The Defense Information Systems Agency seeks removal and installation of furniture systems at its Columbus facility, with proposals due August 26, 2026, at 2:00 PM CDT. This is a Total Small Business set-aside, firm fixed-price procurement.

Place of performance is Defense Supply Center Columbus, Building 10, 3990 East Broad Street, Whitehall, Ohio 43213. The NAICS code is 337214 (Office Furniture Manufacturing), and the PSC is Z2AB (Repair or Alteration of Conference Space and Facilities).

The base scope requires removal of 69 existing workstations, relocation of 4 workstations to a collaboration space, and installation of 78 new workstations (68 linear, 10 circular battle captain consoles) with electrical connections, 312 monitor arms with gas-spring actuation supporting four 24-inch monitors per 60-inch space, 4 floor-to-ceiling ladder racks for cable management, and approximately 24,000 linear feet of CAT6 S/FTP cabling (SIPR and NIPR networks segregated by 36 inches). Electrical work includes 85 connections with a maximum of four workstations per circuit. The contractor must install 120 linear feet of temporary demountable wall with two egress doors and sound attenuation. All work must comply with 2014 NEC, NFPA 101, IBC, UFC, IEEE, ASTM, and ANSI standards.

Amendment 05 (effective August 26) made mandatory the previously optional items: 15,000 square feet of commercial-grade removable carpet squares, 85 ergonomic office chairs meeting specified requirements (adjustable height, lumbar support, 300-pound capacity), 4 glass whiteboards (minimum 74" × 42"), and 60 double-stacked wall lockers. The contractor must submit a 60-day project schedule within 7 calendar days of award, preliminary furniture layouts and 3D renderings within 15 days, final layouts within 30 days, electrical submittals with arc flash calculations within 15 days, and a Lock-Out Tag-Out plan within 20 days. Performance period is 12 months from award with delivery by November 21, 2026.

Evaluation is Lowest Price Technically Acceptable (LPTA), weighing Technical Approach and Compliance (furniture/layout conformance, electrical and IT infrastructure adequacy, demolition/installation methodology) and Project Management (schedule clarity, coordination). All contractor personnel must be U.S. citizens escorted at all times on-site; security clearances are not required. A mandatory pre-proposal site visit occurred August 4, 2026. Contractors may use subcontractors for IT work and carpet installation; failure to complete all required line items results in disqualification. No bid bonds, performance bonds, or payment bonds are required. All products must carry minimum five-year warranties. Five amendments issued between July 31 and August 26 adjusted FAR 52.212-2, clarified specifications, updated Q&A responses, and extended the proposal deadline from August 19 to August 26.

Notice text

6 versions

Update #6 · Latest ·

Amendment 05 8/26/26, Revised PWS, Q&A document

Amendment 04 8/25/26, Revised Q&A document

Amendment 03 8/18/26, Revise/correct the EPL Attachment 3 

Revise Q&A doc

Update PWS Attachment 1 to revise verbiage on part 10 Period of Performance 

Extend the due date of proposals to Aug 26, 2026 2:00 pm CDT

A conformed copy of the solicitation is also placed in the attachments that contains all amenments for reference.

Amendment 02 8/13/26, RFP amended to revise Clause FAR 52.212-2, clarify attachment 6a, attachment 3 EPL, post all Q&A recieved and post site survey results/notes

Amendment 01 7/31/2026. RFP amended to adjust Clause FAR 52.212-2 and chair QTY on PWS, update EPL attachment chair QTY, update Attachment 6a Pre-Proposal Site Visit instructions Q&A due date

The successful vender will remove all existing furniture designated on construction drawings and purchase and install new furniture. Installation shall include the reconnecting the furniture to an existing electrical grid and cable network. The installation we be completed as shown on the proposed concept Plans (Attachment A - Furniture Layout). This contract will have an option in and above the base bid to include carpeting of the project area and receipt of 85 office chairs.

Update #5 ·

Amendment 04 8/25/26, Revised Q&A document

Amendment 03 8/18/26, Revise/correct the EPL Attachment 3 

Revise Q&A doc

Update PWS Attachment 1 to revise verbiage on part 10 Period of Performance 

Extend the due date of proposals to Aug 26, 2026 2:00 pm CDT

A conformed copy of the solicitation is also placed in the attachments that contains all amenments for reference.

Amendment 02 8/13/26, RFP amended to revise Clause FAR 52.212-2, clarify attachment 6a, attachment 3 EPL, post all Q&A recieved and post site survey results/notes

Amendment 01 7/31/2026. RFP amended to adjust Clause FAR 52.212-2 and chair QTY on PWS, update EPL attachment chair QTY, update Attachment 6a Pre-Proposal Site Visit instructions Q&A due date

The successful vender will remove all existing furniture designated on construction drawings and purchase and install new furniture. Installation shall include the reconnecting the furniture to an existing electrical grid and cable network. The installation we be completed as shown on the proposed concept Plans (Attachment A - Furniture Layout). This contract will have an option in and above the base bid to include carpeting of the project area and receipt of 85 office chairs.

Update #4 ·

Amendment 03 8/18/26, Revise/correct the EPL Attachment 3 

Revise Q&A doc

Update PWS Attachment 1 to revise verbiage on part 10 Period of Performance 

Extend the due date of proposals to Aug 26, 2026 2:00 pm CDT

A conformed copy of the solicitation is also placed in the attachments that contains all amenments for reference.

Amendment 02 8/13/26, RFP amended to revise Clause FAR 52.212-2, clarify attachment 6a, attachment 3 EPL, post all Q&A recieved and post site survey results/notes

Amendment 01 7/31/2026. RFP amended to adjust Clause FAR 52.212-2 and chair QTY on PWS, update EPL attachment chair QTY, update Attachment 6a Pre-Proposal Site Visit instructions Q&A due date

The successful vender will remove all existing furniture designated on construction drawings and purchase and install new furniture. Installation shall include the reconnecting the furniture to an existing electrical grid and cable network. The installation we be completed as shown on the proposed concept Plans (Attachment A - Furniture Layout). This contract will have an option in and above the base bid to include carpeting of the project area and receipt of 85 office chairs.

Update #3 ·

Amendment 02 8/13/26, RFP amended to revise Clause FAR 52.212-2, clarify attachment 6a, attachment 3 EPL, post all Q&A recieved and post site survey results/notes

Amendment 01 7/31/2026. RFP amended to adjust Clause FAR 52.212-2 and chair QTY on PWS, update EPL attachment chair QTY, update Attachment 6a Pre-Proposal Site Visit instructions Q&A due date

The successful vender will remove all existing furniture designated on construction drawings and purchase and install new furniture. Installation shall include the reconnecting the furniture to an existing electrical grid and cable network. The installation we be completed as shown on the proposed concept Plans (Attachment A - Furniture Layout). This contract will have an option in and above the base bid to include carpeting of the project area and receipt of 85 office chairs.

Update #2 ·

Amendment 01 7/31/2026. RFP amended to adjust Clause FAR 52.212-2 and chair QTY on PWS, update EPL attachment chair QTY, update Attachment 6a Pre-Proposal Site Visit instructions Q&A due date

The successful vender will remove all existing furniture designated on construction drawings and purchase and install new furniture. Installation shall include the reconnecting the furniture to an existing electrical grid and cable network. The installation we be completed as shown on the proposed concept Plans (Attachment A - Furniture Layout). This contract will have an option in and above the base bid to include carpeting of the project area and receipt of 85 office chairs.

Update #1 ·

The successful vender will remove all existing furniture designated on construction drawings and purchase and install new furniture. Installation shall include the reconnecting the furniture to an existing electrical grid and cable network. The installation we be completed as shown on the proposed concept Plans (Attachment A - Furniture Layout). This contract will have an option in and above the base bid to include carpeting of the project area and receipt of 85 office chairs.

Files

File Type Posted
HC102826R0053 AMD 05.pdf PDF
Attachment 1 Performance Work Statement 26 Aug.docx DOCX document
832674621 Columbus furniture upgrade QA Full listing 26 Aug.docx DOCX document
HC102826R0053 AMD 04.pdf PDF
832674621 Columbus furniture upgrade QA Full listing 25 Aug.docx DOCX document
Attachement 3 _EPL revised 18 AUG.xlsx XLSX spreadsheet
Attachment 1 Performance Work Statement 18 Aug.docx DOCX document
HC102826R0053 Conformed copy.docx DOCX document
HC102826R0053 AMD 03.pdf PDF
832674621 Columbus furniture upgrade QA Full listing 18 Aug.docx DOCX document
Attachement 3 _EPL revised 13 AUG.xlsx XLSX spreadsheet
832674621 Site Survey Notes.docx DOCX document
Attachment 1 Performance Work Statement.docx DOCX document
HC102826R0053 AMD 02.pdf PDF
832674621 Columbus furniture upgrade QA Full listing 13 Aug v2.docx DOCX document
HC102826R0053 AMD 01.pdf PDF
Attachement 3 _EPL.xlsx XLSX spreadsheet
Attachment 6a_Pre-Proposal Site Visit Instructions31JUL.docx DOCX document
Attachment 6c_DSCC Map to Bldg.pdf PDF
HC102826R0053 Furniture upgrade.pdf PDF
Attachment 6b_VAR info.pdf PDF
Attachment 6a_Pre-Proposal Site Visit Instructions.docx DOCX document
Attachment 5d_Plans and Specifications (Attachment C WS4 on PWS.pdf PDF
Attachment 5c_Plans and Specifications(Attachment B WS14 on PWS).pdf PDF
Attachment 5a_Plans and Specifications.pdf PDF
Attachment 4_Provisions Clauses.docx DOCX document
Attachment 2_QASP_Columbus Furniture.docx DOCX document
Attachment 5b_Plans and Specifications (Attachment A on PWS).pdf PDF
Attachement 3 _EPL.xlsx XLSX spreadsheet
Show all 29

Similar open opportunities

Opportunity Agency Set-aside Responses due
Cubicle Installation Jbsa Lackland, Texas 78236, United States · NAICS 337214 Air Education and Training Command Total Small Business
Ergonomic Workstations JTF WHEM Doral, Florida 33172, United States · NAICS 337214 Army Contracting Command Total Small Business
Office Furniture Bldg. 2213 Hill Air Force Base, Utah, United States · NAICS 337214 Air Force Sustainment Center No set-aside
Sources Sought for configuration, furnishing and installation and of office furniture. Aberdeen Proving Ground, Maryland 21005, United States · NAICS 337214 ACC Aberdeen Proving Ground No set-aside
Furniture Tahoma National Cemetery Kent, Washington 98042, United States · NAICS 337211 National Cemetery Administration Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors