This solicitation seeks general construction services for multiple facilities projects at Joint Base Elmendorf-Richardson in Alaska. The Department of the Air Force Pacific Air Forces is procuring these services through a Mini-Multiple Award Construction Contract (Mini-MACC) to be awarded to up to four contractors. The scope of work will include various construction disciplines across general construction categories, with designs provided ranging from 35% to 95% completion. Incidental design work is expected. Proposals are due by June 14, 2021 and the contract is set aside for total small business.
The solicitation has a total small business set-aside designation. The primary NAICS code is 237990 and PSC code S206. The Mini-MACC is intended to complement an existing MACC design-build contract by addressing projects valued between $500,000 to $2,000,000. The period of performance is from July 2021 through July 2026 and the place of performance is Joint Base Elmendorf-Richardson located in Anchorage, Alaska. Evaluation criteria includes past performance, technical approach, and price.
Notice text
8 versions
Update #8 · Latest ·
Amendment 007 - The purpose this amendment is to cancel the solicitation.
*************************************************************************************************************************************************
Amendment 006 - The purpose of this amendment is to change Schedule B unit of issue from Lot to Project. Attachment 4 Price Schedule remains the same.
*************************************************************************************************************************************************
Amendment 005 - The purpose of this amendment is to extend teh proposal due date to 14 Jun 2021 and rovide responses to follow-up questions.
*****************************************************************************************************************************************
Amendment 004 - The purpose of this amendment is to provide responses to all questions and provide a revised SOW, Specificaitons, and drawings.
****************************************************************************************************************************************
Amendment 003 - Provide responses to contractor qestions #1-40.
*******************************************************************************************************************************************
Amendment 002 - See list of changes. Partial list of Questions & Answer to be posted on Amendment 003.
***************************************
Amendment 001 - Provides updated Solicitaiton dated 20210503 and FOPR dated 20210503. Changes the Site visit dates in the Solicitation and Attachment 3 FOPR to 11 May 2021 at 1300 and meeting at Bldg 5327 versus B10480.
************************************
The Mini-MACC contract will continue to complement the larger MACC design-build (DB) contract. The primarily work will consist of multiple disciplines in general construction categories of on-base facilities for JBER, Alaska. Designs provided to Contractor may be as little as 35% design (basic concept) to a 95% design. The design and engineering required is at the level normally expected of a general construction contractor and considered incidental to the accomplishment of the scope of work provided by the Government. Contracts requiring more than incidental design or the services of a registered architect or professional engineer are primarily reserved for the MACC. The Mini-MACC contract fills the small project magnitude, general contractor niche by providing a stable pool of Contractors focused on continued good performance in order to continue to receive future projects.
Update #7 ·
Amendment 006 - The purpose of this amendment is to change Schedule B unit of issue from Lot to Project. Attachment 4 Price Schedule remains the same.
*************************************************************************************************************************************************
Amendment 005 - The purpose of this amendment is to extend teh proposal due date to 14 Jun 2021 and rovide responses to follow-up questions.
*****************************************************************************************************************************************
Amendment 004 - The purpose of this amendment is to provide responses to all questions and provide a revised SOW, Specificaitons, and drawings.
****************************************************************************************************************************************
Amendment 003 - Provide responses to contractor qestions #1-40.
*******************************************************************************************************************************************
Amendment 002 - See list of changes. Partial list of Questions & Answer to be posted on Amendment 003.
***************************************
Amendment 001 - Provides updated Solicitaiton dated 20210503 and FOPR dated 20210503. Changes the Site visit dates in the Solicitation and Attachment 3 FOPR to 11 May 2021 at 1300 and meeting at Bldg 5327 versus B10480.
************************************
The Mini-MACC contract will continue to complement the larger MACC design-build (DB) contract. The primarily work will consist of multiple disciplines in general construction categories of on-base facilities for JBER, Alaska. Designs provided to Contractor may be as little as 35% design (basic concept) to a 95% design. The design and engineering required is at the level normally expected of a general construction contractor and considered incidental to the accomplishment of the scope of work provided by the Government. Contracts requiring more than incidental design or the services of a registered architect or professional engineer are primarily reserved for the MACC. The Mini-MACC contract fills the small project magnitude, general contractor niche by providing a stable pool of Contractors focused on continued good performance in order to continue to receive future projects.
Update #6 ·
Amendment 005 - The purpose of this amendment is to extend teh proposal due date to 14 Jun 2021 and rovide responses to follow-up questions.
*****************************************************************************************************************************************
Amendment 004 - The purpose of this amendment is to provide responses to all questions and provide a revised SOW, Specificaitons, and drawings.
****************************************************************************************************************************************
Amendment 003 - Provide responses to contractor qestions #1-40.
*******************************************************************************************************************************************
Amendment 002 - See list of changes. Partial list of Questions & Answer to be posted on Amendment 003.
***************************************
Amendment 001 - Provides updated Solicitaiton dated 20210503 and FOPR dated 20210503. Changes the Site visit dates in the Solicitation and Attachment 3 FOPR to 11 May 2021 at 1300 and meeting at Bldg 5327 versus B10480.
************************************
The Mini-MACC contract will continue to complement the larger MACC design-build (DB) contract. The primarily work will consist of multiple disciplines in general construction categories of on-base facilities for JBER, Alaska. Designs provided to Contractor may be as little as 35% design (basic concept) to a 95% design. The design and engineering required is at the level normally expected of a general construction contractor and considered incidental to the accomplishment of the scope of work provided by the Government. Contracts requiring more than incidental design or the services of a registered architect or professional engineer are primarily reserved for the MACC. The Mini-MACC contract fills the small project magnitude, general contractor niche by providing a stable pool of Contractors focused on continued good performance in order to continue to receive future projects.
Update #5 ·
Amendment 004 - The purpose of this amendment is to provide responses to all questions and provide a revised SOW, Specificaitons, and drawings.
****************************************************************************************************************************************
Amendment 003 - Provide responses to contractor qestions #1-40.
*******************************************************************************************************************************************
Amendment 002 - See list of changes. Partial list of Questions & Answer to be posted on Amendment 003.
***************************************
Amendment 001 - Provides updated Solicitaiton dated 20210503 and FOPR dated 20210503. Changes the Site visit dates in the Solicitation and Attachment 3 FOPR to 11 May 2021 at 1300 and meeting at Bldg 5327 versus B10480.
************************************
The Mini-MACC contract will continue to complement the larger MACC design-build (DB) contract. The primarily work will consist of multiple disciplines in general construction categories of on-base facilities for JBER, Alaska. Designs provided to Contractor may be as little as 35% design (basic concept) to a 95% design. The design and engineering required is at the level normally expected of a general construction contractor and considered incidental to the accomplishment of the scope of work provided by the Government. Contracts requiring more than incidental design or the services of a registered architect or professional engineer are primarily reserved for the MACC. The Mini-MACC contract fills the small project magnitude, general contractor niche by providing a stable pool of Contractors focused on continued good performance in order to continue to receive future projects.
Update #4 ·
Amendment 003 - Provide responses to constructor questions #1-40.
****************************************************************************
Amendment 002 - See list of changes. Partial list of Questions & Answer to be posted on Amendment 003.
***************************************
Amendment 001 - Provides updated Solicitaiton dated 20210503 and FOPR dated 20210503. Changes the Site visit dates in the Solicitation and Attachment 3 FOPR to 11 May 2021 at 1300 and meeting at Bldg 5327 versus B10480.
************************************
The Mini-MACC contract will continue to complement the larger MACC design-build (DB) contract. The primarily work will consist of multiple disciplines in general construction categories of on-base facilities for JBER, Alaska. Designs provided to Contractor may be as little as 35% design (basic concept) to a 95% design. The design and engineering required is at the level normally expected of a general construction contractor and considered incidental to the accomplishment of the scope of work provided by the Government. Contracts requiring more than incidental design or the services of a registered architect or professional engineer are primarily reserved for the MACC. The Mini-MACC contract fills the small project magnitude, general contractor niche by providing a stable pool of Contractors focused on continued good performance in order to continue to receive future projects.
Update #3 ·
Amendment 002 - See list of changes. Partial list of Questions & Answer to be posted on Amendment 003.
***************************************
Amendment 001 - Provides updated Solicitaiton dated 20210503 and FOPR dated 20210503. Changes the Site visit dates in the Solicitation and Attachment 3 FOPR to 11 May 2021 at 1300 and meeting at Bldg 5327 versus B10480.
************************************
The Mini-MACC contract will continue to complement the larger MACC design-build (DB) contract. The primarily work will consist of multiple disciplines in general construction categories of on-base facilities for JBER, Alaska. Designs provided to Contractor may be as little as 35% design (basic concept) to a 95% design. The design and engineering required is at the level normally expected of a general construction contractor and considered incidental to the accomplishment of the scope of work provided by the Government. Contracts requiring more than incidental design or the services of a registered architect or professional engineer are primarily reserved for the MACC. The Mini-MACC contract fills the small project magnitude, general contractor niche by providing a stable pool of Contractors focused on continued good performance in order to continue to receive future projects.
Update #2 ·
Amendment 001 - Provides updated Solicitaiton dated 20210503 and FOPR dated 20210503. Changes the Site visit dates in the Solicitation and Attachment 3 FOPR to 11 May 2021 at 1300 and meeting at Bldg 5327 versus B10480.
The Mini-MACC contract will continue to complement the larger MACC design-build (DB) contract. The primarily work will consist of multiple disciplines in general construction categories of on-base facilities for JBER, Alaska. Designs provided to Contractor may be as little as 35% design (basic concept) to a 95% design. The design and engineering required is at the level normally expected of a general construction contractor and considered incidental to the accomplishment of the scope of work provided by the Government. Contracts requiring more than incidental design or the services of a registered architect or professional engineer are primarily reserved for the MACC. The Mini-MACC contract fills the small project magnitude, general contractor niche by providing a stable pool of Contractors focused on continued good performance in order to continue to receive future projects.
Update #1 ·
The Mini-MACC contract will continue to complement the larger MACC design-build (DB) contract. The primarily work will consist of multiple disciplines in general construction categories of on-base facilities for JBER, Alaska. Designs provided to Contractor may be as little as 35% design (basic concept) to a 95% design. The design and engineering required is at the level normally expected of a general construction contractor and considered incidental to the accomplishment of the scope of work provided by the Government. Contracts requiring more than incidental design or the services of a registered architect or professional engineer are primarily reserved for the MACC. The Mini-MACC contract fills the small project magnitude, general contractor niche by providing a stable pool of Contractors focused on continued good performance in order to continue to receive future projects.
Attachments
Show all 43
Notice history
| Notice | Type | Posted |
|---|---|---|
| JBER Mini-MACC | Solicitation | |
| JBER Mini-MACC | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity