Exhibit 6 Past Performance Questionnaire.docx

DOCX document 17 KB Posted

Attached to
Eastern Multiple Award Task Order Contract (MATOC) Replacement Federal contract opportunity
Solicitation number
47PL0122R0035
Issued by
General Services Administration Public Buildings Service Region 10

About this file

This document contains a past performance questionnaire and information about a federal contract opportunity for construction services. The past performance questionnaire requests a contractor to provide details of prior relevant projects for evaluation. It will be used to assess performance on factors such as quality, schedule, management and safety. The federal contract opportunity is a solicitation for an indefinite delivery indefinite quantity multiple award task order contract for construction projects in Region 10. Services include tenant improvements, repairs, mechanical and electrical work. The contract has a maximum value of $70 million over five years. Task orders will range from $25,000 to $5 million, with most typical orders between $50,000 to $250,000. The General Services Administration is seeking to award this contract to six contractors.

View the file

Other files for this federal contract opportunity

Other files attached to Eastern Multiple Award Task Order Contract (MATOC) Replacement, newest first.
File Type Posted
Amend 0007 Attachment F Seed Project Price and Services Schedule Rev2.xlsx XLSX spreadsheet
Amend 0007 SF30 47PL0122R0035.pdf PDF
Amend 0007 Contractor RFIs and Responses.pdf PDF
Amend 0006 Attachment F Seed Project Price and Services Schedule Rev1.xlsx XLSX spreadsheet
Amend 0006 Contractor RFIs and Responses.pdf PDF
Amend 0006 SF30 47PL0122R0035.pdf PDF
Amend 0006 Attachment F Seed Project Price and Services Schedule Rev1.xlsx XLSX spreadsheet
Amend 0005 SF30 47PL0122R0035.pdf PDF
Amend 0005 Contractor RFIs and Responses 4.pdf PDF
Amend 0004 SF30 47PL0122R0035.pdf PDF
Amend 0004 Site Visit Sign In Sheet 2 Redacted.pdf PDF
Amend 0003 2019 Asbestos Reinspection Survey Report Thomas S Foley USCH.pdf PDF
Amend 0003 SF30 47PL0122R0035.pdf PDF
Amend 0003 Contractor RFI_s and Responses 2.pdf PDF
Amend 0002 Contractor RFIs and Responses.pdf PDF
Amend 0002 SF30 47PL0122R0035.pdf PDF
Amend 0002 Exhibit 6 Past Performance Questionnaire Rev1.docx DOCX document
Amend 0002 R10 EMATOC SOW 04222022.pdf PDF
Amend 0002 Site Visit Sign In Sheet Redacted.pdf PDF
Amend 0001 SF1442 47PL0122R0035.pdf PDF
Amend 0001 RFP EMATOC 47PL0122R0035.pdf PDF
Amend 0001 SF30 47PL0122R0035.pdf PDF
Amend 0001 Attachment D - TORFP Seed Project.pdf PDF
Attachment C Example of TO Reps and Certs.docx DOCX document
Exhibit 2 Read Me First - CUI Document.pdf PDF
7.5 Submittal Transmittal Form.xls XLS spreadsheet
7.11 Project Management Information System.pdf PDF
SF1442 47PL0122R0035 EMATOC.pdf PDF
Attachment A EMATOC Terms and Conditions.pdf PDF
Attachment D TORFP Seed Project.pdf PDF
Attachment E Seed Project SOW.pdf PDF
Attachment F Seed Project Price and Services Schedule.xlsx XLSX spreadsheet
7.1 Vendor Security Training.pdf PDF
7.4 Sample OF 306.pdf PDF
RFP EMATOC 47PL0122R0035.pdf PDF
EMATOC Agreement.pdf PDF
Attachment B Example of TO Agreement.docx DOCX document
Exhibit 1 3490.3 Policy.pdf PDF
Exhibit 4 Contractor Project Experience Form.docx DOCX document
Exhibit 5 Key Personnel Resume Form.docx DOCX document
Exhibit 8 IDIQ Price Schedule.xlsx XLSX spreadsheet
SF1442 47PL0122R0041 Seed Project.pdf PDF
7.6 Controlled Unclassified Information 34903.pdf PDF
GSA527-21.pdf PDF
Attachment G Seed Project Wage Determination.pdf PDF
Exhibit 3 GSAAffiliatedCustomerAccounts.pdf PDF
Exhibit 7 GSA Security Manual.pdf PDF
7.2 Sample ROCAL.xlsx XLSX spreadsheet
7.3 Sample CIW Form 850.docx DOCX document
7.7 R10 NCMMS Asset ImpExp Template.xlsx XLSX spreadsheet
Show all 50

Eastern Multiple Award Task Order Contract (MATOC) Replacement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PBS PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. CONTRACTOR INFORMATION

Firm Name:

Address:

Phone Number:
DUNs Number:

Contact Name:

Email Address:
Contact Phone Number:

2. GENERAL WORK INFORMATION

Work performed as: ☐ Prime Contractor ☐ Sub Contractor ☐ Joint Venture ☐ Other (Please explain):

Percent (%) of project work performed:

If a subcontractor, who was the prime (Name/Phone #):

3. CONTRACT INFORMATION

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: ☐ Firm Fixed Price ☐ Cost Reimbursement ☐ Other (Please explain)

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Original Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Schedule Change:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. PROJECT DESCRIPTION

Complexity of Work: ☐High ☐ Med ☐ Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

NOTE: Completed PPQs shall be sent directly to the Government’s point of contact, Kimberly Johnson , Contract Specialist, via email at kimberlym.johnson@gsa.gov , prior to the Proposal closing date. The only information in the subject line shall include: 47PL0118D9000 titled Multiple Award Task Order Contract (IDIQ) Historic Preservation Construction Services for Region 10. Project Owner Name and the Contractor being rated.

NOTE: Completed PPQ shall not be reviewed by the Offeror or subcontractor prior to submission. The PPQ must be submitted by the client/evaluator directly to the POC noted above. The PPQ shall include project owner and the contractor being rated.

Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.

RATING
DEFINITION
NOTE
(E) Exceptional
Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good
Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory
Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

CLIENT INFORMATION

Client Information:

Name:

Title:

Phone Number:

Email Address:

Describe the client’s role in the project:

Date Questionnaire was completed (mm/dd/yy):

Client’s Signature:

Instructions: Please select the adjective rating and the Yes/No reply that best reflects your evaluation of the contractor’s performance.

1. QUALITY:
E VG S M U N
(a) Quality of technical data/report preparation efforts.
☐ ☐ ☐ ☐ ☐ ☐
(b) Ability to meet quality standards specified for technical performance.
☐ ☐ ☐ ☐ ☐ ☐
(c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
☐ ☐ ☐ ☐ ☐ ☐
(d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance).
☐ ☐ ☐ ☐ ☐ ☐
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
E VG S M U N
(a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below.)
☐ ☐ ☐ ☐ ☐ ☐
(b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract.
☐ ☐ ☐ ☐ ☐ ☐
3. CUSTOMER SATISFACTION:
E VG S M U N
(a) To what extent were the end users satisfied with the project?
☐ ☐ ☐ ☐ ☐ ☐
(b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication).
☐ ☐ ☐ ☐ ☐ ☐
(c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
☐ ☐ ☐ ☐ ☐ ☐
(d) Overall customer satisfaction.
☐ ☐ ☐ ☐ ☐ ☐
4. MANAGEMENT/ PERSONNEL/LABOR
E VG S M U N
(a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
☐ ☐ ☐ ☐ ☐ ☐
(b) Ability to hire, apply, and retain a qualified workforce to this effort.
☐ ☐ ☐ ☐ ☐ ☐
(c) Government Property Control.
☐ ☐ ☐ ☐ ☐ ☐
(d) Knowledge/expertise demonstrated by contractor personnel.
☐ ☐ ☐ ☐ ☐ ☐
(e) Utilization of Small Business concerns.
☐ ☐ ☐ ☐ ☐ ☐
(f) Ability to simultaneously manage multiple projects with multiple disciplines.
☐ ☐ ☐ ☐ ☐ ☐
(g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes.
☐ ☐ ☐ ☐ ☐ ☐
(h) Effectiveness of overall management (including ability to effectively lead, manage and control the program).
☐ ☐ ☐ ☐ ☐ ☐
5. COST/FINANCIAL MANAGEMENT
E VG S M U N
(a) Ability to meet the terms and conditions within the contractually agreed price(s)?
☐ ☐ ☐ ☐ ☐ ☐
(b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.
☐ ☐ ☐ ☐ ☐ ☐
(c) If this is/was a Government cost type contract, or a CMc/CMc at Risk Contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns).
☐ ☐ ☐ ☐ ☐ ☐
(d) Is the Contractor’s accounting system adequate for management and tracking of costs? (If no, please explain in comment section below.)
☐ Yes ☐ No
(e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in comment section below.)
☐ Yes ☐ No
(f) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.)
☐ Yes ☐ No
6. SAFETY/SECURITY
E VG S M U N
(a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.).
☐ ☐ ☐ ☐ ☐ ☐
(b) Contractor complied with all security requirements for the project and personnel security requirements.
☐ ☐ ☐ ☐ ☐ ☐

7. SUSTAINABILITY

Were sustainability methods, processes, or materials incorporated into the project? (If yes, please explain in the comments section below.)
☐ Yes ☐ No
8. GENERAL
E VG S M U N
(a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
☐ ☐ ☐ ☐ ☐ ☐
(b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below.)
☐ ☐ ☐ ☐ ☐ ☐
(c) Would you hire or work with this firm again? (If no, please explain in the comments section below.)
☐ Yes ☐ No
(d) In summary, provide an overall rating for the work performed by this contractor.
☐ ☐ ☐ ☐ ☐ ☐

COMMENTS SECTION

Please provide additional information below, and attach additional pages if necessary.

Please provide responses to the above questions (if applicable) and/or additional remarks. Also please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

File details come from the government source that posted it. Updated .