01 20 00_Amend2.pdf
PDF 35 KB Posted
- Solicitation number
- W912DS24B0017
About this file
This document is a section of technical specifications for a federal construction contract opportunity. The key details are:
The contract is for the Fire Island Inlet to Moriches Inlet (FIMI) Reach PL 84-99, PIR 2024 Project, which includes approximately 1.7 million CY of beach fill restoration, replacement of 35,202 ft of sand fencing, planting of 31 acres of dune grass, repair of 6-10 timber dune crossovers, and repair of 2 vehicular crossovers. The sand will be dredged from the Atlantic Ocean Sand Borrow Area 2C. The construction cost is estimated to be in the range of $50-100 million. Payment for the work will be based on single job payment items and unit price payment items listed in the bidding schedule, with requirements for surveys, documentation, and other procedures. An option for additional insurance is also included.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PL 84- 99 FI MI - Ocean Bay Par k t o Davi s Par k PL8499FI MI Amendment 02
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 3: 02/ 23
PART 1 GENERAL
1. 1 CONTRACT COST BREAKDOWN
The Cont r act or must f ur ni sh wi t hi n 30 days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i ncl uded i n t he var i ous i t ems. Thi s Cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .
1. 2 SI NGLE JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s Cont r act f or whi ch Cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BI DDI NG PROPOSAL SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
1. 2. 1 Mobi l i zat i on and Demobi l i zat i on
1. 2. 1. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h mobi l i zat i on and demobi l i zat i on, as def i ned i n Speci al Cont r act Requi r ement PAYMENT FOR
MOBI LI ZATI ON AND DEMOBI LI ZATI ON.
1. 2. 1. 2 Uni t of Measur e
Uni t of measur e: j ob.
1. 2. 2 Fi nal Recor d Dr awi ngs
Cont r act or must compl et e t he “ Recor d Dr awi ng As- Bui l t s" CAD submi t t al as r equi r ed by Speci f i cat i on Sect i on 01 78 00 CLOSEOUT SUBMI TTALS f or Recor d Dr awi ngs Fi l es and f or CAD st andar ds and compl i ance r equi r ement s.
1. 2. 2. 1 Uni t of Measur e
Uni t of measur e: j ob.
SECTI ON 01 20 00 Page 1
1. 2. 3 Debr i s Removal
1. 2. 3. 1 Payment
Al l wor k f or debr i s r emoval must be i ncl uded i n t he Debr i s Removal Li ne I t em on t he Bi d Schedul e.
1. 2. 3. 2 Uni t of Measur e
Uni t of measur e: j ob.
1. 2. 4 Vi br at i on Moni t or i ng
1. 2. 4. 1 Payment
Al l wor k f or Vi br at i on Moni t or i ng shal l be i ncl uded i n t he Vi br at i on Moni t or i ng Li ne I t em on t he Bi d Schedul e.
1. 2. 4. 2 Uni t of Measur e
Uni t of measur e: j ob.
1. 3 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s Cont r act on whi ch t he Cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI DDI NG PROPOSAL SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.
1. 3. 1 Hydr aul i c Beach Fi l l - Ocean Bay t o Davi s Par k
1. 3. 1. 1 Payment
The t ot al amount of mat er i al accept abl y pl aced on t he beach ( f r om t he bor r ow ar eas) i s t o be pai d f or at t he cont r act uni t pr i ce as shown on t he bi d schedul e must be measur ed by t he cubi c yar d i n pl ace on t he beach by comput i ng t he vol ume bet ween t he beach sur f ace shown by a sur vey made bef or e f i l l i ng and beach sur f ace shown on a sur vey af t er f i l l i ng. The r ef er ence dat um shal l be NAVD. No payment shal l be made f or mat er i al pl aced:
( 1) I n excess of t he quant i t y t o t he desi gn gr ade pl us t he 0. 5 f oot t ol er ance. Ref er t o t he Compensat ed Sl ope par agr aph i n sect i on 31 24
00. 00 18 BEACH FI LL PLACEMENT f or except i on r egar di ng compensat ed sl ope.
( 2) For t he ext ent of t he pr oj ect as shown on t he cont r act dr awi ngs, above dune cr est pl us t ol er ance; 14 f t NAVD pl us t ol er ance on t he dune cr est ; beyond t he 1 on 5 s l ope l i ne on dune si de sl ope pl us t ol er ance, above +8. 5 f t NAVD pl us t ol er ance on t he ber m, and beyond t he poi nt wher e t he 1 on 20 sl ope l i ne f r om El . +8. 5 f t . NAVD pl us t ol er ance, i nt er sect s t he ocean bot t om. Ref er t o t he Compensat ed Sl ope par agr aph i n sect i on 31 24 00. 00 18 BEACH FI LL PLACEMENT f or except i on bel ow el evat i on +3. 0 NAVD.
( 3) Whi ch was obt ai ned f r om out si de t he desi gnat ed bor r ow ar ea or bel ow
SECTI ON 01 20 00 Page 2 t he maxi mum dr edgi ng l i mi t of t he bor r ow ar ea, except as di r ect ed by t he Cont r act i ng Of f i cer or hi s r epr esent at i ve.
1. 3. 1. 2 Or i gi nal and Fi nal Sur veys
The Cont r act or shal l make or i gi nal and f i nal sur veys under t he super vi s i on of t he Cont r act i ng Of f i cer ' s r epr esent at i ve and shal l make comput at i ons t o det er mi ne t he quant i t i es of mat er i al s pl aced on t he beach f or accept ance.
1. 3. 1. 3 Sur veys f or Pr ogr ess Payment s
The Cont r act or wi l l make any sur veys f or per i ods f or whi ch pr ogr ess payment s ar e r equest ed and shal l make t he comput at i ons based on t hese sur veys.
1. 3. 1. 4 I ni t i al and Fi nal Sur veys
I ni t i al and f i nal sur veys f or accept ance wi l l be t aken i mmedi at el y pr i or t o and af t er f i l l pl acement . Bef or e f i l l , sur veys shal l not be t aken mor e t han 14 days pr i or t o f i l l pl acement . Sur veys wi l l be t aken on par al l el pr of i l e l i nes ( r anges) spaced at a maxi mum of 100- f oot i nt er val s. The mi ni mum st at i oni ng i nt er val wi l l be 25 f eet or at br eaks i n s l ope.
The Cont r act or shal l conduct t he or i gi nal and f i nal sur veys, wi t h t he pr esence of Gover nment r epr esent at i ves, and make t he comput at i ons based on t hem. The Cont r act or shal l conduct t he sur veys f or any per i ods f or whi ch pr ogr ess payment s ar e r equest ed and shal l make t he comput at i ons based on t hese sur veys. Al l sur veys conduct ed by t he Cont r act or shal l be done by a New Yor k l i censed sur veyor and cer t i f i ed hydr ogr apher subj ect ed t o appr oval by t he Cont r act i ng Of f i cer .
- The Cont r act or shal l be r esponsi bl e t o conduct al l sur veys. The Cont r act or shal l mai nt ai n wor k sect i ons - a pr e- const r uct i on and f i nal accept ance sect i on sur veyed whi l e const r uct i on i s t aki ng pl ace i n bet ween.
The pr e- const r uct i on sect i ons shoul d be mai nt ai ned at a mi ni mum 300 f eet ahead of t he f i l l pl acement . The Cont r act or shal l make such comput at i ons as ar e necessar y t o det er mi ne t he quant i t i es of wor k per f or med or f i nal l y i n pl ace and submi t t he comput at i on f or Gover nment appr oval .
- Pr ompt l y upon compl et i ng a sur vey, t he Cont r act or shal l f ur ni sh t he or i gi nal s of al l f i el d not es and al l ot her r ecor ds r el at i ng t o t he sur vey or t o t he l ayout of t he wor k t o t he Cont r act i ng Of f i cer , who shal l use t hem as necessar y t o det er mi ne t he amount of pr ogr ess payment s. The Cont r act or shal l r et ai n copi es of al l such mat er i al f ur ni shed t o t he Cont r act i ng Of f i cer or hi s r epr esent at i ve. ( FAR 52. 236- 16)
For Beach Fi l l Pl acement :
The Cont r act or wi l l coor di nat e wi t h t he Cont r act i ng Of f i cer ' s r epr esent at i ve t o mai nt ai n wor k sect i ons. The Cont r act or wi l l per f or m pr econst r uct i on sur veys bet ween 500 f eet and 1500 f eet i n advance of t he l ast accept ance st at i on but not mor e t han 14 days pr i or t o f i l l pl acement .
The sur veys shal l be per f or med i n 100 f oot i ncr ement s. Accept ance sur veys shal l be per f or med when 500 l i near f eet of beach i s dr essed and gr aded t o t empl at e.
For Bor r ow Ar ea Sur veys:
SECTI ON 01 20 00 Page 3
A pr e- and post - const r uct i on sur vey of t he bor r ow ar ea at l east 100 f eet al ong t he l engt h of t he bor r ow ar ea and 25- f oot i nt er val s i s r equi r ed f or t hi s pr oj ect t o moni t or t he pr e- and post - const r uct i on bor r ow ar ea condi t i ons wi t h ot her sur vey met hods appr oved by t he COR.
I n addi t i on, weekl y bor r ow ar ea sur veys ar e r equi r ed at 200- f oot sect i ons and 50 f oot i nt er val s. The Cont r act or shal l comput e t he vol ume ext r act ed and f ur ni sh al l comput at i ons, Fat homet er pl ot s, and dept h r eadi ngs ut i l i zed t o t he Cont r act i ng Of f i cer wi t h each CQC r epor t See
01 45 00. 00 10 QUALI TY CONTROL
1. 3. 1. 5 Or i gi nal Fi el d Not es, Comput at i ons and Ot her Recor ds
Al l or i gi nal f i el d not es, comput at i ons and ot her r ecor ds f or t he pur pose of l ayout of sur veys conduct ed by t he Cont r act or shal l be r ecor ded i n dupl i cat i ng f i el d books, t he or i gi nal pages of whi ch shal l be f ur ni shed pr ompt l y t o t he Cont r act i ng Of f i cer , or hi s r epr esent at i ve, at t he s i t e of wor k. The Cont r act or shal l f ur ni sh t he Cont r act i ng Of f i cer , or hi s r epr esent at i ve, pr of i l e dat a f or t he sur vey i n el ect r oni c f or mat speci f i ed by t he cont r act i ng of f i cer . The sur vey dat a shal l be i n a f or mat compat i bl e wi t h bot h t he HYPACK pr ogr am and i n X, Y, Z f or mat , and st or ed on DVD' s. The Cont r act or shal l submi t t o t he Cont r act i ng Of f i cer , pr i or t o sur veyi ng, a base l i ne dr awi ng showi ng al l of f set s, el evat i on, r ef er ence l i nes and r ange l i ne l ocat i ons t o be ut i l i zed.
1. 3. 1. 6 Tempor ar y Fenci ng
No separ at e payment shal l be made f or t empor ar y f enci ng, and al l cost s i n connect i on t her ewi t h shal l be i ncl uded i n t he cont r act uni t pr i ce f or Hydr aul i c Beach Fi l l .
1. 3. 2 Hand Pl aced Beach Fi l l
1. 3. 2. 1 Payment
Payment wi l l be made f or al l pl ant , l abor , equi pment , t r anspor t at i on, and mat er i al s f or t he hand pl acement of beach f i l l i n accor dance wi t h t he Cont r act dr awi ngs and Speci f i cat i ons.
1. 3. 2. 2 Measur ement
Measur ement wi l l be by pl aced cubi c yar d of beach f i l l .
1. 3. 2. 3 Uni t of Measur e
Uni t of measur e: Cubi c Yar d.
1. 3. 3 Pl ant i ng of Beach Gr ass
1. 3. 3. 1 Payment
Payment wi l l be made f or al l i t ems f or pl ant i ng wi l l be measur ed by t he uni t s i nst al l ed i n accor dance wi t h t he Cont act dr awi ngs and speci f i cat i ons Sect i on 32 94 00 and t o t he sat i sf act i on of t he Cont r act i ng Of f i cer .
1. 3. 3. 2 Measur ement
Al l i t ems f or pl ant i ng wi l l be measur ed by t he uni t s i nst al l ed i n
SECTI ON 01 20 00 Page 4 accor dance wi t h t he Cont r act dr awi ngs and speci f i cat i ons and t o t he sat i sf act i on of t he Cont r act i ng Of f i cer .
1. 3. 3. 3 Uni t of Measur e
The pr i ce f or al l veget at i on ( e. g. , seeds, gr asses, pl ant s, t r ees, et c) and i nst al l at i on shal l i ncl ude t he cost of f ur ni shi ng al l l abor , mat er i al s, equi pment , and i nci dent al s necessar y t o compl et e t hi s i t em i n accor dance wi t h t he Cont r at dr awi ngs, speci f i cat i ons, and t he di r ect i ons of t he Cont r act i ng Of f i cer . The pr i ce f or al l pl ant i ngs shal l be i n acr es.
The Cont r act or shal l be pai d f or per cent age compl et e based on det er mi nat i on of t he Cont r act i ng Of f i cer dur i ng i nst al l at i on. A pr e- det er mi ned amount wi l l be r et ai ned by t he Cont r act i ng Of f i cer payabl e when t he condi t i ons i n par agr aphs PLANT AND SEED SURVI VABI LI TY and PLANT GUARANTEE of Speci f i cat i on Sect i on 32 94 00 DUNE VEGETATI ON PLAN ar e met and appr oved as sat i sf act or y by t he Cont r act i ng Of f i cer .
1. 3. 4 Sand Fence
1. 3. 4. 1 Payment
Payment wi l l be made f or al l pl ant , l abor , equi pment , t r anspor t at i on, and mat er i al s f or s i t e pr epar at i on and i nst al l at i on of sand f ence i n accor dance wi t h t he Cont r act dr awi ngs and Speci f i cat i ons.
1. 3. 4. 2 Measur ement
Measur ement wi l l be by l i near f eet of f ence.
1. 3. 4. 3 Uni t of Measur e
Uni t of measur e: Li near f eet .
1. 3. 5 Ti mber Cr ossover Repai r
1. 3. 5. 1 Payment
Payment wi l l be made f or al l pl ant , l abor , equi pment , t r anspor t at i on, and mat er i al s f or s i t e pr epar at i on and i nst al l at i on of Ti mber Cr ossover Repai r i n accor dance wi t h t he Cont r act dr awi ngs and Speci f i cat i ons.
1. 3. 5. 2 Uni t of Measur e
Uni t of measur e: each.
1. 3. 6 Vehi cul ar Cr ossover s Repai r
1. 3. 6. 1 Payment
Payment wi l l be made f or al l pl ant , l abor , equi pment , t r anspor t at i on, and mat er i al s f or s i t e pr epar at i on and i nst al l at i on of Vehi cul ar Cr ossover r epai r i n accor dance wi t h t he Cont r act dr awi ngs and Speci f i cat i ons.
1. 3. 6. 2 Uni t of Measur e
Uni t of measur e: each.
SECTI ON 01 20 00 Page 5
1. 4 OPTI ONS
1. 4. 1 Addi t i onal I nsur ance ( Opt i on 1)
1. 4. 1. 1 Payment
Payment wi l l be made f or Addi t i onal I nsur ance i ncl uded i n t he Li ne I t em on t he Bi d Schedul e. Ref er t o Sect i on 01 30 00.
1. 4. 1. 2 Uni t of Measur e
Uni t of measur e: Job.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
- - End of Sect i on - -
SECTI ON 01 20 00 Page 6
| 01 20 00 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 CONTRACT COST BREAKDOWN |
| 1.2 SINGLE JOB PAYMENT ITEMS |
| 1.2.1 Mobilization and Demobilization |
| 1.2.1.1 Payment |
| 1.2.1.2 Unit of Measure |
| 1.2.2 Final Record Drawings |
| 1.2.2.1 Unit of Measure |
| 1.2.3 Debris Removal |
| 1.2.3.1 Payment |
| 1.2.3.2 Unit of Measure |
| 1.2.4 Vibration Monitoring |
| 1.2.4.1 Payment |
| 1.2.4.2 Unit of Measure |
| 1.3 UNIT PRICE PAYMENT ITEMS |
| 1.3.1 Hydraulic Beach Fill - Ocean Bay to Davis Park |
| 1.3.1.1 Payment |
| 1.3.1.2 Original and Final Surveys |
| 1.3.1.3 Surveys for Progress Payments |
| 1.3.1.4 Initial and Final Surveys |
| 1.3.1.5 Original Field Notes, Computations and Other Records |
| 1.3.1.6 Temporary Fencing |
| 1.3.2 Hand Placed Beach Fill |
| 1.3.2.1 Payment |
| 1.3.2.2 Measurement |
| 1.3.2.3 Unit of Measure |
| 1.3.3 Planting of Beach Grass |
| 1.3.3.1 Payment |
| 1.3.3.2 Measurement |
| 1.3.3.3 Unit of Measure |
| 1.3.4 Sand Fence |
| 1.3.4.1 Payment |
| 1.3.4.2 Measurement |
| 1.3.4.3 Unit of Measure |
| 1.3.5 Timber Crossover Repair |
| 1.3.5.1 Payment |
| 1.3.5.2 Unit of Measure |
| 1.3.6 Vehicular Crossovers Repair |
| 1.3.6.1 Payment |
| 1.3.6.2 Unit of Measure |
| 1.4 OPTIONS |
| 1.4.1 Additional Insurance Option 1 |
| 1.4.1.1 Payment |
| 1.4.1.2 Unit of Measure |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
File details come from the government source that posted it. Updated .