This document appears to be Amendment 2 to the solicitation for the Fire Island Inlet to Moriches Inlet (FIMI) Reach PL 84-99, PIR 2024 Project. The project aims to repair and restore the eroded shoreline in Suffolk County, New York, through beach fill restoration of approximately 1.7 million CY, replacement of 35,202 ft of sand fencing, planting of 31 acres of dune grass, repair of 6-10 elevated timber dune crossover structures, and repair of two vehicular crossovers. The sand will be dredged from the Atlantic Ocean Sand Borrow Area 2C. The estimated construction cost range is between $50,000,000 and $100,000,000. The U.S. Army Corps of Engineers, New York District, is the federal agency responsible for this defense-related project.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PL 84- 99 FI MI - Ocean Bay Par k t o Davi s Par k PL8499FI MI Amendment 02
SECTI ON 00 31 24. 01 18
WATER QUALI TY CERTI FI CATE
07/ 17
PART 1 GENERAL
1. 1 DESCRI PTI ON
Wat er Qual i t y Cer t i f i cat e wi l l be pr ovi ded when avai l abl eat t ached.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
- - End of Sect i on - -
DOCUMENT 00 31 24. 01 18 Page 1
June 14, 2024
Peter Weppler, Chief Environmental Analysis Branch U.S. Army Corps of Engineers – Planning 26 Federal Plaza – Room 2151 New York NY 10278-0090
Re: DEC #: 1-4799-00023/00009 Fire Island Inlet to Moriches Inlet
PL 84-99 Rehabilitation Project Water Quality Certificate (WQC)
Dear Mr. Weppler:
In conformance with the requirements of the State Uniform Procedures Act (Article 70, ECL) and its implementing regulations (6NYCRR, Part 621) we are enclosing your approved Water Quality Certification. This approval follows recent discussions held on site on June 7, 2024, during which NYSDEC staff emphasized that additional information was required for review if dredging was proposed within the Atlantic Sturgeon restriction window that extends from September 1 to November 30 inclusive. The specific information was a description of the temporal and spatial parameters for dredging the borrow area, and the completed Sturgeon Avoidance of Monitoring Plan (Plan) template that had been provided to the Corps in April 2024. Both pieces are necessary in order to determine potential impacts on the sturgeon by the dredge operation during a time when sturgeon are typically known to be in the area.
Your June 11, 2024 email responded in part regarding one aspect of the dredging procedure, but did not provide the Plan template for work proposed within the restriction window. Subsequent discussions held today revealed that such a plan may be shortly forthcoming for NYSDEC review, but as of this letter, it has not been received.
NYSDEC staff are certainly aware of the many challenges on numerous fronts presented by this project and look to continue with our efforts to work with the Corps in order to authorize the required work in a manner that sufficiently protects our sensitive natural resources.
Therefore, with understanding that the Corps needs the approved WQC no later than June 18, 2024, we have issued the WQC today with the standard restriction windows, and anticipate receipt of a sufficient Plan for 2024 which DEC staff understand is subject to the constraints of time and funding as determined by the Corps’ response under PL 84-99 to repair the damages after the storm events from January 7-13, 2024 within the Ocean Bay Park to Davis Park section of Fire Island. Upon receipt the 2024 Plan and request to work within the Sturgeon restriction window for this immediate 2024 project, we expect to issue a WQC modification in a very expedient manner.
Please carefully read all permit conditions and special permit conditions contained in the permit to ensure compliance during the term of the permit. If you are unable to comply with any conditions, please contact us at the above address.
Also enclosed please find a permit sign which is to be conspicuously posted at the project site and protected from the weather
Please contact me at 631-444-0369, or at kevin.kispert@dec.ny.gov if you have any questions, or need to discuss this matter. Thank you for your continued cooperation.
Sincerely, Kevin Kispert Permit Administrator Enclosures cc: NYSDEC Review Team mailto:kevin.kispert@dec.ny.gov
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Facility DEC ID 1-4799-00023
PERMIT
Under the Environmental Conservation Law (ECL)
Permittee and Facility Information
Permit Issued To:
US DEPT OF THE ARMY
THE PENTAGON
WASHINGTON, DC 20310
Facility:
BARRIER ISLANDS & ATLANTIC
COASTLINE
FIRE ISLAND INLET TO MONTAUK POINTT
Brookhaven;East Hampton;Islip;Southampton, NY
Facility Application Contact:
PETER WEPPLER
Usacoe Planning C/O Psc Mail Center 26 Federal Plz Rm 17-420
NEW YORK, NY 10278-0090
(917) 790-8634
Facility Location: In MULTIPLE TOWNS in SUFFOLK COUNTY Facility Principal Reference Point: NYTM-E: 660.5 NYTM-N: 4502.3
Latitude: 40°39'21.5" Longitude: 73°06'05.3" Authorized Activity: Undertake a project to stabilize and restore the beach berm and primary dune at various locations along the length of Fire Island which are eroded during coastal storms. The proposed work is within the scope of the previous US Army Corps of Engineers (USACE) permit 1- 4799-00023/00008, and includes the removal, via hopper dredge, of up to 7 million cubic yards of sand from three offshore borrow areas and the placement of the material according to several beach berm construction and dune construction templates at various locations along the barrier beach from Robert Moses State Park to Moriches Inlet. The approximate total linear footage of beach berm and dune construction is about 16.12 miles, which will be undertaken in phases as needed.
Work on the overall project will take place on lands located in the towns of Brookhaven and Islip; and the incorporated villages of Ocean Beach and Saltaire; including the parkland of Suffolk County and New York State; and the federally-owned parcel containing the Fire Island Lighthouse.
The three offshore borrow areas from which the sand for the overall project will be obtained are designated USACE Borrow Areas 2C, 4C and 5B. Borrow Area 2C is an irregularly shaped area of approximate dimensions 2.6 miles long by 0.85 miles wide located about two miles off Point O' Woods and will be deepened by approximately 10-12 feet. Borrow Area 4C is an approximately 60 acre area located about 1 mile off Westhampton Beach which will be deepened by about 10 feet. Borrow Area 5B is an approximately 555 acre area located about 1.8 miles off Quogue which will be deepened by 10-12 feet.
The initial phase starts with Ocean Bay Park to Davis Park section of Fire island that spans 44,150 ft between those communities. The beachfill includes a beach berm at elevation +8.5 ft NAVD88, backed by a dune with a height of +14ft NAVD88. The dune will have a crest width of 25 ft and 1V:5H side slopes on both landward and seaward sides. The design berm width will be 90 ft plus advance nourishment fill, with a design onshore slope of 1V:12H to elevation +1ft NAVD88 and a design offshore slope of approximately 1V:40H to ocean bottom. The project’s fill template with approximately 1.7 million cubic yards of sand obtained from previously used Atlantic Ocean Borrow Area 2C. The project also includes replacement of approximately 35,202 ft of sand fencing, planting of approximately 31 acres of American Beach Grass (Ammophila breviligulata), repair of approximately 6- 10 elevated timber dune crossover structures, and repair of approximately two vehicular crossovers.
The plan view and cross-section drawing sets for each subsequent phase of the project will be submitted for DEC review and approval at least 30 days prior to construction commencement of the phase.
Permit Authorizations
Water Quality Certification - Under Section 401 - Clean Water Act Permit ID 1-4799-00023/00009 New Permit Effective Date: 6/14/2024 Expiration Date: 6/13/2034
NYSDEC Approval
By acceptance of this permit, the permittee agrees that the permit is contingent upon strict compliance with the ECL, all applicable regulations, and all conditions included as part of this permit.
Permit Administrator: KEVIN A KISPERT, Deputy Regional Permit Administrator Address: NYSDEC Region 1 Headquarters
SUNY @ Stony Brook|50 Circle Rd Stony Brook, NY 11790 -3409
Authorized Signature: ______________________________________ Date 6/14/2024
Distribution List
PETER WEPPLER
KEVIN A KISPERT
Marine Habitat Protection Marine Resources Flood Control and Coastal Erosion Wildlife
Permit Components
NATURAL RESOURCE PERMIT CONDITIONS
WATER QUALITY CERTIFICATION SPECIFIC CONDITION
GENERAL CONDITIONS, APPLY TO ALL AUTHORIZED PERMITS
NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS
Permit Attachments
5/31/2024Site Plan 95% Project Specifications Section 01 56 10.00 18 5/31/2024
NATURAL RESOURCE PERMIT CONDITIONS - Apply to the Following Permits: WATER QUALITY CERTIFICATION
1. Notice of Commencement At least 48 hours prior to commencement of the project, the permittee and contractor shall sign and return the top portion of the enclosed notification form certifying that they are fully aware of and understand all terms and conditions of this permit. Within 30 days of completion of project, the bottom portion of the form must also be signed and returned, along with photographs of the completed work.
2. Post Permit Sign The permit sign enclosed with this permit shall be posted in a conspicuous location on the worksite and adequately protected from the weather.
3. Required Drawing Submissions The permittee shall submit the following drawings or sets of drawings, in quadruplicate, to the Department for review and approval within the specified time frame below prior to work starting on the subject aspect of the project:
Project limits (i.e. station numbers or revised plan), plan view and cross-section drawing sets for the successive phases of the project must be provided for DEC review at least 30 days prior to construction start on each phase.
4. Prohibition Period to Protect Listed Species of Beach Nesting Shorebirds In order to protect state and federally listed species of beach nesting shorebirds such as the piping plover and least tern, activities authorized by this permit are prohibited between the dates April 1 and August 31 of each year.
5. Dredging Prohibition Period to protect Atlantic Sturgeon Dredging is specifically prohibited between May 1 to June 30 inclusive, and September 1 to November 30 inclusive, of each calendar year to protect Atlantic sturgeon.
6. Borrow Area Monitoring Requirement Within 90 days of the issuance of the Water Quality Certification, the permittee must develop and receive Department approval (MarineHabitat@dec.ny.gov) for a schedule of data collection tasks for each borrow area authorized herein consistent with the August 2014 "Borrow Area Monitoring Plan for NYSDEC WQC Requirements for New York State Coastal Restoration Projects Implemented Under Public Law 113-2, the Disaster Relief Appropriations Act."
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Facility DEC ID 1-4799-00023
The permittee shall submit an annual data report to the Department for review and approval to
MarineHabitat@dec.ny.gov.
Coastals@dec.ny.gov
7. Dredge Plant Monitor Requirements The permittee shall employ appropriate monitoring and protection procedures for Atlantic Sturgeon, marine turtles and marine mammals on any and all dredges used to conduct the work authorized in this Water Quality Certification. These procedures are set forth in the attached 95% Project Specifications: Section 01 56 10.00 18. (Attached).
These Project Specifications address the following:
Monitoring Specifications for Hopper Dredges.
Sea Turtle Handling & Resuscitation.
Incident Report of Sea Turtle Take.
Incident Report of Atlantic Sturgeon Take.
Endangered Species Observer Program - Large Whale Observation Data
Copies of all dredge observer forms, incident report forms, and detailed season summary reports shall be submitted to the Department at MarineHabitat@dec.ny.gov
8. Leave a Uniform Bottom Elevation All dredging shall be conducted so as to leave a uniform bottom elevation free of mounds or holes.
9. Grade Borrow Area Side Slopes All side slopes of the borrow areas shall not exceed 1 vertical to 5 horizontal (1v : 5h).
10. Dredged Depth Survey Within 60 days of completion of the dredging operation at each borrow area, an as-dredged depth survey of the dredged area shall be submitted to the three addresses below:
Regional Habitat - TW NYSDEC Region 1 Headquarters SUNY @ Stony Brook - 50 Circle Rd.
Stony Brook, NY 11790-3409 Attn: Compliance
MarineHabitat@dec.ny.gov
Coastals@dec.ny.gov
11. Annual Report The permittee must submit an annual report indicating the site, date, dredge volume, and characterization of dredged material (sand, gravel, etc.) by April 1 of the calendar year following each dredge event. The report must be submitted to the three addresses below:
Marine Habitat Protection NYDEC Region 1 Headquarters SUNY @ Stony Brook, 50 Circle Rd.
Stony Brook, NY 11790-3409 Attn: Compliance
MarineHabitat@dec.ny.gov
Coastals@dec.ny.gov
12. Properly Locate & Position Dredged Material Discharge Pipe The dredged material discharge pipe shall be located and positioned to prevent the scouring or damage of existing dunes and to prevent the direct placement of material seaward of the line of apparent high water. A diffuser shall be attached to the end of the discharge pipe.
13. Grade Completed Beach Smooth Upon completion of the project, the permittee shall grade the beach berm nourishment area as necessary to ensure that the finished seaward slope conforms with the final slope depicted on the approved plans, and to remove wheel ruts, tire tracks, or any mounds, ridges or holes in excess of six (6) inches above or below the finished beach surface. The grade of the finished beach must be suitable to support the nesting of piping plovers and least terns.
14. Use Only Clean, Beach Compatible Sand All material used to reconstruct or repair dunes and rebuild the beach must be clean, beach compatible (grain size equal to or slightly larger than the existing beach material) sand suitable to provide nesting substrate for the piping plover and least tern.
15. Restore Any Areas Disturbed By Construction Any areas of beach, dune or wetland disturbed by the activities authorized herein, such as the installation, relocation and removal of pipes or booster pumps, temporary sand stockpiles or the operation of staging and access areas must be restored to pre-project conditions upon completion of work.
16. No Construction Debris in Wetland or Adjacent Area Any debris or excess material from construction of this project shall be completely removed from the adjacent area (upland) and removed to an approved upland area for disposal. No debris is permitted in wetlands and/or protected buffer areas.
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Facility DEC ID 1-4799-00023
17. Storage Tanks Fuel or other chemical storage tanks shall be contained and located at all times in an area greater than 100 feet landward of the regulated wetland or water body. If the above requirement cannot be met by the permittee, then the storage areas must be designed to completely contain any and all potential leakage. Such a containment system must be approved by Department staff prior to equipment, machinery or tank storage within 100 feet of the wetland or water body.
18. Storage of Equipment, Materials The storage of construction equipment and materials shall be confined within the project work area and/or upland areas greater than 100 linear feet from the tidal wetland boundary.
19. Conformance With Plans All activities authorized by this permit must be in strict conformance with the approved plans submitted by the applicant or applicant's agent as part of the permit application.
Such approved plans were prepared by USACE NY District, 95% Submission 5/31/2024.
20. Approved Plans All activities authorized by this permit must be in strict conformance with the approved plans submitted by the applicant or applicant's agent as part of the permit application. Such approved plans were prepared by USACE NY District, 95% Submission PL 84-99 Rehabilitation Project, Ocean Bay Park to Davis Park, 43 sheets, stamped “NYSDEC Approved” on 6/14/2024.
The plan view and crossection drawings for each subsequent phase of the project must be submitted for DEC review and approval at least 30 days prior to commencement of construction for that phase
21. Precautions Against Contamination of Waters All necessary precautions shall be taken to preclude contamination of any wetland or waterway by suspended solids, sediments, fuels, solvents, lubricants, epoxy coatings, paints, concrete, leachate or any other environmentally deleterious materials associated with the project.
WATER QUALITY CERTIFICATION SPECIFIC CONDITIONS
1. Water Quality Certification The authorized project, as conditioned pursuant to the Certificate, complies with Section 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act, as amended and as implemented by the limitations, standards, and criteria of state statutory and regulatory requirements set forth in 6 NYCRR Section 608.9(a). The authorized project, as conditioned, will also comply with applicable New York State water quality standards, including but not limited to effluent limitations, best usages and thermal discharge criteria, as applicable, as set forth in 6 NYCRR Parts 701, 702, 703, and 704.
2. Water Quality Certification The authorized project, as conditioned pursuant to the Certificate, complies with Section 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act, as amended and as implemented by the limitations, standards, and criteria of state statutory and regulatory requirements set forth in 6 NYCRR Section 608.9(a). The authorized project, as conditioned, will also comply with applicable New York State water quality standards, including but not limited to effluent limitations, best usages and thermal discharge criteria, as applicable, as set forth in 6 NYCRR Parts 701, 702, 703, and 704.
GENERAL CONDITIONS - Apply to ALL Authorized Permits:
1. Facility Inspection by The Department The permitted site or facility, including relevant records, is subject to inspection at reasonable hours and intervals by an authorized representative of the Department of Environmental Conservation (the Department) to determine whether the permittee is complying with this permit and the ECL. Such representative may order the work suspended pursuant to ECL 71- 0301 and SAPA 401(3).
The permittee shall provide a person to accompany the Department's representative during an inspection to the permit area when requested by the Department.
A copy of this permit, including all referenced maps, drawings and special conditions, must be available for inspection by the Department at all times at the project site or facility. Failure to produce a copy of the permit upon request by a Department representative is a violation of this permit.
2. Relationship of this Permit to Other Department Orders and Determinations Unless expressly provided for by the Department, issuance of this permit does not modify, supersede or rescind any order or determination previously issued by the Department or any of the terms, conditions or requirements contained in such order or determination.
3. Applications For Permit Renewals, Modifications or Transfers The permittee must submit a separate written application to the Department for permit renewal, modification or transfer of this permit. Such application must include any forms or supplemental information the Department requires.
Any renewal, modification or transfer granted by the Department must be in writing. Submission of applications for permit renewal, modification or transfer are to be submitted to:
Regional Permit Administrator NYSDEC Region 1 Headquarters SUNY @ Stony Brook|50 Circle Rd Stony Brook, NY11790 -3409
4. Submission of Renewal Application The permittee must submit a renewal application at least 30 days before permit expiration for the following permit authorizations: Water Quality Certification.
5. Permit Modifications, Suspensions and Revocations by the Department The Department reserves the right to exercise all available authority to modify, suspend or revoke this permit. The grounds for modification, suspension or revocation include:
a. materially false or inaccurate statements in the permit application or supporting papers;
b. failure by the permittee to comply with any terms or conditions of the permit;
c. exceeding the scope of the project as described in the permit application;
d. newly discovered material information or a material change in environmental conditions, relevant technology or applicable law or regulations since the issuance of the existing permit;
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Facility DEC ID 1-4799-00023
e. noncompliance with previously issued permit conditions, orders of the commissioner, any provisions of the Environmental Conservation Law or regulations of the Department related to the permitted activity.
6. Permit Transfer Permits are transferrable unless specifically prohibited by statute, regulation or another permit condition. Applications for permit transfer should be submitted prior to actual transfer of ownership.
NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS
Item A: Permittee Accepts Legal Responsibility and Agrees to Indemnification The permittee, excepting state or federal agencies, expressly agrees to indemnify and hold harmless the Department of Environmental Conservation of the State of New York, its representatives, employees, and agents ("DEC") for all claims, suits, actions, and damages, to the extent attributable to the permittee's acts or omissions in connection with the permittee’s undertaking of activities in connection with, or operation and maintenance of, the facility or facilities authorized by the permit whether in compliance or not in compliance with the terms and conditions of the permit. This indemnification does not extend to any claims, suits, actions, or damages to the extent attributable to DEC's own negligent or intentional acts or omissions, or to any claims, suits, or actions naming the DEC and arising under Article 78 of the New York Civil Practice Laws and Rules or any citizen suit or civil rights provision under federal or state laws.
Item B: Permittee's Contractors to Comply with Permit The permittee is responsible for informing its independent contractors, employees, agents and assigns of their responsibility to comply with this permit, including all special conditions while acting as the permittee's agent with respect to the permitted activities, and such persons shall be subject to the same sanctions for violations of the Environmental Conservation Law as those prescribed for the permittee.
Item C: Permittee Responsible for Obtaining Other Required Permits The permittee is responsible for obtaining any other permits, approvals, lands, easements and rights-of-way that may be required to carry out the activities that are authorized by this permit.
Item D: No Right to Trespass or Interfere with Riparian Rights This permit does not convey to the permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the impairment of any rights, title, or interest in real or personal property held or vested in a person not a party to the permit.
© 2024 Microsoft Corporation Earthstar Geographics SIO
PROJECT LOCATION
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
NEW YORK DISTRICT
FIRE ISLAND INLET TO MORICHES INLET
PL 84-99 REHABILITATION PROJECT
OCEAN BAY PARK TO DAVIS PARK
SUFFOLK COUNTY, NY
+VOLUME X
+XXXXXX-XX-X-XXXX
+XXXXXX-XX-X-XXXX
+MMMMMMMMMM YYYY
US Army Corps of Engineers ®
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
C
IV
IL
R
ES
O
U R
C
ES
B R
AN
C
H C
EN
AN
EN
C
R B
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
+X
XX
XX
X-
XX
-X
-X
XX
X
+M M
M M
M M
M M
M M
Y
YY
Y
O
PT
IO
N
AL
F
IE
LD
O
PT
IO
N
AL
F
IE
LD
AN
SI
F
U
LL
B
LE
ED
D
(2 2.
X
4.
IN
C H
ES
+X
XX
XX
X-
XX
-X
-X
XX
X
FI
R
E
IS
LA
N
D
IN
LE
T
TO
M
O R
IC
H
ES
IN
LE
T
PL
4-
R
EH
AB
IL
IT
AT
IO
N
P R
O
JE
C T
O C
EA
N
B
AY
P
AR
K
TO
D
AV
IS
P
AR
K
SU
FF
O
LK
C O
U N
TY
, N
Y
S U
BM
IS
SI
O
N
S.
R
E.
G
S.
R
./E .G
E.
G
C
O
VE
R S
H
EE
T
G-100
DRAWING INDEX
DRAWING No. DRAWING TITLE SHEET No.
G-100 COVER SHEET AND DRAWING INDEX 1
G-101 GENERAL PLAN AND ALIGNMENT DATA 2
G-102 BORROW AREA PLAN 3
C-101 BEACH FILL PLAN SHEET 4
C-102 BEACH FILL PLAN SHEET 5
C-103 BEACH FILL PLAN SHEET 6
C-104 BEACH FILL PLAN SHEET 7
C-105 BEACH FILL PLAN SHEET 8
C-106 BEACH FILL PLAN SHEET 9
C-107 BEACH FILL PLAN SHEET 10
C-108 BEACH FILL PLAN SHEET 11
C-109 BEACH FILL PLAN SHEET 12
C-216 CROSSOVER PROFILE SHEET 28
C-301 BEACH FILL CROSS SECTION SHEET 29
C-302 BEACH FILL CROSS SECTION SHEET 30
C-303 BEACH FILL CROSS SECTION SHEET 31
C-304 BEACH FILL CROSS SECTION SHEET 32
C-305 BEACH FILL CROSS SECTION SHEET 33
C-306 BEACH FILL CROSS SECTION SHEET 34
C-307 BEACH FILL CROSS SECTION SHEET 35
C-308 BEACH FILL CROSS SECTION SHEET 36
C-309 BEACH FILL CROSS SECTION SHEET 37
C-501 TIMBER CROSSOVER REPAIR DETAILS (1) 38
C-201 CHAMPLAIN WALK (OCEAN BAY PARK) 13
C-202 SANDY/SUSAN WALK (FIRE ISLAND PINES)
C-203 DRIFTWOOD WALK (FIRE ISLAND PINES)
C-204 COASTGUARD WALK 1 OF 2 (FIRE ISLAND PINES)
C-205
CEDAR WALK (FIRE ISLAND PINES)C-206
ATLANTIC WALK (FIRE ISLAND PINES)C-207
FISHERMANS PATH 1 0F 2 (FIRE ISLAND PINES)C-208
C-209
C-210 DONELLA WALK (DAVIS PARK)
C-211 EAST WALK (DAVIS PARK)
C-212 TRUSTEES WALK 1 0F 2 (DAVIS PARK)
C-213 TRUSTEES WALK 2 0F 2 (DAVIS PARK)
C-214 LEEWARD WALK (DAVIS PARK)
C-215 WHALEBONE WALK (DAVIS PARK)
FISHERMANS PATH 2 0F 2 (FIRE ISLAND PINES)
COASTGUARD WALK 2 OF 2 (FIRE ISLAND PINES)
C-502 TIMBER CROSSOVER REPAIR DETAILS (2) 39
C-503 TIMBER CROSSOVER REPAIR DETAILS (3) 40
C-504 TIMBER CROSSOVER REPAIR DETAILS (4) 41
C-505 TIMBER CROSSOVER REPAIR DETAILS (5) 42
C-506 VEHICULAR CROSSOVER DETAIL SHEET 43
kakisper New Stamp
385+00
390+00
395+00
400+00
405+00
410+00
415+00
420+00
425+00
430+00
435+00
440+00
445+00
450+00
455+00
460+00
465+00
470+00
475+00
480+00
485+00
490+00
495+00
500+00
505+00
510+00
515+00
520+00
525+00
530+00
535+00
540+00
545+00
550+00
555+00
560+00
565+00
570+00
575+00
580+00
585+00
590+00
595+00
600+00
605+00
610+00
615+00
620+00
625+00
630+00
635+00
640+00
645+00
650+00
655+00
660+00
665+00
670+00
675+00
680+00
685+00
690+00
695+00
700+00
705+00
710+00 715+00 720+00 725+00 730+00 735+00 740+00 745+00 750+00 755+00 760+00 765+00
770+00 775+00 780+00 785+00 790+00 795+00 800+00 805+00 810+00 815+00 820+00 825+00 830+00 835+00 840+00 845+00 850+00 855+00 860+00 865+00 870+00 875+00
880+00 885+00
890+00 895+00
900+00 905+00
910+00 915+00 920+00 925+00 930+00 935+00 940+00 945+00 950+00 955+00 960+00 965+00 970+00 975+00 980+00 985+00
PT30
PT31
PT32
PT33
PT34 PT35 PT36 PT37 PT38 PT39
PT40
PT41 PT42 PT43
PT44
PT45 PT46 PT47 PT48 PT49 PT50 PT51 PT52
PT53 PT54 PT55
PT56 PT57 PT58 PT59 PT60 PT61 PT62 PT63 PT64 PT65
PT66 PT67
PT68 PT69
PT70 PT71
PT72
GREAT SOUTH BAY
ATLANTIC OCEAN
SEAVIEW
DAVIS PARK
OCEAN BAY PARK
CHERRY GROVE FIRE ISLAND PINE
WATER ISLAND
STAGING AREA
STAGING AREA
STAGING AREA
PINES AZ
GENERAL NOTES:
1. TOPOGRAPHIC AND BATHYMETRIC SURVEY DATA IS FROM USACE NAN FIELD SURVEY COLLECTED
MARCH/APRIL 2024
2. COORDINATES REFER TO NEW YORK LONG ISLAND STATE PLANE COORDINATE SYSTEM NAD83
(NYLISPCS NAD83) US SURVEY FEET
3. ALL SURVEY CONTROL POINTS TO BE VERIFIED BY CONTRACTOR BEFORE UTILIZING
4. AERIAL IMAGERY PROVIDED BY "USACE SURVEY BRANCH" AND IS FOR ORIENTATION PURPOSES ONLY.
5. ELEVATIONS REFER TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88) IN US SURVEY FEET
6. THE PLANE OF MEAN HIGH WATER AS SHOWN IS +1.5 TO +1.7 FT NAVD88
7. THE PLANE OF MEAN LOW WATER AS SHOWN IS -2.0 FT NAVD88
8. DESIGN CROSS SECTIONS ARE TAKEN PERPENDICULAR TO THE REFERENCE LINE
9. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR ANY DAMAGE AND RESTORE ANY
INTERRUPTION TO ANY UTILITY SERVICE THAT MAY BE CAUSED BY THE CONTRACTOR'S EQUIPMENT OR CONSTRUCTION AT THE CONTRACTORS EXPENSE AND AT NO ADDITIONAL COST TO THE GOVERNMENT
10. EXISTING SAND BAGS THAT FALL WITHIN THE DUNE FOOTPRINT BELOW THE PROPOSED DUNE ELEVATION MAY REMAIN. BAGS THAT WERE EXPOSED AT TIME OF SURVEY ARE IDENTIFIED ON PLANS.
11. ALL DISTURBED AREAS WITHIN THE PROPOSED DUNE FOOTPRINT SHALL BE VEGETATED
12. EXISTING DUNE SHALL BE LEFT AS-IS IF IT IS HIGHER THAN PROPOSED DUNE. DASHED DUNE LINES
REPRESENT THE AREA(S) WHERE EXISTING DUNE MAY BE HIGHER THAN PROPOSED DUNE. VERIFY IN
FIELD.
13. PORTION OF THE DUNE UNDER ANY ELEVATED STRUCTURE SHALL BE HAND FILLED TO THE PROPOSED
FOOTPRINT
14. THE CONTRACTOR SHALL COLLECT AND REMOVE ALL DEBRIS WITHIN THE BEACHFILL LIMITS PRIOR TO
SAND PLACEMENT (NO DEBRIS SHALL BE BURIED)
SURVEY CONTROLS
BENCHMARK ELEVATION (NAVD88) NORTHING EASTING
LOCAL CONTROL DATA
R 375 (PID: KUO724) 8.84' 170419.95 1201741.40
NSRS BENCHMARK
USACE PINES AZ 31.05' 184384.15 1247656.72
DUNE PLANTING DETAIL
N.T.S.
SAND FENCE AT THE TOE OF THE PROPOSED DUNE
EL.14.0
5 5
PLANTING
EL.8.5
EL. -1.0
6" TOLERANCE
25' TYP
WIDTH VARIES
3" Ø MIN, ROUND POST OR 2"x2" WOODEN
POST OR AS APPROVED EQUAL
ATTACH SAND FENCE TO POST
WITH FIVE 14 GAUGE GALVANIZED
WIRE TIES AT WIRE STRANDS
1/2" X 1 1/2" SLATS
FIVE ROWS 12.5 GAUGE GALVANIZED
WIRE STRANDS
4' -0
" M
IN
4' -0
" M
IN
MIN. 8' LONG
WOOD POST
NOTES:
1. POSTS SHALL NOT BE SPACED FARTHER THAN 10' ON CENTER.
2. WOOD SLATS SHALL BE AT MINIMUM 4'-0" LONG.
3. SAND FENCE ALIGNMENT SHALL BE PARALLEL TO TOE OF NEW DUNE.
4. SAND FENCE SHALL BE PLACED ON LANDWARD AND SEAWARD TOE OF DUNE IN
AREAS WHERE THERE IS DUNE CONSTRUCTION WHICH WOULD REQUIRE NEW
VEGETATION PLANTING
SAND FENCE DETAIL
N.T.S
SCALE:1"=2000'
LEGEND
6IN TOLERANCE
ESTIMATED EXISTING GROUND
PROPOSED SAND FILL BERM.
TOP OF THE SLOPE
BOTTOM OF THE SLOPE
PEDESTRIAN CROSSOVERVEHICULAR CROSSOVER
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SHEET ID
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
S.
R
E.
G
S.
R
./E .G
E.
G
G
EN
ER
AL
P
LA
N
A N
D A
LI
G
N M
EN
T
D
AT
A
G-101
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
+X
XX
XX
X-
XX
-X
-X
XX
X
+M M
M M
M M
M M
M M
Y
YY
Y
O
PT
IO
N
AL
F
IE
LD
O
PT
IO
N
AL
F
IE
LD
AN
SI
D
+X
XX
XX
X-
XX
-X
-X
XX
X
FI
R
E
IS
LA
N
D
IN
LE
T
TO
M
O R
IC
H
ES
IN
LE
T
PL
4-
R
EH
AB
IL
IT
AT
IO
N
P R
O
JE
C T
O C
EA
N
B
AY
P
AR
K
TO
D
AV
IS
P
AR
K
SU
FF
O
LK
C O
U N
TY
, N
EW
Y
O R
K
S U
BM
IS
SI
O
N
REFERENCE LINE COORDINATES
POINT PI STATION NORTHING EASTING DISTANCE DIRECTION
Pt. 32 431+76.29 175,095.0660' 1,218,796.7026' 959.794' N74° 53' 57.90"E
Pt. 33 441+36.09 175,345.1062' 1,219,723.3553'
917.045' N74° 49' 43.33"E
Pt. 34 450+53.13 175,585.1021' 1,220,608.4390' 613.285' N72° 52' 24.55"E
Pt. 35 456+66.42 175,765.7039' 1,221,194.5293' 3,422.403' N72° 14' 21.56"E
Pt. 36 490+88.82 176,809.6800' 1,224,453.8174' 1,641.286' N71° 22' 11.48"E
Pt. 37 507+30.11 177,334.0019' 1,226,009.1012' 1,202.246' N71° 06' 31.41"E
Pt. 38 519+32.35 177,723.2572' 1,227,146.5881' 1,111.369' N71° 43' 49.52"E
Pt. 39 530+43.72 178,071.6585' 1,228,201.9353' 669.052' N73° 49' 09.31"E
Pt. 40 537+12.78 178,258.1022' 1,228,844.4848' 1,372.712' N74° 40' 20.45"E
Pt. 41 550+85.49 178,620.9629' 1,230,168.3694' 1,323.953' N75° 06' 03.31"E
Pt. 42 564+09.44 178,961.3740' 1,231,447.8110' 1,707.429' N72° 58' 08.45"E
Pt. 43 581+16.87 179,461.4608' 1,233,080.3631' 1,113.233' N72° 24' 45.97"E
Pt. 44 592+30.10 179,797.8324' 1,234,141.5610' 1,632.497' N74° 20' 26.30"E
Pt. 45 608+62.60 180,238.4718' 1,235,713.4649' 1,127.591' N74° 09' 11.97"E
Pt. 46 619+90.19 180,546.3764' 1,236,798.2030' 671.552' N74° 43' 10.69"E
Pt. 47 626+61.74 180,723.3588' 1,237,446.0137' 1,248.355' N71° 46' 53.69"E
Pt. 48 639+10.10 181,113.6449' 1,238,631.7907' 1,903.800' N72° 26' 17.68"E
Pt. 49 658+13.90 181,688.0854' 1,240,446.8593' 1,737.730' N71° 54' 18.65"E
Pt. 50 675+51.63 182,227.8077' 1,242,098.6477' 1,535.666' N71° 18' 29.15"E
Pt. 51 690+87.29 182,719.9566' 1,243,553.3158' 2,011.006' N71° 04' 14.72"E
Pt. 52 710+98.30 183,372.3275' 1,245,455.5666' 844.142' N67° 35' 46.47"E
Pt. 53 719+42.44 183,694.0563' 1,246,235.9939' 1,387.600' N67° 45' 19.23"E
Pt. 54 733+30.04 184,219.3494' 1,247,520.3228' 1,771.840' N66° 06' 53.08"E
Pt. 55 751+01.88 184,936.7788' 1,249,140.4195' 1,306.201' N64° 35' 47.28"E
Pt. 56 764+08.08 185,497.1272' 1,250,320.3228' 506.681' N65° 11' 48.50"E
Pt. 57 769+14.76 185,709.6813' 1,250,780.2647' 1,565.328' N69° 18' 49.67"E
Pt. 58 784+80.09 186,262.6327' 1,252,244.6744' 1,063.186' N69° 29' 14.09"E
Pt. 59 795+43.28 186,635.1901' 1,253,240.4487' 658.015' N68° 18' 32.42"E
Pt. 60 802+01.29 186,878.3931' 1,253,851.8705' 1,133.829' N66° 47' 44.79"E
Pt. 61 813+35.12 187,325.1327' 1,254,893.9800' 1,001.668' N66° 43' 23.42"E
Pt. 62 823+36.79 187,720.9660' 1,255,814.1189' 1,493.478' N65° 33' 07.60"E
Pt. 63 838+30.27 188,339.0648' 1,257,173.6884' 1,904.082' N65° 15' 58.24"E
Pt. 64 857+34.35 189,135.7390' 1,258,903.0925' 1,238.305' N64° 45' 48.85"E
Pt. 65 869+72.66 189,663.6959' 1,260,023.2086' 420.402' N63° 20' 12.85"E
Pt. 66 873+93.06 189,852.3485' 1,260,398.9053' 1,212.168' N62° 25' 30.49"E
Pt. 67 886+05.23 190,413.4698' 1,261,473.3792' 2,501.108' N61° 45' 43.00"E
Pt. 68 911+06.33 191,596.8343' 1,263,676.8293' 2,309.078' N64° 39' 53.85"E
Pt. 69 934+15.41 192,584.9138' 1,265,763.8229' 414.900' N63° 36' 55.30"E
Pt. 70 938+30.31 192,769.2933' 1,266,135.5031' 1,836.900' N63° 36' 55.60"E
Pt. 71 956+67.21 193,585.6002' 1,267,781.0563' 2,371.113' N63° 20' 15.35"E
Pt. 72 980+38.33 194,649.5960' 1,269,900.0393' 793.510' N62° 37' 53.19"E
0 4000'2000'
PLAN
NORTH
2C-2
2C-1
2C-6 2C-3
2C-4
2C-5
PROJECT LOCATION
GREAT SOUTH BAY
ATLANTIC OCEAN
SEAVIEW
B A
D
C
BORROW
AREA 2C
-70-70-70
-60-60 -72
-68-66-64 -62
-60
-60 -64-64-64
-70
-60
-60-60-60
-7
-7
-7
-7
1995 #02 (VC-2)
N 170301.01 E 1231458.65
1979 02-09 N 169649.01
E 1231475.65
1997 #02 N 166589.95 E 1233851.43
-6
-6
-66
-6
-6
-6 6-64
-6 4-6 8-68
-6
DAVIS PARK
OCEAN BAY PARK
CHERRY GROVE FIRE ISLAND PINE
WATER ISLAND
STAGING AREA
STAGING AREA
STAGING AREA
PROJECT REFERENCE LINE
PINES AZ
-75
-70
-65
-60
-55
-75
-70
-60
0+
5+
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+2
-75
-70
-65
-60
-55
-75
-70
-60
0+
5+
+0
+0
+0
+0
+0
+0
A-B SECTION VIEW
C-D SECTION VIEW
EXISTING SURFACE
DREDGE DEPTH
EL -68'
1:5 SLOPE
DC
A B
DREDGE DEPTH
EL -68'
EXISTING SURFACE
BORROW AREA COORDINATES
POINT EASTING NORTHING
2C-1 1228880 168706
2C-2 1232880 170421
2C-3 1238730 166214
2C-4 1243160 165925
2C-5 1243030 163397
2C-6 1230660 164480
BORROW AREA NOTES:
1. COORDINATES REFER TO THE NEW YORK LONG ISLAND
LAMBERT SYSTEM NAD83 US SURVEY FEET
2. VERTICAL DATUM FOR THIS PROJECT IS NAVD88 IN US
SURVEY FEET
3. REFER TO SPECIFICATIONS SECTION 00 31 32.03 18 FOR
BORROW AREA INFORMATION
4. BATHYMETRIC DATA IS FROM A FEB 2024 HYDROGRAPHIC
SURVEY
BORROW AREA CROSS SECTIONS
1"=10'V 1"=600'H
BORROW AREA PLAN VIEW
1"=2000'
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SHEET ID
O
PT
IO
N
AL
V
AL
U E
1%
O
PT
IO
N
AL
V
AL
U E
2%
S.
R
E.
G
S.
R
./E .G
E.
G
BO
R R
O W
A R
EA
P
LA
N
G-102
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
+X
XX
XX
X-
XX
-X
-X
XX
X
+M M
M M
M M
M M
M M
Y
YY
Y
O
PT
IO
N
AL
F
IE
LD
O
PT
IO
N
AL
F
IE
LD
AN
SI
D
+X
XX
XX
X-
XX
-X
-X
XX
X
FI
R
E
IS
LA
N
D
IN
LE
T
TO
M
O R
IC
H
ES
IN
LE
T
PL
4-
R
EH
AB
IL
IT
AT
IO
N
P R
O
JE
C T
O C
EA
N
B
AY
P
AR
K
TO
D
AV
IS
P
AR
K
SU
FF
O
LK
C O
U N
TY
, N
EW
Y
O R
K
S U
BM
IS
SI
O
N
0 4000'2000'
PLAN
NORTH
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
PI
: 4
+6
6.
-10
-10
-10
-10
-5 -5
-5
0 0
5 5
-13
-12
-12 -12
-12
-11
-11
-11
-11
-9
-9
-9
-9
-9
-9
-8
-8 -8
-7
-7
-7 -6
-6
-6
-4 -4
-4-3 -3 -3
-1 -1 -1
1 1
2 2
3 3
4 4
6 6
7 7
8 8
9 9 9
11 1011
14 1414
151314
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
M
ID
W
AY
A
VE
LA
U
R
EL
A
VE
O N
TA
R
IO
S
T
M
IC
H
IG
AN
W
AL
K
H U
R O
N S
T
ER
IE
S T
O C
EA
N
B
AY
B
LV
D
C H
AM
PL
AI
N
W
AL
K
SU
PE
R
IO
R S
T
O C E A N B A Y P A R K
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
0'
BERM @ EL. 8.5'
PROPOSED DUNE
(SEE NOTE 4)
MEET EXISTING
8.5' ELEVATION
MEET EXISTING
ELEVATION
APPROXIMATE TOE OF 1:15 SLOPE
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
BERM @ EL. 8.5'
E
E
E
N 176000
N 177000
E
N 177000
E
N 176000
N 176000
N 175000
E
SL
O
PE
1:
SL
O
PE
1:
SL
O
PE
1:
20 SL
O
PE
1:
PROJECT REFERENCE LINE
PROJECT REFERENCE LINE
300' TAPER
(TYP')
TRAP BAGS (TYP.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
C
IV
IL
R
ES
O
U R
C
ES
B R
AN
C
H C
EN
AN
EN
C
R B
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
+X
XX
XX
X-
XX
-X
-X
XX
X
+M M
M M
M M
M M
M M
Y
YY
Y
O
PT
IO
N
AL
F
IE
LD
O
PT
IO
N
AL
F
IE
LD
AN
SI
F
U
LL
B
LE
ED
D
(2 2.
X
4.
IN
C H
ES
+X
XX
XX
X-
XX
-X
-X
XX
X
FI
R
E
IS
LA
N
D
IN
LE
T
TO
M
O R
IC
H
ES
IN
LE
T
PL
4-
R
EH
AB
IL
IT
AT
IO
N
P R
O
JE
C T
O C
EA
N
B
AY
P
AR
K
TO
D
AV
IS
P
AR
K
SU
FF
O
LK
C O
U N
TY
, N
Y
S U
BM
IS
SI
O
N
S.
R
E.
G
S.
R
./E .G
E.
G
ST
A.
+0
0.
T O
S
TA
. 4
+5 0.
BE
AC
H
F
IL
L
PL
AN
S
H
EE
T
C-101
PLAN
NORTH
100' 200'0
NOTES:
1. FOR GENERAL NOTES AND LEGENDS SEE SHEET G-101
2. FOR GENERAL PLAN REFERENCE LINE DATA AND BORROW AREA
COORDINATES SEE SHEET G-101 & G-102
3. FOR CROSS SECTIONS SEE SHEETS C-301 TO C-309
4. EXISTING DUNE SHALL BE LEFT AS-IS IF IT IS HIGHER THAN PROPOSED
DUNE. DASHED DUNE LINES REPRESENT THE AREA(S) WHERE EXISTING
DUNE MAY BE HIGHER THAN PROPOSED DUNE. VERIFY IN FIELD.
5. FOR CROSSOVER SHEETS SEE SHEETS C-201 TO C-216.
6. FOR CROSSOVER DETAILS SEE SHEET C-501 TO C-506
7. TRAP BAG LOCATIONS ARE SHOWN FOR INFORMATION ONLY. BAGS ARE
TO REMAIN ON SITE.
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
: 4
+8
8.
PI
: 5
+3
0.
-5 -5
-5 -5
-9 -9
-9
-9
-8
-8
-8
-7
-7
-7
-6 -6
-6 -6
-4 -4
-4 -4
-3 -3
-3 -3
-1
-1
-1 -1
89 9 11 101112
111213
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
O N
EI
D
A
ST
C H
AM
PL
AI
N
W
AL
K
SE
N
EC
A
W
AL
K
BA
Y
AV
E
1S T
ST
2N D
S T
3R D
S T
6T H
S T
C H
U R
C H
S T
NEW YORK AVE
NEW YORK AVE
C
EN
TE
R
S T
P O I N T O' W O O D S O C E A N B A Y P A R K
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
E
E
E
N 177000
E
E
E
N 178000
N 176000
N 177000
APPROXIMATE TOE OF 1:15 SLOPE
SL
O
PE
1:
SL
O
PE
1:
SL
O
PE
1:
20 SL
O
PE
1:
SL
O
PE
1:
BERM @ EL. 8.5'
BERM @ EL. 8.5'
PROJECT REFERENCE LINE15
0' 15
0'
PROPOSED DUNE
(SEE NOTE 4)PROPOSED DUNE
(SEE NOTE 4)
EXISTING ADA CROSSOVER #55 AT
CHAMPLAIN WALK TO BE REPAIRED -
SEE CROSSOVER SHEETS FOR DETAILS STAGING
AREA
TRAP BAGS (TYP.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
C
IV
IL
R
ES
O
U R
C
ES
B R
AN
C
H C
EN
AN
EN
C
R B
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
+X
XX
XX
X-
XX
-X
-X
XX
X
+M M
M M
M M
M M
M M
Y
YY
Y
O
PT
IO
N
AL
F
IE
LD
O
PT
IO
N
AL
F
IE
LD
AN
SI
F
U
LL
B
LE
ED
D
(2 2.
X
4.
IN
C H
ES
+X
XX
XX
X-
XX
-X
-X
XX
X
FI
R
E
IS
LA
N
D
IN
LE
T
TO
M
O R
IC
H
ES
IN
LE
T
PL
4-
R
EH
AB
IL
IT
AT
IO
N
P R
O
JE
C T
O C
EA
N
B
AY
P
AR
K
TO
D
AV
IS
P
AR
K
SU
FF
O
LK
C O
U N
TY
, N
Y
S U
BM
IS
SI
O
N
S.
R
E.
G
S.
R
./E .G
E.
G
ST
A.
+5
0.
T O
S
TA
. 5
+0
BE
AC
H F
IL
L
PL
AN
S H
EE
T
C-102
PLAN
NORTH
100' 200'0
NOTES:
1. FOR GENERAL NOTES AND LEGENDS SEE SHEET G-101
2. FOR GENERAL PLAN REFERENCE LINE DATA AND BORROW AREA
COORDINATES SEE SHEET G-101 & G-102
3. FOR CROSS SECTIONS SEE SHEETS C-301 TO C-309
4. EXISTING DUNE SHALL BE LEFT AS-IS IF IT IS HIGHER THAN PROPOSED
DUNE. DASHED DUNE LINES REPRESENT THE AREA(S) WHERE EXISTING
DUNE MAY BE HIGHER THAN PROPOSED DUNE. VERIFY IN FIELD.
5. FOR CROSSOVER SHEETS SEE SHEETS C-201 TO C-216.
6. FOR CROSSOVER DETAILS SEE SHEET C-501 TO C-506
7. TRAP BAG LOCATIONS ARE SHOWN FOR INFORMATION ONLY. BAGS ARE
TO REMAIN ON SITE.
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
: 5
+3
2.
PI
: 5
+4
3.
PI
: 5
+1
2.
-10
-10
-10
-10
-5
-5 -5
-9
-9 -9
-8
-8 -8
-7
-7
-7
-6
-6
-6
-4
-4
-4
-3
-3
-3
-1
-1
-1
-1
789 8
101112
111213 1011121314
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
S 8T
H S
T
S 9T
H S
T
S
TH
S
T
S
TH
S
T
FIRE ISLAND BEACH RD
TH
S T
P O I N T O' W O O D S
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
E
E
E
E
E
N 178000
N 179000
N 178000
N 177000
APPROXIMATE TOE OF 1:15 SLOPE
PROJECT REFERENCE LINE PROJECT
REFERENCE LINE15
0' 15 0'
SL
O
PE
1:
20 SL
O
PE
1:
APPROXIMATE TOE OF 1:15 SLOPE
BERM @ EL. 8.5'
PROPOSED DUNE
(SEE NOTE 4)PROPOSED DUNE
(SEE NOTE 4)
MEET EXISTING
8.5' ELEVATION
MEET EXISTING
ELEVATION
300' TAPER
(TYP')
TRAP BAGS (TYP.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
C
IV
IL
R
ES
O
U R
C
ES
B R
AN
C
H C
EN
AN
EN
C
R B
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
+X
XX
XX
X-
XX
-X
-X
XX
X
+M M
M M
M M
M M
M M
Y
YY
Y
O
PT
IO
N
AL
F
IE
LD
O
PT
IO
N
AL
F
IE
LD
AN
SI
F
U
LL
B
LE
ED
D
(2 2.
X
4.
IN
C H
ES
+X
XX
XX
X-
XX
-X
-X
XX
X
FI
R
E
IS
LA
N
D
IN
LE
T
TO
M
O R
IC
H
ES
IN
LE
T
PL
4-
R
EH
AB
IL
IT
AT
IO
N
P R
O
JE
C T
O C
EA
N
B
AY
P
AR
K
TO
D
AV
IS
P
AR
K
SU
FF
O
LK
C O
U N
TY
, N
Y
S U
BM
IS
SI
O
N
S.
R
E.
G
S.
R
./E .G
E.
G
ST
A.
+0
TO
S
TA
. 5
+0
BE
AC
H F
IL
L
PL
AN
S H
EE
T
C-103
PLAN
NORTH
100' 200'0
NOTES:
1. FOR GENERAL NOTES AND LEGENDS SEE SHEET G-101
2. FOR GENERAL PLAN REFERENCE LINE DATA AND BORROW AREA
COORDINATES SEE SHEET G-101 & G-102
3. FOR CROSS SECTIONS SEE SHEETS C-301 TO C-309
4. EXISTING DUNE SHALL BE LEFT AS-IF IF IT IS HIGHER THAN PROPOSED
DUNE. DASHED DUNE LINES REPRESENT THE AREA(S) WHERE EXISTING
DUNE MAY BE HIGHER THAN PROPOSED DUNE. VERIFY IN FIELD.
5. FOR CROSSOVER SHEETS SEE SHEETS C-201 TO C-216.
6. FOR CROSSOVER DETAILS SEE SHEET C-501 TO C-506
7. TRAP BAG LOCATIONS ARE SHOWN FOR INFORMATION ONLY. BAGS ARE
TO REMAIN ON SITE.
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
: 6
+9
0.
PI
: 6
+6
1.
PI
: 6
+1
0.
-10 -10
-10
-5 -5
-5
5 5
-9
-9
-9
-8 -8
-8
-7 -7
-7
-6
-6
-6
-4 -4
-4
-3 -3
-3 -1 -1
-1 1 1
12 2
4 4
46 6
7 7
8 8
89 9
11 101112
111213
111213
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
SU
R
F W
AL
K
O C
EA
N
W
AL
K M
AI
N W
AL
K
D O
C
TO
R S
W
AL
K
AE
O
N W
AL
K
LEWIS WALK
LEWIS WALK
JUDY GARLAND MEMORIAL PATH
G R
EE
N
E W
AL
K
C H E R R Y G R O V E
C H E R R Y G R O V E
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
E
E
N 180000
E
E
E
N 181000
APPROXIMATE TOE OF 1:15 SLOPE
SL
O
PE
1:
SL
O
PE
1:
SL
O
PE
1:
SL
O
PE
1:
5' 13
5'
PROJECT REFERENCE LINE
BERM @ EL. 8.5' BERM @ EL. 8.5'
MEET
EXISTING
ELEVATION
300' TAPER
(TYP')
300' TAPER
(TYP')
MEET EXISTING
ELEVATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
C
IV
IL
R
ES
O
U R
C
ES
B R
AN
C
H C
EN
AN
EN
C
R B
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
+X
XX
XX
X-
XX
-X
-X
XX
X
+M M
M M
M M
M M
M M
Y
YY
Y
O
PT
IO
N
AL
F
IE
LD
O
PT
IO
N
AL
F
IE
LD
AN
SI
F
U
LL
B
LE
ED
D
(2 2.
X
4.
IN
C H
ES
+X
XX
XX
X-
XX
-X
-X
XX
X
FI
R
E
IS
LA
N
D
IN
LE
T
TO
M
O R
IC
H
ES
IN
LE
T
PL
4-
R
EH
AB
IL
IT
AT
IO
N
P R
O
JE
C T
O C
EA
N
B
AY
P
AR
K
TO
D
AV
IS
P
AR
K
SU
FF
O
LK
C O
U N
TY
, N
Y
S U
BM
IS
SI
O
N
S.
R
E.
G
S.
R
./E .G
E.
G
ST
A.
+0
TO
S
TA
. 6
+0
BE
AC
H F
IL
L
PL
AN
S H
EE
T
C-104
PLAN
NORTH
100' 200'0
NOTES:
1. FOR GENERAL NOTES AND LEGENDS SEE SHEET G-101
2. FOR GENERAL PLAN REFERENCE LINE DATA AND BORROW AREA
COORDINATES SEE SHEET G-101 & G-102
3. FOR CROSS SECTIONS SEE SHEETS C-301 TO C-309
4. EXISTING DUNE SHALL BE LEFT AS-IS IF IT IS HIGHER THAN PROPOSED
DUNE. DASHED DUNE LINES REPRESENT THE AREA(S) WHERE EXISTING
DUNE MAY BE HIGHER THAN PROPOSED DUNE. VERIFY IN FIELD.
5. FOR CROSSOVER SHEETS SEE SHEETS C-201 TO C-216.
6. FOR CROSSOVER DETAILS SEE SHEET C-501 TO C-506
7. TRAP BAG LOCATIONS ARE SHOWN FOR INFORMATION ONLY. BAGS ARE
TO REMAIN ON SITE.
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
: 6
+1
3.
-10
-10
-10 -10
-5
-5
-5
5 5
-9
-9
-9
-8
-8
-8
-7 -7
-7
-6 -6
-6 -6
-4
-4
-4
-3
-3
-3
-1 -1
-1
12 2
3 3
34 4 4
67 6 6
7 7
8 8
109 9101112 101112 101112
111213 111213
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
SA
N
D Y
W
AL
K
OCEAN WALK
BE
AC
H C
O M
BE
R
W
AL
K
C O
AS
T
G U
AR
D
W
AL
K
BE
AC
H H
IL
L
W
AL
K
D R
IF
TW
O O
D W
AL
K
O
AK
W
AL
K
OCEAN WALK
F I R E I S L A N D P I N E S
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
E
E
E
E
E
E
N 181000
N 182000
APPROXIMATE TOE OF 1:15 SLOPE
0'
130' BERM @
EL. 8.5'
130' BERM @
EL. 8.5'
0'
1:5 SLOPE
25' DUNE @ EL. 14.0'
1:5
SLOPE
1:5 SLOPE
25' DUNE @ EL. 14.0'
1:5
SLOPE
SL
O
PE
1:
SL
O
PE
1:
SL
O
PE
1:
SL
O
PE
1:
PROJECT REFERENCE LINE PROJECT REFERENCE LINE
EXISTING CROSSOVER #73 AT SUSAN
WALK TO BE REPAIRED - SEE
CROSSOVER SHEETS FOR DETAILS
SU
SA
N W
AL
K
EXISTING CROSSOVER #74 AT
DRIFTWOOD WALK TO BE REPAIRED -
SEE CROSSOVER SHEETS FOR DETAILS
EXISTING ADA CROSSOVER &
VEHICULAR CROSSOVER #75
AT COAST GUARD WALK TO
BE REPAIRED - SEE
CROSSOVER SHEETS FOR
DETAILS
EXISTING CROSSOVER #77 AT
REPAIRED - SEE CROSSOVER
TRAP BAGS (TYP.)
MEET EXISTING
8.5' ELEVATION
MEET EXISTING
ELEVATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
C
IV
IL
R
ES
O
U R
C
ES
B R
AN
C
H C
EN
AN
EN
C
R B
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
+X
XX
XX
X-
XX
-X
-X
XX
X
+M M
M M
M M
M M
M M
Y
YY
Y
O
PT
IO
N
AL
F
IE
LD
O
PT
IO
N
AL
F
IE
LD
AN
SI
F
U
LL
B
LE
ED
D
(2 2.
X
4.
IN
C H
ES
+X
XX
XX
X-
XX
-X
-X
XX
X
FI
R
E
IS
LA
N
D
IN
LE
T
TO
M
O R
IC
H
ES
IN
LE
T
PL
4-
R
EH
AB
IL
IT
AT
IO
N
P R
O
JE
C T
O C
EA
N
B
AY
P
AR
K
TO
D
AV
IS
P
AR
K
SU
FF
O
LK
C O
U N
TY
, N
Y
S U
BM
IS
SI
O
N
S.
R
E.
G
S.
R
./E .G
E.
G
ST
A.
+0
TO
S
TA
. 6
+0
BE
AC
H F
IL
L
PL
AN
S H
EE
T
C-105
PLAN
NORTH
100' 200'0
NOTES:
1. FOR GENERAL NOTES AND LEGENDS SEE SHEET G-101
2. FOR GENERAL PLAN REFERENCE LINE DATA AND BORROW AREA
COORDINATES SEE SHEET G-101 & G-102
3. FOR CROSS SECTIONS SEE SHEETS C-301 TO C-309
4. EXISTING DUNE SHALL BE LEFT AS-IS IF IT IS HIGHER THAN PROPOSED
DUNE. DASHED DUNE LINES REPRESENT THE AREA(S) WHERE EXISTING
DUNE MAY BE HIGHER THAN PROPOSED DUNE. VERIFY IN FIELD.
5. FOR CROSSOVER SHEETS SEE SHEETS C-201 TO C-216.
6. FOR CROSSOVER DETAILS SEE SHEET C-501 TO C-506
7. TRAP BAG LOCATIONS ARE SHOWN FOR INFORMATION ONLY. BAGS ARE
TO REMAIN ON SITE.
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
: 6
+5
1.
PI
: 6
+8
7.
-10
-10
-1
-10
-1
-10
-10
-10
-5 -5 -5
-9 -9
-9
-8 -8
-8
-7 -7 -7 -6
-6 -6
-4 -4 -4
-3 -3 -3 -1
-1 -11 1
3 3
6 6 6
8 8 789
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
PI
N
E W
AL
K
C
ED
AR
W
AL
K
W
ID
G
EO
N W
AL
K
AT
LA
N
TI
C W
AL
K
H
AR
BO
R
W
AL
K
N
EP
TU
N
E W
AL
K
SC
AU
P W
AL
K
N
AU
TI
LU
S W
AL
K
SU
N
BU
R
ST
W
AL
K
O
ZO
N E
W
AL
K
SH
EL
L W
AL
K
C R
O W
N W
AL
K
OCEAN WALK
F I R E I S L A N D P I N E S
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
E
E
E
E
E
N 183000
N 182000
APPROXIMATE TOE OF 1:15 SLOPE
OCEAN WALK
PROPOSED DUNE
(SEE NOTE 4)
130' BERM @
EL. 8.5'
130' BERM @
EL. 8.5'17
0'
1:5 SLOPE
25' DUNE @ EL. 14.0'
1:5 SLOPE
25' DUNE @ EL. 14.0'
1:5
SLOPE
SL
O
PE
1:
SL
O
PE
1:
SL
O
PE
1:
20 SL
O
PE
1:
PROJECT REFERENCE LINE
EXISTING CROSSOVER #77 AT
CEDAR WALK TO BE
REPAIRED - SEE CROSSOVER
SHEETS FOR DETAILS
EXISTING CROSSOVER #78 AT
ATLANTIC WALK TO BE
REPAIRED - SEE CROSSOVER
SHEETS FOR DETAILS
STAGING
AREA
TRAP BAGS (TYP.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
C
IV
IL
R
ES
O
U R
C
ES
B R
AN
C
H C
EN
AN
EN
C
R B
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
+X
XX
XX
X-
XX
-X
-X
XX
X
+M M
M M
M M
M M
M M
Y
YY
Y
O
PT
IO
N
AL
F
IE
LD
O
PT
IO
N
AL
F
IE
LD
AN
SI
F
U
LL
B
LE
ED
D
(2 2.
X
4.
IN
C H
ES
+X
XX
XX
X-
XX
-X
-X
XX
X
FI
R
E
IS
LA
N
D
IN
LE
T
TO
M
O R
IC
H
ES
IN
LE
T
PL
4-
R
EH
AB
IL
IT
AT
IO
N
P R
O
JE
C T
O C
EA
N
B
AY
P
AR
K
TO
D
AV
IS
P
AR
K
SU
FF
O
LK
C O
U N
TY
, N
Y
S U
BM
IS
SI
O
N
S.
R
E.
G
S.
R
./E .G
E.
G
ST
A.
+0
TO
S
TA
. 7
+0
BE
AC
H F
IL
L
PL
AN
S H
EE
T
C-106
PLAN
NORTH
100' 200'0
NOTES:
1. FOR GENERAL NOTES AND LEGENDS SEE SHEET G-101
2. FOR GENERAL PLAN REFERENCE LINE DATA AND BORROW AREA
COORDINATES SEE SHEET G-101 & G-102
3. FOR CROSS SECTIONS SEE SHEETS C-301 TO C-309
4. EXISTING DUNE SHALL BE LEFT AS-IS IF IT IS HIGHER THAN PROPOSED
DUNE. DASHED DUNE LINES REPRESENT THE AREA(S) WHERE EXISTING
DUNE MAY BE HIGHER THAN PROPOSED DUNE. VERIFY IN FIELD.
5. FOR CROSSOVER SHEETS SEE SHEETS C-201 TO C-216.
6. FOR CROSSOVER DETAILS SEE SHEET C-501 TO C-506
7. TRAP BAG LOCATIONS ARE SHOWN FOR INFORMATION ONLY. BAGS ARE
TO REMAIN ON SITE.
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
: 7
+9
8.
30 PI
: 7
+4 2.
-1 0 -10
-10
-10
-10
-10
-10
-10
-5
-5
-5-6-4-3
56 5
-1
-9
-9
-9
-9
-9
-8
-8
-8
-7
-7
-7
-7
-7
-6
-6
-6-6
-6
-4-3
-4
-5-6-4-3
-4-3
-3
-3
-3
-3-1
-1
-1
-1
1089ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
FI
SH
ER
M
AN
S
PA
TH
SK
Y
W
AL
K
TA
R
PO
IN
W
AL
K
SA
IL
W
AL
K
OCEAN WALK
F I R E I S L A N D P I N E S M
AT
C
H L
IN
E
SH
EE
T C
-1
M
AT
C H
L
IN
E
SH
EE
T
C -1
M
AT
C
H L
IN
E
SH
EE
T C
-1
M
AT
C H
L
IN
E
SH
EE
T
C -1
E
E
E
E
E
E
N 184000
N 183000
N 183000
APPROXIMATE TOE OF 1:15 SLOPE
PROPOSED DUNE
(SEE NOTE 4)
PROPOSED DUNE
(SEE NOTE 4)PROPOSED DUNE
(SEE NOTE 4)
BERM @ EL. 8.5'
BERM @ EL. 8.5'
SL
O
PE
1:
SL
O
PE
1:
15SL
O
PE
1:
SL
O
PE
1:
PROJECT REFERENCE LINE
0'
EXISTING ADA CROSSOVER #82
AT FISHERMANS PATH TO BE
REPAIRED - SEE CROSSOVER
SHEETS FOR DETAILS
MEET EXISTING
8.5' ELEVATION
MEET
EXISTING
ELEVATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
C
IV
IL
R
ES
O
U R
C
ES
B R
AN
C
H C
EN
AN
EN
C
R B
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
Y
+X
XX
XX
X-
XX
-X
-X
XX
X
+M M
M M
M M
M M
M M
Y
YY
Y
O
PT
IO
N
AL
F
IE
LD
O
PT
IO
N
AL
F
IE
LD
AN
SI
F
U
LL
B
LE
ED
D
(2 2.
X
4.
IN
C H
ES
+X
XX
XX
X-
XX
-X
-X
XX
X
FI
R
E
IS
LA
N
D
IN
LE
T
TO
M
O R
IC
H
ES
IN
LE
T
PL
4-
R
EH
AB
IL
IT
AT
IO
N
P R
O
JE
C T
O C
EA
N
B
AY
P
AR
K
TO
D
AV
IS
P
AR
K
SU
FF
O
LK
C O
U N
TY
, N
Y
S U
BM
IS
SI
O
N
S.
R
E.
G
S.
R
./E .G
E.
G
ST
A.
+0
TO
S
TA
. 7
+0
BE
AC
H F
IL
L
PL
AN
S H
EE
T
C-107
PLAN
NORTH
100' 200'0
NOTES:
1. FOR GENERAL NOTES AND LEGENDS SEE SHEET G-101
2. FOR GENERAL PLAN REFERENCE LINE DATA AND BORROW AREA
COORDINATES SEE SHEET G-101 & G-102
3. FOR CROSS SECTIONS SEE SHEETS C-301 TO C-309
4. EXISTING DUNE SHALL BE LEFT AS-IS IF IT IS HIGHER THAN PROPOSED
DUNE. DASHED DUNE LINES REPRESENT THE AREA(S) WHERE EXISTING
DUNE MAY BE HIGHER THAN PROPOSED DUNE. VERIFY IN FIELD.
5. FOR CROSSOVER SHEETS SEE SHEETS C-201 TO C-216.
6. FOR CROSSOVER DETAILS SEE SHEET C-501 TO C-506
7. TRAP BAG LOCATIONS ARE SHOWN FOR INFORMATION ONLY. BAGS ARE
TO REMAIN ON SITE.
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
: 8
+3
4.
PI
: 8
+7
2.
PI
: 8
+9
3.
-10 -10 -10
-5
-5
-5 -5
-9 -9 -9
-8 -8
-8-7 -7
-7-6
-6 -6
-4
-4 -4
-3 -3
-3
-1
1 12 2 23 3 34
4 4 6 6
89 1089
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
A.
+0
ST
This is the start of the file's text. The full file is on GovTribe.