Fire Island Inlet to Montauk Point, New York | Fire Island Inlet to Moriches Inlet Reach Suffolk County, NY, PL 84-99, FIMI PIR 2024
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912DS24B0017
- Agency
-
ENDIST New York
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KF Maintenance Of Dredging Facilities
- Place of performance
- Ocean Beach, New York 11770, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, New York District is seeking contractors to perform the Fire Island Inlet to Moriches Inlet (FIMI) Reach PL 84-99, PIR 2024 Project. This structural contract includes the repair and restoration of the shoreline in Suffolk County, New York, consisting of approximately 1.7 million CY of beachfill, 35,202 ft of sand fencing replacement, 31 acres of dune grass planting, and repair of elevated timber dune crossovers and vehicular crossovers. The sand will be dredged from the Atlantic Ocean Sand Borrow Area 2C. The contract will be awarded to the conforming responsible offeror with the lowest Total Base Bid amount. Bids are due by 2:00 PM EST on July 11, 2024.
This is a 100% unrestricted full and open competition with a HUBZone price evaluation preference under NAICS code 237990. The estimated construction cost range is between $50,000,000 and $100,000,000. The contractor must submit a Project Labor Agreement prior to contract award. The period of performance is 180 calendar days for dredging and 502 calendar days for the overall project, which will be performed at Ocean Beach, NY 11770.
Notice text
The New York District, U.S. Army Corps of Engineers (District) is preparing plans and specifications for the Fire Island Inlet to Moriches Inlet (FIMI) Reach PL 84-99, PIR 2024 Project.
FIMI PL 84-99 PIR 2024 is a structural contract that includes repair and restoration of the project to design conditions, including advance fill. The total work will consist of approximately 1.7 million CY of beachfill restoration on the eroded shoreline, replacement of approximately 35,202 ft of sand fencing, planting of approximately 31 acres of dune grass, repair of approximately 6-10 elevated timber dune crossover structures, and repair of approximately two vehicular crossovers. The sand will be dredged from the Atlantic Ocean Sand Borrow Area 2C.
The critically needed beachfill will restore the eroded beach that spans a distance of 44,150 feet spanning between the communities of Ocean Bay Park to Davis Park in Suffolk County, NY. The placement distance within the project area is approximately 23,000 feet. The beachfill includes a beach berm at elevation +8.5 ft NAVD88, backed by 1V:5H side slopes on both landward and seaward sides. The construction berm width will be 90 ft plus advance nourishment fill, with an onshore slope of 1V:20H to elevation
-1ft NAVD88 and an offshore slope of approximately 1V:15H to ocean bottom. Construction cost is in the range of $50,000,000 to $100,000,000.
Files
Show all 30
Notice history
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity