J-4 - SOW Appendix B - Instructions for Downloading.docx

DOCX document 144 KB Posted

Attached to
LBNF Argon Distribution Equipment IDIQ
Solicitation number
LBNF-355802-JD
Issued by

About this file

This document provides instructions for downloading Statement of Work (SOW) Appendix B, which contains isometric drawings and a 3D model of the Argon Distribution Equipment, as part of a larger Request for Proposal (RFP) for the Long Baseline Neutrino Facility (LBNF) Argon Distribution Equipment Indefinite Delivery/Indefinite Quantity (IDIQ) contract.

The RFP, identified as LBNF-355802-JD, is being issued by the Department of Energy's Fermi National Accelerator Laboratory. The Argon Distribution Equipment is a critical component of the LBNF project, which aims to support the Deep Underground Neutrino Experiment (DUNE) by providing the infrastructure necessary to transfer and maintain liquid and gaseous argon throughout the underground LBNF facility. Due to the large file sizes, the SOW Appendix B materials are provided in compressed file folders that must be downloaded from the Fermi National Accelerator Laboratory OneDrive portal.

View the file

Other files

File Type Posted
Amendment 06--RFP LBNF-355802-JD.pdf PDF
Amendment 05--RFP LBNF-355802-JD.pdf PDF
J-1 FFDG General Terms and Conditions for Subcontracts Combining Supplies and Services Performed at SURF (01.2025).pdf PDF
J-2 2025 INSURANCE REQUIREMENTS FOR FFDG SUBCONTRACTED WORK AT SURF Risk category 4 (Rev 01.pdf PDF
Amendment 04--RFP LBNF-355802-JD_Final.pdf PDF
Amendment 03--RFP LBNF-355802-JD_Final.pdf PDF
Amendment 02--RFP LBNF-355802-JD 11-26-2024.pdf PDF
Amendment 01--RFP LBNF-355802-JD 10-05-2024.pdf PDF
J-3 SDSTA Risk Transfer Protocols with Exhibits Final.pdf PDF
J-4 - IDIQ - Argon Distribution Equipment SOW.pdf PDF
J-6 Section 010010 General Requirements Installation_Feb 2024.pdf PDF
J-15 Fixed Prices for Orders-04-25-2024 (1).xlsx XLSX spreadsheet
SMALL BUSINESS SUBCONTRACTING PLAN template Far 52.219-9.docx DOCX document
J-13 - Section 01320 Project Schedule_Final 02-14-2024.pdf PDF
J-14 Wage Determination 2015-5377 Rev 26 07-22-2024.pdf PDF
RFP LBNF-355802-JD Final 09-27-2024.pdf PDF
J-2 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 4 (Rev 2-2018)A.pdf PDF
J-4 - Delivery Order 1 - Argon Distribution VJ Pipes Valves SOW (2) (1).pdf PDF
J-5-Exhibit A.pdf PDF
FRA Safety Questionnaire (Rev. 08-17).pdf PDF
J-1 General Terms and Conditions - Supplies and Services at SURF 10-23.pdf PDF
J-4 - Delivery Order 2 - Argon Distribution Uninsulated Pipes Valves SOW (1).pdf PDF
J-4 - IDIQ Task Order 1 and 2 - Appendix A - FORM_2_Rev_B.3_load_envelopes.pdf PDF
J-4 - SOW Appendice C - Instructions for Downloading.docx DOCX document
J-7 - Section 013300 Submittals_02-14-2024.pdf PDF
J-8 - Section 014100 Cryo Quality Requirements_2-16-2024.pdf PDF
Mandatory Site Visit Registration Questionnaire Sept 2024.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Long Baseline Neutrino Facility

RFP-LBNF-355802-JD

Argon Distribution Equipment

Instructions for Obtaining Access to SOW Appendix B--LBNF Isometric Drawings and 3D model of LBNF Argon Distribution VJ Pipes and Valves

Due to large file sizes, and limitations of the SAM.gov platform on which RFP-LBNF-355802-JD is posted, Statement Of Work Appendix B are provided in two compressed file folders (.zip) that must be downloaded by visiting the following Fermilab OneDrive portal:

Argon Distribution SOW Appendix B

Fermi National Accelerator Laboratory 21-Dec-20 11 image1.emf image2.emf

File details come from the government source that posted it. Updated .