This document is a Request for Proposals (RFP) for the Fire Island Inlet to Moriches Inlet (FIMI) Reach PL 84-99, PIR 2024 Project. The U.S. Army Corps of Engineers, New York District is seeking proposals to repair and restore the project area to design conditions, including approximately 1.7 million CY of beachfill restoration, 35,202 ft of sand fencing replacement, 31 acres of dune grass planting, repair of 6-10 elevated timber dune crossover structures, and repair of 2 vehicular crossovers. The sand will be dredged from the Atlantic Ocean Sand Borrow Area 2C. The estimated construction cost is between $50,000,000 and $100,000,000. The period of performance is through May 31, 2024.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
95% SPECIFICATIONS
FIRE ISLAND INLET
TO MORICHES INLET
PL 84-99 REHABILITATION PROJECT
OCEAN BAY PARK TO DAVIS PARK
SUFFOLK COUNTY, NY
IFB No. W912DS-24-X-00XX
May 2024
U.S. Army Corps of Engineers New York District
THIS PAGE INTENTIONALLY LEFT BLANK
PL 84- 99 FI MI - Ocean Bay Par k t o Davi s Par k PL8499FI MI 95%
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 31 00. 02 18 07/ 17 REPORT OF OPERATI ONS FORM ( Eng For m
27A) - HOPPER DREDGES
00 31 24. 01 18 07/ 17 WATER QUALI TY CERTI FI CATE
00 31 32. 01 18 06/ 17 WENTWORTH SCALE
00 31 32. 03 18 07/ 17 BORROW AREA CORE PENETRATI ON GRAPHS
AND COMPOSI TE GRAI N SI ZE DI STRI BUTI ON
CURVES
00 31 32. 05 18 05/ 24 TRAP BAGS LOCATI ON
00 31 32. 06 18 05/ 24 SPECI AL USE PERMI T
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 08/ 15, CHG 2: 08/ 21 SUMMARY OF WORK
01 11 35 AI R EMI SSI ONS REQUI REMENTS
01 14 00 11/ 22, CHG 1: 02/ 23 WORK RESTRI CTI ONS
01 20 00 11/ 20, CHG 3: 02/ 23 PRI CE AND PAYMENT PROCEDURES
01 30 00 11/ 20, CHG 3: 08/ 23 ADMI NI STRATI VE REQUI REMENTS
01 32 01. 00 10 08/ 23 PROJECT SCHEDULE
01 33 00 08/ 18, CHG 4: 02/ 21 SUBMI TTAL PROCEDURES
01 35 26 11/ 20, CHG 4: 08/ 23 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 02/ 19, CHG 1: 08/ 23 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00 08/ 23 QUALI TY CONTROL
01 45 00. 15 10 11/ 23 RESI DENT MANAGEMENT SYSTEM CONTRACTOR
MODE ( RMS CM)
01 50 00 11/ 20, CHG 2: 08/ 22 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND
CONTROLS
01 56 10. 00 18 ENDANGERED SPECI ES OBSERVERS ( HOPPER
DREDGES ONLY)
01 57 19 08/ 22 TEMPORARY ENVI RONMENTAL CONTROLS
01 58 00 08/ 19, CHG 5: 08/ 22 PROJECT I DENTI FI CATI ON
01 74 19 02/ 19 DREDGI NG WASTE MANAGEMENT AND DI SPOSAL
01 78 00 05/ 19, CHG 1: 08/ 21 CLOSEOUT SUBMI TTALS
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 08/ 22 DEMOLI TI ON
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 13 00 11/ 16 CROSSOVER
06 13 34. 00 18 VEHI CULAR DUNE CROSSOVER
DI VI SI ON 31 - EARTHWORK
31 05 19. 13 02/ 21 GEOTEXTI LES FOR EARTHWORK
31 24 00. 00 18 BEACH FI LL PLACEMENT
31 62 19 11/ 16 TI MBER MARI NE PI LES
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 31 10. 00 18 SAND FENCE
32 94 00 DUNE VEGETATI ON PLAN
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
PROJECT TABLE OF CONTENTS Page 1
35 20 23 08/ 20 DREDGI NG
35 20 23. 23 02/ 22 NATI ONAL DREDGI NG QUALI TY MANAGEMENT
PROGRAM - HOPPER DREDGE
DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS
40 77 23 07/ 19 VI BRATI ON MONI TORI NG OF STRUCTURES
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 2
SECTI ON 00 31 00. 02 18
REPORT OF OPERATI ONS FORM ( Eng For m 27A) - HOPPER DREDGES 07/ 17
PART 1 GENERAL
1. 1 DESCRI PTI ON
Eng For m 27A, Dai l y Repor t of Oper at i ons - Hopper Dr edges
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
- - End of Sect i on - -
DOCUMENT 00 31 00. 02 18 Page 1 b.
AGITATING
ENG FORM 27A, APR 1973 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 3
1. DISTRICT
DAILY REPORT OF OPERATIONS - HOPPER DREDGES
For use of this form, see ER 37-2-10; the proponent agency is CECW-OD.
a. MAINTENANCE
REPORTS CONTROL SYMBOL
ENGCW-0-13
2. DREDGE
3. EXACT LOCATION OF WORK 5. DATE (YYYYMMDD)
6. NUMBER OF PERSONS IN CREW
b. NEW WORK
7. AV. LENGTH OF CUT 10. CHARACTER OF MATERIAL
8. AV. WIDTH OF CUT
9. AV. DIST. TO DUMP
a. DENSITY OF MAT. IN PLACE
°F
11. HOPPER CAPACITY
12. AV. VOL. OF BIN WATER
13. AV. UNFILLED CAPACITYFT.
FT.
FT.
GMS/LITER
b. DENSITY OF WATER GMS/LITER AT
CU YDS.
CU YDS.
CU YDS.
14. NAVIGATION AND OTHER DREDGING AIDS (Describe and include statement on adequacy and recommendations)
15. WORK PERFORMED
a.
DREDGING AND HAULING
(1)
NO. OF LOADS
(2)
TOT. CU. YDS.
(3)
DISPOSAL AREA
(1)
TOT. CU. YDS.
16. DRAFT FOR LOAD NO. (for one load only)
(1)
LIGHT
(2)
LOADED
a. FORWARD
b. AFT
18. DRAG DEPTH MAX. MIN.
19. INDICATORS LAST CHECKED ON
DATE (YYYYMMDD)
20. GAS EJECTORS USED % OF PUMPING TIME
21. DISTRIBUTION OF TIME AND MILES RUN
(a) AGITATING (Minutes)
(b) DREDGING AND HAULING (Minutes)
(c) MILES RUN (Stat. Miles)
a. EFFECTIVE WORKING TIME
(1) PUMPING
(2) TURNING
(3) TO DUMP
(4) DUMPING
(5) TO CUT
(7) TOTALS
b. NON-EFFECTIVE WORKING TIME
(1) TAKING ON FUEL AND SUPPLIES
(2) TO AND FROM WHARF OR ANCHORAGE
(3) LOSS DUE TO NATURAL ELEMENTS
(4) LOSS DUE TO TRAFFIC AND BRIDGES
(5) MINOR OPERATING REPAIRS
(6) TRANSFERRING BETWEEN WORKS
(7) LAY TIME
(8) FIRE AND BOAT DRILLS
(9) MISCELLANEOUS
(10) TOTALS
4. WORK TYPE
17.
AREA
ENG FORM 27A, APR 1973 Page 2 of 3
c. SIGNATUREb. DATE (YYYYMMDD)
21. DISTRIBUTION OF TIME AND MILES RUN (Continuation)
(a) AGITATING (Minutes)
(b) DREDGING AND HAULING (Minutes)
(c) MILES RUN (Stat. Miles)
c. LOST TIME
(1) MAJOR REPAIRS AND ALTERATIONS
(2) CESSATION
(3) COLLISIONS
(4) TOTAL LOST TIME
(d) TOTAL TIME IN PERIOD
22. AVERAGE SPEED OF DREDGE 23. MINUTES RADAR IN USE
a. LOADING b. FEET / MINUTE 24. TIDE DATA WAS OBTAINED BY MEANS OF
c. AGITATING 25. WEATHER
d. GALS. OF FUEL OIL CONSUMED
e. GALS. OF WATER CONSUMED
26. NUMBER OF INSPECTIONS BY SUPERVISORY PERSONNEL
a. FIELD b. OFFICE
27. REMARKS
28a. SUBMITTED BY NAME (Last, First MI) AND TITLE
I
I
MATE AND
DRAGTENDERS
ENG FORM 27A, APR 1973 Page 3 of 3
32. REMARKS
29.
BREAKDOWN OF LOADS DREDGED AND HAULED
30. DATE (YYYYMMDD)
b.
TIME PUMP
(0001-2400) c.
MINUTES
d.
CUBIC YARDS RETAINED
(In terms of in place material)
a. PUMPING TIME (Minutes) b. ECONOMIC LOAD (Cubic Yards) c. TEST LOAD NUMBER. d. DATE OF TEST (YYYYMMDD)
31. ECONOMIC LOAD DATA
f. AVERAGE e.
MID-DEPTH SAMPLES
NOTE:
*WHEN LOAD IS DREDGED WITH HOPPERS UNWATERED, INDICATE BY LETTER "U".
**TOTAL CUBIC YARDS RETAINED = SETTLED SOLIDS + SUSPENDED SOLIDS - BIN WATER SOLIDS OR DETERMINED DIRECTLY BY
YARDAGE METER.
***NOT NECESSARY WHEN MEASURING LOAD BY YARDAGE METER.
a.
(1) (2) (1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6) (1) (2) (3)
S
O
LID
S
(In place)
***D E
N S
IT
Y
G
M S
/L
IT
E R
P
R E
L A
P S
D f
M
IN
U T
R P
U M
P
IN
U
**T O
T A
L
B
W A
T
--s u
S P
E N
D
-*S
T T
L f
S O
T
L
C U
M P
D U
R N
M P
O P
P
A R
T
*U N
W A
T E
R
LO
D N
U M
B
LEFT BLANK I NTENTI ONALLY
DOCUMENT 00 31 00. 02 18 Page 2
SECTI ON 00 31 24. 01 18
WATER QUALI TY CERTI FI CATE
07/ 17
PART 1 GENERAL
1. 1 DESCRI PTI ON
Wat er Qual i t y Cer t i f i cat e wi l l be pr ovi ded when avai l abl e.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
DOCUMENT 00 31 24. 01 18 Page 1
DOCUMENT 00 31 24. 01 18 Page 2
SECTI ON 00 31 32. 01 18
WENTWORTH SCALE
06/ 17
PART 1 GENERAL
1. 1 DESCRI PTI ON
Went wor t h scal e
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
DOCUMENT 00 31 32. 01 18 Page 1
00 90 03-1
COMPOSITE GRAIN SIZE DISTRIBUTION CURVES FOR SAND SEDIMENTS AND
GRAIN SIZE SCALES FOR SEDIMENT
The grade scale most commonly used for sediments is the Wentworth (1922) scale which is a logarithmic scale in that each grade limit is twice as large as the next smaller grade limit. The scale starting at 1mm and changing by a fixed ratio of 2 was introduced by J.A. Udden (1898), who also named the sand grades we use today.
However, Udden drew the gravel/sand border at 1 mm and used different terms in the gravel and mud division. For more detailed work, sieves have been constructed at intervals 2 ^(1/2) and 2^(1/14). The Φ (phi) scale, devised by Krumbein, is a much more convenient way of presenting data than if the values are expressed in millimeters, and is used almost entirely in recent work.
WENTWORTH SCALE
DOCUMENT 00 31 32. 01 18 Page 2
SECTI ON 00 31 32. 03 18
BORROW AREA CORE PENETRATI ON GRAPHS AND COMPOSI TE GRAI N SI ZE DI STRI BUTI ON
CURVES
07/ 17
PART 1 GENERAL
1. 1 DESCRI PTI ON
Document at i on i ncl udi ng gr ai n s i ze di st r i but i on cur ves, cor e l ogs, summar y t abl es, and a sampl e sei smi c pr of i l e.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
DOCUMENT 00 31 32. 03 18 Page 1
FIMP Borrow Area 2C
Location
BA_Name PT_Name EastingSP83 NorthingSP83 Latitude Longitude 2C 1 1228880 168706 40.62636 -73.1187 2C 2 1232880 170421 40.63095 -73.1042 2C 3 1238730 166214 40.61924 -73.0833 2C 4 1243160 165925 40.61832 -73.0674 2C 5 1243030 163397 40.61138 -73.0679 2C 6 1230660 164480 40.61471 -73.1125
Core 1979 02-09 Data
Core 1995 #02 Data
Core 1997 #02 Data
DOCUMENT 00 31 32. 03 18 Page 2
SECTI ON 00 31 32. 05 18
TRAP BAGS LOCATI ON
05/ 24
PART 1 GENERAL
1. 1 DESCRI PTI ON
Tr ap Bags l ocat i ons ar e f or i nf or mat i on onl y t o show wher e t he bags ar e l ocat ed.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
DOCUMENT 00 31 32. 05 18 Page 1
DOCUMENT 00 31 32. 05 18 Page 2
"/Trustees Walk
East Walk
West Walk
Donella Walk
Sea Jay Walk
Beach Plum Walk
Pepperidge Walk
165.0 164.5
164.0
163.5 163.0
162.5 162.0
161.5 161.0
1 inch = 250 feet
"/ Monitor Station Reinstall TrapBags (1,800 ft) Fill and Cover TrapBags (65 ft) Cover TrapBags (350 ft) CEHA Line Existing TrapBags Upland Sand Source
Ü
NOTES:
1. Project: (1) Re-installation of 1,800 linear feet of TrapBag Erosion Control System. Existing, damaged TrapBags shall be removed and new TrapBags installed in place. (2) Placement of fill in existing TrapBags where fill has been lost.
2. Method: TrapBags to be filled with sand upland from Upland Sand Source locations on plan (with permission from Town/County), or using upland sand barged to Davis Park.
Sand shall be placed in TrapBag with small bulldozer and/or skid loader.
3. Total volume of sand required for TrapBag fill is 1,350 +/- cy. Upland Sand Sources contain approximately 700 cy of clean sand. Remainder shall be barged from approved upland source. Total number of TrapBags proposed is 600 bags.
4. TrapBag system to be covered with sand from an approved upland source or through beach scraping if criteria are met. Once covered, TrapBag system will be planted with American beach grass, 2" plugs 18" on center.
Snow fencing shall then be installed in zigzag immediately seaward of of TrapBag system, for protection and to trap sand for cover.
5. 2016 orthoimages from NYS GIS Clearinghouse (gis.ny.gov).
Davis Park BECD: TrapBag Erosion Control System Atlantic oceanfront, Davis Park, Fire Island
Prepared By: Land Use Ecological Services, Inc.
570 Expressway Drive South, Suite 2F Medford, NY 11763
Date: 1/22/2013
Project: Davis Park TrapBag Erosion Control System For: Town of Brookhaven for Davis Park BECD Attn: Thomas Carrano, DEP 1 Independence Hill Farmingville, NY 11738 Revisions: 2/14/2013, 3/10/2017, 4/16/2018, 5/25/2018
3'
1' 4'
Existing Grade Proposed Grade Proposed TrapBag In-Place Damaged TrapBag to be Removed Proposed Dune Fencing
6'
1 inch = 20 feet Profile View
M
ATCH LINE
Harbor Walk
Atlantic Walk
Cedar Walk
Coast Guard Walk
Beach Hill Walk
Sandy Walk
Driftwood Walk
Low Priority 100 ft Work Area
Priority #2 400 ft Little or No Dune
Priority #3 150 ft
Low Priority 250 ft Work Area
AHW 4/2018
ALW 1/9/2013
FIP7FIP6FIP5FIP4FIP3FIP2
Reinstall TrapBags (1,700 ft) Fill + Cover TrapBags (2,240 ft) Cover TrapBags (930 ft) Existing TrapBags CEHA_Line
"/ Monitor Station
Fire Island Pines BECD: TrapBag Erosion Control System
Prepared By: Land Use Ecological Services, Inc.
570 Expressway Drive South, Suite 2F Medford, NY 11763 Drawn By: K. Risotto Date: 1/17/2013 Rev.: 2/14/13, 4/22/15, 9/17/15, 3/10/17, 3/15/17, 4/19/18
Project: Fire Island Pines TrapBag Erosion Control System For: Fire Island Pines BECD c/o Town of Brookhaven Division of Environmental Protection 1 Independence Hill Farmingville, NY 11738 Scale: As Noted Sheet: 1 of 1
Profile View 3'
4' 6'
Existing Grade Proposed Grade Proposed TrapBag In-Place Damaged TrapBag to be Removed Proposed Dune Fencing
M
ATCH LINE
Nautilus Walk
Fisherman's Walk
Sail Walk
Ozone Walk
Crown Walk
Sunburst Walk
Priority #1 850 ft Most Vulnerable Area
Low Priority 100 ft Work AreaPriority #2 400 ft
Little or No Dune
AHW 4/2018
ALW 1/9/2013
FIP9 FIP13FIP12FIP11
FIP10
1'
1 inch = 200 feet Ü
NOTES:
1. Project: (1) Re-installation of 1,700 linear feet of TrapBag Erosion Control System where shown. Existing, damaged TrapBags shall be removed and new TrapBags installed in place.
(2) Placement of fill in existing TrapBags where fill has been lost.
2. Method:TrapBags to be filled with sand obtained from an upland sand source. Sand shall be placed in TrapBag with small bulldozer and/or skid loader. TrapBag is held open by Man Portable Deployment Units (MPDUs), which are removed once bag is filled.
3. Total volume of sand required for TrapBag reinstallation and fill is 2,000 +/- cy. Total number of TrapBags proposed is 567 bags.
4. TrapBag system to be covered with sand from an approved upland source or through beach scraping if criteria are met. Once covered, TrapBag system will be planted with American beach grass, 2" plugs 18" on center.
Snow fencing shall then be installed in zigzag immediately seaward of of TrapBag system, for protection and to trap sand for cover.
5. 2016 orthoimages from NYS GIS Clearinghouse (gis.ny.gov).
AHW
ALW
Su pe rio r A ve
Mi ch iga n W alk
Hu ron
St
Er ie
St
On tar io St
Oc ea n B ay
Bl vd
Ch am pla in
Wa lk
On eid a S t
Se ne ca W alk
122.0 122.5
123.0 123.5
124.0
1 inch = 150 feet
Reinstall TrapBags (600 ft) Fill TrapBags (0 ft) Cover TrapBags (155 ft) Traffic Ave. Sand Source Existing TrapBags CEHA Line
"/ Monitor Station
Ü
NOTES:
1. Project: (1) Reinstallation of 600 linear feet of TrapBag Erosion Control System from Oneida St to east of Ontario St. Existing, damaged bags to be removed and new TrapBags installed in place.
2. Method: TrapBags to be filled with sand obtained from an upland sand source. Sand to be placed in TrapBag with small bulldozer and/or skid loader.
3. Total volume of sand required for TrapBag reinstallation is 440 +/- cy. Upland sand available from Traffic Ave is 400-450 cy.
Take upper 8" of sand from east of Ocean Bay Blvd. Take upper 6" of sand from west of Ocean Bay Blvd.
4. Total number of TrapBags proposed is 200 bags.
5. TrapBag system to be covered with sand from an approved upland source or through beach scraping if criteria are met. Once covered, TrapBag system will be planted with American beach grass, 2" plugs 18" on center. Snow fencing shall then be installed in zigzag immediately seaward of of TrapBag system, for protection and to trap sand for cover.
6. 2016 orthoimages from NYS GIS Clearinghouse (gis.ny.gov).
Ocean Bay Park BECD: TrapBag Erosion Control System Atlantic oceanfront, Ocean Bay Park, Fire Island
Prepared By: Land Use Ecological Services, Inc.
570 Expressway Drive South, Suite 2F Medford, NY 11763 Date: 1/22/2013
REV: 2/14/2013, 2/19/2013, 4/17/2018,
5/18/2018
Project: Ocean Bay Park TrapBag Erosion Control System For: Ocean Bay Park BECD, Town of Brookhaven Attn: Thomas Carrano, DEP, 1 Independence Hill Farmingville, NY 11738 Scale: As Noted
ORV Access Cut
Profile View 3'
1' 4'
6'
Existing Grade Proposed Grade Proposed TrapBag In-Place Damaged TrapBag to be Removed Proposed Dune Fencing
FIRE ISLAND
APPLICATION BY COUNTY OF SUFFOLK
CHARLES BARTHA, P.E.
COMMISSIONER
DEPARTMENT OF PUBLIC WORKS
GEI CONSULTANTS, INC., P. C.
HUNTINGTON STATION, NEW YORK
EMERGENCY COASTAL PROTECTION:
SUFFOLK COUNTY, NEW YORK
DATE: FEBRUARY 2024
Document Path: B:\Working\SUFFOLK COUNTY NY DPW\2002497 Permit Application Services\05_GIS\Fire_Island_Beach_Nourishment\GIS\FireIsland_LocationMap.mxd
0 8,000 16,0004,000 Feet
SHEET 1 OF 5
SOURCE: BAY SHORE EAST, SAYVILLE, AND HOWELLS POINT USGS QUADRANGLE
PROJECT LOCATION
LAT. 40°38'43.888"N
LONG. 73°8'39.992"W
PROJECT LOCATION
LAT. 40°39'50.27"N
LONG. 73°3'58.487"W
PROJECT LOCATION
LAT. 40°40'55.828"N
LONG. 73°0'15.385"W
SHEET 4
SHEET 3
SHEET 5
Source: Esri, Maxar, Earthstar Geographics, and the GIS User Community
FIRE ISLAND
APPLICATION BY COUNTY OF SUFFOLK
COMMISSIONER
CHARLES BARTHA, P.E.
DEPARTMENT OF PUBLIC WORKS
GEI CONSULTANTS, INC., P. C.
HUNTINGTON STATION, NEW YORK
SUFFOLK COUNTY, NEW YORK
DATE: FEBRUARY 2024
0 8,000 16,0004,000 Feet
SHEET 2 OF 5
NOTES:
1. AERIAL IMAGERY (ESRI, 2022).
LEGEND:
APPROXIMATE EXCESSIVE BERM STOCKPILE LOCATION ABOVE MHW
APPROXIMATE TRAP BAG LOCATION
MAP SHEETS
EMERGENCY COASTAL PROTECTION:
OCEAN BAY PARK TRAP BAGS ~ 2,000 LF
APPLICATION BY COUNTY OF SUFFOLK
COMMISSIONER
CHARLES BARTHA, P.E.
DEPARTMENT OF PUBLIC WORKS
GEI CONSULTANTS, INC., P. C.
HUNTINGTON STATION, NEW YORK
DATE: FEBRUARY 2024
0 590 1,180295 Feet
SHEET 3 OF 5
LEGEND:
APPROXIMATE EXCESSIVE BERM STOCKPILE LOCATION ABOVE MHW
APPROXIMATE TRAP BAG LOCATION
APPARENT MEAN HIGH WATER (2/5/2024)
NOTES:
1. AERIAL IMAGERY (ESRI, 2022).
EMERGENCY COASTAL PROTECTION:
SUFFOLK COUNTY, NEW YORK
FIRE ISLAND PINES TRAP BAGS ~ 6,000 LF
APPLICATION BY COUNTY OF SUFFOLK
COMMISSIONER
CHARLES BARTHA, P.E.
DEPARTMENT OF PUBLIC WORKS
GEI CONSULTANTS, INC., P. C.
HUNTINGTON STATION, NEW YORK
DATE: FEBRUARY 2024
0 590 1,180295 Feet
SHEET 4 OF 5
LEGEND:
APPROXIMATE TRAP BAG LOCATION
APPARENT MEAN HIGH WATER (2/5/2024)
NOTES:
1. AERIAL IMAGERY (ESRI, 2022).
EMERGENCY COASTAL PROTECTION:
DAVIS PARK TRAP BAGS ~ 4,000 LF
APPLICATION BY COUNTY OF SUFFOLK
COMMISSIONER
CHARLES BARTHA, P.E.
DEPARTMENT OF PUBLIC WORKS
GEI CONSULTANTS, INC., P. C.
HUNTINGTON STATION, NEW YORK
DATE: FEBRUARY 2024
0 590 1,180295 Feet
SHEET 5 OF 5
LEGEND:
APPROXIMATE TRAP BAG LOCATION
APPARENT MEAN HIGH WATER (2/5/2024)
NOTES:
1. AERIAL IMAGERY (ESRI, 2022).
EMERGENCY COASTAL PROTECTION:
LEFT BLANK INTENTIONALLY
SECTI ON 00 31 32. 06 18
SPECI AL USE PERMI T
05/ 24
PART 1 GENERAL
1. 1 DESCRI PTI ON
The Speci al Use Per mi t f or FI MI - Sal t ai r e t o Seavi ew wor k i s at t ached f or r ef er ence of s i mi l ar wor k r est r i ct i ons.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
DOCUMENT 00 31 32. 06 18 Page 1
NPS Form 10-114 (Rev. 01/2017)
National Park Service
SPECIAL USE PERMIT
Fire Island National Seashore] 120 Laurel Street Patchogue, New York 11772 631-687-4758
Name Park Alpha Code
Veronica A. Hiriams FIIS
Company/Organization Type of Use
U.S. Army Corps of Engineers FIMP Construction
Street Address Permit #
Jacob K. Javits Federal Building, 26 Federal Plaza 21-FIIS-031
City State Zip Code Country
New York NY 10278 USA
Telephone Number Cell Phone Number
917-790-8430
Fax Number
Email Address
Veronica.a.hiriams@usace.army.mil is hereby authorized to use the following described land or facilities in Fire Island National Seashore:
National Park Service administered lands from the eastern boundary of Robert Moses State Park approximately 800 feet onto NPS lands.
The area must be restored to its original condition at the end of the permit.
The permit begins at 6:00 x am / pm on 9/15/2021. The permit expires at 5:00 am / x pm on 3/1/202022.
SUMMARY OF PERMITTED ACTIVITY: (see attached sheets for additional information and conditions)
The US Army Corps of Engineers (USACE) is seeking access on, over and through federal lands administered by the National Park Service (NPS) in connection with the Fire Island to Montauk Point Coastal Storm Risk Management Project (FIMP). Proposed work in support of FIMP Contract 1 activities is to take place on NPS lands located on the south shore of Fire Island from the dune southward to the water's edge and westward along Robert Moses State Park. Sand placement is proposed for Robert Moses State Park and, tapered eastward onto adjoining land located within NPS jurisdiction in order to blend with existing oceanfront dunes (berm/dune tapers). Contractor staging areas will be located at Robert Moses State Park, Parking Field 2.
Support equipment includes 4 Excavators, Dredge Pipe, USACE vehicles (labeled with placard) for project manager and Quality Assurance team.
Person on site responsible for adherence to the terms and conditions of the permit (include contact information)
Kevin Merenda – 917-790-6153 / 917-816-2545
Authorizing legislation or other authority
54 U.S.C. §100101
APPLICATION FEE
Received Amount
X Not Required $ Waived
PERFORMANCE BOND
Required Amount
Not Required $
LIABILITY INSURANCE
X Required Amount
Not Required $
COST RECOVERY
Required Amount
Not Required $
LOCATION FEE
Required Amount
Not Required $
ISSUANCE of this permit is subject to the attached conditions. The undersigned hereby accepts this permit subject to the terms, covenants, obligations, and reservations, expressed or implied herein.
Title: Acting Chief, Real Estate, New York District Real Estate Contracting Officer
Date:
PERMITTEE Signature - VERONICA A. HIRIAMS
Title: Superintendent Date:
Authorizing NPS Official
Title: Date:
Authorizing NPS Official (additional, if required)
NPS Form 10-114 (Rev. 01/2017)
National Park Service
CONDITIONS OF THIS PERMIT
Failure to comply with any of the terms and conditions of this permit may result in the immediate suspension or revocation of the permit. [36 CFR 1.6(h)]
1. The permittee is prohibited from giving false information; to do so will be considered a breach of conditions and be grounds for revocation: [36 CFR
2.32(a)(3)].
2. This permit may not be transferred or assigned without the prior written consent of the Superintendent.
3. The permittee shall exercise this privilege subject to the supervision of the Superintendent or designee, and shall comply with all applicable Federal, State, county and municipal laws, ordinances, regulations, codes, and the terms and conditions of this permit. Failure to do so may result in the immediate suspension of the permitted activity or the revocation of the permit. All costs associated with clean up or damage repairs in conjunction with a revoked permit will be the responsibility of the permittee.
4. The permittee is responsible for making all necessary contacts and arrangements with other Federal, State, and local agencies to secure required inspections, permits, licenses, etc.
5. The park area associated with this permit will remain open and available to the public during park visiting hours. This permit does not guarantee exclusive use of an area. Permit activities will not unduly interfere with other park visitors’ use and enjoyment of the area.
6. This permit may be revoked at the discretion of the Superintendent upon 24 hours notice.
7. This permit may be revoked without notice if damage to resources or facilities occurs or is threatened, notwithstanding any other term or condition of the permit to the contrary.
8. The Permittee agrees to be responsible for administration and/or payment of any and all claims for property damage or personal injuries which may arise out of the activities authorized by this Agreement in accordance with the provisions of the Federal Tort Claims Act.
9. Agents of the Permittee, including any contractors providing services to the Permittee in connection with the activity authorized under this permit, are required to submit proof of insurance to the NPS as a condition of this Permit. This Permit may be delayed, suspended, or terminated for failure to provide satisfactory proof of insurance to the NPS. Applicable insurance requirements include:
a. General Liability Insurance Requirements – Commercial General Liability through one or more primary and umbrella liability policies against claims for bodily injury and property damage occurring on the Premises, the improvements thereon, or the streets, curbs or sidewalks adjoining the Premises, with such limits as may be required by the NPS, but in any event not less than One Million Dollars ($1,000,000) per incident and Three Million Dollars ($3,000,000) in the aggregate for the Premises.
b. All insurance policies shall name the United States of America as an additional insured. The United States of America must be identified as additional insured on the face on documents issued in connection with same.
c. No approval by the NPS of any insurer, or the terms or conditions of any policy, or any coverage or amount of insurance, or any deductible amount shall be construed as a representation by the NPS of the solvency of the insurer or the sufficiency of any policy or any coverage or amount of insurance or deductible.
10. The person(s) named on the permit as in charge of the permitted activity on-site must have full authority to make any decisions about the activity and must remain available, during normal working hours. He/she shall be responsible for all individuals, groups, vendors, etc. involved with the permit
11. Nothing herein contained shall be construed as binding the Service to expend in any one fiscal year any sum in excess of appropriations made by
Congress or administratively allocated for the purpose of this permit for the fiscal year, or to involve the Service in any contract or other obligation for the further expenditure of money in excess of such appropriations or allocations.
12. If any provision of this permit shall be found to be invalid or unenforceable, the remainder of this permit shall not be affected and the other provisions of this permit shall be valid and be enforced to the fullest extent permitted by law.
13. The permit holder is not authorized to stage equipment, fuel, and building supplies on Seashore administered lands for work in conjunction with the contract authorizing the work under this permit.
14. Permittee will need to prepare and send to the National Park Service a hazardous material spill control plan to be utilized for any and all equipment being used on the beach.
15. There will be no access on the Burma Road east of the west end check point.
16. The USACE will provide the National Park Service with a copy of the awarded contract.
17. No work will be authorized on National Park Service lands between March 1st and September 15th.
18. The USACE will ensure that construction activities will follow the mitigations outlined in the USFWS Biological Opinion (BO). The permit holder will be responsible for any monitoring required by the BO and shall ensure that certified ecological monitors will monitor for the presence of any threatened and endangered species that may be in the project area (Red Knots, Sea Bach Amaranth, etc.). on the beach within the project area and adjacent to communities. These monitors must notify the National Park Service immediately at 631-687-4760 (POC – Michael Bilecki) if any threatened and endangered species are observed. The National Park Service and the permit holder shall coordinate a joint response which may include the installation of fencing, posted signs, and further monitoring. The permit holder is responsible for supplying materials related to protection of threatened and endangered species within the project area.
19. Work is authorized south of the dune district and/or 20 feet from the toe of the dune.
20. Vehicles owned or leased by the United States with operators that provide project support may access portions of the job site by entering on the beach, park lands from the eastern boundary of Robert Moses State Park. These vehicles must have USACE placards on the vehicles.
21. The permit holder must give the National Park Service via email, www.FIIS_checkpoint@nps.gov, a minimum of 48 hours notice prior to mobilization of the project.
22. Any change in contractor’s equipment list and vehicles must be approved by the National Park Service.
23. Permittee will provide a list of USACE vehicles and authorized drivers along with required documentation, to the National Park Service.
24. The National Park Service shall have the option to review and make necessary adjustments to permit conditions.
http://www.FIIS_checkpoint@nps.gov/
DOCUMENT 00 31 32. 06 18 Page 2
SECTI ON 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 FAR 52. 211- 10, COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK
a. The Cont r act or must be r equi r ed t o ( i ) commence wor k under t hi s cont r act wi t hi n t en ( 10) cal endar days af t er t he dat e t he Cont r act or r ecei ves t he Not i ce t o Pr oceed ( NTP) , ( i i ) pr osecut e t he wor k di l i gent l y, and ( i i i ) compl et e t he ent i r e wor k r eady f or use not l at er t han 250 cal endar days af t er t he dat e t he Cont r act or r ecei ves t he not i ce t o pr oceed. See Sect i on 01 14 00, Par a 1. 3 Or der of Wor k f or f ur t her det ai l s. The dat e st at ed f or compl et i on must i ncl ude f i nal c l eanup of t he pr emi ses.
b. Al l wor k must be i n accor dance wi t h t he dr awi ngs and speci f i cat i ons or i nst r uct i ons at t ached her et o and made a par t t her eof , or t o be f ur ni shed her eaf t er by t he Cont r act i ng Of f i cer and subj ect , i n ever y det ai l , t o hi s super vi s i on, di r ect i on, and i nst r uct i ons.
c. Repl ace t he wor d " shal l " wi t h " must " i n t hi s Cont r act Speci f i cat i ons.
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
The wor k i ncl udes dr edgi ng and beach f i l l pl acement , sand f enci ng, pedest r i an and vehi cul ar cr ossover r epai r s, dune veget at i on pl ant i ng and i nci dent al r el at ed wor k.
1. 2. 2 Locat i on
The wor k i s l ocat ed bet ween Fi r e I s l and I nl et t o Mor i ches I nl et , speci f i cal l y f r om Seavi ew t o Davi s Par k, Suf f ol k Count y. The exact l ocat i on i s shown i n bi d document s.
1. 3 DFARS 236. 204, DI SCLOSURE OF THE MAGNI TUDE OF CONSTRUCTI ON PROJECTS
Thi s pr oj ect i s est i mat ed bet ween $25, 000, 000. 00 and $100, 000, 000. 00
1. 4 EXI STI NG WORK
I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
c. The Cont r act or i s r esponsi bl e f or t he r epai r , r est or at i on, or f or al l
SECTI ON 01 11 00 Page 1 cost of damage r esul t i ng t her ef r om. I f t he Cont r act or el ect s t o have al t er at i ons made t o any exi st i ng st r uct ur e, ut i l i t y , dune, r oad, or ot her i mpr ovement s, cont r act or must make ar r angement s wi t h t he owner of t he f aci l i t y f or such al t er at i on and t he ar r angement s must be appr oved by t he Cont r act i ng Of f i cer pr i or t o maki ng al t er at i ons.
Repai r and r est or at i on must compl y wi t h cont r act r equi r ement s and must al so be appr oved by t he Cont r act i ng Of f i cer
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
SECTI ON 01 11 00 Page 2
SECTI ON 01 11 35
AI R EMI SSI ONS REQUI REMENTS
PART 1 GENERAL
1. 1 BACKGROUND
The Cont r act or must compl y wi t h t he ai r emi ssi ons r equi r ement s of t hi s sect i on whi ch ar e i nt ended t o ensur e compl i ance wi t h t he Feder al Cl ean Ai r Act .
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng must be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 06 Test Repor t s
Pr oj ect Ai r Emi ssi ons Cal cul at or ; G, RO
Mont hl y Ai r Emi ssi ons Cal cul at or ; G, RO
Nar r at i ve; G, RO
SD- 07 Cer t i f i cat es
Cer t i f i cat i on; G, RO
1. 3 PRE- OPERATI ONAL PLANNI NG AND REPORTI NG
The Cont r act or must r et ai n an i ndependent f i r m havi ng a mi ni mum of 3 year s of exper i ence i n cal cul at i ng ai r emi ssi ons f or equi pment i n t he ut i l i t y , pr ocess, const r uct i on or manuf act ur i ng i ndust r i es t o assi st t he Cont r act or i n f ul f i l l i ng t he r equi r ement s of t hi s sect i on.
The Cont r act or must submi t t he Pr oj ect Ai r Emi ssi ons Cal cul at or i nf or mat i on wi t hi n 30 cal endar days af t er not i ce t o pr oceed.
The Pr oj ect Ai r Emi ssi ons Cal cul at or wi l l be pr ovi ded el ect r oni cal l y t o t he Cont r act or by t he Gover nment on or shor t l y af t er not i ce of cont r act awar d. The Cont r act or must compl et e t he cal cul at or by ent er i ng i nf or mat i on on al l di esel - power ed equi pment ant i c i pat ed t o be used i n per f or mance of t he cont r act and t he ant i c i pat ed number of hour s of oper at i on of each pi ece of equi pment i n each cal endar year t hat wor k i s expect ed t o t ake pl ace. The cal cul at or submi t t al must be made i n t he same f or mat as t he or i gi nal Pr oj ect Ai r Emi ssi ons Cal cul at or pr ovi ded by t he Gover nment .
1. 4 OPERATI ONAL MONI TORI NG, RECORDKEEPI NG AND REPORTI NG
Pr ovi de mont hl y i nf or mat i on l i s t ed bel ow dur i ng t he execut i on of t he cont r act :
SECTI ON 01 11 35 Page 1
1. 4. 1 Mont hl y Ai r Emi ssi ons Cal cul at or and Nar r at i ve
The Mont hl y Ai r Emi ssi ons Cal cul at or wi l l be pr ovi ded t o t he Cont r act or by t he Gover nment at t he st ar t of wor k and at t he begi nni ng of each cal endar year i n whi ch wor k t ake pl ace.
The Mont hl y Ai r Emi ssi ons Cal cul at or and Nar r at i ve must be updat ed mont hl y and submi t t ed el ect r oni cal l y t o t he COR. Updat ed cal cul at or , nar r at i ve and ot her i nf or mat i on associ at ed wi t h t hi s t ask ar e due 10 cal endar days af t er t he end of each mont h. The updat ed mont hl y cal cul at or submi t t al must be made i n t he same f or mat as t he or i gi nal Ai r Emi ssi ons Cal cul at or pr ovi ded by t he Gover nment .
The Mont hl y Ai r Emi ssi ons Cal cul at or must be updat ed mont hl y t o r ef l ect act ual hour s wor ked, equi pment act ual l y used, act ual emi ssi on cont r ol met hods used dur i ng t he pr evi ous mont h, and a pr oj ect i on of r emai ni ng wor k on t he cont r act dur i ng t he cal endar year ; and
A Nar r at i ve expl ai ni ng t he changes f r om t he Pr oj ect Ai r Emi ssi ons Cal cul at or t o t he updat ed Mont hl y Ai r Emi ssi ons Cal cul at or must be submi t t ed wi t hi n 30 cal endar days af t er t he not i ce t o pr oceed.
1. 4. 2 Cer t i f i cat i on
Pr ovi de a Cer t i f i cat i on f r om an i ndependent Ai r Emi ssi ons Consul t ant st at i ng t hat t he i nf or mat i on pr ovi ded i n t he MONTHLY AI R EMI SSI ONS CALCULATOR AND NARRATI VE par agr aph i s accur at e and t hat any t echnol ogi es, t echni ques, or met hods used t o r educe emi ssi ons ar e appr oved by t he U. S.
Envi r onment al Pr ot ect i on Agency ( EPA) .
The Cont r act or must be r equi r ed t o measur e and r ecor d t he f ol l owi ng par amet er s wi t hi n t he 3- naut i cal mi l e l i ne of t he coast : dat e and t i me, engi ne hour s of oper at i on, and f uel use r at es on al l di esel - power ed engi nes associ at ed wi t h act ual dr edgi ng equi pment and t he auxi l i ar y power gener at or s and pumps. Thi s i nf or mat i on can be obt ai ned by downl oadi ng dat a f r om t he el ect r oni c engi ne management cont r ol syst em, i f avai l abl e. The submi t t al s must be i n one of t he f ol l owi ng f i l e f or mat s: ( 1) t ext f or mat , ei t her comma or t ab del i mi t ed or ( 2) Mi cr osof t Excel . Submi t t al s wi l l be r ej ect ed t hat r equi r e pr opr i et ar y sof t war e f or access.
1. 5 RETAI NAGE AND REDUCTI ON I N CONTRACT PRI CE
Fai l ur e of t he Cont r act or t o pr ovi de t he associ at ed document s i n compl i ance wi t h r equi r ement s f ound i n t he PRE- OPERATI ONAL PLANNI NG AND REPORTI NG and OPERATI ONAL MONI TORI NG, RECORDKEEPI NG AND REPORTI NG par agr aphs wi l l r esul t i n r et ai nage and r educt i on i n t he cont r act pr i ce.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTI ON
NOT USED.
SECTI ON 01 11 35 Page 2
U.S. Army Corps of Engineers - New York District Contract: Fire Island Emergency Stabilization Project - Saltaire to Seaview
MONTH:
YEAR: 2020 sample
Page: of
Vessel Name:
Engine Information Activity Information
Date Engine Name Engine Type
(Propulsion, Auxiliary, etc.)
Daily
Runtime
(hours)
Daily Fuel
Consumption
(tons or gallons)
# of Daily
Trips to
Offload
Average
Transit Time
Within 3-
Nautical Mile Line (hours)
Average
Loaded
Speed
(knots)
Average
Unloaded
Speed
(knots)
SECTI ON 01 14 00
WORK RESTRI CTI ONS
11/ 22, CHG 1: 02/ 23
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2024) Saf et y and Heal t h Requi r ement s Manual
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or i nf or mat i on onl y. When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment .
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Li st of Cont act Per sonnel
1. 3 ORDER OF WORK
Pr oceed wi t h t he pl acement of beach f i l l i n a cont i nuous manner al ong t he shor el i ne f r om t he east t o t he west , or as di r ect ed and appr oved by t he Cont r act i ng Of f i cer or Cont r act i ng Of f i cer Repr esent at i ve ( COR) . Dr edgi ng wor k must be compl et ed no l at er t han 180 days af t er t he not i ce t o pr oceed i s i ssued.
Pl ace beach f i l l i n maxi mum 1, 000- f oot - wi de beach wor kzone/ cl osur e ar eas.
Wor ki ng i n mor e t han one cl osur e ar ea at a t i me must be at t he di scr et i on of t he COR and wi t h coor di nat i on wi t h l ocal communi t i es. Mai nt ai n access t o t he beach at al l t i mes except wi t hi n t he act i ve est abl i shed beach f i l l wor k zone( s) .
Manual sand pl acement wi l l be r equi r ed f or t he new dune wher e heavy equi pment cannot access pl us addi t i onal l ocat i ons as di r ect ed by t he COR.
Mi ni mi ze damages t o exi st i ng dunes and dune veget at i on. Rest or e and r e- veget at e exi st i ng dunes t hat wer e r emoved or al t er ed t o meet pr e- const r uct i on condi t i ons at t he mi ni mum.
Di r ect t he use of ot her avai l abl e beach access ( i . e. nei ghbor i ng exi st i ng access ways, or t empor ar y access ways) out si de t he sand pl acement wor k zones, dur i ng const r uct i on of t he beach and dune f i l l .
SECTI ON 01 14 00 Page 1
1. 4 CONTRACTOR ACCESS AND USE OF PREMI SES
1. 4. 1 Act i v i t y Regul at i ons
Ensur e t hat Cont r act or per sonnel empl oyed on t he Act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear appr opr i at e per sonal pr ot ect i ve equi pment ( PPE) i n desi gnat ed ar eas. Do not ent er any r est r i ct ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Ensur e al l Cont r act or equi pment , i ncl ude del i ver y vehi c l es, ar e c l ear l y i dent i f i ed wi t h t hei r company name.
1. 4. 1. 1 Subcont r act or s and Per sonnel Cont act s
Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.
1. 4. 1. 2 No Smoki ng Pol i cy
Smoki ng i s pr ohi bi t ed except i n desi gnat ed smoki ng ar eas, except i n desi gnat ed smoki ng ar eas. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.
1. 4. 2 Wor ki ng Hour s
Regul ar wor ki ng hour s wi l l consi st of an 8 1/ 2 hour per i od or est abl i shed by t he Cont r act i ng Of f i cer , bet ween 7 a. m. and 3: 30 p. m. , Monday t hr ough Fr i day, excl udi ng Gover nment hol i days.
24 hour s per day, 7 days per week i s al l owed f or dr edgi ng and beach f i l l pl acement wor k.
1. 4. 3 Wor ki ng Condi t i ons
Compl y wi t h par agr aph Fat i gue Management Pl an ( FMP) of EM 385- 1- 1.
1. 4. 4 Wor k Out si de Regul ar Hour s
Wor k out si de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .
Make appl i cat i on 15 cal endar days pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess, gi v i ng t he speci f i c dat es, hour s, l ocat i on, t ype of wor k t o be per f or med, cont r act number and pr oj ect t i t l e. Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out si de r egul ar hour s. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer .
1. 4. 5 Access To Pr oj ect
Al l access t o t he FI MI pr oj ect ar ea must occur v i a WATER ACCESS ONLY, i ncl udi ng del i ver y of mat er i al s, r emoval of wast e, mobi l i zat i on of addi t i onal equi pment , and per sonnel ar r i val and depar t ur e. Ref er t o NPS Speci al Use Per mi t f or det ai l ed access r est r i ct i ons.
SECTI ON 01 14 00 Page 2
1. 4. 6 Tr ans- At l ant i c Submar i ne Cabl es
Ther e ar e no Tr ans- At l ant i c Submar i ne Cabl es wi t hi n t he pr oj ect ar ea.
1. 4. 7 Wor k Li mi t s
Li mi t of Wor ks ext end bet ween t he l andwar d t oe of t he dune and t he seawar d i nt er sect i on of t he beach f i l l s l ope and t he exi st i ng gr ade.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 14 00 Page 3
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 3: 02/ 23
PART 1 GENERAL
1. 1 CONTRACT COST BREAKDOWN
The Cont r act or must f ur ni sh wi t hi n 30 days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i ncl uded i n t he var i ous i t ems. Thi s Cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .
1. 2 SI NGLE JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s Cont r act f or whi ch Cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BI DDI NG PROPOSAL SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
1. 2. 1 Mobi l i zat i on and Demobi l i zat i on
1. 2. 1. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h mobi l i zat i on and demobi l i zat i on, as def i ned i n Speci al Cont r act Requi r ement PAYMENT FOR
MOBI LI ZATI ON AND DEMOBI LI ZATI ON.
1. 2. 1. 2 Uni t of Measur e
Uni t of measur e: j ob.
1. 2. 2 Fi nal Recor d Dr awi ngs
Cont r act or must compl et e t he “ Recor d Dr awi ng As- Bui l t s" CAD submi t t al as r equi r ed by Speci f i cat i on Sect i on 01 78 00 CLOSEOUT SUBMI TTALS f or Recor d Dr awi ngs Fi l es and f or CAD st andar ds and compl i ance r equi r ement s.
1. 2. 2. 1 Uni t of Measur e
Uni t of measur e: j ob.
SECTI ON 01 20 00 Page 1
1. 2. 3 Vi br at i on Moni t or i ng
1. 2. 3. 1 Payment
Al l wor k f or Vi br at i on Moni t or i ng shal l be i ncl uded i n t he Vi br at i on Moni t or i ng Li ne I t em on t he Bi d Schedul e.
1. 2. 3. 2 Uni t of Measur e
Uni t of measur e: j ob.
1. 3 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s Cont r act on whi ch t he Cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI DDI NG PROPOSAL SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.
1. 3. 1 Hydr aul i c Beach Fi l l - Ocean Bay t o Davi s Par k
1. 3. 1. 1 Payment
The t ot al amount of mat er i al accept abl y pl aced on t he beach ( f r om t he bor r ow ar eas) i s t o be pai d f or at t he cont r act uni t pr i ce as shown on t he bi d schedul e must be measur ed by t he cubi c yar d i n pl ace on t he beach by comput i ng t he vol ume bet ween t he beach sur f ace shown by a sur vey made bef or e f i l l i ng and beach sur f ace shown on a sur vey af t er f i l l i ng. The r ef er ence dat um shal l be NAVD. No payment shal l be made f or mat er i al pl aced:
( 1) I n excess of t he quant i t y t o t he desi gn gr ade pl us t he 0. 5 f oot t ol er ance. Ref er t o t he Compensat ed Sl ope par agr aph i n sect i on 31 24
00. 00 18 BEACH FI LL PLACEMENT f or except i on r egar di ng compensat ed sl ope.
( 2) For t he ext ent of t he pr oj ect as shown on t he cont r act dr awi ngs, above dune cr est pl us t ol er ance; 14 f t NAVD pl us t ol er ance on t he dune cr est ; beyond t he 1 on 5 s l ope l i ne on dune si de sl ope pl us t ol er ance, above +8. 5 f t NAVD pl us t ol er ance on t he ber m, and beyond t he poi nt wher e t he 1 on 20 sl ope l i ne f r om El . +8. 5 f t . NAVD pl us t ol er ance, i nt er sect s t he ocean bot t om. Ref er t o t he Compensat ed Sl ope par agr aph i n sect i on 31 24 00. 00 18 BEACH FI LL PLACEMENT f or except i on bel ow el evat i on +3. 0 NAVD.
( 3) Whi ch was obt ai ned f r om out si de t he desi gnat ed bor r ow ar ea or bel ow t he maxi mum dr edgi ng l i mi t of t he bor r ow ar ea, except as di r ect ed by t he Cont r act i ng Of f i cer or hi s r epr esent at i ve.
1. 3. 1. 2 Or i gi nal and Fi nal Sur veys
The Cont r act or shal l make or i gi nal and f i nal sur veys under t he super vi s i on of t he Cont r act i ng Of f i cer ' s r epr esent at i ve and shal l make comput at i ons t o det er mi ne t he quant i t i es of mat er i al s pl aced on t he beach f or accept ance.
SECTI ON 01 20 00 Page 2
1. 3. 1. 3 Sur veys f or Pr ogr ess Payment s
The Cont r act or wi l l make any sur veys f or per i ods f or whi ch pr ogr ess payment s ar e r equest ed and shal l make t he comput at i ons based on t hese sur veys.
1. 3. 1. 4 I ni t i al and Fi nal Sur veys
I ni t i al and f i nal sur veys f or accept ance wi l l be t aken i mmedi at el y pr i or t o and af t er f i l l pl acement . Bef or e f i l l , sur veys shal l not be t aken mor e t han 14 days pr i or t o f i l l pl acement . Sur veys wi l l be t aken on par al l el pr of i l e l i nes ( r anges) spaced at a maxi mum of 100- f oot i nt er val s. The mi ni mum st at i oni ng i nt er val wi l l be 25 f eet or at br eaks i n s l ope.
The Cont r act or shal l conduct t he or i gi nal and f i nal sur veys, wi t h t he pr esence of Gover nment r epr esent at i ves, and make t he comput at i ons based on t hem. The Cont r act or shal l conduct t he sur veys f or any per i ods f or whi ch pr ogr ess payment s ar e r equest ed and shal l make t he comput at i ons based on t hese sur veys. Al l sur veys conduct ed by t he Cont r act or shal l be done by a New Yor k l i censed sur veyor and cer t i f i ed hydr ogr apher subj ect ed t o appr oval by t he Cont r act i ng Of f i cer .
- The Cont r act or shal l be r esponsi bl e t o conduct al l sur veys. The Cont r act or shal l mai nt ai n wor k sect i ons - a pr e- const r uct i on and f i nal accept ance sect i on sur veyed whi l e const r uct i on i s t aki ng pl ace i n bet ween.
The pr e- const r uct i on sect i ons shoul d be mai nt ai ned at a mi ni mum 300 f eet ahead of t he f i l l pl acement . The Cont r act or shal l make such comput at i ons as ar e necessar y t o det er mi ne t he quant i t i es of wor k per f or med or f i nal l y i n pl ace and submi t t he comput at i on f or Gover nment appr oval .
- Pr ompt l y upon compl et i ng a sur vey, t he Cont r act or shal l f ur ni sh t he or i gi nal s of al l f i el d not es and al l ot her r ecor ds r el at i ng t o t he sur vey or t o t he l ayout of t he wor k t o t he Cont r act i ng Of f i cer , who shal l use t hem as necessar y t o det er mi ne t he amount of pr ogr ess payment s. The Cont r act or shal l r et ai n copi es of al l such mat er i al f ur ni shed t o t he Cont r act i ng Of f i cer or hi s r epr esent at i ve. ( FAR 52. 236- 16)
For Beach Fi l l Pl acement :
The Cont r act or wi l l coor di nat e wi t h t he Cont r act i ng Of f i cer ' s r epr esent at i ve t o mai nt ai n wor k sect i ons. The Cont r act or wi l l per f or m pr econst r uct i on sur veys bet ween 500 f eet and 1500 f eet i n advance of t he l ast accept ance st at i on but not mor e t han 14 days pr i or t o f i l l pl acement .
The sur veys shal l be per f or med i n 100 f oot i ncr ement s. Accept ance sur veys shal l be per f or med when 500 l i near f eet of beach i s dr essed and gr aded t o t empl at e.
For Bor r ow Ar ea Sur veys:
A pr e- and post - const r uct i on sur vey of t he bor r ow ar ea at l east 100 f eet al ong t he l engt h of t he bor r ow ar ea and 25- f oot i nt er val s i s r equi r ed f or t hi s pr oj ect t o moni t…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .