Amend 0003 2019 Asbestos Reinspection Survey Report Thomas S Foley USCH.pdf

PDF 6 MB Posted

Attached to
Eastern Multiple Award Task Order Contract (MATOC) Replacement
Solicitation number
47PL0122R0035
Issued by

About this file

This solicitation seeks proposals for an indefinite delivery indefinite quantity multiple award task order contract to provide construction services for federally owned and leased facilities in Eastern Washington, Eastern Oregon, and Idaho. The scope of work includes tenant improvements, building repairs and alterations, conveyance systems work, roofing, mechanical and electrical systems, plumbing, and exterior improvements. The contract has a maximum value of $70 million over five years. Task order solicitations will be between $25,000 and $5 million, with most between $50,000 and $250,000. Six contractors will be selected for award. The North American Industry Classification System code is 236220 for commercial and institutional building construction, with a small business size standard of $39.5 million. A pre-proposal site walk will be held on July 6, 2022.

View the file

Other files

File Type Posted
Amend 0007 Attachment F Seed Project Price and Services Schedule Rev2.xlsx XLSX spreadsheet
Amend 0007 SF30 47PL0122R0035.pdf PDF
Amend 0007 Contractor RFIs and Responses.pdf PDF
Amend 0006 Attachment F Seed Project Price and Services Schedule Rev1.xlsx XLSX spreadsheet
Amend 0006 Contractor RFIs and Responses.pdf PDF
Amend 0006 SF30 47PL0122R0035.pdf PDF
Amend 0006 Attachment F Seed Project Price and Services Schedule Rev1.xlsx XLSX spreadsheet
Amend 0005 SF30 47PL0122R0035.pdf PDF
Amend 0005 Contractor RFIs and Responses 4.pdf PDF
Amend 0004 SF30 47PL0122R0035.pdf PDF
Amend 0004 Contractor RFIs and Responses 3.pdf PDF
Amend 0004 Site Visit Sign In Sheet 2 Redacted.pdf PDF
Amend 0003 SF30 47PL0122R0035.pdf PDF
Amend 0003 Contractor RFI_s and Responses 2.pdf PDF
Amend 0002 Site Visit Sign In Sheet Redacted.pdf PDF
Amend 0002 Contractor RFIs and Responses.pdf PDF
Amend 0002 SF30 47PL0122R0035.pdf PDF
Amend 0002 R10 EMATOC SOW 04222022.pdf PDF
Amend 0002 Exhibit 6 Past Performance Questionnaire Rev1.docx DOCX document
Amend 0001 SF1442 47PL0122R0035.pdf PDF
Amend 0001 RFP EMATOC 47PL0122R0035.pdf PDF
Amend 0001 SF30 47PL0122R0035.pdf PDF
Amend 0001 Attachment D - TORFP Seed Project.pdf PDF
Exhibit 2 Read Me First - CUI Document.pdf PDF
7.2 Sample ROCAL.xlsx XLSX spreadsheet
7.1 Vendor Security Training.pdf PDF
Attachment E Seed Project SOW.pdf PDF
7.4 Sample OF 306.pdf PDF
Attachment D TORFP Seed Project.pdf PDF
7.5 Submittal Transmittal Form.xls XLS spreadsheet
Exhibit 4 Contractor Project Experience Form.docx DOCX document
7.6 Controlled Unclassified Information 34903.pdf PDF
Attachment A EMATOC Terms and Conditions.pdf PDF
Attachment F Seed Project Price and Services Schedule.xlsx XLSX spreadsheet
Exhibit 1 3490.3 Policy.pdf PDF
Exhibit 8 IDIQ Price Schedule.xlsx XLSX spreadsheet
GSA527-21.pdf PDF
7.11 Project Management Information System.pdf PDF
Attachment C Example of TO Reps and Certs.docx DOCX document
SF1442 47PL0122R0035 EMATOC.pdf PDF
EMATOC Agreement.pdf PDF
Exhibit 5 Key Personnel Resume Form.docx DOCX document
RFP EMATOC 47PL0122R0035.pdf PDF
Attachment B Example of TO Agreement.docx DOCX document
SF1442 47PL0122R0041 Seed Project.pdf PDF
7.3 Sample CIW Form 850.docx DOCX document
Exhibit 7 GSA Security Manual.pdf PDF
7.7 R10 NCMMS Asset ImpExp Template.xlsx XLSX spreadsheet
Exhibit 6 Past Performance Questionnaire.docx DOCX document
Attachment G Seed Project Wage Determination.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

SB

ESTO

S REIN

SPEC

TIO

N SU

R

VEY R

EPO

R T

Thom as S. Foley U nited States C ourthouse 920 W est R iverside Avenue

Spokane, W ashington 99201

Prepared for:

Bob Bliss, C

IH

G eneral Services Adm inistration

400 15 th Street Southw est Auburn, W ashington 98001 Telephone 206-282-8245

Prepared by:

U nited States Public H ealth Service

Federal O ccupational H ealth JFK Building, R oom E-110, G overnm ent C enter Boston, M assachusetts 02203

D ecem ber 20, 2019 nited States C ourthouse ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W ashington

Page i

C ontents

1.0 Introduction

2.0 Building D

escription

3.0 Sum

m ary of Findings

4.0 Physical Assessm

ent of AC M

C ondition

6.0 e-Inspection Survey Procedures

7.0 Analytical Procedures

8.0 Lim

itations

Appendix A AH

ER

A C ertification .................................................................................... A

Appendix B Building and Asbestos Photographs ............................................................ B

Appendix C Excel D atabase Form w ith Abatem ent Estim ate ......................................... C

Appendix D Asbestos M aterial Location D raw ings ......................................................... D

Appendix E Analytical R esults – Asbestos ..................................................................... E

Appendix F Sam ple Location D ings ........................................................................... F

Appendix G STAT Analysis C orporation N

VLAP C

ertification ........................................ G

Tables

Table 1. Sum m ary of Identified AC M

Table 2. Sum m ary of Bulk Sam ples Tested for Asbestos C ontent ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W ashington

1.0

IN

TR

O

D U

C

TIO

N

At the request of G eneral Services Adm inistration (G SA), Federal O ccupational H ealth

(FO

H

), perform ed an asbestos condition re-inspection of the Thom as S. Foley U nited

States C ourthouse located at 920 W est R iverside Avenue in Spokane, W ashington.

FO

H provided a visual inspection of previously identified asbestos-containing m aterials

(AC

M ) or w here m aterials w ere assum ed to contain asbestos using previous reports.

This re-inspection w as perform ed by an Accredited Asbestos H azard Em ergency R esponse Act (AH

ER

A) Building Inspector; see A ppendix A for a copy of the certificate. This re-inspection of the G

SA facility w as perform ed by Anthony Fullerton, of

FO

H on N ovem ber 8 th and 9 th, 2018.

As part of the re-inspection, FO H

AH

ER

A Building Inspectors review ed the follow ing reports that are available electronically from

G

SA R

egion 10:

Asbestos Survey U pdate, N ovem ber 1999, G eneral Services Adm inistration.

Asbestos R e-Inspection Survey R eport, N ovem ber 2006, EH

S International, Inc.

Asbestos R e-Inspection Survey R eport, Septem ber 2012, U nited States Public

H ealth Service, FO

H

Lim ited Asbestos Inspection- Foley C ourthouse G arage D oors Survey R eport, O ctober 2014, Fulcrum Environm ental C onsulting.

Lim ited Asbestos Inspection Survey R eport (C eiling tiles and fireproofing), April 2018, Fulcrum

Environm ental C onsulting.

2.0 B

U

ILD

IN

G

D

ESC

R

IPTIO

The Federal Building and U S C ourthouse (W A0064ZZ) w as constructed in 1969. The building is a 9-story building w ith tw o sub-basem ent floors, a basem ent parking garage, and a low er and upper penthouse floor. The building has a structural steel fram e and is insulated fireproof insulation. The building exterior is natural unpainted brick and m etal w indow fram es w ith an anodized finish. The roof is flat. The interior floors are concrete finished w ith vinyl floor tiles, carpet, ceram ic tile, terrazzo flooring, or bare concrete floors. The w alls are com posed of w allboard, w allboard panels, plaster, concrete, brick, concrete cinderblock, or ceram ic tile. The ceiling finish is lay-in ceiling tiles, concrete, exposed fireproofing or painted plaster.

Building and asbestos m aterial photographic docum entation is included in A ppendix B

Since the 2012 Asbestos R e-Inspection, there have been several abatem ent projects com pleted. These include:

Select areas of fireproofing w as abated from

SR

and SF floors as part of the

2013 U

SC

IS TI Project, 1 st floor G

SA offices and sm all area w est of public restroom s, 6 th floor east areas as part of Phase 2 and Phase 3 Projects.

ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W ashington

Asbestos floor tile and m astic w as rem oved in 2013 from portions of the 6 th floor as part of the Phase 2 and Phase 3 projects, 8 th floor east side of the building as part of 2013 AR

R A Project.

3.0

SU

M M

A

RY O

F FIN

D

IN

G

S

Findings below are based on results from the Initial Asbestos Inspection (G

SA 1999),

the R e-Inspections conducted in N ovem ber 2006 and Septem ber 2012 and this R e-

Inspection. A visual inspection of building m aterials and discussion w ith m aintenance personnel form the basis for changes from the previous 2012 report. W here w arranted, additional sam pling w as perform ed to identify additional AC M

, confirm original findings and to m eet AH

ER

A requirem ents. The G SA Excel database w ith AC M m aterial location, quantity and condition is included in A ppendix C

. The database also has the asbestos abatem ent cost estim ate.

This facility contains know n asbestos m aterials as detailed in Table 1 below

Table 1.

Sum m ary of Identified A aterial Type

Location Q uantity Type of A sbestos

Surfacing M aterials

Fireproofing, beige Throughout except 2nd, 3rd, 7th and 8th floors

85,636 SF

5%

C hrysotile

Therm al System

Insulation (TSI)

Therm al system insulation on fittings

Pipes throughout

400 EA

3% C hrysotile

2% Am osite

M iscellaneous M aterials

Floor tile and m astic

Throughout

49,581 SF

8% C hrysotile (floor tile)

10% C hrysotile (m astic)

Joint com pound on w alls

Throughout *N ote 2%

C hrysotile

C eiling tile 2’ x 6’

Throughout

9,856 SF

3% Am osite ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W ashington

M aterial Type

Location Q uantity Type of A sbestos

Pipe packing Insulation

Penthouse levels

5 SF

5% C hrysotile

Vibration Joint C loth

U pper Penthouse

100 SF

2%

C hrysotile

Acoustical ceiling tile m astic (dark brow n) th floor

2,004 SF

2%

Trem olite

Fire door Throughout

80 EA

Assum ed

G askets

Throughout *N ote Assum ed

Valve packing Throughout

*N ote

Assum ed

D uct sealant

Throughout *N ote Assum ed

*N ote= Initial asbestos survey report and prior re-inspection survey reports did not indicate quantity of m aterial identified therefore no quantity is listed. EA = each, SF = square feet

Asbestos m aterials in Table 1 are depicted on m aterial location draw ings in A ppendix D

. An abatem ent cost estim ate for rem oval of the identified asbestos m aterials in Table 1 is included in the Excel D atabase sheet in Appendix C . The 2012 re-inspection quantities differ for som e m aterials due to abatem ent. The quantities rem aining have been updated and are reflected in Table 1.

N on-A C

M M aterials This category includes m aterials that w ere considered suspect and w ere sam pled at the tim e of the original inspection and/or re-inspections and w ere determ ined to be non-asbestos containing. These m aterials include: terrazzo flooring, ceiling tile 2’x4’, ceiling tile 2’x 2’, acoustical ceiling/w all tile 12”x12”, straight pipe insulation, vinyl w all cove m astic, w allboard, joint com pound from abated areas, yellow carpet m astic, floor tile

12”x12” w ith associated m astic from abated areas, roof caulking, plaster, cinderblock m ortar, brick m ortar, ceram ic tile 2”x 2” w ith associated grout, linoleum , caulking on roof access doors, green fireproofing, w ood fire door liners. N one of these sam pled m aterials w ere found to be asbestos containing m aterials.

A dditional A sbestos Testing As part of this survey, FO

H collected sam ples of suspect asbestos m aterials not previously tested or requiring testing as part of upcom ing renovation projects. FO

H tested the m aterials included in Table 2 below for asbestos content; see A ppendix E for laboratory analytical results; a sum m ary of each m aterial description follow s Table 2.

Sam ple location draw ings are included in A ppendix F.

ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W ashington

Table 2.

Sum m ary of B ulk Sam ples Tested for A sbestos C ontent

Sam ple

M aterial

Location A

H

Type esult

8572.8p-W

A0064ZZ-01

W indow fram e caulk-new er entrance w indow and door fram es

Exterior-south side, w est end M isc.

8572.8p-W

A0064ZZ-02

W indow fram e- new er entrance w indow and door fram es

Exterior- south side, w est end M isc.

A0064ZZ-03

W indow fram e to brick caulk Exterior-w est side M isc.

A0064ZZ-04

W indow fram e to brick caulk Exterior-north side

M isc.

A0064ZZ-05

W indow fram e to brick caulk Exterior-east side

M isc.

A0064ZZ-06

W indow fram e- new er entrance w indow and door fram es

Exterior- south side, east end

M isc.

A0064ZZ-07

Yellow carpet m astic th floor juror’s area M isc.

A0064ZZ-08

Yellow carpet m astic th floor juror’s area M isc.

A0064ZZ-09

Yellow carpet m astic th floor juror’s area M isc.

A0064ZZ-10

U n-textured G

W B system th floor juror’s area

M isc.

A0064ZZ-11

U n-textured G

W

M isc.

A0064ZZ-12

U n-textured G

W

M isc.

A0064ZZ-13

D rop in acoustical ceiling tile th floor juror’s area M isc.

A0064ZZ-14

D rop in acoustical ceiling tile th floor juror’s area M isc.

A0064ZZ-15

D rop in acoustical ceiling tile th floor juror’s area M isc.

A0064ZZ-16

Black sink undercoat th floor juror’s area M isc.

A0064ZZ-17

Black sink undercoat th floor juror’s area M isc.

A0064ZZ-18

Black sink undercoat th floor juror’s area M isc.

W fram e caulk- new er entrance w indow and door fram es (H

M -01): At the request of G SA, exterior building caulk w as investigated for suspect AC M

. Exterior entrance w indow and door fram es had this brow n caulking m aterial on the seam s to prevent ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W ashington w ater infiltration. Three sam ples w ere collected and sent to the lab for analysis; this m aterial does not contain asbestos.

W indow fram e to brick caulk (H

M -02): At the request of G

SA, exterior building caulk w as investigated for suspect AC M

. This m aterial w as observed w here the older w interface w ith the brick w alls. Three sam ples w ere collected and sent to the lab for analysis; this m aterial does not contain asbestos.

Yellow carpet m astic (H

M -03): At the request of G

SA the 7 th floor juror’s area w as surveyed for an upcom ing project. The floor is finished w ith carpet squares that are affixed to the concrete floor by yellow m astic. Three sam ples w ere collected of the yellow m astic and sent to the lab for analysis; this m aterial does not contain asbestos.

U n-textured gypsum w allboard (G W

B) system (H

M -04): At the request of G

SA the 7 th floor juror’s area w as surveyed for an upcom ing project. The w alls are finished w ith un-textured G

W B system

. Three sam ples w ere collected of the un-textured G W

B system and sent to the lab for analysis; this m aterial does not contain asbestos.

D rop-in acoustical ceiling tile (H

M -05): At the request of G

SA the 7 th floor juror’s area w as surveyed for an upcom ing project. The ceilings consist of drop-in ceiling tiles in a m etal t-grid system . Three sam ples w ere collected of the acoustical ceiling tiles and sent to the lab for analysis; this m aterial does not contain asbestos.

Black sink undercoat (H M

-06): At the request of G SA the 7 th floor juror’s area w as surveyed for an upcom ing project. The kitchenette area has a stainless-steel sink w ith black undercoat. Three sam ples w ere collected of the black undercoat and sent to the lab for analysis; this m aterial does not contain asbestos.

Sam ple location draw ings for the sam ples collected above are included in A ppendix G

4.0

PH

YSIC

A

L A

SSESSM

EN

T O

F AC

M

C O

N D

ITIO

All previously identified asbestos containing m aterials appear to be in good condition at the tim e of this reinspection. R efer to the G SA Excel database w ith AC M m aterial location, quantity and condition in Appendix C for details.

A R

EA

S O

F M O

D

ER

A

TE C

O N

C

The Therm al System

Insulation Fittings are considered to be friable, and pose a m inim al health hazard, as long as they are properly m aintained.

Therm al System Insulation M aterials Location

M aterial Type

Type of A sbestos

Throughout Therm al system insulation on pipe fittings 3%

C hrysotile

2% osite ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W ashington

Therm al System

Insulation on Pipe Fittings - This m aterial w as observed throughout.

The therm al system insulation is considered friable. The therm al system insulation on pipe fittings is in low use areas of the facility and presents a low health hazard potential to building occupants due to a m inim al potential for disturbance and fiber release. The areas of pipe fitting therm al system insulation show ing som e dam age are in the pipe chase located next to the elevators. These areas of asbestos-containing therm al system insulation on pipe fittings show ing som e dam age should be rem oved, enclosed, encapsulated, or repaired to correct the dam age. This asbestos-containing therm al system insulation on pipe fittings should be placed in an O perations and M aintenance program until renovation or dem olition activities require rem oval.

Surfacing M aterials Location

M aterial Type

Type of A sbestos

C eiling

Fireproofing- beige 5%

C hrysotile

Fireproofing, beige - This m aterial w as observed throughout. The fireproofing w as sam pled and analyzed for asbestos content. The fireproofing is considered friable. The fireproofing is in high use areas of the facility and presents a low health hazard potential to building occupants due to a m inim al potential for disturbance and fiber release. This asbestos-containing fireproofing should be placed in an O perations and M aintenance program until renovation or dem olition activities require rem oval.

A R

EA

S O

F LO

W

C O

N C

These identified building m aterials w ere identified as AC

M and are a low concern. The physical assessm ents show ed N

O D

AM

AG

E. The m aterials w ere non-friable and/or of low accessibility, and as a result, pose m inim al health hazards as long as the m aterial is properly m aintained.

M

ISC

ELLA

N

EO

U

S A C

M M

A

TER

IA

LS

Location M aterial Type Type of A sbestos Floors

Floor tile and associated m astic

8% C hrysotile (floor tile)

10% C hrysotile (m astic)

W alls

Joint com pound

2% C hrysotile

C eiling

C eiling tile, 2’ x 6’

3% Am osite

Floors Pipe packing insulation

5% hrysotile ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W ashington

Location M aterial Type Type of A sbestos D ucts Vibration joint cloth

2% C hrysotile

C eiling

Acoustical ceiling tile m astic – dark brow n

2% Trem olite

Egresses/vaults Fire doors

Assum ed

Valves G askets Assum ed

Valves Valve packing

Assum ed

D ucts

D uct sealant

Assum ed

Floor Tile 9” x 9” and associated m astic - Both floor tile and associated black m astic w ere sam pled and analyzed for asbestos content. The floor tile and black m astic are tw o m aterials but is one integral unit and should be treated as one building m aterial for abatem ent purposes. The floor tile and black m astic are non-friable and in good condition. The floor tile and black m astic are in high use areas of the facility but present a low health hazard potential to building occupants due to a m inim al potential for disturbance and fiber release. This asbestos-containing floor tile and black m astic should be placed in an O perations and M aintenance program until renovation or dem olition activities require rem oval.

Joint C om pound – This m aterial w as observed throughout on all w allboard w alls. The joint com pound w as sam pled and analyzed for asbestos content. This hom ogeneous area

(H A) consists of joint com pound associated w ith the w allboard.

The joint com pound and w allboard is one integral unit and should be treated as one hom ogeneous area although the w allboard is non asbestos containing. The joint com pound is considered non-friable. The joint com pound is in high use areas of the facility but present a low health hazard potential to building occupants due to a m inim al potential for disturbance and fiber release. This asbestos-containing joint com pound should be placed in an O perations and M aintenance program until renovation or dem olition activities require rem oval.

C eiling Tile, 2’ x 6’– This m aterial w as observed throughout the building. The ceiling tile 2’ x 6’ w as sam pled and analyzed for asbestos content. The ceiling tile 2’ x 6’ is considered friable. The ceiling tile 2’ x 6’ is in high use areas of the facility but present a low health hazard potential to building occupants due to a m inim al potential for disturbance and fiber release. This asbestos-containing ceiling tile 2’ x 6’ should be placed in an O perations and M aintenance program until renovation or dem olition activities require rem oval.

ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W ashington

Pipe Packing Insulation – This m aterial w as observed throughout the building. The pipe packing insulation w as sam pled and analyzed for asbestos content. The pipe packing insulation is considered non-friable. The pipe packing insulation is in low use areas of the facility and presents a low health hazard potential to building occupants due to a m inim al potential for disturbance and fiber release. This asbestos-containing pipe packing insulation should be placed in an O perations and M aintenance program until renovation or dem olition activities require rem oval.

Vibration Joint C loth – This m aterial w as observed in the penthouse. The vibration joint cloth w as sam pled and analyzed for asbestos content. The vibration joint cloth is considered non- friable. The vibration joint cloth is in low use areas of the facility and presents a low health hazard potential to building occupants due to a m inim al potential for disturbance and fiber release. This asbestos-containing vibration joint cloth should be placed in an O perations and M aintenance program until renovation or dem olition activities require rem oval.

A coustical C eiling Tile M astic, dark brow n – This m aterial w as observed on the ninth floor. The acoustical ceiling tile and associated m astic w ere both sam pled and analyzed for asbestos content. O nly the acoustical ceiling tile associated m astic w as found to be asbestos containing. This H

A consists of m astic associated w ith the acoustical ceiling tile. The acoustical ceiling tile and associated m astic is one integral unit and should be treated as one hom ogeneous area although the acoustical ceiling tile is non asbestos containing. The acoustical ceiling tile associated m astic is considered non-friable. The acoustical ceiling tile associated m astic is in high use areas of the facility and presents a low health hazard potential to building occupants due to a m inim al potential for disturbance and fiber release. This asbestos-containing acoustical ceiling tile associated m astic should be placed in an O perations and M aintenance program until renovation or dem olition activities require rem oval.

Fire D oors – The fire doors w ere not sam pled due to the sam pling being to destructive, therefore, the fire doors are assum ed to be AC

M . The fire doors are in high use areas of the facility but present a low health hazard potential to building occupants due to a m inim al potential for disturbance and asbestos fiber release. This assum ed asbestos-containing fire door should be placed in an O unless testing determ ines it to be non-AC

M or until renovation or dem olition activities require rem oval.

G askets - The gasket w as not sam pled due to inaccessibility; therefore, the gasket is assum ed to be AC M

. The gasket is in low use areas of the facility and presents a low health hazard potential to building occupants due to a m inim al potential for disturbance and asbestos fiber release. This assum ed asbestos-containing gasket should be placed in an O perations and M aintenance program unless testing determ or until renovation or dem olition activities require rem oval.

Valve Packing - The valve packing w as not sam pled due to inaccessibility; therefore, the valve packing is assum ed to be AC M

. The valve packing is in low use areas of the ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W ashington facility and presents a low health hazard potential to building occupants due to a m inim al potential for disturbance and asbestos fiber release. This assum ed asbestos-containing valve packing should be placed in an O unless testing determ

M or until renovation or dem olition activities require rem oval.

D uct Sealant - The duct sealant w as not sam pled due to inaccessibility; therefore, the duct sealant is assum ed to be AC M

. The duct sealant is in low use areas of the facility and presents a low health hazard potential to building occupants due to a m inim al potential for disturbance and asbestos fiber release. This assum ed asbestos-containing duct sealant should be placed in an O perations and M aintenance program unless testing determ ines it to be non-AC

M or until renovation or dem olition activities require rem oval.

A

R

EA

S O F H

IG

H

C O

N C one.

6.0 R

E-IN

SPEC

TIO

N

SU

RVEY PR

O C

ED

U

R

ES

The asbestos re-inspection involved an asbestos assessm ent com prised of the follow ing three subtasks: Visual Inspection and Sam pling, C ondition Assessm ent and Laboratory Analysis.

The activities perform ed in each task are detailed in the follow ing paragraphs:

Visual Inspection and Sam pling: The re-inspection and additional sam pling for suspect AC

M included visual observation of the interior surfaces, finishes, areas above suspended ceilings, m echanical areas and all accessible AC

M . Additional sam pling included m aterials not previously sam pled for asbestos content or confirm ation of m aterials based on pending renovation projects.

C ondition A ssessm ent: A condition assessm ent w as perform ed on all accessible AC previously identified in the building(s). Building m aterials w ere categorized by friability, condition, and potential for disturbance. C onsideration w as given to the process of dem olition and renovation and the im pact of the forces upon the AC M

Laboratory

A nalysis:

All sam ples w ere subm itted to

FO

H

’s, N ational Environm ental R eference Laboratory in C hicago, Illinois and w ere analyzed by progressive Polarized Light M icroscopy (PLM ). P

LM

is the EPA recom m ended analytical m ethod for determ ining asbestos content in bulk sam ples.

Prior to conducting additional sam pling, a thorough field observation inspection w as conducted to determ ine appropriate sam pling procedures for the m aterials and to ensure representative assessm ent w as m ade in collecting the agreed upon sam ples.

An assessm ent of m aterial condition and an estim ation of m aterial quantities w ere m ade at the tim e of sam ple collection.

ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W ashington

The follow ing protocol w as used in the additional sam pling survey:

M aterials w ere divided into hom ogeneous areas;

R epresentative sam ples of each hom ogeneous area of m iscellaneous, surfacing, and therm al system insulation m aterials w ere collected.

A m inim um of tw o sam ples of each hom ogeneous m iscellaneous area w as collected. A m inim um of three, five or seven sam ples of each hom ogeneous surfacing area w as collected depending on the total square footage. A m inim um of three sam ples of each hom ogeneous therm al system insulation m aterial w as collected. Additional sam ples for TSI w ere collected based on square feet or different system type, such as patch m aterial.

After collection, each sam ple w as sealed zip-lock plastic bags and labeled. A sam ple log w as m aintained w hich identified sam ple num ber, sam ple m aterial type, location, and area description location

7.0 A

N A

LYTIC

A

L PR

O

C

ED

U R

ES

Bulk sam ple analysis w as conducted by the N ational Environm ental R eference Laboratory (N

ER

L) in C hicago, Illinois. Bulk sam ples w ere analyzed by PLM dispersion staining EPA M ethod 600/R

-93-116 analysis. Sam ples analyzed having no identified asbestos are reported as “none detected” (N D

). Those containing asbestos w ere reported w ith the type and percentage of asbestos.

The

FO

H

L-C H

IC

AG

O is accredited by the

Am erican

Industrial H ygiene Association (AIH

A). The organization identification num ber is 016905. Sam ple analysis w as subcontracted to STAT Analysis C orporation. A copy of their N

VLAP certification is included in A ppendix H

8.0

LIM

ITATIO

N

S

R easonable effort w as m ade by FO

H personnel to locate and reassess the condition of

AC

M m aterials identified in the previous re-inspection reports. This report has been prepared for the exclusive use of G

SA

and its clients. This re-inspection is not intended for use as abatem ent plans, specifications or abatem ent project design.

ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W ashington

Page A

A

PPEN

D

IX A

AH

ER

A C

ER

TIFIC

ATIO

ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W ashington

Page B

PPEN

IX B

Building and Asbestos Photographs

Spokane Federal Building and U ber 20, 2019 G

SA Building N um ber W

A0064ZZ

W est 920 R iverside Avenue

Appendix B-1

Photo 1. TSI on pipe fittings w ith 3% C hrysotile and 2% osite.

Photo 2. Floor tile and m astic w ith 8%

C hrysotile (tile) and 10%

C hrysotile (m astic).

ber 20, 2019 G

SA Building N um ber W

A0064ZZ

W est 920 R iverside Avenue

Appendix B-2

Photo 3: C eiling tile, 2’ x 6’ w ith 3%

Am osite and joint com pound w ith 2% hrysotile.

Photo 4. Pipe packing insulation w ith 5% hrysotile asbestos.

ber 20, 2019 G

SA Building N um ber W

A0064ZZ

W est 920 R iverside Avenue

Appendix B-3

Photo 5: Acoustical ceiling tile m astic dark brow n w ith 2% Trem olite

Photo 6: Fireproofing, beige 5% hrysotile and green tinted fireproofing that is negative for asbestos.

ber 20, 2019 G

SA Building N um ber W

A0064ZZ

W est 920 R iverside Avenue

Appendix B-4

Photo 7: G askets and valve packing assum e AC

Photo 8: D uct sealant assum ed AC ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W

Page C

IX C

Excel D atabase Form w ith Abatem ent Estim ate sdsd

REGION BUILDING NUMBER BUILDING NAME

BUILDING

CONSTRUCTION

DATE

(system generated field)

BUILDING SIZE (GSF)

(system generated field)

BUILDING COMMENTS

FLOOR NUMBER

(can be text or number or combination)

FLOOR AREA

(GSF of the floor)

(system generated)

FLOOR COMMENTS

LOCATION NUMBER

(any unique number assigned to an area or room)

LOCATION COMMENTS

HOMOGENEOUS

AREA NUMBER

DATE OF SURVEY

SURVEY ID NUMBER

(system generated)

RESULTS

(Asbestos Status)

LONG DESCRIPTION RESULTS

(Asbestos Status)

FRIABILITY CONDITION ACCESSIBILITY

ASBESTOS

QUANTITY

ASBESTOS

QUANTITY

UNITS

TYPE AND DESCRIPTION OF

ASBESTOS

Abatement Cost Estimate (only acm abatement and only acm on this row)

Variability (approximate +/- accuracy of estimate) Estimate Comments

10 WA0064ZZ Thomas S. Foley United States Courthouse Basement Piping B-001 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 40 EA Thermal System Insulation on Fittings $2,025 10% All unit pricing provided by GSA 10 WA0064ZZ Thomas S. Foley United States Courthouse Basement Walls B-001 Asbestos-Containing Material => 1% ACM=>1 YES GOOD HIGH Unknown n/a Joint Compound $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Basement Ceiling B-001 Asbestos-Containing Material => 1% ACM=>1 NO GOOD HIGH 201 SF Floor Tile and associated mastic $1,288 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Basement Ceiling B-001 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 18,444 SF Fireproofing, beige $279,795 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Basement Egresses/Vaults B-001 Presumed Asbestos-Containing Material PACM YES GOOD LOW 7 EA Fire Door $2,152 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Basement Valves B-001 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Gaskets $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Basement Valves B-001 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Valve Packing $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Basement Ducts B-001 Presumed Asbestos-Containing Material PACM NO GOOD LOW 400 LF Duct Sealant $2,632 10%

10 WA0064ZZ Thomas S. Foley United States Courthouse 1st Piping 1-002 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 30 EA Thermal System Insulation on Fittings $1,519 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 1st Floor 1-002 Asbestos-Containing Material => 1% ACM=>1 NO GOOD HIGH 9,544 SF Floor Tile and associated mastic $61,177 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 1st Walls 1-002 Asbestos-Containing Material => 1% ACM=>1 YES GOOD HIGH Unknown n/a Joint Compound $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 1st Ceiling 1-002 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 3,444 SF Ceiling Tile, 2- x 6-foot $14,258 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 1st Ceiling 1-002 Asbestos-Containing Material => 1% ACM=>1 Yes GOOD LOW 11,243 SF Fireproofing, beige $170,556 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 1st Egresses/Vaults 1-002 Presumed Asbestos-Containing Material PACM YES GOOD LOW 7 EA Fire Door $2,152 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 1st Valves 1-002 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Gaskets $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 1st Valves 1-002 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Valve Packing $0 10%

10 WA0064ZZ Thomas S. Foley United States Courthouse 2nd Piping 2-003 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 30 EA Thermal System Insulation on Fittings $1,519 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 2nd Walls 2-003 Asbestos-Containing Material => 1% ACM=>1 YES GOOD HIGH Unknown n/a Joint Compound $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 2nd Egresses/Vaults 2-003 Presumed Asbestos-Containing Material PACM YES GOOD LOW 7 EA Fire Door $2,152 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 2nd Valves 2-003 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Gaskets $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 2nd Valves 2-003 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Valve Packing $0 10%

10 WA0064ZZ Thomas S. Foley United States Courthouse 3rd Piping 3-004 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 30 EA Thermal System Insulation on Fittings $1,519 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 3rd Walls 3-004 Asbestos-Containing Material => 1% ACM=>1 YES GOOD HIGH Unknown n/a Joint Compound $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 3rd Egresses/Vaults 3-004 Presumed Asbestos-Containing Material PACM YES GOOD LOW 7 EA Fire Door $2,152 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 3rd Valves 3-004 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Gaskets $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 3rd Valves 3-004 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Valve Packing $0 10%

10 WA0064ZZ Thomas S. Foley United States Courthouse 4th Piping 4-005 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 30 EA Thermal System Insulation on Fittings $1,519 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 4th Floor 4-005 Asbestos-Containing Material => 1% ACM=>1 NO GOOD HIGH 15,962 SF Floor Tile and associated mastic $102,316 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 4th Walls 4-005 Asbestos-Containing Material => 1% ACM=>1 YES GOOD HIGH Unknown n/a Joint Compound $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 4th Ceiling 4-005 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 6,412 SF Ceiling Tile, 2- x 6-foot $26,546 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 4th Ceiling 4-005 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 14,912 SF Fireproofing, beige $226,215 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 4th Egresses/Vaults 4-005 Presumed Asbestos-Containing Material PACM YES GOOD LOW 7 EA Fire Door $2,152 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 4th Valves 4-005 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Gaskets $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 4th Valves 4-005 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Valve Packing $0 10%

10 WA0064ZZ Thomas S. Foley United States Courthouse 5th Piping 5-006 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 30 EA Thermal System Insulation on Fittings $1,519 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 5th Floor 5-006 Asbestos-Containing Material => 1% ACM=>1 NO GOOD HIGH 836 Floor Tile and associated mastic $5,359 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 5th Walls 5-006 Asbestos-Containing Material => 1% ACM=>1 YES GOOD HIGH Unknown n/a Joint Compound $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 5th Ceiling 5-006 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 8,667 SF Fireproofing, beige $131,478 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 5th Egresses/Vaults 5-006 Presumed Asbestos-Containing Material PACM YES GOOD LOW 7 EA Fire Door $2,152 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 5th Valves 5-006 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Gaskets $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 5th Valves 5-006 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Valve Packing $0 10%

10 WA0064ZZ Thomas S. Foley United States Courthouse 6th Piping 6-007 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 30 EA Thermal System Insulation on Fittings $1,519 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 6th Floor 6-007 Asbestos-Containing Material => 1% ACM=>1 NO GOOD HIGH 7,190 SF Floor Tile and associated mastic $46,088 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 6th Walls 6-007 Asbestos-Containing Material => 1% ACM=>1 YES GOOD HIGH Unknown n/a Joint Compound $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 6th Ceiling 6-007 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 17,217 SF Fireproofing, beige $261,182 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 6th Egresses/Vaults 6-007 Presumed Asbestos-Containing Material PACM YES GOOD LOW 7 EA Fire Door $2,152 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 6th Valves 6-007 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Gaskets $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 6th Valves 6-007 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Valve Packing $0 10%

10 WA0064ZZ Thomas S. Foley United States Courthouse 7th Piping 7-008 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 30 EA Thermal System Insulation on Fittings $1,519 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 7th Floor 7-008 Asbestos-Containing Material => 1% ACM=>1 NO GOOD HIGH 80 SF Floor Tile and associated mastic $513 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 7th Walls 7-008 Asbestos-Containing Material => 1% ACM=>1 YES GOOD HIGH Unknown n/a Joint Compound $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 7th Egresses/Vaults 7-008 Presumed Asbestos-Containing Material PACM YES GOOD LOW 7 EA Fire Door $2,152 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 7th Valves 7-008 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Gaskets $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 7th Valves 7-008 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Valve Packing $0 10%

10 WA0064ZZ Thomas S. Foley United States Courthouse 8th Piping 8-009 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 30 EA Thermal System Insulation on Fittings $1,519 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 8th Floor 8-009 Asbestos-Containing Material => 1% ACM=>1 NO GOOD HIGH 2,023 SF Floor Tile and associated mastic $12,967 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 8th Walls 8-009 Asbestos-Containing Material => 1% ACM=>1 YES GOOD HIGH Unknown n/a Joint Compound $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 8th Valves 8-009 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Gaskets $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 8th Valves 8-009 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Valve Packing $0 10%

10 WA0064ZZ Thomas S. Foley United States Courthouse 9th Piping 9-010 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 30 EA Thermal System Insulation on Fittings $1,519 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 9th Floor 9-010 Asbestos-Containing Material => 1% ACM=>1 NO GOOD HIGH 11,296 SF Floor Tile and associated mastic $72,407 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 9th Walls 9-010 Asbestos-Containing Material => 1% ACM=>1 YES GOOD HIGH Unknown n/a Joint Compound $0 10%

10 WA0064ZZ Thomas S. Foley United States Courthouse 9th Ceiling 9-010 Asbestos-Containing Material => 1% ACM=>1 GOOD 2,004 SF Acoustical Ceiling Tile Mastic, dark brown $4,930 10%

10 WA0064ZZ Thomas S. Foley United States Courthouse 9th Ceiling 9-010 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 10,756 SF Fireproofing, beige $163,169 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 9th Egresses/Vaults 9-010 Presumed Asbestos-Containing Material PACM YES GOOD LOW 8 EA Fire Door $2,459 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 9th Valves 9-010 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Gaskets $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse 9th Valves 9-010 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Valve Packing $0 10%

10 WA0064ZZ Thomas S. Foley United States Courthouse SR & SF Piping S-011 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 30 EA Thermal System Insulation on Fittings $1,519 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse SR & SF Floor S-011 Asbestos-Containing Material => 1% ACM=>1 NO GOOD HIGH 22,447 SF Floor Tile and associated mastic $143,885 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse SR & SF Walls S-011 Asbestos-Containing Material => 1% ACM=>1 YES GOOD HIGH Unknown n/a Joint Compound $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse SR & SF Ceiling S-011 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 3,804 SF Fireproofing, beige $57,707 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse SR & SF Egresses/Vaults S-011 Presumed Asbestos-Containing Material PACM YES GOOD LOW 8 EA Fire Door $2,459 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse SR & SF Valves S-011 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Gaskets $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse SR & SF Valves S-011 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Valve Packing $0 10%

10 WA0064ZZ Thomas S. Foley United States Courthouse Lower Penthouse Piping LPH-012 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 30 EA Thermal System Insulation on Fittings $1,519 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Lower Penthouse Walls LPH-012 Asbestos-Containing Material => 1% ACM=>1 YES GOOD HIGH Unknown n/a Joint Compound $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Lower Penthouse Floor LPH-012 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 5 SF Pipe Packing Insulation $96 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Lower Penthouse Ceiling LPH-012 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 593 Fireproofing, beige $8,996 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Lower Penthouse Egresses/Vaults LPH-012 Presumed Asbestos-Containing Material PACM YES GOOD LOW 3 EA Fire Door $922 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Lower Penthouse Valves LPH-012 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Gaskets $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Lower Penthouse Valves LPH-012 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Valve Packing $0 10%

10 WA0064ZZ Thomas S. Foley United States Courthouse Upper Penthouse Piping UPH-013 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 30 EA Thermal System Insulation on Fittings $1,519 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Upper Penthouse Walls UPH-013 Asbestos-Containing Material => 1% ACM=>1 YES GOOD HIGH Unknown n/a Joint Compound $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Upper Penthouse Ducts UPH-013 Asbestos-Containing Material => 1% ACM=>1 YES GOOD LOW 100 SF Vibration Joint Cloth $3,233 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Upper Penthouse Egresses/Vaults UPH-013 Presumed Asbestos-Containing Material PACM YES GOOD LOW 2 EA Fire Door $615 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Upper Penthouse Valves UPH-013 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Gaskets $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Upper Penthouse Valves UPH-013 Presumed Asbestos-Containing Material PACM NO GOOD LOW Unknown n/a Valve Packing $0 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Mailchute Asbestos-Containing Material => 1% ACM=>1 NO GOOD LOW 1 EA Mail Chute Pad $51 10% 10 WA0064ZZ Thomas S. Foley United States Courthouse Floor No Asbestos Detected NND Terrazzo flooring 10 WA0064ZZ Thomas S. Foley United States Courthouse Ceiling No Asbestos Detected NND Ceiling tile 2- x 4-foot 10 WA0064ZZ Thomas S. Foley United States Courthouse Ceiling No Asbestos Detected NND Ceiling tile 2- x 2-foot

10 WA0064ZZ Thomas S. Foley United States Courthouse ceiling/wall No Asbestos Detected NND Acoustical ceiling/wall 12- x 12-inch 10 WA0064ZZ Thomas S. Foley United States Courthouse Pipes No Asbestos Detected NND Straight pipe insulation 10 WA0064ZZ Thomas S. Foley United States Courthouse Lower walls No Asbestos Detected NND Vinyl wall cove mastic 10 WA0064ZZ Thomas S. Foley United States Courthouse ceiling/wall No Asbestos Detected NND Wallboard 10 WA0064ZZ Thomas S. Foley United States Courthouse Walls No Asbestos Detected NND Joint compound abated areas 10 WA0064ZZ Thomas S. Foley United States Courthouse Floor No Asbestos Detected NND Carpet mastic yellow

10 WA0064ZZ Thomas S. Foley United States Courthouse Floor No Asbestos Detected NND Floor tile 12- x 12-inch with associated mastic abated areas

10 WA0064ZZ Thomas S. Foley United States Courthouse Roof No Asbestos Detected NND Roof caulking 10 WA0064ZZ Thomas S. Foley United States Courthouse Ceiling/wall No Asbestos Detected NND Plaster 10 WA0064ZZ Thomas S. Foley United States Courthouse Wall No Asbestos Detected NND Cinderblock/mortar 10 WA0064ZZ Thomas S. Foley United States Courthouse Wall No Asbestos Detected NND Brick/mortar

10 WA0064ZZ Thomas S. Foley United States Courthouse Wall/floor No Asbestos Detected NND Ceramic tile 2- x 2-inch with associated grout

10 WA0064ZZ Thomas S. Foley United States Courthouse Floor No Asbestos Detected NND Linoleum 10 WA0064ZZ Thomas S. Foley United States Courthouse Roof access No Asbestos Detected NND Caulking on roof access doors 10 WA0064ZZ Thomas S. Foley United States Courthouse Ceiling No Asbestos Detected NND Fireproofing, green 10 WA0064ZZ Thomas S. Foley United States Courthouse Egresses No Asbestos Detected NND Wood fire door liners ber 20, 2019

G SA Building N um ber W

A0064ZZ

920 W est R iverside Avenue

Spokane, W

Page D

IX D

Asbestos M aterial Location D ings h tt p

/w w w .m e d to xn w m s n

.c o m

E D

-T O

X S

A F

E E

N V

IR

O

M E

N T O

F A

M E

R

IC

A

IN

C d b a

N O

R T H

W E

S T

O C

C U

P A

T

IO

N A

L E

N V

IR

O

M E

N T A

L H

E A

L T H

S E

R V

IC

E

S

(2

-0

(2

-0

F

A X

W E

S T

V A

L L E

Y H

IG

H

W A

Y N

S

U

IT

E

A

U B

U R

N

W A

S H

IN

G

T O

N

HM-1.1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text J

AutoCAD SHX Text H

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text 116A

AutoCAD SHX Text 114A

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

FEC

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

UP

AutoCAD SHX Text

FEC

AutoCAD SHX Text

FEC

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 182A

AutoCAD SHX Text 182A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 129C

AutoCAD SHX Text 129D

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

ELEC.

AutoCAD SHX Text

TELE.

AutoCAD SHX Text

MECH.

AutoCAD SHX Text

FRIEGHT

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

MECH.

AutoCAD SHX Text

MECH.

AutoCAD SHX Text

MEN

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

CUST.

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

AutoCAD SHX Text Sheet

AutoCAD SHX Text reference

AutoCAD SHX Text number

AutoCAD SHX Text Sheet

AutoCAD SHX Text A.8572.8p

AutoCAD SHX Text Plot Date:

AutoCAD SHX Text Chk by:

AutoCAD SHX Text Dwn by:

AutoCAD SHX Text

ERIC JARVIS

AutoCAD SHX Text Designed by:

AutoCAD SHX Text

JAL

AutoCAD SHX Text File Name:

AutoCAD SHX Text Date:

AutoCAD SHX Text Plot Scale:

AutoCAD SHX Text Drawing Number:

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text Symbol

AutoCAD SHX Text Description

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text

EJ

AutoCAD SHX Text A.8572.8p

AutoCAD SHX Text 3/12/2019

AutoCAD SHX Text THOMAS S. FOLEY UNITED STATES COURTHOUSE GSA BUILDING NUMBER WA 0064ZZ SPOKANE, WA HOMOGENOUS MATERIAL DRAWING

AutoCAD SHX Text

FIRST FLOOR PLAN ASBESTOS CEILING MATERIAL LOCATIONS SCALE: NTS

AutoCAD SHX Text

LEGEND ACM CEILING TILE

AutoCAD SHX Text BUILDING NOTES 1. DRAWING IS SCHEMATIC AND SAMPLE LOCATIONS FOR ASBESTOS AND DRAWING IS SCHEMATIC AND SAMPLE LOCATIONS FOR ASBESTOS AND LEAD PAINT ARE APPROXIMATE. 2. REFER TO REPORT FOR MORE INFORMATION ABOUT THE SAMPLED REFER TO REPORT FOR MORE INFORMATION ABOUT THE SAMPLED MATERIALS. 3. CONCEALED AND ACCESSIBLE PIPING INSULATION ON DOMESTIC AND CONCEALED AND ACCESSIBLE PIPING INSULATION ON DOMESTIC AND HYDRONIC PIPING IS ASBESTOS CONTAINING. 4. IN ADDITION TO THE ASBESTOS CONTAINING MATERIALS SHOWN ON IN ADDITION TO THE ASBESTOS CONTAINING MATERIALS SHOWN ON THIS DRAWING, THE FOLLOWING ITEMS HAVE BEEN CONFIRMED OR ARE ASSUMED TO CONTAIN ASBESTOS. A. JOINT COMPOUND JOINT COMPOUND B. PACKING AROUND PIPE PENETRATIONS PACKING AROUND PIPE PENETRATIONS C. MAIL CHUTE PAD MAIL CHUTE PAD D. VIBRATION JOINT CLOTH VIBRATION JOINT CLOTH E. DARK BROWN MASTIC ASSOCIATED WITH 12-INCH CEILING TILE DARK BROWN MASTIC ASSOCIATED WITH 12-INCH CEILING TILE F. GASKETS GASKETS G. VALVE PACKING VALVE PACKING H. DUCTWORK SEALANT DUCTWORK SEALANT I. VAULT DOOR INTERIORSVAULT DOOR INTERIORS

AutoCAD SHX Text SENSITIVE BUT UNCLASSIFIED (SBU) PROPERTY OF THE UNITED STATES GOVERNMENT. COPYING DISSEMINATION OR DISTRIBUTION OF THESE DRAWINGS, PLANS OR SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED. DO NOT REMOVE THIS NOTICE, PROPERLY DESTROY DOCUMENTS WHEN NO LONGER NEEDED.

p

/w w w .m e d to xn w m s n

.c o m

E D

-T O

X S

A F

E E

N V

IR

O

M E

N T O

F A

M E

R

IC

A

IN

C d b a

N O

R T H

W E

S T

O C

C U

P A

T

IO

N A

L E

N V

IR

O

M E

N T A

L H

E A

L T H

S E

R V

IC

E

S

(2

-0

(2

-0

F

A X

W E

S T

V A

L L E

Y H

IG

H

W A

Y N

S

U

IT

E

A

U B

U R

N

W A

S H

IN

G

T O

N

HM-1.0

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text J

AutoCAD SHX Text H

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text 116A

AutoCAD SHX Text 114A

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

FEC

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

UP

AutoCAD SHX Text

FEC

AutoCAD SHX Text

FEC

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 182A

AutoCAD SHX Text 182A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 129C

AutoCAD SHX Text 129D

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

ELEC.

AutoCAD SHX Text

TELE.

AutoCAD SHX Text

MECH.

AutoCAD SHX Text

FRIEGHT

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

MECH.

AutoCAD SHX Text

MECH.

AutoCAD SHX Text

MEN

AutoCAD SHX Text

WOMEN

AutoCAD SHX Text

CUST.

AutoCAD SHX Text

PROJECT NUMBER:

AutoCAD SHX Text

AutoCAD SHX Text Sheet

AutoCAD SHX Text reference

AutoCAD SHX Text number

AutoCAD SHX Text Sheet

AutoCAD SHX Text A.8572.8p

AutoCAD SHX Text Plot Date:

AutoCAD SHX Text Chk by:

AutoCAD SHX Text Dwn by:

AutoCAD SHX Text

ERIC JARVIS

AutoCAD SHX Text Designed by:

AutoCAD SHX Text

JAL

AutoCAD SHX Text File Name:

AutoCAD SHX Text Date:

AutoCAD SHX Text Plot Scale:

AutoCAD SHX Text Drawing Number:

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text Symbol

AutoCAD SHX Text Description

AutoCAD SHX Text Date

AutoCAD SHX Text Approved

AutoCAD SHX Text

EJ

AutoCAD SHX Text A.8572.8p

AutoCAD SHX Text 3/12/2019

AutoCAD SHX Text THOMAS S. FOLEY UNITED STATES COURTHOUSE GSA BUILDING NUMBER WA 0064ZZ SPOKANE, WA HOMOGENOUS MATERIAL DRAWING

AutoCAD SHX Text

FIRST FLOOR PLAN ASBESTOS FLOORING MATERIAL LOCATIONS SCALE: NTS

AutoCAD SHX Text

LEGEND ACM FLOOR TILE AND MASTIC ACM-CORE FIRE DOORS