35 20 23_Amend 2.pdf
PDF 37 KB Posted
- Solicitation number
- W912DS24B0017
About this file
This document is a technical specification for dredging work required under a federal contract opportunity. The key details are:
The contract involves dredging and placement of approximately 1.7 million cubic yards of material to restore an eroded shoreline spanning 44,150 feet between Ocean Bay Park and Davis Park in Suffolk County, New York. The dredged material will be obtained from the Atlantic Ocean Sand Borrow Area 2C. The beachfill restoration includes a beach berm at +8.5 ft NAVD88 elevation, 1V:5H side slopes, and an onshore slope of 1V:20H to -1 ft NAVD88 and offshore slope of 1V:15H. The total construction cost is estimated between $50-100 million. The work is part of the Fire Island Inlet to Moriches Inlet (FIMI) Reach PL 84-99, PIR 2024 project managed by the U.S. Army Corps of Engineers, New York District. The specification outlines requirements for dredging, material placement, environmental compliance, quality control, and measurement and payment.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PL 84- 99 FI MI - Ocean Bay Par k t o Davi s Par k PL8499FI MI Amendment 02
SECTI ON 35 20 23
DREDGI NG
08/ 20
PART 1 GENERAL
1. 1 GENERAL I NFORMATI ON
Thi s Sect i on cover s f ur ni shi ng sui t abl e dr edgi ng pl ant and per f or mi ng al l wor k r equi r ed t o r emove t he speci f i ed mat er i al s f r om wi t hi n t he pr escr i bed wor k ar ea l i mi t s as i ndi cat ed, and pl acement of t he dr edge mat er i al wi t hi n t he pr escr i bed mat er i al pl acement ar eas. The Cont r act or i s r esponsi bl e f or maki ng t hei r own i nvest i gat i on of submer ged, sur f ace, and over head st r uct ur es i n t he wor k ar eas and ot her l ocat i ons t hey f i nd necessar y t o t r aver se. The exact l ocat i on, dept hs, and hei ght s of var i ous st r uct ur es i ncl udi ng, but not l i mi t ed t o submar i ne cabl es, pi pes, hi ghl i nes, docks, pi er s, bul kheads, and br i dges ( as appl i cabl e) , ar e not known and i t wi l l be necessar y f or t he Cont r act or t o ascer t ai n i nt er f er ence pr obl ems and not i f y t he r espect i ve owner s i n advance of dr edgi ng oper at i ons. The Cont r act or i s r esponsi bl e f or maki ng necessar y ar r angement s wi t h t he r espect i ve owner s of t he st r uct ur e( s) t o assur e sat i sf act or y compl et i on of dr edgi ng i n t he v i c i ni t y wi t h a mi ni mum i nt er r upt i on of ser vi ce, and must per f or m t hei r oper at i ons i n such a manner as wi l l avoi d damage t o t hese f aci l i t i es.
1. 2 DEFI NI TI ONS
1. 2. 1 Mai nt enance Mat er i al
Mai nt enance mat er i al i s def i ned as t hat compr i s i ng shoal i ng whi ch has occur r ed si nce t he channel ar eas wer e l ast dr edged.
1. 2. 1 New Wor k Mat er i al
New wor k mat er i al i s def i ned as pr evi ousl y undr edged mat er i al .
1. 2. 2 Har d Mat er i al
Har d mat er i al i s def i ned as mat er i al r equi r i ng bl ast i ng or t he use of speci al equi pment f or economi cal r emoval , and i ncl udes boul der s or f r agment s t oo l ar ge t o be r emoved i n one pi ece by t he dr edge.
1. 3 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 02 Shop Dr awi ngs
Submer ged Pi pel i nes
Soundi ngs or Sweepi ngs; G, RO
SECTI ON 35 20 23 Page 1
I ndi cat e pi pel i ne l ocat i on and i nst al l at i on det ai l s. Submi t dr awi ngs of sur veys dur i ng pr ogr ess of wor k by soundi ngs or sweepi ngs.
1. 4 METHOD OF COMMUNI CATI ON
Pr ovi de a syst em of communi cat i on bet ween t he dr edge cr ew and t he cr ew at t he pl acement ar ea. A por t abl e t wo- way r adi o i s accept abl e.
1. 5 ENVI RONMENTAL COMPLI ANCE AND PROTECTI ON
Compl y wi t h condi t i ons and r equi r ement s of St at e or Feder al per mi t s. The Gover nment wi l l secur e t he per mi t f or dr edgi ng and pl acement of mat er i al as i ndi cat ed. Coor di nat e wi t h COR f or pl acement of excavat ed mat er i al s.
Dur i ng t he l i f e of t he cont r act , pr ovi de and mai nt ai n envi r onment al pr ot ect i ve measur es. Al so, envi r onment al pr ot ect i ve measur es r equi r ed t o cor r ect condi t i ons, such as oi l spi l l s or debr i s, t hat occur dur i ng t he dr edgi ng oper at i ons, must be pr ovi ded. Compl y wi t h Feder al , St at e, and l ocal r egul at i ons per t ai ni ng t o wat er , ai r , and noi se pol l ut i on.
1. 6 BASI S FOR BI DS
For uni t pr i ce bi d, see par agr aph ent i t l ed " Basi s of Bi ds, Measur ement , and Payment " i n Sect i on 01 20 00 PRI CE AND PAYMENT PROCEDURES.
I f t he Cont r act i ng Of f i cer r equi r es an i ncr ease or a decr ease i n t ot al vol ume of dr edgi ng, t he cont r act pr i ce wi l l be adj ust ed i n accor dance wi t h t he FAR 52. 211- 18 Var i at i on i n Est i mat ed Quant i t y. Dr edgi ng condi t i ons speci f i ed and i ndi cat ed descr i be condi t i ons whi ch ar e known at t he t i me of sur vey. However , t he Cont r act or i s r esponsi bl e f or ot her condi t i ons encount er ed whi ch ar e not unusual when compar ed t o condi t i ons r ecogni zed i n t he dr edgi ng busi ness as usual i n dr edgi ng act i v i t i es such as t hose r equi r ed under t hi s cont r act .
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
3. 1 I NSPECTI ON
I nspect t he wor k, keep r ecor ds of wor k per f or med, and ensur e t hat gages, t ar get s, r anges, and ot her mar ker s ar e i n pl ace and usabl e f or t he i nt ended pur pose. Pr ovi de, at t he r equest of t he Cont r act i ng Of f i cer , boat s, boat men, l abor er s, and mat er i al s necessar y f or i nspect i ng, super vi s i ng, and sur veyi ng t he wor k. When r equi r ed, pr ovi de t r anspor t at i on f or t he Cont r act i ng Of f i cer and i nspect or s t o and f r om t he pl acement ar ea and bet ween t he dr edgi ng pl ant and adj acent poi nt s on shor e.
The dr edge pl ant wi l l be i nspect ed by t he Cont r act i ng Of f i cer , or t hei r r epr esent at i ve, pr i or t o begi nni ng wor k t o ensur e t ot al dr edgi ng pl ant i s i n saf e wor ki ng condi t i on. Bef or e any machi ner y or mechani zed equi pment i s pl aced i n ser vi ce, i t must be i nspect ed and t est ed by t he Cont r act or and cer t i f i ed t o be i n saf e oper at i ng condi t i on.
SECTI ON 35 20 23 Page 2
3. 2 DREDGI NG
3. 2. 1 Or der of Wor k
See Sect i on 01 14 00 Wor k Rest r i ct i on. The Gover nment r eser ves t he r i ght t o change t he or der of wor k at any t i me.
3. 2. 2 I nt er f er ence wi t h Navi gat i on
Mi ni mi ze i nt er f er ence wi t h t he use of channel s and passages. The Cont r act or i s r esponsi bl e f or shi f t i ng or movi ng of dr edges or t he i nt er r upt i on of dr edgi ng oper at i ons t o accommodat e t he movement of vessel s and f l oat i ng equi pment , i f necessar y. Adher e t o Coast Guar d Regul at i ons f or passi ng vessel s.
3. 2. 3 Li ght s
Each ni ght , bet ween sunset and sunr i se and dur i ng per i ods of r est r i ct ed vi s i bi l i t y , pr ovi de l i ght s f or f l oat i ng pl ant s, pi pel i nes, r anges, and mar ker s. Al so, pr ovi de l i ght s f or buoys t hat coul d endanger or obst r uct navi gat i on. When ni ght wor k i s i n pr ogr ess, mai nt ai n l i ght s f r om sunset t o sunr i se f or t he obser vat i on of dr edgi ng oper at i ons. Li ght i ng must conf or m t o Uni t ed St at es Coast Guar d r equi r ement s f or v i s i bi l i t y and col or .
3. 2. 4 Navi gat i on War ni ngs
Fur ni sh and mai nt ai n navi gat i on war ni ng si gns al ong t he pi pel i ne. Pr ovi de not i ce t o i ncr ease publ i c awar eness of pot ent i al hazar ds pr esent ed by dr edge pl ant equi pment by st at i ng t he l ocat i on, dat e of const r uct i on, equi pment moor i ng, mar shal i ng ar eas, usi ng l ocal newspaper s, r adi os, t el evi s i on, wat er way user s associ at i ons, or ot her appr opr i at e ar ea speci f i c communi cat i on net wor ks. Ensur e t hat an announcement i s made t hr ough t he same net wor ks at t he begi nni ng of t he dr edgi ng oper at i on.
Make per i odi c updat es/ st at us announcement s at i nt er val s of not mor e t han a mont h t hr oughout t he cont r act l i f e.
Di spl ay a st ur dy and pr omi nent war ni ng si gn at al l publ i c boat mar i nas wi t hi n 10 mi l es of dr edgi ng oper at i ons or moor ed equi pment . The Cont r act or i s r esponsi bl e f or keepi ng t hi s s i gn cur r ent wi t h r espect t o t he dr edgi ng oper at i ons or equi pment .
3. 2. 5 Ranges, Gages, and Li nes
Pr ovi de, set , and mai nt ai n r anges, buoys, and mar ker s needed t o def i ne t he wor k and t o f aci l i t at e i nspect i on. Est abl i sh and mai nt ai n gages i n l ocat i ons obser vabl e f r om each par t of t he wor k so t hat t he dept h may be det er mi ned. Suspend dr edgi ng when t he gages or r anges cannot be seen or f ol l owed. The Cont r act i ng Of f i cer wi l l f ur ni sh, upon r equest by t he Cont r act or , sur vey l i nes, poi nt s, and el evat i ons necessar y f or t he set t i ng of r anges, gages, and buoys.
3. 2. 6 Dr edge Pl ant and Equi pment
a. Mai nt ai n al l dr edge pl ant and associ at ed equi pment such as, but not l i mi t ed t o, scows, coami ngs, bar ges, and pi pel i nes, t o meet t he r equi r ement s of t he wor k. Pr ompt l y r epai r l eaks or br eaks al ong pi pel i nes.
SECTI ON 35 20 23 Page 3
3. 2. 6. 1 Si de Sl opes
Si de sl opes i n t he dr edgebor r ow ar eas wi t hi n t hi s cont r act wi l l be measur ed and pai d based on a f i ve f eet hor i zont al t o one f eet ver t i cal r at i o. Dr edgi ng on si de sl opes must f ol l ow, as c l osel y as pr act i cabl e, t he dr edgebor r ow ar ea l i mi t s i ndi cat ed on associ at ed l ayout dr awi ngs.
No al l owance wi l l be made f or dr edgi ng beyond t he dr edgebor r ow ar ea l i mi t s as i ndi cat ed on t he associ at ed l ayout dr awi ngs. No dr edgi ng can occur out si de of t he dr edgebor r ow ar ea and si de sl ope l i mi t s.
3. 2. 7 Obst r uct i ons and Debr i s
The Gover nment has no knowl edge of cabl es, pi pes, or ot her ar t i f i c i al obst r uct i ons or of any wr ecks, wr eckage, or ot her mat er i al t hat woul d necessi t at e t he use of expl osi ves or t he empl oyment of addi t i onal equi pment f or economi cal r emoval . Cont r act or s shoul d however exer ci se due di l i gence i n det er mi ni ng t he exi st ence of any obst r uct i ons wi t hi n pr oposed wor k ar eas dur i ng bi d pr epar at i on.
The Gover nment has no knowl edge of exi st i ng wr ecks, wr eckage, or ot her mat er i al of such si ze or char act er as t o r equi r e t he use of expl osi ves or speci al or addi t i onal pl ant f or i t s economi cal r emoval .
3. 2. 8 Qual i t y Cont r ol
Est abl i sh and mai nt ai n qual i t y cont r ol f or oper at i ons t o assur e compl i ance wi t h cont r act ual r equi r ement s and mai nt ai n r ecor ds of t hi s qual i t y cont r ol f or dr edgi ng oper at i ons.
Whi l e per f or mi ng al l dr edgi ng wor k cont r ol t he hor i zont al posi t i oni ng of t he dr edge wi t h el ect r oni c posi t i oni ng.
3. 2. 9 Sur veys dur i ng Pr ogr ess of Wor k
Qual i t y of dr edgi ng dept h wi l l be det er mi ned by soundi ngs or sweepi ngs t aken behi nd t he dr edge as wor k pr ogr esses. The Cont r act or wi l l t ake pr ogr ess soundi ngs or sweepi ngs. I ndi cat e pi pel i ne l ocat i on and i nst al l at i on det ai l s. Submi t dr awi ngs of sur veys dur i ng pr ogr ess of wor k by soundi ngs or sweepi ngs.
3. 2. 10 Ski mmi ng of Hopper s
Ski mmi ng of hopper s must be per f or med i n compl i ance wi t h envi r onment al r equi r ement s and ABS/ USCG l oad l i ne mar ks.
3. 2. 11 Sal vaged Mat er i al
Anchor s, chai ns, f i r ear ms, and ot her ar t i c l es of val ue, whi ch ar e br ought t o t he sur f ace dur i ng dr edgi ng oper at i ons, must r emai n or become t he pr oper t y of t he Gover nment and wi l l be pl aced on shor e at a conveni ent l ocat i on near t he s i t e of t he wor k, as di r ect ed.
3. 2. 12 Saf et y of St r uct ur es
The pr osecut i on of wor k must ensur e t he st abi l i t y of pi er s, bul kheads, and ot her st r uct ur es l y i ng on or adj acent t o t he s i t e of t he wor k, i nsof ar as st r uct ur es may be j eopar di zed by dr edgi ng oper at i ons. Repai r damage r esul t i ng f r om dr edgi ng oper at i ons i s t he r esponsi bi l i t y of t he
SECTI ON 35 20 23 Page 4
Cont r act or , i nsof ar as such damage may be caused by var i at i on i n l ocat i ons or dept h of dr edgi ng, or bot h, f r om t hat i ndi cat ed or per mi t t ed under t he cont r act . The Cont r act or i s r esponsi bl e f or coor di nat i ng wi t h t he owner of t he st r uct ur e f or any necessar y r epai r s.
3. 3 PLACEMENT OPERATONS
3. 3. 1 Pl acement of Excavat ed Mat er i al s
Pr ovi de f or saf e t r anspor t at i on and pl acement of dr edged mat er i al s.
Tr anspor t and pl acement of dr edged mat er i al i n t he pl acement ar e as shown on t he cont r act dr awi ngs. The pl acement of dr edged mat er i al s i n unaut hor i zed pl aces i s f or bi dden. Compl y wi t h r ul es and r egul at i ons of al l , f eder al , st at e and l ocal aut hor i t i es.
3. 3. 2 Met hod of Pl acement
Pl ace al l dr edged mat er i al by t he hydr aul i c pr ocess. Coor di nat e compl et i on of l oad wi t h t he Gover nment . Pi pel i ne f or hydr aul i c dr edgi ng must di schar ge i nt o t he pl acement ar ea.
3. 3. 3 Mi spl aced Dr edged Mat er i al
Any dr edged mat er i al s deposi t ed at l ocat i ons ot her t han i n ar eas desi gnat ed or appr oved by t he Cont r act i ng Of f i cer wi l l be consi der ed mi spl aced mat er i al and wi l l not be pai d f or unt i l t he Cont r act or , at hi s own expense, r emoves and deposi t s such mi spl aced mat er i al wher e di r ect ed.
Thi s r equi r ed r emoval and r edeposi t of t he mi spl aced mat er i al and any necessar y pl acement s i t e r est or at i on wor k i s not t he basi s f or a t i me ext ensi on or addi t i onal compensat i on under t hi s cont r act .
3. 3. 4 Submer ged Pi pel i nes
I f a l eak occur s i n t he di schar ge pi pel i ne, i mmedi at el y di scont i nue usi ng t he l i ne unt i l l eaks ar e r epai r ed. Fol l owi ng a l eak, t he Cont r act or shoul d conduct , or r equest t he Gover nment t o conduct , a hydr osur vey t o ensur e t hat any dr edged mat er i al di schar ged t hr ough t he l eak di d not accumul at e or cause moundi ng. I f accumul at i on di d occur , t he Cont r act or must coor di nat e wi t h t he Gover nment t o r emove t he accumul at ed mat er i al , i f deemed necessar y. The Cont r act or i s r esponsi bl e f or any r esul t i ng cost s of r epai r and r est or at i on.
3. 4 MEASUREMENT
The Cont r act or i s r esponsi bl e f or t aki ng soundi ngs bef or e and af t er dr edgi ng.
Fi nal quant i t i es wi l l be subj ect t o deduct i ons or cor r ect i on of deduct i ons pr evi ousl y made because of excessi ve over dept h, dr edgi ng out si de or aut hor i zed ar eas, or pl acement of mat er i al i n an unaut hor i zed manner .
3. 4. 1 Met hod of Measur ement
Quant i t y of mat er i al r emoved t hat wi l l be pai d f or wi l l be measur ed by cubi c yar d by means of t opogr aphi c sur veys of f i l l s i t es t aken bef or e and af t er dr edgi ng. The dr awi ngs r epr esent exi st i ng condi t i ons based on cur r ent avai l abl e i nf or mat i on, but wi l l be ver i f i ed and cor r ect ed, i f necessar y, by soundi ngs t aken bef or e dr edgi ng i n each l ocal i t y.
SECTI ON 35 20 23 Page 5
3. 4. 2 Mont hl y Est i mat es
Mont hl y est i mat es of wor k compl et ed wi l l be based on t he r esul t of soundi ngs t aken dur i ng t he pr ogr ess of t he wor k. Deduct i ons wi l l be made f or dr edgi ng and pl acement not i n accor dance wi t h t he speci f i cat i ons.
3. 5 FI NAL EXAMI NATI ON AND ACCEPTANCE
As soon as pr act i cabl e af t er t he compl et i on of ar eas, whi ch i n t he opi ni on of t he Cont r act i ng Of f i cer , wi l l not be af f ect ed by f ur t her dr edgi ng oper at i ons, each ar ea wi l l be exami ned by t he Gover nment by soundi ng or sweepi ng, or bot h. Remove shoal s and l umps as r equi r ed by met hods appr oved by t he Gover nment . However , i f t he bot t om i s sof t and t he shoal ar eas f or m no mat er i al obst r uct i on t o navi gat i on, r emoval may be wai ved at t he di scr et i on of t he Gover nment . The Cont r act or wi l l be not i f i ed when soundi ngs or sweepi ngs ar e t o be made and wi l l be per mi t t ed t o accompany t he soundi ng or sweepi ng par t y and t o i nspect t he dat a and met hods used i n pr epar i ng t he f i nal quant i t y f or payment . When ar eas ar e f ound t o be i n a sat i sf act or y condi t i on, t he wor k t her ei n wi l l be accept ed as compl et e.
Re- dr edgi ng at t he Cont r act pr i ce, wi t hi n t he l i mi t of avai l abl e f unds, may be compl et ed wi t h t he consent of bot h t he Gover nment and t he Cont r act or when i nf i l l or shoal i ng beyond t he Cont r act or ' s cont r ol occur s i n any ar ea pr evi ousl y accept ed.
3. 6 PLANT REMOVAL
Upon compl et i on of t he wor k, r emove al l dr edgi ng pl ant , i ncl udi ng r anges, buoys, pi l es, and ot her mar ker s or obst r uct i ons wi t hi n 14 days.
- - End of Sect i on - -
SECTI ON 35 20 23 Page 6
| 35 20 23 - DREDGING |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.2 DEFINITIONS |
| 1.2.1 New Work Material |
| 1.2.2 Hard Material |
| 1.3 SUBMITTALS |
| 1.4 METHOD OF COMMUNICATION |
| 1.5 ENVIRONMENTAL COMPLIANCE AND PROTECTION |
| 1.6 BASIS FOR BIDS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 INSPECTION |
| 3.2 DREDGING |
| 3.2.1 Order of Work |
| 3.2.2 Interference with Navigation |
| 3.2.3 Lights |
| 3.2.4 Navigation Warnings |
| 3.2.5 Ranges, Gages, and Lines |
| 3.2.6 Dredge Plant and Equipment |
| 3.2.6.1 Side Slopes |
| 3.2.7 Obstructions and Debris |
| 3.2.8 Quality Control |
| 3.2.9 Surveys during Progress of Work |
| 3.2.10 Skimming of Hoppers |
| 3.2.11 Salvaged Material |
| 3.2.12 Safety of Structures |
| 3.3 PLACEMENT OPERATONS |
| 3.3.1 Placement of Excavated Materials |
| 3.3.2 Method of Placement |
| 3.3.3 Misplaced Dredged Material |
| 3.3.4 Submerged Pipelines |
| 3.4 MEASUREMENT |
| 3.4.1 Method of Measurement |
| 3.4.2 Monthly Estimates |
| 3.5 FINAL EXAMINATION AND ACCEPTANCE |
| 3.6 PLANT REMOVAL |
File details come from the government source that posted it. Updated .