J-4 - SOW Appendice C - Instructions for Downloading.docx

DOCX document 144 KB Posted

Attached to
LBNF Argon Distribution Equipment IDIQ
Solicitation number
LBNF-355802-JD
Issued by

About this file

This document is an instruction guide for accessing Statement of Work Appendix C related to Solicitation Number LBNF-355802-JD for the procurement of Argon Distribution Equipment for the Long Baseline Neutrino Facility (LBNF) project.

The Argon Distribution Equipment is required to transfer gaseous and liquid argon throughout the underground portions of the LBNF, housed 4850 ft below the surface at the Sanford Underground Research Facility (SURF). It will also support limited transfer of gaseous and liquid nitrogen, connect the various argon subsystems, provide dry nitrogen gas to the cryostat insulation space, and enable injection of xenon gas. The equipment will be installed by the contractor to support the DUNE neutrino experiment, which aims to make transformative discoveries related to neutrino properties, supernovae dynamics, and proton decay. Due to file size limitations on the SAM.gov platform, the Statement of Work Appendix C must be downloaded from the Fermilab OneDrive portal.

View the file

Other files

File Type Posted
Amendment 06--RFP LBNF-355802-JD.pdf PDF
Amendment 05--RFP LBNF-355802-JD.pdf PDF
J-1 FFDG General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (01.2025).pdf PDF
J-2 2025 INSURANCE REQUIREMENTS FOR FFDG SUBCONTRACTED WORK AT SURF Risk category 4 (Rev 01.pdf PDF
Amendment 04--RFP LBNF-355802-JD_Final.pdf PDF
Amendment 03--RFP LBNF-355802-JD_Final.pdf PDF
Amendment 02--RFP LBNF-355802-JD 11-26-2024.pdf PDF
Amendment 01--RFP LBNF-355802-JD 10-05-2024.pdf PDF
J-4 - SOW Appendix B - Instructions for Downloading.docx DOCX document
J-13 - Section 01320 Project Schedule_Final 02-14-2024.pdf PDF
J-14 Wage Determination 2015-5377 Rev 26 07-22-2024.pdf PDF
RFP LBNF-355802-JD Final 09-27-2024.pdf PDF
J-2 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 4 (Rev 2-2018)A.pdf PDF
J-4 - Delivery Order 1 - Argon Distribution VJ Pipes Valves SOW (2) (1).pdf PDF
J-5-Exhibit A.pdf PDF
FRA Safety Questionnaire (Rev. 08-17).pdf PDF
J-3 SDSTA Risk Transfer Protocols with Exhibits Final.pdf PDF
J-4 - IDIQ - Argon Distribution Equipment SOW.pdf PDF
J-6 Section 010010 General Requirements Installation_Feb 2024.pdf PDF
J-15 Fixed Prices for Orders-04-25-2024 (1).xlsx XLSX spreadsheet
SMALL BUSINESS SUBCONTRACTING PLAN template Far 52.219-9.docx DOCX document
J-1 General Terms and Conditions - Supplies and Services at SURF 10-23.pdf PDF
J-4 - Delivery Order 2 - Argon Distribution Uninsulated Pipes Valves SOW (1).pdf PDF
J-4 - IDIQ Task Order 1 and 2 - Appendix A - FORM_2_Rev_B.3_load_envelopes.pdf PDF
J-7 - Section 013300 Submittals_02-14-2024.pdf PDF
J-8 - Section 014100 Cryo Quality Requirements_2-16-2024.pdf PDF
Mandatory Site Visit Registration Questionnaire Sept 2024.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Long Baseline Neutrino Facility

RFP-LBNF-355802-JD

Argon Distribution Equipment

Instructions for Obtaining Access to SOW Appendix C

Due to large file sizes, and limitations of the SAM.gov platform on which RFP-LBNF-355802-JD is posted, Statement Of Work Appendix C are presented as compressed files (.zip) that must be downloaded by visiting the following Fermilab OneDrive portal:

Argon Distribution SOW Appendix C

Fermi National Accelerator Laboratory 21-Dec-20 11 image1.emf image2.emf

File details come from the government source that posted it. Updated .