This document is a section from the specifications for a federal contract opportunity related to the Fire Island Inlet to Moriches Inlet (FIMI) Reach PL 84-99, PIR 2024 project in Suffolk County, New York.

The project includes dredging and beach fill placement, sand fencing, pedestrian and vehicular crossover repairs, and dune vegetation planting over a distance of approximately 44,150 feet between Ocean Bay Park and Davis Park. The contract requires the contractor to commence work within 10 calendar days of receiving the Notice to Proceed and complete the entire work within 250,502 calendar days. The project is estimated to cost between $25,000,000 and $100,000,000. The contractor is responsible for repairing or replacing any existing work that is altered or damaged during construction. The solicitation number is W912DS24B0017 and the work will be performed by the U.S. Army Corps of Engineers, New York District.

View the file

Other files

File Type Posted
C.04.01 24B0017 FIMI Bid Abstract.Rev1.pdf PDF
amendment 0005.pdf PDF
B.08.03+Amendment+04.pdf PDF
B.08.03 Amendment 03.pdf PDF
Amend 3_01_35_26.pdf PDF
Amend 3_00 31 32.06 18.pdf PDF
01 14 00_Amend2.pdf PDF
01 35 26_Amend2.pdf PDF
B.08.03 Amendment 02.pdf PDF
00 31 24.01 18_Amend2.pdf PDF
31 24 00.00 18_Amend2.pdf PDF
31 62 19_Amend2.pdf PDF
01 20 00_Amend2.pdf PDF
00 31 32.06 18_Amend2.pdf PDF
01 78 00_Amend2.pdf PDF
35 20 23_Amend 2.pdf PDF
06 13 00_Amend2.pdf PDF
Borrow 2C ENElev_Navd88.txt TXT text file
Amend 2 FIMI PIR 2024 Plans.pdf PDF
01 57 19_Amend2.pdf PDF
35 20 23.23_Amend 2.pdf PDF
01 50 00_Amend2.pdf PDF
B.08.03 Amendment 01.pdf PDF
B.08.03 01 30 00.pdf PDF
A.03.09 95pct_FIMI PIR 2024 DDR.pdf PDF
A.03.09 May 31 FIMI PIR 2024 Plans.pdf PDF
A.03.09 ECIFP_FIMI.pdf PDF
A.03.09 PL8499_FIMI_PIR_95_PCNT_SPEC_05-31-2024.pdf PDF
B.08.03 Invitation for Bid W912DS24B0017.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PL 84- 99 FI MI - Ocean Bay Par k t o Davi s Par k PL8499FI MI Amendment 02

SECTI ON 01 11 00

SUMMARY OF WORK

08/ 15, CHG 2: 08/ 21

PART 1 GENERAL

1. 1 FAR 52. 211- 10, COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK

a. The Cont r act or must be r equi r ed t o ( i ) commence wor k under t hi s cont r act wi t hi n t en ( 10) cal endar days af t er t he dat e t he Cont r act or r ecei ves t he Not i ce t o Pr oceed ( NTP) , ( i i ) pr osecut e t he wor k di l i gent l y, and ( i i i ) compl et e t he ent i r e wor k r eady f or use not l at er t han 250502 cal endar days af t er t he dat e t he Cont r act or r ecei ves t he not i ce t o pr oceed. See Sect i on 01 14 00, Par a 1. 3 Or der of Wor k f or f ur t her det ai l s. The dat e st at ed f or compl et i on must i ncl ude f i nal c l eanup of t he pr emi ses.

b. Al l wor k must be i n accor dance wi t h t he dr awi ngs and speci f i cat i ons or i nst r uct i ons at t ached her et o and made a par t t her eof , or t o be f ur ni shed her eaf t er by t he Cont r act i ng Of f i cer and subj ect , i n ever y det ai l , t o hi s super vi s i on, di r ect i on, and i nst r uct i ons.

c. Repl ace t he wor d " shal l " wi t h " must " i n t hi s Cont r act Speci f i cat i ons.

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

The wor k i ncl udes dr edgi ng and beach f i l l pl acement , sand f enci ng, pedest r i an and vehi cul ar cr ossover r epai r s, dune veget at i on pl ant i ng and i nci dent al r el at ed wor k.

1. 2. 2 Locat i on

The wor k i s l ocat ed bet ween Fi r e I s l and I nl et t o Mor i ches I nl et , speci f i cal l y f r om Seavi ew t o Davi s Par k, Suf f ol k Count y. The exact l ocat i on i s shown i n bi d document s.

1. 3 DFARS 236. 204, DI SCLOSURE OF THE MAGNI TUDE OF CONSTRUCTI ON PROJECTS

Thi s pr oj ect i s est i mat ed bet ween $25, 000, 000. 00 and $100, 000, 000. 00

1. 4 EXI STI NG WORK

I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

c. The Cont r act or i s r esponsi bl e f or t he r epai r , r est or at i on, or f or al l

SECTI ON 01 11 00 Page 1

PL 84- 99 FI MI - Ocean Bay Par k t o Davi s Par k PL8499FI MI Amendment 02 cost of damage r esul t i ng t her ef r om. I f t he Cont r act or el ect s t o have al t er at i ons made t o any exi st i ng st r uct ur e, ut i l i t y , dune, r oad, or ot her i mpr ovement s, cont r act or must make ar r angement s wi t h t he owner of t he f aci l i t y f or such al t er at i on and t he ar r angement s must be appr oved by t he Cont r act i ng Of f i cer pr i or t o maki ng al t er at i ons.

Repai r and r est or at i on must compl y wi t h cont r act r equi r ement s and must al so be appr oved by t he Cont r act i ng Of f i cer

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Sect i on - -

SECTI ON 01 11 00 Page 2

01 11 00 - SUMMARY OF WORK
PART 1 GENERAL
1.1 FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.3 DFARS 236.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS
1.4 EXISTING WORK
PART 2 PRODUCTS
PART 3 EXECUTION