of delivery, proposals must comply with the instructions in Section L of the RFP. The existing RFP instructions require that each offeror’s proposal is organized into two separate files: a Technical Proposal and a Price/Contractual Proposal. Amendment 6 hereby adds the following requirement to these instructions:

Proposals shall be submitted to Fermilab using the standardized filenames below. Each offeror shall replace the red text with its company name.

Vendor name – RFP LBNF35802JD Technical Proposal.pdf Vendor name – RFP LBNF35802JD Business Proposal.pdf

All other provisions remain unchanged.

Fermi Forward Discovery Group, LLC P.O. Box 500 Batavia, IL 60510 M.S 123

Jeremy Duncan LBNF Procurement Specialist

(865) 300-0443 mailto:jeremyd@fnal.gov https://fermilab.app.box.com/f/5add4475409c4006914ba4ec6f47a5f0

File details come from the government source that posted it. Updated .