Attachment F Seed Project Price and Services Schedule.xlsx

XLSX spreadsheet 121 KB Posted

Attached to
Eastern Multiple Award Task Order Contract (MATOC) Replacement Federal contract opportunity
Solicitation number
47PL0122R0035
Issued by
General Services Administration Public Buildings Service Region 10

About this file

This document includes a solicitation for a multiple award task order contract to provide construction services and a related seed project opportunity. The General Services Administration Northwest/Arctic Region will award one indefinite delivery indefinite quantity multiple award task order contract for five years to six contractors to complete construction projects in federally owned and leased facilities in Eastern Washington, Eastern Oregon and Idaho. Project delivery methods may include non-complex construction, design-bid-build using government designs, design-build and bridging design-build using some government designs. Scope of work includes tenant improvements, building envelope repairs, conveyance, roofing, mechanical, electrical and plumbing systems and exterior improvements. Awarded contractors will deliver completed projects safely and cost effectively. The contract maximum value is $70 million over five years with typical task order values between $50,000 to $250,000. A pre-proposal conference for a seed project will be held on July 6, 2022 onsite. The North American Industry Classification System code is 236220 for commercial and institutional building construction and the small business size standard is $39.5 million.

View the file

Other files for this federal contract opportunity

Other files attached to Eastern Multiple Award Task Order Contract (MATOC) Replacement, newest first.
File Type Posted
Amend 0007 Attachment F Seed Project Price and Services Schedule Rev2.xlsx XLSX spreadsheet
Amend 0007 SF30 47PL0122R0035.pdf PDF
Amend 0007 Contractor RFIs and Responses.pdf PDF
Amend 0006 Attachment F Seed Project Price and Services Schedule Rev1.xlsx XLSX spreadsheet
Amend 0006 Contractor RFIs and Responses.pdf PDF
Amend 0006 SF30 47PL0122R0035.pdf PDF
Amend 0006 Attachment F Seed Project Price and Services Schedule Rev1.xlsx XLSX spreadsheet
Amend 0005 SF30 47PL0122R0035.pdf PDF
Amend 0005 Contractor RFIs and Responses 4.pdf PDF
Amend 0004 SF30 47PL0122R0035.pdf PDF
Amend 0004 Site Visit Sign In Sheet 2 Redacted.pdf PDF
Amend 0003 2019 Asbestos Reinspection Survey Report Thomas S Foley USCH.pdf PDF
Amend 0003 SF30 47PL0122R0035.pdf PDF
Amend 0003 Contractor RFI_s and Responses 2.pdf PDF
Amend 0002 Contractor RFIs and Responses.pdf PDF
Amend 0002 SF30 47PL0122R0035.pdf PDF
Amend 0002 Exhibit 6 Past Performance Questionnaire Rev1.docx DOCX document
Amend 0002 R10 EMATOC SOW 04222022.pdf PDF
Amend 0002 Site Visit Sign In Sheet Redacted.pdf PDF
Amend 0001 SF1442 47PL0122R0035.pdf PDF
Amend 0001 RFP EMATOC 47PL0122R0035.pdf PDF
Amend 0001 SF30 47PL0122R0035.pdf PDF
Amend 0001 Attachment D - TORFP Seed Project.pdf PDF
Attachment C Example of TO Reps and Certs.docx DOCX document
Exhibit 2 Read Me First - CUI Document.pdf PDF
7.5 Submittal Transmittal Form.xls XLS spreadsheet
7.11 Project Management Information System.pdf PDF
SF1442 47PL0122R0035 EMATOC.pdf PDF
Attachment A EMATOC Terms and Conditions.pdf PDF
Attachment D TORFP Seed Project.pdf PDF
Attachment E Seed Project SOW.pdf PDF
7.1 Vendor Security Training.pdf PDF
7.4 Sample OF 306.pdf PDF
RFP EMATOC 47PL0122R0035.pdf PDF
EMATOC Agreement.pdf PDF
Attachment B Example of TO Agreement.docx DOCX document
Exhibit 1 3490.3 Policy.pdf PDF
Exhibit 4 Contractor Project Experience Form.docx DOCX document
Exhibit 5 Key Personnel Resume Form.docx DOCX document
Exhibit 8 IDIQ Price Schedule.xlsx XLSX spreadsheet
SF1442 47PL0122R0041 Seed Project.pdf PDF
7.6 Controlled Unclassified Information 34903.pdf PDF
GSA527-21.pdf PDF
Attachment G Seed Project Wage Determination.pdf PDF
Exhibit 3 GSAAffiliatedCustomerAccounts.pdf PDF
Exhibit 6 Past Performance Questionnaire.docx DOCX document
Exhibit 7 GSA Security Manual.pdf PDF
7.2 Sample ROCAL.xlsx XLSX spreadsheet
7.3 Sample CIW Form 850.docx DOCX document
7.7 R10 NCMMS Asset ImpExp Template.xlsx XLSX spreadsheet
Show all 50

Eastern Multiple Award Task Order Contract (MATOC) Replacement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price

INSTRUCTIONS: Please use this spreadsheet to submit quotes in excel. Please do not PDF and submit. Only make entries in area in green.
CLINDESCRIPTIONQUANITYUNITAMOUNT
0001DESIGN1LS$ - 0
0002CONSTRUCTION1LS$ - 0
0003BONDS/INSURANCE1LS$ - 0
0004HSPD121NTE$ - 0
0005CLOSEOUT1LS#REF!
0006ADDITIONAL COSTS1LS$ - 0
TOTAL PROPOSED PRICE#REF!
ADDITIONAL PRICE ELEMENTS (See Evaluated Price Information Worksheet)
Period of Performance Offered: (days)0
Future Modification Mark Up Rate Offered %0%
Government caused delay ratePer Day$ - 0

Price Schedule Notes

PROPOSAL PRICE SCHEDULE NOTES
1Offeror shall prepare pricing in accordance with the attached Statement of Work (Exhibit 5) and associated attachments/appendices. See FAR Clause 52.211-10, COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984).

2 Offeror shall submit pricing (inclusive of profit and overhead as applicable) on all items. For purposes of price analysis the TOTAL EVALUATED PROPOSED PRICE will be utilized.

3 The total award price associated with this contract shall include all design and construction costs.

4 CLIN 0005 – Closeout. This CLIN shall include all closeout effort inclusive of as-built submission, etc. as required in the Statement of Work.

5Funds for this project are currently available.
The intent of this solicitation is to obtain the best proposal within the cost limitation for the price proposed and to ensure the best value when considering price and non-price factors. Offerors are advised that there is no obligation to approach or match the cost limitation in the offer.

Price Breakout Worksheet

PRICE BREAKOUT WORKSHEET
CLINDescriptionQTY/UNITUnit PriceTotal Amount
0001Design (see note below)
A.0$ - 0$ - 0
B$ - 0
Add additional lines as needed.
I. CLIN 0001 TOTAL$ - 0
CLINDescriptionQTYUnit
0002Construction (see note below)
A.00$ - 0
B.0
Add additional lines as needed.
II. CLIN 0002 TOTAL$ - 0
CLINDescriptionQTYUnit
0003Bonds/insurance (see note below) when entering percentage enter as follows .25% enter .0025
A.Performance Bond PremiumTotal Proposed Contract Amount$ - 0
(rate)X
B.Payment Bond PremiumTotal Proposed Contract Amount$ - 0
(rate)X
CInsurance Premium(Type)Total Proposed Contract Amount$ - 0
(rate)X
Add additional lines as needed.
III. CLIN 0003 TOTAL (A+B+C)$ - 0
0004HSPD-12 Clearance Costs
A.HSPD-12 (Long Term Contractor Personnel)
1.Hours allocated per person per ClearanceHRS
2.Cost per hour per person (including travel and labor)RATE
3.Number of employees estimated to require ClearancesEMPLOYEES
Long Term Clearance TOTAL (A1*A2*A3):$ - 0NTE
BHSPD-12 (Short Term Contractor Personnel)
1.Hours allocated per person per ClearanceHRS
2.Cost per hour per person (including travel and labor)EMPLOYEES
3.Number of employees estimated to require ClearancesNTE
Long Term Clearance TOTAL (A1*A2*A3):$ - 0NTE
IV. CLIN 0004 TOTAL (A1*A2*A3) + (B1*B2*B3)$ - 0NTE
CLINDescriptionQTYUnitUnit PriceAmount
0005Closeout (see note below)
A.$0
B$0
Add additional lines as needed.
V. CLIN 0007 TOTAL#REF!
CLINDescriptionQTYUnitUnit PriceAmount
0006Additional items
A.$0
B$0
V. CLIN 0006 TOTAL$0
TOTAL (CLIN 0001 + 0002 + 0003 + 0004 + 0005 + 0006)#REF!
NOTES
1. CLINs 0001/0002/0005 – Offerors shall provide detailed pricing breakout information to support the proposed lump sum amount for these CLINs. Information shall provide this additional pricing backup documentation in CSI format. For CLIN 0005 offeror shall include the estimated quantity, unit of measure and unit price.

2. CLIN 0003 – Bonds/Insurance. Offerors shall clearly annotate what Payment and Performance Bond Premiums will be charged if awarded the contract. Provide the Bond Rate (i.e. $X.XX/thousand dollars) and calculate total Premium payable using Total Proposed Contract Price. Do not include Optional Bid Items in this calculation.

3. CLIN 0004 – HSPD-12 Clearance costs. Offerors shall provide a breakout of the lump sum pricing proposed for estimated HSPD-12 clearance costs using this worksheet. This amount will be award as a NTE amount and will be monitored during the course of performance. If additional HSPD-12 clearances determined to be reasonable and above what is originally estimated herein are required, the Contracting Officer will negotiated an equitable adjustment after award using the breakout information contained herein. Similarly, if less than the estimated number of clearances proposed by the Offeror herein are used during performance, a deductive modification will be executed at the end of the contract to deobligate any remaining unused funds.
For purposes of calculating Long Term Clearance costs, contractor personnel who require routine access to GSA-controlled facilities for more than six months and/or access to government information technology (IT) systems must receive a favorable HSPD-12 security background investigation. The following information is provided to assist the contractor in estimating the costs associated with this requirement. The contractor will be expected to utilize the nearest credentialing site to their offices or place of contract performance. The credentialing station may be a mobile station in the area or credentialing stations may be located through the following: http://www.fedidcard.gov/centerlocator.aspx. Credentialing centers that are listed as “Open to all Agency personnel” means that they are open to personnel from any GSA Managed Service Office (MSO) customer agency including GSA contractors. Credentialing centers that are listed as “For use by personnel from this Agency only” means that they are only open to personnel of the agency that is hosting that credentialing center. Currently a minimum of two visits to a credentialing center are required to enroll and activate the card once received. Travel distance to a credentialing center will vary based on availability of enrollment and activation stations. If there is a problem activating the PIV card, one additional visit to the credentialing center may be required. Additional visits to a credentialing center may also be required if the card holder needs to: renew a PIV card that has expired or will expire within 60 days; have new certificates downloaded to the PIV card because the current certificates on the card have expired or will expire within 60 days; or replace a lost, stolen, or damaged PIV card. Each visit to a credentialing center is scheduled for 15 minutes. Filling out the form for a NACI clearance takes about 4 hours on average. Individual contractor employee involvement in processing, getting questions answered, fingerprints, etc. takes another 3 hours on average. Times may vary depending on individual circumstances and the level of clearance required.

If a Long Term HSPD-12 credential is required, the contractor is responsible for all travel and labor costs associated with fingerprinting to meet background investigation requirements and PIV Card enrollment and activation to meet HSPD-12 requirements and shall include these costs in the breakout worksheet and Price Schedule lump sum price proposal above. Travel costs are comprised of mileage, vehicle rental or other modes of transportation, per diem, and lodging.

For purposes of calculating Short Term Clearance costs, contractor personnel who require temporary (less than 6 months) access to the facility need only complete the Contractor Information Worksheet (CIW) and fingerprint requirements for submission of an initial suitability determination review. Travel to credentialing stations is not required for this type of clearance. Contractors shall, however, still be responsible for including all anticipated labor and travel costs associated with completion of the required CIW paperwork and obtainment of acceptable fingerprints.
Additional information can be found in Exhibit 7 of the Request for Proposal.

Evaluated Price Info sheet

TOTAL EVALUATED PRICE INFORMATION WORKSHEET
FOR USE IN PRICE ANALYSIS
1.TOTAL BASE BID#REF!
Enter total price proposed for Base Bid (i.e. CLINs 0001 – 0006) as indicated on Price Schedule above.
2.EVALUATED GOVERNMENT ADMINISTRATION COSTS.
Enter the number of days proposed to complete the project, inclusive of design and construction efforts.

The project period of performance shall be betweem 65 and 90 calendar days.

For price evaluation purposes, complete the formula below to calculate this cost.

0calendar daysX$110/day =$ - 0
(construction duration offered)(Est. Gov't Daily Rate)

NOTE: Failure to offer a contract duration within the range specified herein (65-100) calendar days, inclusive) shall result in the Offeror’s proposal being deemed non-responsive and will not be considered for award.

3.EVALUATED FUTURE MODIFICATIONS MARK-UP COSTS.
Enter the percentage proposed for use as the predetermined profit and overhead mark-up rate on future modification. This proposed percentage shall be inclusive of all Contractor overhead, general and administrative (G&A), bonds, insurance fees, all other indirect costs and commission, profit and other associated fees. The rates offered shall be used by the Government for future contract modifications, except for Government-caused delays, if any arise after award. For price evaluation purposes, complete the formula below to calculate this cost.

1 (plus) + 0% X $21,131.00 (Equal) = $ - 0

(mark up rate offered) (Est Future Mods Direct Costs)

4. EVALUATED GOVERNMENT CAUSED DELAY COSTS.
Enter the proposed daily delay rate for use in calculating Government caused delay costs during contract performance. The daily delay rate shall be inclusive of Contractor and Subcontractor field overhead, home office overhead, general and administrative costs, commissions, profits, bonds, and insurance fees which are the result of delays caused by the Government. The rate shall be used by the Government for calculating delay costs during contract performance if the contractor demonstrates the delay caused increased costs to be incurred. For price evaluation purposes, complete the formula below to calculate this cost.

$ - 0 X 30 days (Equal) = $ - 0

TOTAL EVALUATED PROPOSED PRICE:
(1+2+3+4+5+6 from above)

File details come from the government source that posted it. Updated .