06 13 00_Amend2.pdf
PDF 25 KB Posted
- Solicitation number
- W912DS24B0017
About this file
This document is a construction specification for Crossover structures as part of the Fire Island Inlet to Moriches Inlet (FIMI) Reach PL 84-99, PIR 2024 Project. It provides detailed requirements for the design, materials, and installation of the crossover structures, including decking, railings, and hardware. Key details include:
The Crossover structures must be designed by a licensed Professional Engineer per applicable building codes and standards, and the design plans, specifications, and calculations must be submitted for government review and approval prior to construction. All lumber must be treated with preservatives per industry standards. Hardware such as bolts, nuts, and screws must meet specified material requirements. Installation requirements are provided for the decking, railings, and other components. The specification also outlines the testing and replacement process for any non-compliant materials. This crossover work is part of a larger $50-100 million dollar construction project for the FIMI Reach, which includes beach restoration, sand fencing, and dune grass planting over a 44,150 foot shoreline area between Ocean Bay Park and Davis Park, Suffolk County, New York.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PL 84- 99 FI MI - Ocean Bay Par k t o Davi s Par k PL8499FI MI Amendment 02
SECTI ON 06 13 00
CROSSOVER
11/ 16
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN SOCI ETY OF CI VI L ENGI NEERS ( ASCE)
ASCE 7 ( 2022) Mi ni mum Desi gn Loads f or Bui l di ngs and Ot her St r uct ur es
AMERI CAN WOOD PROTECTI ON ASSOCI ATI ON ( AWPA)
AWPA U1 ( 2023) Use Cat egor y Syst em: User Speci f i cat i on f or Tr eat ed Wood
ASTM I NTERNATI ONAL ( ASTM)
ASTM A307 ( 2021) St andar d Speci f i cat i on f or Car bon St eel Bol t s, St uds, and Thr eaded Rod 60 000 PSI Tensi l e St r engt h
ASTM A193/ A193M ( 2023) St andar d Speci f i cat i on f or Al l oy- St eel and St ai nl ess St eel Bol t i ng Mat er i al s f or Hi gh- Temper at ur e Ser vi ce and Ot her Speci al Pur pose Appl i cat i ons
AMERI CAN WOOD COUNCI L ( AWC)
AWC NDS ( 2018) Nat i onal Desi gn Speci f i cat i on ( NDS) f or Wood Const r uct i on
I NTERNATI ONAL CODE COUNCI L ( I CC)
I CC I BC ( 2021) I nt er nat i onal Bui l di ng Code
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 02 Shop Dr awi ngs
Cr ossover ; G, DO
SD- 03 Pr oduct Dat a
Lumber ; G, DO
SECTI ON 06 13 00 Page 1
SD- 05 Desi gn Dat a
Desi gn Pl ans/ Dr awi ngs; G, DO
Speci f i cat i ons; G, DO
Desi gn Anal ysi s; G, DO
1. 3 DEFI NI TI ONS
1. 3. 1 Desi gner of Recor d ( DOR)
Pr of essi onal Regi st er ed member ( s) of t he Cont r act or ’ s Desi gn t eam t hat check, appr ove, s i gn, dat e, and cer t i f y, pr i or t o submi t t i ng t he del i ver abl es t o t he Gover nment , t hat t he desi gn submi t t al s compl y wi t h t he cont r act r equi r ement s.
The DOR' s st amp, s i gn, and dat e each desi gn dr awi ng and ot her desi gn del i ver abl es under t hei r r esponsi bl e di sci pl i ne at each desi gn submi t t al st age. The DOR( s) ar e r esponsi bl e f or mai nt ai ni ng t he i nt egr i t y of t he desi gn and f or compl i ance wi t h t he cont r act r equi r ement s t hr ough const r uct i on and document at i on of t he as- bui l t condi t i on by coor di nat i on, r evi ew and appr oval of ext ensi ons of desi gn, mat er i al , equi pment and ot her const r uct i on submi t t al s, r evi ew and appr oval or di sappr oval of r equest ed devi at i ons t o t he accept ed desi gn or t o t he cont r act , coor di nat i on wi t h t he Gover nment of t he above act i v i t i es, and by per f or mi ng ot her t ypi cal pr of essi onal desi gn r esponsi bi l i t i es.
1. 4 DELI VERY AND STORAGE
Mat er i al s shal l be del i ver ed t o t he s i t e i n undamaged condi t i on, st or ed of f gr ound i n f ul l y cover ed, wel l - vent i l at ed ar eas, and pr ot ect ed f r om ext r eme changes i n t emper at ur e and humi di t y.
1. 5 MEASUREMENT AND PAYMENT
1. 5. 1 Measur ement
The quant i t y t o be measur ed f or payment wi l l be t he one uni t compl et e.
1. 5. 2 Payment
Payment f or t he cont r act uni t pr i ce shal l i ncl ude t he desi gn, al l l abor , mat er i al s, equi pment , and per f or mi ng al l oper at i ons r equi r ed f or t he compl et e const r uct i on Cr ossover .
PART 2 PRODUCTS
2. 1 DESI GN PLANS, SPECI FI CATI ONS AND CALCULATI ONS
Pr ovi de desi gn pl ans, speci f i cat i ons and cal cul at i on f or Cr ossover Const r uct i on and r epai r s f or gover nment r evi ew. Desi gn l oads f or cr ossover shal l be per I CC I BC 2021, ASCE 7 and AWC NDS and any ot her st at e or l ocal r egul at i ons at mi ni mum. Member di mensi ons and embedment l engt hs shown on USACE t ypi cal det ai l s shal l be consi der ed mi ni mum r equi r ement s.
SECTI ON 06 13 00 Page 2
2. 1. 1 DESI GN PLANS/ DRAWI NGS
Pr ovi de el ect r oni c dr awi ng f i l es i n PDF f or mat i n t he desi gn set . Al so, submi t t he sour ce f i l es, i n t he pr ocessi ng syst em f or mat , used t o cr eat e t he PDF f or mat .
2. 1. 2 SPECI FI CATI ONS
Pr ovi de a Cont r act or - or i gi nat ed desi gn speci f i cat i on t hat , i n conj unct i on wi t h t he dr awi ngs, demonst r at es compl i ance wi t h mat er i al s, equi pment , execut i on, and f i el d qual i t y cont r ol .
2. 1. 2. 1 Speci f i cat i on For mat
Ut i l i ze t he Uni f i ed Faci l i t y Gui de Speci f i cat i ons ( UFGS) cur r ent at t he t i me of Cont r act awar d.
2. 1. 2. 2 Speci f i cat i on Del i ver abl e
Submi t a speci f i cat i on package i n PDF f or mat f or t hi s desi gn. Al so, submi t t he sour ce f i l es, i n t he pr ocessi ng syst em f or mat , used t o cr eat e t he PDF f or mat .
2. 1. 3 Desi gn Anal ysi s
Pr epar e, or gani ze, and pr esent a desi gn anal ysi s t hat wi l l document t he gener al par amet er s, f unct i onal and t echni cal r equi r ement s, desi gn obj ect i ves, desi gn assumpt i ons, and pr ovi des desi gn cal cul at i ons appl i cabl e t o a pr oj ect ' s desi gn. Or gani ze t he desi gn anal ysi s i nt o t hr ee par t s; Par t 1 - Gener al Descr i pt i on; Par t 2 - Desi gn Requi r ement s and Pr ovi s i ons; and Par t 3 - O&M Pr ovi s i ons.
2. 2 SEALS ON DOCUMENTS
Si gn, dat e and seal al l Cont r act or - or i gi nat ed desi gn dr awi ngs by t he qual i f i ed pr of essi onal engi neer , l i censed i n t he St at e of New Yor k. Thi s i s t he seal of t he Desi gner of Recor d f or t hat dr awi ng. Appl i cat i on of t he el ect r oni c seal and si gnat ur e accept s r esponsi bi l i t y f or t he wor k shown t her eon.
2. 3 ACCEPTANCE AND RELEASE FOR CONSTRUCTI ON
Onl y af t er accept ance of t he Desi gn Compl et e Const r uct i on Document ( s) t he Cont r act i ng Of f i cer wi l l al l ow Cr ossover const r uct i on t o st ar t .
2. 4 MATERI ALS
2. 4. 1 CROSSOVER
Al l l umber f or t he cr ossover decki ng, r ai l i ngs, and t r ead f or st ai r s wi l l be t r eat ed usi ng MCA ( Mi cr oni zed Copper Azol e) pr eser vat i ve t r eat ment i n accor dance wi t h i ndust r y st andar ds AWPA U1, i nt ended f or gr ound cont act .
Al l ot her l umber i ncl udi ng t i mber pi l es wi l l be t r eat ed usi ng AWPA U1, cat egor y UC5A wi t h a r et ent i on of 1. 5 pcf CCA ( Chr omat ed Copper Ar senat e) .
2. 4. 2 Har dwar e
Har dwar e must consi st of bol t s wi t h necessar y nut s and washer s, dr i f t
SECTI ON 06 13 00 Page 3 pi ns, dowel s, nai l s, scr ews, spi kes, and ot her f ast eni ngs. Bol t s and nut s must conf or m t o ASTM A307. Pr ovi de cast - i r on ogee, mal l eabl e i r on washer s, or pl at e or cut washer s as r equi r ed. Pr ovi de bol t s wi t h washer s under nut and head. Wher e i ndi cat ed, pr ovi de St ai nl ess St eel scr ews conf or mi ng t o ASTM A193/ A193M, Gr ade 316.
PART 3 EXECUTI ON
Pr ovi de i nst al l at i on pr ocess, f i el d t r eat ment and t est i ng i n t he desi gn speci f i cat i ons not l i mi t ed t o r ai l i ng, decki ng, br aci ng, st r i nger s, f ast eni ng et c.
3. 1 DECKI NG
Decki ng connect i ons as r equi r ed by t he desi gn and t he submi t t ed cal cul at i ons. Decki ng connect i on det ai l s must be i ncl uded i n t he desi gn pl ans, speci f i cat i ons, and cal cul at i ons as per par agr aphs 1. 3. 1 and 2. 1.
shal l be secur ed t o j oi st s usi ng #10, 3 1/ 2" l ong st ai nl ess st eel deck scr ews. Pr ovi de t hr ee ( 3) scr ews per j oi st cr ossi ng, al so t ypi cal f or st ai r s .
3. 2 RAI LI NG
Al l r ai l i ngs shal l be secur ed t o post s usi ng St ai nl ess St eel scr ews as i ndi cat ed. Al l handr ai l s shal l be gal vani zed met al .
3. 3 ACTI ON REQUI RED FOR NON- COMPLI ANCE
Test i ng shal l be submi t t ed by t he Desi gner of r ecor d and must be appr oved by t he gover nment .
Whenever t est i ng speci f i ed and appr oved by t he gover nment i ndi cat es mat er i al non- compl i ance, t he Cont r act or shal l be r equi r ed t o r emove al l mat er i al not meet i ng t he speci f i cat i on r equi r ement s. The Cont r act i ng Of f i cer shal l r equi r e as many addi t i onal t est s as necessar y t o i dent i f y t he l i mi t s of unsui t abl e mat er i al . No addi t i onal payment wi l l be made f or t est s r equi r ed t o det er mi ne t he l i mi t s of unsui t abl e mat er i al or f or t he cost or r emoval and r epl acement wi t h sui t abl e mat er i al .
- - End of Sect i on - -
SECTI ON 06 13 00 Page 4
| 06 13 00 - CROSSOVER |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DEFINITIONS |
| 1.3.1 Designer of Record DOR |
| 1.4 DELIVERY AND STORAGE |
| 1.5 MEASUREMENT AND PAYMENT |
| 1.5.1 Measurement |
| 1.5.2 Payment |
| PART 2 PRODUCTS |
| 2.1 DESIGN PLANS, SPECIFICATIONS AND CALCULATIONS |
| 2.1.1 DESIGN PLANS/DRAWINGS |
| 2.1.2 SPECIFICATIONS |
| 2.1.2.1 Specification Format |
| 2.1.2.2 Specification Deliverable |
2.1.3 Design Analysis
| 2.2 SEALS ON DOCUMENTS |
| 2.3 ACCEPTANCE AND RELEASE FOR CONSTRUCTION |
| 2.4 MATERIALS |
| 2.4.1 CROSSOVER |
| 2.4.2 Hardware |
| PART 3 EXECUTION |
| 3.1 DECKING |
| 3.2 RAILING |
| 3.3 ACTION REQUIRED FOR NON-COMPLIANCE |
File details come from the government source that posted it. Updated .