This document is an instruction guide for accessing Statement of Work Appendix C related to Solicitation Number LBNF-355802-JD for the procurement of Argon Distribution Equipment for the Long Baseline Neutrino Facility (LBNF) project.
The Argon Distribution Equipment is required to transfer gaseous and liquid argon throughout the underground portions of the LBNF, housed 4850 ft below the surface at the Sanford Underground Research Facility (SURF). It will also support limited transfer of gaseous and liquid nitrogen, connect the various argon subsystems, provide dry nitrogen gas to the cryostat insulation space, and enable injection of xenon gas. The equipment will be installed by the contractor to support the DUNE neutrino experiment, which aims to make transformative discoveries related to neutrino properties, supernovae dynamics, and proton decay. Due to file size limitations on the SAM.gov platform, the Statement of Work Appendix C must be downloaded from the Fermilab OneDrive portal.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Long Baseline Neutrino Facility
RFP-LBNF-355802-JD
Argon Distribution Equipment
Instructions for Obtaining Access to SOW Appendix C
Due to large file sizes, and limitations of the SAM.gov platform on which RFP-LBNF-355802-JD is posted, Statement Of Work Appendix C are presented as compressed files (.zip) that must be downloaded by visiting the following Fermilab OneDrive portal:
Argon Distribution SOW Appendix C
Fermi National Accelerator Laboratory 21-Dec-20 11 image1.emf image2.emf