Eastern Multiple Award Task Order Contract (MATOC) Replacement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
47PL0122R0035
Agency
Region 10 Public Buildings Service, General Services Administration
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2AA Repair Or Alteration Of Office Buildings
Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

The General Services Administration's Northwest/Arctic Region is soliciting proposals for an Indefinite Delivery Indefinite Quantity Multiple Award Task Order Contract to provide construction services for federally owned and leased facilities in Eastern Washington, Eastern Oregon, and Idaho. Services include non-complex construction, design-bid-build, design-build, and bridging design-build projects. GSA intends to award this contract to six contractors for a total value of $70 million over five years to complete tenant improvements, building repairs, conveyance systems work, roofing, mechanical, electrical, plumbing, and exterior projects. Proposals are due by specified dates with evaluation criteria of technical approach, past performance, and price. A pre-proposal conference will be held on July 6, 2022.

This opportunity is set aside as a total small business solicitation. The NAICS code is 236220 for commercial and institutional building construction with a small business size standard of $39.5 million. Task order values will range from $25,000 to $5 million, with most between $50,000 and $250,000. The period of performance will be five years for projects located in federally owned and leased facilities within Eastern Washington, Eastern Oregon, and Idaho.

Notice text

9 versions

Update #9 · Latest ·

Amendment 0007: Amend 0007 SF30 47PL0122R0035.pdf

Provide the following documents in response to Contractor RFI's:

Amend 0007 Contractor RFI's and Responses 6.pdf

Amend 0007 Attachment F  Seed Project Price and Services Schedule Rev2.xlxs

NO OTHER AMENDMENTS WILL BE ISSUED. PROPOSALS REMAIN DUE 8/3/2022 1:00PM PST. 

Updating attachment: Amend 0006 Attachment F  Seed Project Price and Services Schedule Rev1.xlxs

Note regarding period or performance on "Evaluated Price Info Sheet" corrected for appropriate duration. (100-160). 

Amendment 0006: Amend 0006 SF30 47PL0122R0035.pdf

Provide the following documents in response to Contractor RFI's:

Amend 0006 Contractor RFI's and Responses 5.pdf

Amend 0006 Attachment F  Seed Project Price and Services Schedule Rev1.xlxs

Amendment 0005: Amend 0005 SF30 47PL0122R0035.pdf

Extending the due date for proposal to 3 August 2022 at 1:00PM PST,

Provide the following documents in response to Contractor RFI's:

Amend 0005 Contractor RFI's and Responses 4.pdf

Amendment 0004: Amend 0004 SF30 47PL0122R0035.pdf

Provide the following documents in response to Contractor RFI's:

Amend 0004 Contractor RFI's and Responses 3.pdf

Amend 0004 Site Visit Sign In Sheet 2 Redacted.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0003: Amend 0003 SF30 47PL0122R0035.pdf

Extending the due date for proposal to 1 August 2022 at 1:00PM PST,

Schedule a second site visit for the Seed Project for 20 July 2022 at 10:30AM PST 

Provide the following documents in response to Contractor RFI's:

Amend 0003 Contractor RFI's and Responses.pdf

2019 Asbestos Reinspection Survey Report Thomas S. Foley USCH.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0002: Amend 0002 SF30 47PL0122R0035.pdf

Providing the following documents: 

Amend 0002 Contractor RFI's & Responses.pdf, 
Amend 0002 Exhibit 6 Past Performance Questionnaire Rev1.doc;
Amend 0002 R10 EMATOC SOW 04222022.pdf.

Amend 0002 Site Visit Sign in Sheet.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0001: Amend 0001 SF30 47PL0122R0035.pdf

Updating inconsistencies between documents regarding Site Visit, add directions for site visit attendees regarding Spokane County's Covid-19 Level HIGH rating, and providing a correct EMATOC SF1442 document. See revised Attachments: 

Amend 0001 RFP EMATOC 47PL0122R0035.pdf, 
Amend 0001 Attachment D - TORFP Seed Project.pdf;
Amend 0001 SF 1442 47PL0122R0035.pdf.

**In accordance with CDC requirements for a County Level that has been categorized as HIGH, which Spokane County was as of 30 June 2022 all site visit attendees must bring and properly wear a mask while indoors.**

Description of Services

The GSA Northwest/Arctic Region (R10) has a recurring requirement for construction services. In order to support these projects R10 will award (1) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for construction projects in federally owned and leased facilities in the area of responsibility (AOR) covering a geographic range of Eastern Washington, Eastern Oregon, and Idaho. This IDIQ supports the following project delivery methods; 

1) non-complex construction efforts to be constructed based on Government furnished scope of work. 

2) design-bid-build, using Government furnished design documents. 

3) design/build, based on the Government furnishing a statement of objectives to be used as the basis of design and which the selected contractor designs and constructs the effort.

 4) bridging design/build, using Government furnished design documents developed to no more than 30% design documents. 

The construction scope Work includes, but is not limited to, tenant improvement, minor repair and alteration of building envelope, conveyance systems, roofing, mechanical and electrical systems, plumbing, and exterior improvements. Construction projects will be completed in a safe, efficient, cost effective manner that is based upon prudent use of taxpayer funds. Contractor firms awarded a Task Order Contract shall deliver the completed construction project, for its intended purpose and within the established project delivery schedule. Prime contractors are responsible for project management, site superintendence, labor, subcontractor management, quality control of installation and end use functionality for all work awarded.  

GSA anticipates awarding 6 separate contracts as a result of the solicitation. Total contract length, and ordering period, will be for five (5) years. Awarded contractors are expected to compete by participation in task order solicitations. Task Order solicitations will be issued by GSA offices assigned to the Acquisition Division within Region 10. 

Contract Value

The Contract Maximum Value (CMV) for this contract vehicle is $70,000,000.00. Meaning the cumulative total for all task orders awarded to all contractors over the life of the contract (5 Years) shall not exceed $70 Million.

The anticipated ordering limits are between $25,000.00 and $5,000,000.00. The typical task order is expected to be between $50,000.00 and $250,000.00. Task Order solicitations will adhere to the competitive procedures outlined in FAR 16.5.

Access to Controlled Unclassified Information (CUI): 

Please see Exhibit 2 and 3 for instructions to obtain access to Seed Project attachments that contain CUI. Provide signed acknowledgement and the GACA email address and created for your firm to mackenzie.dunn@gsa.gov, Cc: heather.bowden@gsa.gov. 

NAICS Code and Small Business Standard

The applicable NAICS code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $39.5 million. 

Pre-Proposal Conference for Prime Contractors

A pre-proposal site walk for the Seed Project will be held onsite on Wednesday, July 6, 2022. 

See attached files for solicitation details.

Update #8 ·

Updating attachment: Amend 0006 Attachment F  Seed Project Price and Services Schedule Rev1.xlxs

Note regarding period or performance on "Evaluated Price Info Sheet" corrected for appropriate duration. (100-160). 

Amendment 0006: Amend 0006 SF30 47PL0122R0035.pdf

Provide the following documents in response to Contractor RFI's:

Amend 0006 Contractor RFI's and Responses 5.pdf

Amend 0006 Attachment F  Seed Project Price and Services Schedule Rev1.xlxs

Amendment 0005: Amend 0005 SF30 47PL0122R0035.pdf

Extending the due date for proposal to 3 August 2022 at 1:00PM PST,

Provide the following documents in response to Contractor RFI's:

Amend 0005 Contractor RFI's and Responses 4.pdf

Amendment 0004: Amend 0004 SF30 47PL0122R0035.pdf

Provide the following documents in response to Contractor RFI's:

Amend 0004 Contractor RFI's and Responses 3.pdf

Amend 0004 Site Visit Sign In Sheet 2 Redacted.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0003: Amend 0003 SF30 47PL0122R0035.pdf

Extending the due date for proposal to 1 August 2022 at 1:00PM PST,

Schedule a second site visit for the Seed Project for 20 July 2022 at 10:30AM PST 

Provide the following documents in response to Contractor RFI's:

Amend 0003 Contractor RFI's and Responses.pdf

2019 Asbestos Reinspection Survey Report Thomas S. Foley USCH.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0002: Amend 0002 SF30 47PL0122R0035.pdf

Providing the following documents: 

Amend 0002 Contractor RFI's & Responses.pdf, 
Amend 0002 Exhibit 6 Past Performance Questionnaire Rev1.doc;
Amend 0002 R10 EMATOC SOW 04222022.pdf.

Amend 0002 Site Visit Sign in Sheet.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0001: Amend 0001 SF30 47PL0122R0035.pdf

Updating inconsistencies between documents regarding Site Visit, add directions for site visit attendees regarding Spokane County's Covid-19 Level HIGH rating, and providing a correct EMATOC SF1442 document. See revised Attachments: 

Amend 0001 RFP EMATOC 47PL0122R0035.pdf, 
Amend 0001 Attachment D - TORFP Seed Project.pdf;
Amend 0001 SF 1442 47PL0122R0035.pdf.

**In accordance with CDC requirements for a County Level that has been categorized as HIGH, which Spokane County was as of 30 June 2022 all site visit attendees must bring and properly wear a mask while indoors.**

Description of Services

The GSA Northwest/Arctic Region (R10) has a recurring requirement for construction services. In order to support these projects R10 will award (1) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for construction projects in federally owned and leased facilities in the area of responsibility (AOR) covering a geographic range of Eastern Washington, Eastern Oregon, and Idaho. This IDIQ supports the following project delivery methods; 

1) non-complex construction efforts to be constructed based on Government furnished scope of work. 

2) design-bid-build, using Government furnished design documents. 

3) design/build, based on the Government furnishing a statement of objectives to be used as the basis of design and which the selected contractor designs and constructs the effort.

 4) bridging design/build, using Government furnished design documents developed to no more than 30% design documents. 

The construction scope Work includes, but is not limited to, tenant improvement, minor repair and alteration of building envelope, conveyance systems, roofing, mechanical and electrical systems, plumbing, and exterior improvements. Construction projects will be completed in a safe, efficient, cost effective manner that is based upon prudent use of taxpayer funds. Contractor firms awarded a Task Order Contract shall deliver the completed construction project, for its intended purpose and within the established project delivery schedule. Prime contractors are responsible for project management, site superintendence, labor, subcontractor management, quality control of installation and end use functionality for all work awarded.  

GSA anticipates awarding 6 separate contracts as a result of the solicitation. Total contract length, and ordering period, will be for five (5) years. Awarded contractors are expected to compete by participation in task order solicitations. Task Order solicitations will be issued by GSA offices assigned to the Acquisition Division within Region 10. 

Contract Value

The Contract Maximum Value (CMV) for this contract vehicle is $70,000,000.00. Meaning the cumulative total for all task orders awarded to all contractors over the life of the contract (5 Years) shall not exceed $70 Million.

The anticipated ordering limits are between $25,000.00 and $5,000,000.00. The typical task order is expected to be between $50,000.00 and $250,000.00. Task Order solicitations will adhere to the competitive procedures outlined in FAR 16.5.

Access to Controlled Unclassified Information (CUI): 

Please see Exhibit 2 and 3 for instructions to obtain access to Seed Project attachments that contain CUI. Provide signed acknowledgement and the GACA email address and created for your firm to mackenzie.dunn@gsa.gov, Cc: heather.bowden@gsa.gov. 

NAICS Code and Small Business Standard

The applicable NAICS code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $39.5 million. 

Pre-Proposal Conference for Prime Contractors

A pre-proposal site walk for the Seed Project will be held onsite on Wednesday, July 6, 2022. 

See attached files for solicitation details.

Update #7 ·

Amendment 0006: Amend 0006 SF30 47PL0122R0035.pdf

Provide the following documents in response to Contractor RFI's:

Amend 0006 Contractor RFI's and Responses 5.pdf

Amend 0006 Attachment F  Seed Project Price and Services Schedule Rev1.xlxs

Amendment 0005: Amend 0005 SF30 47PL0122R0035.pdf

Extending the due date for proposal to 3 August 2022 at 1:00PM PST,

Provide the following documents in response to Contractor RFI's:

Amend 0005 Contractor RFI's and Responses 4.pdf

Amendment 0004: Amend 0004 SF30 47PL0122R0035.pdf

Provide the following documents in response to Contractor RFI's:

Amend 0004 Contractor RFI's and Responses 3.pdf

Amend 0004 Site Visit Sign In Sheet 2 Redacted.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0003: Amend 0003 SF30 47PL0122R0035.pdf

Extending the due date for proposal to 1 August 2022 at 1:00PM PST,

Schedule a second site visit for the Seed Project for 20 July 2022 at 10:30AM PST 

Provide the following documents in response to Contractor RFI's:

Amend 0003 Contractor RFI's and Responses.pdf

2019 Asbestos Reinspection Survey Report Thomas S. Foley USCH.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0002: Amend 0002 SF30 47PL0122R0035.pdf

Providing the following documents: 

Amend 0002 Contractor RFI's & Responses.pdf, 
Amend 0002 Exhibit 6 Past Performance Questionnaire Rev1.doc;
Amend 0002 R10 EMATOC SOW 04222022.pdf.

Amend 0002 Site Visit Sign in Sheet.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0001: Amend 0001 SF30 47PL0122R0035.pdf

Updating inconsistencies between documents regarding Site Visit, add directions for site visit attendees regarding Spokane County's Covid-19 Level HIGH rating, and providing a correct EMATOC SF1442 document. See revised Attachments: 

Amend 0001 RFP EMATOC 47PL0122R0035.pdf, 
Amend 0001 Attachment D - TORFP Seed Project.pdf;
Amend 0001 SF 1442 47PL0122R0035.pdf.

**In accordance with CDC requirements for a County Level that has been categorized as HIGH, which Spokane County was as of 30 June 2022 all site visit attendees must bring and properly wear a mask while indoors.**

Description of Services

The GSA Northwest/Arctic Region (R10) has a recurring requirement for construction services. In order to support these projects R10 will award (1) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for construction projects in federally owned and leased facilities in the area of responsibility (AOR) covering a geographic range of Eastern Washington, Eastern Oregon, and Idaho. This IDIQ supports the following project delivery methods; 

1) non-complex construction efforts to be constructed based on Government furnished scope of work. 

2) design-bid-build, using Government furnished design documents. 

3) design/build, based on the Government furnishing a statement of objectives to be used as the basis of design and which the selected contractor designs and constructs the effort.

 4) bridging design/build, using Government furnished design documents developed to no more than 30% design documents. 

The construction scope Work includes, but is not limited to, tenant improvement, minor repair and alteration of building envelope, conveyance systems, roofing, mechanical and electrical systems, plumbing, and exterior improvements. Construction projects will be completed in a safe, efficient, cost effective manner that is based upon prudent use of taxpayer funds. Contractor firms awarded a Task Order Contract shall deliver the completed construction project, for its intended purpose and within the established project delivery schedule. Prime contractors are responsible for project management, site superintendence, labor, subcontractor management, quality control of installation and end use functionality for all work awarded.  

GSA anticipates awarding 6 separate contracts as a result of the solicitation. Total contract length, and ordering period, will be for five (5) years. Awarded contractors are expected to compete by participation in task order solicitations. Task Order solicitations will be issued by GSA offices assigned to the Acquisition Division within Region 10. 

Contract Value

The Contract Maximum Value (CMV) for this contract vehicle is $70,000,000.00. Meaning the cumulative total for all task orders awarded to all contractors over the life of the contract (5 Years) shall not exceed $70 Million.

The anticipated ordering limits are between $25,000.00 and $5,000,000.00. The typical task order is expected to be between $50,000.00 and $250,000.00. Task Order solicitations will adhere to the competitive procedures outlined in FAR 16.5.

Access to Controlled Unclassified Information (CUI): 

Please see Exhibit 2 and 3 for instructions to obtain access to Seed Project attachments that contain CUI. Provide signed acknowledgement and the GACA email address and created for your firm to mackenzie.dunn@gsa.gov, Cc: heather.bowden@gsa.gov. 

NAICS Code and Small Business Standard

The applicable NAICS code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $39.5 million. 

Pre-Proposal Conference for Prime Contractors

A pre-proposal site walk for the Seed Project will be held onsite on Wednesday, July 6, 2022. 

See attached files for solicitation details.

Update #6 ·

Amendment 0005: Amend 0005 SF30 47PL0122R0035.pdf

Extending the due date for proposal to 3 August 2022 at 1:00PM PST,

Provide the following documents in response to Contractor RFI's:

Amend 0005 Contractor RFI's and Responses 4.pdf

Amendment 0004: Amend 0004 SF30 47PL0122R0035.pdf

Provide the following documents in response to Contractor RFI's:

Amend 0004 Contractor RFI's and Responses 3.pdf

Amend 0004 Site Visit Sign In Sheet 2 Redacted.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0003: Amend 0003 SF30 47PL0122R0035.pdf

Extending the due date for proposal to 1 August 2022 at 1:00PM PST,

Schedule a second site visit for the Seed Project for 20 July 2022 at 10:30AM PST 

Provide the following documents in response to Contractor RFI's:

Amend 0003 Contractor RFI's and Responses.pdf

2019 Asbestos Reinspection Survey Report Thomas S. Foley USCH.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0002: Amend 0002 SF30 47PL0122R0035.pdf

Providing the following documents: 

Amend 0002 Contractor RFI's & Responses.pdf, 
Amend 0002 Exhibit 6 Past Performance Questionnaire Rev1.doc;
Amend 0002 R10 EMATOC SOW 04222022.pdf.

Amend 0002 Site Visit Sign in Sheet.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0001: Amend 0001 SF30 47PL0122R0035.pdf

Updating inconsistencies between documents regarding Site Visit, add directions for site visit attendees regarding Spokane County's Covid-19 Level HIGH rating, and providing a correct EMATOC SF1442 document. See revised Attachments: 

Amend 0001 RFP EMATOC 47PL0122R0035.pdf, 
Amend 0001 Attachment D - TORFP Seed Project.pdf;
Amend 0001 SF 1442 47PL0122R0035.pdf.

**In accordance with CDC requirements for a County Level that has been categorized as HIGH, which Spokane County was as of 30 June 2022 all site visit attendees must bring and properly wear a mask while indoors.**

Description of Services

The GSA Northwest/Arctic Region (R10) has a recurring requirement for construction services. In order to support these projects R10 will award (1) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for construction projects in federally owned and leased facilities in the area of responsibility (AOR) covering a geographic range of Eastern Washington, Eastern Oregon, and Idaho. This IDIQ supports the following project delivery methods; 

1) non-complex construction efforts to be constructed based on Government furnished scope of work. 

2) design-bid-build, using Government furnished design documents. 

3) design/build, based on the Government furnishing a statement of objectives to be used as the basis of design and which the selected contractor designs and constructs the effort.

 4) bridging design/build, using Government furnished design documents developed to no more than 30% design documents. 

The construction scope Work includes, but is not limited to, tenant improvement, minor repair and alteration of building envelope, conveyance systems, roofing, mechanical and electrical systems, plumbing, and exterior improvements. Construction projects will be completed in a safe, efficient, cost effective manner that is based upon prudent use of taxpayer funds. Contractor firms awarded a Task Order Contract shall deliver the completed construction project, for its intended purpose and within the established project delivery schedule. Prime contractors are responsible for project management, site superintendence, labor, subcontractor management, quality control of installation and end use functionality for all work awarded.  

GSA anticipates awarding 6 separate contracts as a result of the solicitation. Total contract length, and ordering period, will be for five (5) years. Awarded contractors are expected to compete by participation in task order solicitations. Task Order solicitations will be issued by GSA offices assigned to the Acquisition Division within Region 10. 

Contract Value

The Contract Maximum Value (CMV) for this contract vehicle is $70,000,000.00. Meaning the cumulative total for all task orders awarded to all contractors over the life of the contract (5 Years) shall not exceed $70 Million.

The anticipated ordering limits are between $25,000.00 and $5,000,000.00. The typical task order is expected to be between $50,000.00 and $250,000.00. Task Order solicitations will adhere to the competitive procedures outlined in FAR 16.5.

Access to Controlled Unclassified Information (CUI): 

Please see Exhibit 2 and 3 for instructions to obtain access to Seed Project attachments that contain CUI. Provide signed acknowledgement and the GACA email address and created for your firm to mackenzie.dunn@gsa.gov, Cc: heather.bowden@gsa.gov. 

NAICS Code and Small Business Standard

The applicable NAICS code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $39.5 million. 

Pre-Proposal Conference for Prime Contractors

A pre-proposal site walk for the Seed Project will be held onsite on Wednesday, July 6, 2022. 

See attached files for solicitation details.

Update #5 ·

Amendment 0004: Amend 0004 SF30 47PL0122R0035.pdf

Provide the following documents in response to Contractor RFI's:

Amend 0004 Contractor RFI's and Responses 3.pdf

Amend 0004 Site Visit Sign In Sheet 2 Redacted.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0003: Amend 0003 SF30 47PL0122R0035.pdf

Extending the due date for proposal to 1 August 2022 at 1:00PM PST,

Schedule a second site visit for the Seed Project for 20 July 2022 at 10:30AM PST 

Provide the following documents in response to Contractor RFI's:

Amend 0003 Contractor RFI's and Responses.pdf

2019 Asbestos Reinspection Survey Report Thomas S. Foley USCH.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0002: Amend 0002 SF30 47PL0122R0035.pdf

Providing the following documents: 

Amend 0002 Contractor RFI's & Responses.pdf, 
Amend 0002 Exhibit 6 Past Performance Questionnaire Rev1.doc;
Amend 0002 R10 EMATOC SOW 04222022.pdf.

Amend 0002 Site Visit Sign in Sheet.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0001: Amend 0001 SF30 47PL0122R0035.pdf

Updating inconsistencies between documents regarding Site Visit, add directions for site visit attendees regarding Spokane County's Covid-19 Level HIGH rating, and providing a correct EMATOC SF1442 document. See revised Attachments: 

Amend 0001 RFP EMATOC 47PL0122R0035.pdf, 
Amend 0001 Attachment D - TORFP Seed Project.pdf;
Amend 0001 SF 1442 47PL0122R0035.pdf.

**In accordance with CDC requirements for a County Level that has been categorized as HIGH, which Spokane County was as of 30 June 2022 all site visit attendees must bring and properly wear a mask while indoors.**

Description of Services

The GSA Northwest/Arctic Region (R10) has a recurring requirement for construction services. In order to support these projects R10 will award (1) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for construction projects in federally owned and leased facilities in the area of responsibility (AOR) covering a geographic range of Eastern Washington, Eastern Oregon, and Idaho. This IDIQ supports the following project delivery methods; 

1) non-complex construction efforts to be constructed based on Government furnished scope of work. 

2) design-bid-build, using Government furnished design documents. 

3) design/build, based on the Government furnishing a statement of objectives to be used as the basis of design and which the selected contractor designs and constructs the effort.

 4) bridging design/build, using Government furnished design documents developed to no more than 30% design documents. 

The construction scope Work includes, but is not limited to, tenant improvement, minor repair and alteration of building envelope, conveyance systems, roofing, mechanical and electrical systems, plumbing, and exterior improvements. Construction projects will be completed in a safe, efficient, cost effective manner that is based upon prudent use of taxpayer funds. Contractor firms awarded a Task Order Contract shall deliver the completed construction project, for its intended purpose and within the established project delivery schedule. Prime contractors are responsible for project management, site superintendence, labor, subcontractor management, quality control of installation and end use functionality for all work awarded.  

GSA anticipates awarding 6 separate contracts as a result of the solicitation. Total contract length, and ordering period, will be for five (5) years. Awarded contractors are expected to compete by participation in task order solicitations. Task Order solicitations will be issued by GSA offices assigned to the Acquisition Division within Region 10. 

Contract Value

The Contract Maximum Value (CMV) for this contract vehicle is $70,000,000.00. Meaning the cumulative total for all task orders awarded to all contractors over the life of the contract (5 Years) shall not exceed $70 Million.

The anticipated ordering limits are between $25,000.00 and $5,000,000.00. The typical task order is expected to be between $50,000.00 and $250,000.00. Task Order solicitations will adhere to the competitive procedures outlined in FAR 16.5.

Access to Controlled Unclassified Information (CUI): 

Please see Exhibit 2 and 3 for instructions to obtain access to Seed Project attachments that contain CUI. Provide signed acknowledgement and the GACA email address and created for your firm to mackenzie.dunn@gsa.gov, Cc: heather.bowden@gsa.gov. 

NAICS Code and Small Business Standard

The applicable NAICS code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $39.5 million. 

Pre-Proposal Conference for Prime Contractors

A pre-proposal site walk for the Seed Project will be held onsite on Wednesday, July 6, 2022. 

See attached files for solicitation details.

Update #4 ·

Amendment 0003: Amend 0003 SF30 47PL0122R0035.pdf

Extending the due date for proposal to 1 August 2022 at 1:00PM PST,

Schedule a second site visit for the Seed Project for 20 July 2022 at 10:30AM PST 

Provide the following documents in response to Contractor RFI's:

Amend 0003 Contractor RFI's and Responses.pdf

2019 Asbestos Reinspection Survey Report Thomas S. Foley USCH.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0002: Amend 0002 SF30 47PL0122R0035.pdf

Providing the following documents: 

Amend 0002 Contractor RFI's & Responses.pdf, 
Amend 0002 Exhibit 6 Past Performance Questionnaire Rev1.doc;
Amend 0002 R10 EMATOC SOW 04222022.pdf.

Amend 0002 Site Visit Sign in Sheet.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0001: Amend 0001 SF30 47PL0122R0035.pdf

Updating inconsistencies between documents regarding Site Visit, add directions for site visit attendees regarding Spokane County's Covid-19 Level HIGH rating, and providing a correct EMATOC SF1442 document. See revised Attachments: 

Amend 0001 RFP EMATOC 47PL0122R0035.pdf, 
Amend 0001 Attachment D - TORFP Seed Project.pdf;
Amend 0001 SF 1442 47PL0122R0035.pdf.

**In accordance with CDC requirements for a County Level that has been categorized as HIGH, which Spokane County was as of 30 June 2022 all site visit attendees must bring and properly wear a mask while indoors.**

Description of Services

The GSA Northwest/Arctic Region (R10) has a recurring requirement for construction services. In order to support these projects R10 will award (1) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for construction projects in federally owned and leased facilities in the area of responsibility (AOR) covering a geographic range of Eastern Washington, Eastern Oregon, and Idaho. This IDIQ supports the following project delivery methods; 

1) non-complex construction efforts to be constructed based on Government furnished scope of work. 

2) design-bid-build, using Government furnished design documents. 

3) design/build, based on the Government furnishing a statement of objectives to be used as the basis of design and which the selected contractor designs and constructs the effort.

 4) bridging design/build, using Government furnished design documents developed to no more than 30% design documents. 

The construction scope Work includes, but is not limited to, tenant improvement, minor repair and alteration of building envelope, conveyance systems, roofing, mechanical and electrical systems, plumbing, and exterior improvements. Construction projects will be completed in a safe, efficient, cost effective manner that is based upon prudent use of taxpayer funds. Contractor firms awarded a Task Order Contract shall deliver the completed construction project, for its intended purpose and within the established project delivery schedule. Prime contractors are responsible for project management, site superintendence, labor, subcontractor management, quality control of installation and end use functionality for all work awarded.  

GSA anticipates awarding 6 separate contracts as a result of the solicitation. Total contract length, and ordering period, will be for five (5) years. Awarded contractors are expected to compete by participation in task order solicitations. Task Order solicitations will be issued by GSA offices assigned to the Acquisition Division within Region 10. 

Contract Value

The Contract Maximum Value (CMV) for this contract vehicle is $70,000,000.00. Meaning the cumulative total for all task orders awarded to all contractors over the life of the contract (5 Years) shall not exceed $70 Million.

The anticipated ordering limits are between $25,000.00 and $5,000,000.00. The typical task order is expected to be between $50,000.00 and $250,000.00. Task Order solicitations will adhere to the competitive procedures outlined in FAR 16.5.

Access to Controlled Unclassified Information (CUI): 

Please see Exhibit 2 and 3 for instructions to obtain access to Seed Project attachments that contain CUI. Provide signed acknowledgement and the GACA email address and created for your firm to mackenzie.dunn@gsa.gov, Cc: heather.bowden@gsa.gov. 

NAICS Code and Small Business Standard

The applicable NAICS code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $39.5 million. 

Pre-Proposal Conference for Prime Contractors

A pre-proposal site walk for the Seed Project will be held onsite on Wednesday, July 6, 2022. 

See attached files for solicitation details.

Update #3 ·

Amendment 0002: Amend 0002 SF30 47PL0122R0035.pdf

Providing the following documents: 

Amend 0002 Contractor RFI's & Responses.pdf, 
Amend 0002 Exhibit 6 Past Performance Questionnaire Rev1.doc;
Amend 0002 R10 EMATOC SOW 04222022.pdf.

Amend 0002 Site Visit Sign in Sheet.pdf

Please sign and return ALL AMENDMENTS with proposal submission. 

Amendment 0001: Amend 0001 SF30 47PL0122R0035.pdf

Updating inconsistencies between documents regarding Site Visit, add directions for site visit attendees regarding Spokane County's Covid-19 Level HIGH rating, and providing a correct EMATOC SF1442 document. See revised Attachments: 

Amend 0001 RFP EMATOC 47PL0122R0035.pdf, 
Amend 0001 Attachment D - TORFP Seed Project.pdf;
Amend 0001 SF 1442 47PL0122R0035.pdf.

**In accordance with CDC requirements for a County Level that has been categorized as HIGH, which Spokane County was as of 30 June 2022 all site visit attendees must bring and properly wear a mask while indoors.**

Description of Services

The GSA Northwest/Arctic Region (R10) has a recurring requirement for construction services. In order to support these projects R10 will award (1) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for construction projects in federally owned and leased facilities in the area of responsibility (AOR) covering a geographic range of Eastern Washington, Eastern Oregon, and Idaho. This IDIQ supports the following project delivery methods; 

1) non-complex construction efforts to be constructed based on Government furnished scope of work. 

2) design-bid-build, using Government furnished design documents. 

3) design/build, based on the Government furnishing a statement of objectives to be used as the basis of design and which the selected contractor designs and constructs the effort.

 4) bridging design/build, using Government furnished design documents developed to no more than 30% design documents. 

The construction scope Work includes, but is not limited to, tenant improvement, minor repair and alteration of building envelope, conveyance systems, roofing, mechanical and electrical systems, plumbing, and exterior improvements. Construction projects will be completed in a safe, efficient, cost effective manner that is based upon prudent use of taxpayer funds. Contractor firms awarded a Task Order Contract shall deliver the completed construction project, for its intended purpose and within the established project delivery schedule. Prime contractors are responsible for project management, site superintendence, labor, subcontractor management, quality control of installation and end use functionality for all work awarded.  

GSA anticipates awarding 6 separate contracts as a result of the solicitation. Total contract length, and ordering period, will be for five (5) years. Awarded contractors are expected to compete by participation in task order solicitations. Task Order solicitations will be issued by GSA offices assigned to the Acquisition Division within Region 10. 

Contract Value

The Contract Maximum Value (CMV) for this contract vehicle is $70,000,000.00. Meaning the cumulative total for all task orders awarded to all contractors over the life of the contract (5 Years) shall not exceed $70 Million.

The anticipated ordering limits are between $25,000.00 and $5,000,000.00. The typical task order is expected to be between $50,000.00 and $250,000.00. Task Order solicitations will adhere to the competitive procedures outlined in FAR 16.5.

Access to Controlled Unclassified Information (CUI): 

Please see Exhibit 2 and 3 for instructions to obtain access to Seed Project attachments that contain CUI. Provide signed acknowledgement and the GACA email address and created for your firm to mackenzie.dunn@gsa.gov, Cc: heather.bowden@gsa.gov. 

NAICS Code and Small Business Standard

The applicable NAICS code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $39.5 million. 

Pre-Proposal Conference for Prime Contractors

A pre-proposal site walk for the Seed Project will be held onsite on Wednesday, July 6, 2022. 

See attached files for solicitation details.

Update #2 ·

Amendment 0001: Amend 0001 SF30 47PL0122R0035.pdf

Updating inconsistencies between documents regarding Site Visit, add directions for site visit attendees regarding Spokane County's Covid-19 Level HIGH rating, and providing a correct EMATOC SF1442 document. See revised Attachments: 

Amend 0001 RFP EMATOC 47PL0122R0035.pdf, 
Amend 0001 Attachment D - TORFP Seed Project.pdf;
Amend 0001 SF 1442 47PL0122R0035.pdf.

**In accordance with CDC requirements for a County Level that has been categorized as HIGH, which Spokane County was as of 30 June 2022 all site visit attendees must bring and properly wear a mask while indoors.**

Description of Services

The GSA Northwest/Arctic Region (R10) has a recurring requirement for construction services. In order to support these projects R10 will award (1) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for construction projects in federally owned and leased facilities in the area of responsibility (AOR) covering a geographic range of Eastern Washington, Eastern Oregon, and Idaho. This IDIQ supports the following project delivery methods; 

1) non-complex construction efforts to be constructed based on Government furnished scope of work. 

2) design-bid-build, using Government furnished design documents. 

3) design/build, based on the Government furnishing a statement of objectives to be used as the basis of design and which the selected contractor designs and constructs the effort.

 4) bridging design/build, using Government furnished design documents developed to no more than 30% design documents. 

The construction scope Work includes, but is not limited to, tenant improvement, minor repair and alteration of building envelope, conveyance systems, roofing, mechanical and electrical systems, plumbing, and exterior improvements. Construction projects will be completed in a safe, efficient, cost effective manner that is based upon prudent use of taxpayer funds. Contractor firms awarded a Task Order Contract shall deliver the completed construction project, for its intended purpose and within the established project delivery schedule. Prime contractors are responsible for project management, site superintendence, labor, subcontractor management, quality control of installation and end use functionality for all work awarded.  

GSA anticipates awarding 6 separate contracts as a result of the solicitation. Total contract length, and ordering period, will be for five (5) years. Awarded contractors are expected to compete by participation in task order solicitations. Task Order solicitations will be issued by GSA offices assigned to the Acquisition Division within Region 10. 

Contract Value

The Contract Maximum Value (CMV) for this contract vehicle is $70,000,000.00. Meaning the cumulative total for all task orders awarded to all contractors over the life of the contract (5 Years) shall not exceed $70 Million.

The anticipated ordering limits are between $25,000.00 and $5,000,000.00. The typical task order is expected to be between $50,000.00 and $250,000.00. Task Order solicitations will adhere to the competitive procedures outlined in FAR 16.5.

Access to Controlled Unclassified Information (CUI): 

Please see Exhibit 2 and 3 for instructions to obtain access to Seed Project attachments that contain CUI. Provide signed acknowledgement and the GACA email address and created for your firm to mackenzie.dunn@gsa.gov, Cc: heather.bowden@gsa.gov. 

NAICS Code and Small Business Standard

The applicable NAICS code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $39.5 million. 

Pre-Proposal Conference for Prime Contractors

A pre-proposal site walk for the Seed Project will be held onsite on Wednesday, July 6, 2022. 

See attached files for solicitation details.

Update #1 ·

Description of Services

The GSA Northwest/Arctic Region (R10) has a recurring requirement for construction services. In order to support these projects R10 will award (1) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for construction projects in federally owned and leased facilities in the area of responsibility (AOR) covering a geographic range of Eastern Washington, Eastern Oregon, and Idaho. This IDIQ supports the following project delivery methods; 

1) non-complex construction efforts to be constructed based on Government furnished scope of work. 

2) design-bid-build, using Government furnished design documents. 

3) design/build, based on the Government furnishing a statement of objectives to be used as the basis of design and which the selected contractor designs and constructs the effort.

 4) bridging design/build, using Government furnished design documents developed to no more than 30% design documents. 

The construction scope Work includes, but is not limited to, tenant improvement, minor repair and alteration of building envelope, conveyance systems, roofing, mechanical and electrical systems, plumbing, and exterior improvements. Construction projects will be completed in a safe, efficient, cost effective manner that is based upon prudent use of taxpayer funds. Contractor firms awarded a Task Order Contract shall deliver the completed construction project, for its intended purpose and within the established project delivery schedule. Prime contractors are responsible for project management, site superintendence, labor, subcontractor management, quality control of installation and end use functionality for all work awarded.  

GSA anticipates awarding 6 separate contracts as a result of the solicitation. Total contract length, and ordering period, will be for five (5) years. Awarded contractors are expected to compete by participation in task order solicitations. Task Order solicitations will be issued by GSA offices assigned to the Acquisition Division within Region 10. 

Contract Value

The Contract Maximum Value (CMV) for this contract vehicle is $70,000,000.00. Meaning the cumulative total for all task orders awarded to all contractors over the life of the contract (5 Years) shall not exceed $70 Million.

The anticipated ordering limits are between $25,000.00 and $5,000,000.00. The typical task order is expected to be between $50,000.00 and $250,000.00. Task Order solicitations will adhere to the competitive procedures outlined in FAR 16.5.

Access to Controlled Unclassified Information (CUI): 

Please see Exhibit 2 and 3 for instructions to obtain access to Seed Project attachments that contain CUI. Provide signed acknowledgement and the GACA email address and created for your firm to mackenzie.dunn@gsa.gov, Cc: heather.bowden@gsa.gov. 

NAICS Code and Small Business Standard

The applicable NAICS code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $39.5 million. 

Pre-Proposal Conference for Prime Contractors

A pre-proposal site walk for the Seed Project will be held onsite on Wednesday, July 6, 2022. 

See attached files for solicitation details.

Attachments

Files attached to this notice, newest first
File Type Posted
Amend 0007 SF30 47PL0122R0035.pdf PDF
Amend 0007 Contractor RFIs and Responses.pdf PDF
Amend 0006 Attachment F Seed Project Price and Services Schedule Rev1.xlsx XLSX spreadsheet
Amend 0006 SF30 47PL0122R0035.pdf PDF
Amend 0006 Attachment F Seed Project Price and Services Schedule Rev1.xlsx XLSX spreadsheet
Amend 0005 SF30 47PL0122R0035.pdf PDF
Amend 0005 Contractor RFIs and Responses 4.pdf PDF
Amend 0004 SF30 47PL0122R0035.pdf PDF
Amend 0004 Site Visit Sign In Sheet 2 Redacted.pdf PDF
Amend 0004 Contractor RFIs and Responses 3.pdf PDF
Amend 0003 2019 Asbestos Reinspection Survey Report Thomas S Foley USCH.pdf PDF
Amend 0003 SF30 47PL0122R0035.pdf PDF
Amend 0003 Contractor RFI_s and Responses 2.pdf PDF
Amend 0002 SF30 47PL0122R0035.pdf PDF
Amend 0002 Exhibit 6 Past Performance Questionnaire Rev1.docx DOCX document
Amend 0002 R10 EMATOC SOW 04222022.pdf PDF
Amend 0002 Site Visit Sign In Sheet Redacted.pdf PDF
Amend 0002 Contractor RFIs and Responses.pdf PDF
Amend 0001 RFP EMATOC 47PL0122R0035.pdf PDF
Amend 0001 Attachment D - TORFP Seed Project.pdf PDF
Amend 0001 SF30 47PL0122R0035.pdf PDF
Amend 0001 SF1442 47PL0122R0035.pdf PDF
SF1442 47PL0122R0035 EMATOC.pdf PDF
Attachment A EMATOC Terms and Conditions.pdf PDF
Attachment D TORFP Seed Project.pdf PDF
Attachment E Seed Project SOW.pdf PDF
Attachment F Seed Project Price and Services Schedule.xlsx XLSX spreadsheet
7.1 Vendor Security Training.pdf PDF
7.4 Sample OF 306.pdf PDF
Attachment G Seed Project Wage Determination.pdf PDF
Exhibit 3 GSAAffiliatedCustomerAccounts.pdf PDF
Exhibit 6 Past Performance Questionnaire.docx DOCX document
Exhibit 7 GSA Security Manual.pdf PDF
7.2 Sample ROCAL.xlsx XLSX spreadsheet
7.3 Sample CIW Form 850.docx DOCX document
7.7 R10 NCMMS Asset ImpExp Template.xlsx XLSX spreadsheet
RFP EMATOC 47PL0122R0035.pdf PDF
EMATOC Agreement.pdf PDF
Attachment B Example of TO Agreement.docx DOCX document
Exhibit 1 3490.3 Policy.pdf PDF
Exhibit 4 Contractor Project Experience Form.docx DOCX document
Exhibit 5 Key Personnel Resume Form.docx DOCX document
Exhibit 8 IDIQ Price Schedule.xlsx XLSX spreadsheet
SF1442 47PL0122R0041 Seed Project.pdf PDF
7.6 Controlled Unclassified Information 34903.pdf PDF
GSA527-21.pdf PDF
Attachment C Example of TO Reps and Certs.docx DOCX document
Exhibit 2 Read Me First - CUI Document.pdf PDF
7.5 Submittal Transmittal Form.xls XLS spreadsheet
7.11 Project Management Information System.pdf PDF
Show all 50

This notice has more attachments on GovTribe.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Eastern Multiple Award Task Order Contract (MATOC) Replacement Award Award Notice
Eastern Multiple Award Task Order Contract (MATOC) Replacement This notice · Latest solicitation Solicitation
Eastern Multiple Award Task Order Contract (MATOC) Replacement Pre-Solicitation
Eastern Service Center (ESC) Multiple Award Task Order Contract (MATOC) Replacement Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity