This document is a set of design intent drawings for a federal facilities renovation project at the Defense Information Systems Agency (DISA) Data Center Columbus, Building 10, Section 12.

The project encompasses the demolition of existing furniture and workstations, followed by installation of new furniture systems for a command center environment. Key deliverables include removal and disposal of approximately 104 existing workstations and cubicles with associated electrical power and communication lines, and procurement and installation of new console workstations, utility cabinets, and battle captain bridge consoles arranged in a circular configuration around a raised platform. The new furniture system includes a 12-inch high raised floor platform with ABA/ADA compliant ramps (1:12 slope) and handrails serving 10 battle captain workstations, approximately 68 standard console workstations arranged in linear wings, utility cabinets with power poles and cable management systems, a movable storage console, and optional bid items including personal effects lockers and a collaboration table. Electrical work requires new power drops from the ceiling to utility cabinets with junction boxes, and new communication cable routing through pre-finished metal raceways. The contractor must verify existing conditions including column locations, disconnect and remove all abandoned electrical and communication systems, provide storage space for completion of work, and coordinate scope of electrical and communication work with DISA-Global site personnel prior to proposal preparation. Existing carpet remains in console areas but must be removed from raised platform areas, and approximately 100 damaged ceiling tiles require replacement to match existing specifications.

View the file

Other files

File Type Posted
HC102826R0053 AMD 05.pdf PDF
Attachment 1 Performance Work Statement 26 Aug.docx DOCX document
832674621 Columbus furniture upgrade QA Full listing 26 Aug.docx DOCX document
HC102826R0053 AMD 04.pdf PDF
832674621 Columbus furniture upgrade QA Full listing 25 Aug.docx DOCX document
Attachement 3 _EPL revised 18 AUG.xlsx XLSX spreadsheet
Attachment 1 Performance Work Statement 18 Aug.docx DOCX document
HC102826R0053 AMD 03.pdf PDF
832674621 Columbus furniture upgrade QA Full listing 18 Aug.docx DOCX document
HC102826R0053 Conformed copy.docx DOCX document
Attachement 3 _EPL revised 13 AUG.xlsx XLSX spreadsheet
832674621 Site Survey Notes.docx DOCX document
HC102826R0053 AMD 02.pdf PDF
832674621 Columbus furniture upgrade QA Full listing 13 Aug v2.docx DOCX document
Attachment 1 Performance Work Statement.docx DOCX document
Attachement 3 _EPL.xlsx XLSX spreadsheet
Attachment 6a_Pre-Proposal Site Visit Instructions31JUL.docx DOCX document
HC102826R0053 AMD 01.pdf PDF
Attachment 6c_DSCC Map to Bldg.pdf PDF
Attachment 5b_Plans and Specifications (Attachment A on PWS).pdf PDF
Attachement 3 _EPL.xlsx XLSX spreadsheet
HC102826R0053 Furniture upgrade.pdf PDF
Attachment 6b_VAR info.pdf PDF
Attachment 6a_Pre-Proposal Site Visit Instructions.docx DOCX document
Attachment 5d_Plans and Specifications (Attachment C WS4 on PWS.pdf PDF
Attachment 5c_Plans and Specifications(Attachment B WS14 on PWS).pdf PDF
Attachment 4_Provisions Clauses.docx DOCX document
Attachment 2_QASP_Columbus Furniture.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEFENSE INFORMATION SYSTEMS AGENCY

DATA CENTER COLUMBUS

COVER SHEET

AK

M

/M H

B

1/ 8/

C O

L_ G

-0

G-001

G

EN

ER

AL

C O

VE

R

S H

EE

T

JE

S

N

BUILDING 10

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

:M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

H C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

FY

C O

L D

IS

A

G

LO

BA

L

FU

R

N

IT

U R

E

N /A

N /A

N /A

N /A

N

/A AS

S H

O W

N

BU

IL

D

IN

G

D

AT

A

C

EN

TE

R

C O

LU

M

BU

S

D

EF

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

2 S

. W

ILLO

W

DR

. ST

E. 2

G

R

EE

N W

O O

D V

IL

LA

G E, C O

LO

R

AD

O

1/ 8/

FY25 DISA GLOBAL FURNITURE

SHEET LIST TABLE

SHEET

NUMBER SHEET TITLE

GENERAL

G-001 COVER SHEET

INTERIOR

ID-101 DEMOLITION FURNITURE PLAN - BLDG 10

SECTION 12

I-100 INTERIOR FURNITURE PLAN - BLDG 10

SECTION 12

DETAILS

I-500 BUILDING 10 SECTION 12 - GLOBAL

ENLARGED DETAILS

DESIGN INTENT DRAWINGS - BUILDING 10 SECTION 12

I-501 BUILDING 10 SECTION 12 - GLOBAL

ENLARGED DETAILS

I-502 BUILDING 10 SECTION 12 - GLOBAL

ENLARGED DETAILS

EWC

LOADING PLATFORM

EWC

EWCRACK

AB

OV

E

FLOOR

R

AC

K

CO

PIE

R

10-12-7010-12-71 10-12-6910-12-72

10-12-6810-12-73 10-12-103 10-12-104

10-12-65 10-12-66 10-12-64 10-12-67

10-12-7610-12-77 10-12-7510-12-78

10-12-7410-12-79

10-12-8210-12-83 10-12-8110-12-84

10-12-8010-12-85

10-12-8810-12-89 10-12-8710-12-90

10-12-8610-12-91 10-12-96 10-12-98

10-12-94 10-12-93

10-12-92

10-12-95 10-12-97 10-12-51 10-12-50

10-12-49

10-12-99 10-12-100 10-12-101 10-12-102

10-12-56 10-12-57 10-12-58 10-12-59

10-12-52 10-12-5510-12-53 10-12-54

10-12-29 10-12-30 10-12-27

10-12-28

10-12-15 10-12-17 10-12-18

10-12-16

10-12-11

10-12-13

10-12-14

10-12-12 10-12-20 10-12-19

10-12-21 10-12-22

10-12-24 10-12-26 10-12-25

10-12-23

10-12-07

10-12-09

10-12-10

10-12-08 10-12-03

10-12-05

10-12-06

10-12-04

10-12-61

10-12-60 10-12-63 10-12-62

10-12-48

10-12-47

10-12-01

10-12-02

10-12-45 10-12-46 10-12-43

10-12-44

10-12-41

10-12-42 10-12-39

10-12-40 10-12-37

10-12-38 10-12-35

10-12-36 10-12-33

10-12-34 10-12-31

10-12-30

REF REF REF

EWC

LOADING PLATFORM

EWC

EWCRACK

AB

OV

E

FLOOR

R

AC

K

CO

PIE

R

EWC

LOADING PLATFORM

EWC

EWCRACK

AB

OV

E

FLOOR

R

AC

K

CO

PIE

R

EWC

LOADING PLATFORM

EWC

EWCRACK

AB

OV

E

FLOOR

R

AC

K

CO

PIE

R

TYPICAL AT 22

WORKSTATIONS

TYPICAL AT 4

WORKSTATIONS

TYPICAL AT 22

WORKSTATIONS

TYPICAL AT 7

WORKSTATIONS

2 TYPICAL AT 4 WORKSTATIONS 2

TYPICAL AT 10

WORKSTATIONS

TYPICAL AT 8 WORKSTATIONS

TYPICAL

TYPICAL

11111

TYPICAL AT 27

WORKSTATIONS

TYPICAL

TYPICAL

DEMOLITION FURNITURE PLAN - BUILDING 10 - SECTION 12

SCALE : 3/32" = 1'-0"

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

:M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

H C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

FY

C O

L D

IS

A

G

LO

BA

L

FU

R

N

IT

U R

E

N /A

N /A

N /A

N /A

N

/A AS

S H

O W

N

BU

IL

D

IN

G

D

AT

A

C

EN

TE

R

C O

LU

M

BU

S

D

EF

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

2 S

. W

ILLO

W

DR

. ST

E. 2

G

R

EE

N W

O O

D V

IL

LA

G E, C O

LO

R

AD

O

1/ 8/

AK

M

/M H

B

1/ 8/

C O

L_

ID

-1

ID-101

IN

TE

R

IO

R S

D

EM

O

LI

TI

O

N F

U R

N

IT

U R

E

PL

AN

BL

D

G

- S

EC

JE

S

SCALE: NONE

KEY PLAN 1st FLOOR

C N

0 8' 16' 24'

GENERAL NOTES

1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO PREPARING AND

SUBMITTING A PROPOSAL.

2. STORAGE SPACE INSIDE THE BUILDING IS VERY LIMITED AND THE CONTRACTOR SHALL

PROVIDE STORAGE SPACE REQUIRED FOR COMPLETION OF WORK.

3. CONTRACTOR SHALL DISCONNECT ELECTRICAL POWER FROM CUBICLES THAT ARE

SCHEDULED TO BE REMOVED. REMOVE CABLE AND CONDUIT BACK TO NEAREST SOURCE.

COORDINATE LAYOUT OF NEW ELECTRICAL CABLES AND CONDUIT - EXISTING ITEMS MAY

REMAIN IN PLACE IF THEY ARE TO BE UTILIZED FOR THE NEW INSTALLATION LAYOUT.

4. CONTRACTOR SHALL CONFIRM SCOPE OF COMMUNICATION CABLE DEMOLITION WITH

DISA-GLOBAL SITE POC PRIOR TO PREPARING AND SUBMITTING A PROPOSAL.

5. NO ABANDONED ELECTRICAL OR COMMUNICATION MATERIALS (INCLUDING CONDUITS)

SHALL BE LEFT IN PLACE. ALL ABANDONED ITEMS SHALL BE REMOVED.

6. ALL EXISTING CABLES DROP FROM THE CEILING.

1. EXISTING FURNITURE TO REMAIN - PROTECT FROM DAMAGE.

2. REMOVE AND DISPOSE OF EXISTING WORKSTATIONS AND CUBICLES. REMOVE ELECTRICAL

POWER AND COMMUNICATION LINES BACK TO THE SOURCE OR NEAREST CONNECTION

POINT.

3. EQUIPMENT TO REMAIN IN PLACE. PROTECT FROM DUST AND DAMAGE.

4. COPIER TO BE REMOVED BY DISA GLOBAL.

DEMOLITION KEYNOTES:

EWC

LOADING PLATFORM

EWC

EWCRACK

AB

OV

E

FLOOR

R

AC

K

CO

PIE

R

EWC

LOADING PLATFORM

EWC

EWCRACK

AB

OV

E

FLOOR

R

AC

K

CO

PIE

R

EWC

LOADING PLATFORM

EWC

EWCRACK

AB

OV

E

FLOOR

R

AC

K

CO

PIE

R

TYPICAL

TYPICAL AT 27

WORKSTATIONS

TYPICAL

11111

TYPICAL

1 1 1

EWC

LOADING PLATFORM

EWC

EWCRACK

AB

OV

E

FLOOR

R

AC

K

CO

PIE

R

REF REF REF

EWC

LOADING PLATFORM

EWC

EWCRACK

AB

OV

E

FLOOR

R

AC

K

CO

PIE

R

10-12-7010-12-71 10-12-6910-12-72

10-12-6810-12-73

10-12-7610-12-77 10-12-7510-12-78

10-12-7410-12-79

10-12-8210-12-83 10-12-8110-12-84

10-12-8010-12-85

10-12-8810-12-89 10-12-8710-12-90

10-12-8610-12-91

10-12-94 10-12-93

10-12-92

TYPICAL AT 34

WORKSTATIONS

TYPICAL AT 34

WORKSTATIONS

6 6

6 6

TYPICAL AT 10

WORKSTATIONS

TYPICAL AT 5

PLACES ALONG

THIS ROW

TYPICAL AT 5

PLACES ALONG

THIS ROW

TYPICAL AT 5

PLACES ALONG

THIS ROW

TYPICAL AT 5

PLACES ALONG

THIS ROW

6 6

NEW FURNITURE PLAN - BUILDING 10 - SECTION 12

SCALE : 3/32" = 1'-0"

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

:M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

H C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

FY

C O

L D

IS

A

G

LO

BA

L

FU

R

N

IT

U R

E

N /A

N /A

N /A

N /A

N

/A AS

S H

O W

N

BU

IL

D

IN

G

D

AT

A

C

EN

TE

R

C O

LU

M

BU

S

D

EF

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

2 S

. W

ILLO

W

DR

. ST

E. 2

G

R

EE

N W

O O

D V

IL

LA

G E, C O

LO

R

AD

O

1/ 8/

AK

M

1/ 8/

C O

L_ I-1

I-101

IN

TE

R

IO

R S

N

EW

F U

R N

IT

U

R E

PL

AN

BL

D G

- S

EC

JE

S

SCALE: NONE

KEY PLAN 1st FLOOR

C N

0 8' 16' 24'

GENERAL NOTES

1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS PRIOR TO PREPARING AND

SUBMITTING A PROPOSAL. CONTRACTOR SHALL VERIFY THAT EXISTING COLUMNS DO

NOT INTERFERE WITH NEW FURNITURE LAYOUT.

2. STORAGE SPACE INSIDE THE BUILDING IS VERY LIMITED AND THE CONTRACTOR SHALL

PROVIDE STORAGE SPACE REQUIRED FOR COMPLETION OF WORK.

3. CONTRACTOR SHALL PROVIDE AND INSTALL POWER POLES (ENCLOSED DROP FROM

EXISTING CEILING TO TOP OF UTILITY CABINET). CONFIRM NUMBER, LOCATION, AND SIZE

OF POWER POLES WITH SITE POC. SEE KEYNOTES AND PLANS FOR UTILITY CABINETS.

4. EXISTING CARPET IS IN PLACE - AND SHALL REMAIN - AT AREAS WHERE NEW CONSOLES

ARE TO BE INSTALLED.

5. EXISTING CARPET IS IN PLACE - AND SHALL BE REMOVED BY CONTRACTOR - AT AREAS

WHERE NEW RAISED PLATFORM AND RAMPS ARE TO BE INSTALLED (AT BATTLE CAPTAIN

STATIONS).

6. CONTRACTOR SHALL RUN NEW ELECTRICAL POWER TO THE THE UTILITY CABINETS.

INSTALL J-BOX IN UTILITY CABINETS. ELECTRICAL SUBCONTRACTOR SHALL PERFORM

FINAL CONNECTION OF POWER WHIPS (FROM NEW WORKSTATIONS) TO NEW J-BOXES IN

UTILITY CABINETS.

7. CONTRACTOR SHALL VERIFY SCOPE OF COMMUNICATION CABLE WORK WITH

DISA-GLOBAL SITE POC PRIOR TO PREPARING AND SUBMITTING A PROPOSAL.

8. ALL NEW ELECTRICAL AND COMMUNICATION CABLES SHALL BE ROUTED FROM ABOVE

THE CEILING.

9. CONTRACTOR SHALL REPLACE CEILING TILES THAT ARE IN POOR CONDITION - OR

DAMAGED DUE TO DEMOLITION/INSTALLATION OPERATIONS. NEW CEILING TILES SHALL

MATCH EXISTING TILES IN COLOR, TEXTURE, AND DETAILING. FOR PURPOSES OF

PREPARING A PROPOSAL - CONTRACTOR SHALL ASSUME 100 CEILING TILES ARE TO BE

REPLACED.

1. EXISTING FURNITURE TO REMAIN - PROTECT FROM DAMAGE.

2. TYPICAL CONSOLES - PURCHASE AND INSTALL NEW WORKSTATION/CONSOLES AS PER

DETAIL 1/I-500.

3. TYPICAL BATTLE CAPTAIN WORKSTATION - PURCHASE AND INSTALL NEW WORKSTATIONS

AS PER DETAILS 1/I-501 AND 1/I-502.

4. 12" HIGH RAISED FLOOR SYSTEM PLATFORM, INCLUDING RAMPS AND HANDRAILS -

PURCHASE AND INSTALL AS PER DETAIL 2/I-501.

5. OPTIONAL BID ITEM #1. LOCKERS OR STORAGE CABINETS FOR PERSONAL EFFECTS -

CONFIRM WITH DISA GLOBAL POC.

6. UTILITY CABINET AT END OF CONSOLE WING, WITH POWER POLES (DROP FROM CEILING TO

UTILITY CABINET) - PURCHASE AND INSTALL NEW CABINETS AS PER DETAIL 2/I-500.

7. UTILITY CABINET BETWEEN CONSOLE WING AND CURVED BATTLE CAPTAIN WORKSTATION,

WITH POWER POLES (DROP FROM CEILING) AND CABLE MANAGEMENT SYSTEM INSIDE

CONNECTOR BLOCK - PURCHASE AND INSTALL NEW CABINET AS PER DETAIL 3/I-500.

8. EXISTING EQUIPMENT - PROTECT FROM DUST AND DAMAGE.

9. COPIER TO BE INSTALLED BY DISA GLOBAL.

10. OPTIONAL BID ITEM #2. COLLABORATION TABLE (3'x6') AND 8 CHAIRS - CONFIRM WITH DISA

GLOBAL POC.

11. RAMP FROM EXISTING FLOOR TO RAISED PLATFORM AT BATTLE CAPTAIN WORKSTATIONS.

SLOPE AT 1:12. PROVIDE WITH HANDRAILS. COMPLY WITH ABA REQUIREMENTS. PROVIDE

AND INSTALL RAMP AS PER DETAILS 1/I-501 AND 2/I-501.

12. EXISTING PAINTED STEEL TUBE STRUCTURAL COLUMNS. APPROXIMATE SIZE = 6"x6". FIELD

VERIFY LAYOUT AND LOCATIONS OF ALL COLUMNS.

13. MOVABLE STORAGE CONSOLE. PROVIDE AND INSTALL NEW STORAGE CONSOLE AS PER

DETAIL 2/I-502.

NEW FURNITURE KEYNOTES:

2' -5

SERVICE PANEL WITH SLAT WALL. PROVIDE

TACKABLE ACOUSTICAL PANEL WHEN EXPOSED.

(4) SINGLE MONITOR ARMS, SLAT WALL MOUNTED

CANILEVERED WORK SURFACE, TYPICAL

END PANEL. PROVIDE WITH TACKABLE ACOUSTICAL

PANEL WHERE EXPOSED

END PANELS. PROVIDE WITH TACKABLE

ACOUSTICAL PANEL WHEN EXPOSED.

MOBILE PEDESTAL BOX/FILE

EXISTING FINISHED FLOOR

STORAGE CABINET

ACCESS DOORS WITH VENTING

ADJACENT CONSOLE (MIRRORED CONFIGURATION) -

WHERE OCCURS

MIRRORED CONSOLE - WHERE OCCURS

BACK PANEL. PROVIDE WITH TACKABLE ACOUSTICAL

PANEL WHERE EXPOSED. PROVIDE WITH SLAT WALL

WHERE MONITORS OCCUR.

(4) SINGLE MONITOR ARMS, SLAT WALL MOUNTED.

PROVIDE PROPER SEPARATION BETWEEN MONITORS

BASED ON CLASSIFICATIONS OF DATA DISPLAYED.

CANILEVERED WORK SURFACE, TYPICAL

STORAGE CABINET

ACCESS PANEL TO CABLE TRAY (HATCHED AREA).

PROVIDE WITH 3 WIRE MANAGEMENT GROMMETS.

MOBILE PEDESTAL BOX/FILE

END PANELS

BACK PANEL WITH SLAT WALL AT MONITORS

(4) SINGLE MONITOR ARMS, SLAT WALL MOUNTED

CANILEVERED WORK SURFACE, TYPICAL

STORAGE CABINET WITH OPEN STORAGE (WITH

ADJUSTABLE SHELF) AND DRAWERS (BOX/BOX/FILE)

WIRE MESH CABLE TRAY

REMOVABLE PANEL TO ACCESS TO CABLE TRAY

6'-0"

4' -4

"2' -1

0"

10 1/2" 2'-0"

3' -6

2' -5

1'

-1

OPEN

OPEN

DRAWER

DRAWER

DRAWER

FILE

DRAWER

DRAWER

FILE

BUILT-IN PC CABINET WITH VENTED ACCESS DOORS

EXISTING CARPET OVER CONCRETE SLAB ON GRADE

EXISTING CEILING GRID AND ACOUSTICAL LAY-IN TILES

9' -0

EXISTING CEILING GRID AND ACOUSTICAL LAY-IN TILES

9' -0

2"

(F

IE

LD

V

ER

IF

Y)

(F

IE

LD

V

ER

IF

Y)

1' -5

/2

UTILITY CABINET WITH TOP TO MATCH WORK

SURFACE OF CONSOLE UNITS

ADJACENT CONSOLE (END UNIT). REFER TO

PLAN FOR CONFIGURATION (SINGLE UNIT VS

BACK TO BACK UNITS). REFER TO 1/I-500.

AREA OF REMOVEABLE WORK SURFACE PANEL -

ALLOWING ACCESS TO CABLE TRAY BELOW

CANILEVERED WORK SURFACE

PRE-FINISHED METAL RACEWAY (FROM UTILITY CABINET

TO CEILING) - FOR ELECTRICAL AND COMMUNICATION

CABLES. RACEWAY SHOWN IS FOR SCHEMATIC

PURPOSES ONLY. CONFIRM SIZE, NUMBER, AND

CONFIGURATION OF RACEWAY(S) WITH UTILITY

REQUIREMENTS OF EACH UTILITY CABINET LOCATION.

UTILIZE INTERIOR OF UTILITY CABINET FOR LOCATION OF

JUNCTION BOXES FOR ELECTRICAL FEEDS TO CONSOLE

UNITS.

4'-6"

2' -0

UTILITY CABINET TOP TO MATCH WORK TOP

OF CONSOLE UNITS

END PANEL. MATCH PANELS OF CONSOLE UNITS.

EXISTING FINISHED FLOOR

REMOVABLE PANELS (TO PROVIDE ACCESS

TO INTERIOR OF UTILITY CABINET)

EXISTING CEILING GRID AND ACOUSTICAL LAY-IN TILES

PRE-FINISHED METAL RACEWAY (FROM UTILITY

CABINET TO CEILING) - FOR ELECTRICAL AND

COMMUNICATION CABLES.

BACK PANEL OF CONSOLE UNIT BEYOND. REFER TO B/1-500.

OPENING (AT REAR OF UTILITY CABINET) TO

CABLE TRAY AREA OF CONSOLE UNIT BEYOND

2' -5

9' -0

9' -0

END PANEL OF UTILITY CABINET. MATCH PANELS

OF CONSOLE UNITS.

EXISTING FINISHED FLOOR

TYPICAL CONSOLE UNIT. REFER TO A/I-500.

EXISTING CEILING GRID AND ACOUSTICAL LAY-IN TILES

PRE-FINISHED METAL RACEWAY (FROM UTILITY

CABINET TO CEILING) - FOR ELECTRICAL AND

COMMUNICATION CABLES.

BACK PANEL OF ADJACENT CONSOLE UNIT

CABLE TRAY AREA OF CONSOLE UNIT - WITH

OPENING INTO UTILITY CABINET FOR

ELECTRICAL AND COMMUNICATION CABLES

6' -7

(F

IE

LD

V

ER

IF

Y)

(F

IE

LD

V

ER

IF

Y)

(F

IE

LD

V

ER

IF

Y)

UTILITY CABINET WITH TOP TO MATCH WORK

SURFACE OF CONSOLE UNITS

CENTERLINE OF LAYOUT FOR BATTLE CAPTAIN

STATIONS. SEE 1/I-501.

PRE-FINISHED METAL RACEWAY (FROM UTILITY CABINET

TO CEILING) - FOR ELECTRICAL AND COMMUNICATION

CABLES. RACEWAY SHOWN IS FOR SCHEMATIC

PURPOSES ONLY. CONFIRM SIZE, NUMBER, AND

CONFIGURATION OF RACEWAY(S) WITH UTILITY

REQUIREMENTS OF UTILITY CABINET. UTILIZE INTERIOR

OF UTILITY CABINET FOR LOCATION OF JUNCTION BOXES

FOR ELECTRICAL FEEDS TO CONSOLE UNITS AND BATTLE

CAPTAIN STATIONS.

THE RACEWAYS AT THIS UTILITY CABINET SERVE BOTH

CONSOLES AND BATTLE CAPTAIN STATIONS.

UTILITY CABINET TOP TO MATCH WORK TOP

OF CONSOLE UNITS

BATTLE CAPTAIN BRIDGE CONSOLE ADJACENT

TO UTILITY CABINET. REFER TO B/I-502.

NEW RAISED FLOOR SYSTEM UNDER BATTLE

CAPTAIN STATIONS. UTILITIES ROUTED FROM

RACEWAY TO UNDER RAISED FLOOR.

REMOVABLE PANELS (TO PROVIDE ACCESS

TO INTERIOR OF UTILITY CABINET)

EXISTING CEILING GRID AND ACOUSTICAL LAY-IN TILES

PRE-FINISHED METAL RACEWAY (FROM UTILITY

CABINET TO CEILING) - FOR ELECTRICAL AND

COMMUNICATION CABLES.

CONSOLE UNIT ADJACENT TO UTILITY CABINET.

REFER TO B/1-500.

OPENING (AT SIDE OF UTILITY CABINET) TO

CABLE TRAY AREA OF CONSOLE UNIT

2' -5

9' -0

CONSOLE UNITS (END UNITS) ADJACENT TO

UTILITY CABINET. REFER TO 1/I-500.

BATTLE CAPTAIN BRIDGE CONSOLE. REFER TO 1/I-502.

2'-6"

7' -8

/2

CONFIRM DIMENSION

WITH DETAILING OF

BATTLE CAPTAIN

STATION

CABLE TRAY AREA OF CONSOLE UNIT - WITH

OPENING INTO UTILITY CABINET FOR

ELECTRICAL AND COMMUNICATION CABLES

EXISTING FINISHED FLOOR

ELECTRICAL ROUTING NOTES:

1. ELECTRICAL SERVICE WILL DROP FROM THE CEILING TO FEED ALL WORKSTATIONS.

2. PRE-FINISHED METAL RACEWAYS WILL ENCLOSE THE UTILITIES FROM THE CEILING TO THE UTILITY CABINETS*.

3. POWER FOR CONSOLE UNITS WILL ROUTE THROUGH THE CABLE TRAY CAVITY THAT IS INTEGRAL TO THE CONSOLE

WORKSTATIONS.

4. POWER FOR BATTLE CAPTAIN STATIONS WILL BE ROUTED UNDER THE NEW RAISED FLOOR STRUCTURE WHICH IS THE BASE FOR

THE BATTLE CAPTAIN STATIONS.

5. ONE 20-AMP ELECTRICAL CIRCUIT WILL SERVE 2 WORKSTATIONS. POWER-HARNESSES (BUILT INTO THE CONSOLE UNITS) WILL PROVIDE POWER FOR UP TO 8 WORKSTATIONS (4 CIRCUITS, 8-WIRE, 20 AMP POWER-HARNESS).

6. AFTER DISCUSSIONS WITH THE ELECTRICAL CONTRACTOR - IT MAY BE POSSIBLE TO MOUNT ELECTRICAL JUNCTION BOXES INSIDE THE UTILITY CABINETS AS THE TERMINATION OF THE BUILDING ELECTRICAL POWER SUPPLY FOR THESE POWER-HARNESS

CONNECTIONS.

* SEE PLAN FOR UTILITY CABINET LOCATIONS.

RACEWAY NOTES:

1. RACEWAYS ARE BASED ON 14" X 4" (APPROXIMATE SIZE) PRE-FINISHED METAL UNITS FROM LEGRAND - OTHER MANUFACTURERS

MAY BE USED IF APPROVED BY DISA'S SITE POC (POINT OF CONTACT).

2. BASIS OF DESIGN LEGRAND / WIREMOLD "VISTA ARCHITECTURAL COLUMNS". UNITS ARE AVAILABLE WITH ROUND OR SQUARE END

CAPS.

3. CONSIDER SETTING DUPLEX OUTLETS INTO THE FACE OF THE RACEWAY AT 4" ABOVE THE UTILITY CABINET WORK SURFACE - FOR USE AS CONVENIENCE OUTLETS (THESE SHOULD BE A SEPARATE CIRCUIT - FROM FEEDS FOE WORKSTATIONS).

4. RACEWAYS WILL ALSO BE UTILIZED BY COMMUNICATION CABLES - A MIX OF CLASSIFIED AND UNCLASSIFIED NETWORKS. IT IS ANTICIPATED THAT THE NETWORKS WILL CONSIST OF A MIX OF CAT6 AND DUPLEX FIBER OPTIC CABLES.

5. THE NUMBER OF COMMUNICATION NETWORKS AND TYPES OF CABLES SHALL BE CONFIRMED WITH DISA'S SITE POC.

1' -0

8'

-0 "6'

-7

(F

IE

LD

V

ER

IF

Y)

(F

IE

LD

V

ER

IF

Y)

(F

IE

LD

V

ER

IF

Y)

2"

LINE OF RISED PLATFORM BELOW. SEE 2/I-501.

AK

S/

M H

B

1/ 8/

C O

L_ G

LO

BA

L_ I-5

I-500

IN

TE

R

IO

R S

EN

LA

R G

ED

F

U R

N

IT

U R

E D

ET

AI

LS

BL

D

G

- S

EC

JE

S

I-500

B I-500

A I-500

A I-500

TYPICAL CONSOLE (WORKSTATION) - PLAN

SCALE : 3/8"= 1'-0" 0 2' 4' 6'

TYPICAL CONSOLE - ELEVATION

SCALE : 3/8"= 1'-0" 0 2' 4' 6'

TYPICAL CONSOLE - SECTION

SCALE : 3/8"= 1'-0" 0 2' 4' 6'

B I-500

I-500

C I-500

UTILITY CABINET AT CONSOLE - PLAN

SCALE : 3/8"= 1'-0" 0 2' 4' 6'

UTILITY CABINET - SIDE ELEVATION

SCALE : 3/8"= 1'-0" 0 2' 4' 6'

D I-500

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

:M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

H C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

FY

C O

L D

IS

A

G

LO

BA

L

FU

R

N

IT

U R

E

N /A

N /A

N /A

N /A

N

/A AS

S H

O W

N

BU

IL

D

IN

G

D

AT

A

C

EN

TE

R

C O

LU

M

BU

S

D

EF

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

2 S

. W

ILLO

W

DR

. ST

E. 2

G

R

EE

N W

O O

D V

IL

LA

G E, C O

LO

R

AD

O

1/ 8/

I-500

UTILITY CABINET AT BATTLE CAPTION STATION

SCALE : 3/8"= 1'-0" 0 2' 4' 6'

E I-500

UTILITY CABINET - END ELEVATION

SCALE : 3/8"= 1'-0" 0 2' 4' 6'

E I-500

D I-500

UTILITY CABINET - FRONT ELEVATION

SCALE : 3/8"= 1'-0" 0 2' 4' 6'

C I-500

16°

32°

32°

10°

10'-6" 3'-6"

2'-6"

'-8

'-0

20'-0"

'-0

'-0

'-0

(FIELD VERIFY)

(F

IE

LD

V

ER

IF

Y)

'-6

6'

-2

CENTER LINE

OF PLATFORM

C

EN

TE

R

L

IN

E O

F

PL

AT

FO

R M

13'-2 1/2" 6'-9 1/2"

'-0

(1 2"

H

IG

H R

AI

SE

D P

LA

TF

O R

M W

IT

H

S

IX

TE

EN

' R

AI

SE

D F

LO

O

R T

IL

E

M O

D U

LE

S

FR

O

M R

AM

P

TO

R

AM

P)

(R

AM

P W

IT

H

S

LO

PE

O

F 1:

ABA/ADA COMPLIANT RAMP (2'x2' RAISED

FLOOR TILES) AND HANDRAILS

(FIELD VERIFY) (FIELD VERIFY)

(F

IE

LD

V

ER

IF

Y) (F

IE

LD

V

ER

IF

Y)

(F

IE

LD

V

ER

IF

Y)

(R

AM

P W

IT

H

S

LO

PE

O

F 1:

ABA/ADA COMPLIANT RAMP (2'x2' RAISED

FLOOR TILES) AND HANDRAILS

RAISED FLOOR PLATFORM AT BATTLE

CAPTAIN STATIONS - SEE 2/I-501

EXISTING STEEL TUBE COLUMNS (TYPICAL

AT 6 PLACES SHOWN ON THIS PLAN). FIELD

VERIFY COLUMN LAYOUT AND DIMENSIONS.

'-0

'-0

1' -1

/1 6"

'-0

/1

6"

'-0

/1 6"

1' -1

/1 6"

28'-4"

12'-2" 4'-0" 12'-2"

(1 2"

H

IG

H R

AI

SE

D P

LA

TF

O R

M W

IT

H

S

IX

TE

EN

' R

AI

SE

D F

LO

O

R T

IL

E

M O

D U

LE

S

FR

O

M R

AM

P

TO

R

AM

P)

(R

AM

P W

IT

H

S

LO

PE

O

F 1:

ABA/ADA COMPLIANT RAMP (2'x2' RAISED FLOOR TILES) AND HANDRAILS. PROVIDE

DIAGONAL BRACING - TO ENSURE LATERAL STIFFNESS.

(R

AM

P W

IT

H

S

LO

PE

O

F 1:

ABA/ADA COMPLIANT RAMP (2'x2' RAISED

FLOOR TILES) AND HADRAILS

RAISED FLOOR PLATFORM AT BATTLE CAPTAIN STATIONS (2'x2' RAISED FLOOR TILES

- SET AT 12" ABOVE EXISTING CONCRETE SLAB). PROVIDE DIAGONAL BRACING FROM

TOP OF PEDESTALS (RAISED FLOOR SYSTEM SUPPORT POSTS) TO CONCRETE

FLOOR - TO ENSURE LATERAL STIFFNESS.

CENTER LINE

OF PLATFORM

C

EN

TE

R

L

IN

E O

F

PL

AT

FO

R M

AT PERIMETER OF PLATFORM AND RAMPS - INSTALL PRE-FINISHED METAL FASCIA

(CLOSURE) PLATE (FROM TOP OF RAISED FLOOR TILES TO EXISTING CONCRETE

FLOOR SLAB). INSTALL PRE-FINISHED TRIM ANGLE TO COVER TRANSITION WHERE

FASCIA PLATE MEETS RAISED FLOOR TILES. INSTALL ANGLES (SECURED TO

EXISTING CONCRETE FLOOR SLAB) TO PROVIDE STABILITY AND ANCHORAGE FOR

BOTTOM EDGE OF FASCIA PLATE.

AT RAMP TERMINATION - INSTALL RAMP SHOE (WEDGE BY MANUFACTURER)

TO ENSURE SMOOTH ABA/ADA COMPLIANT TRANSITION FROM LAST RAISED

FLOOR TILE TO FINISHED FLOOR SURFACE.

REMOVE EXISTING CARPET FROM AREA UNDER NEW RAISED FLOOR PLATFORM

AND RAMP - TO PROVIDE SECURE ATTACHMENT OF PEDESTALS (SUPPORT

POSTS) TO EXISTING CONCRETE FLOOR SLAB.

WHERE RAMP MEETS RAISED PLATFORM -

INSTALL THRESHOLD (BY MANUFACTURER) TO

ENSURE SMOOTH ABA/ADA COMPLIANT

TRANSITION FROM TOP END OF RAMP TO

RAISED FLOOR TILE (OF LEVEL PLATFORM).

EXISTING STEEL TUBE COLUMNS (TYPICAL

AT 6 PLACES SHOWN ON THIS PLAN). FIELD

VERIFY COLUMN LAYOUT AND DIMENSIONS.

ENSURE CLEARANCE

BETWEEN PLATFORM

AND THIS COLUMN

THIS EXISTING COLUMN PENETRATES THE

PLATFORM. RAISED FLOOR TILES TO BE

FITTED AROUND COLUMN - PROVIDE

ADDITIONAL SUPPORT STRUCTURE AS

REQUIRED.

DASHED LINE INDICATES LIMITS OF BATTLE

CAPTAIN BRIDGE CONSOLE

R

AM

P

U P

P

P

U P

R

AM

P

AM

P

FACE OF BATTLE CAPTAIN

BRIDGE CONSOLE

FACE OF RAISED PLATFORM

1' -6

ADJACENT UTILITY CABINET

WITH UTILITY RACEWAYS . SEE

3/I-500.

ADJACENT CONSOLE UNITS.

SEE 1/I-500.

BATTLE

CAPTAIN

BRIDGE

CONSOLE

2"

FACE OF BATTLE CAPTAIN

BRIDGE CONSOLE

FACE OF RAISED FLOOR

PLATFORM BELOW

FACE OF GALLERY

BATTLE CAPTAIN BRIDGE

CONSOLE - SEE 1/A-502

(TYPICAL AT 10 WORKSTATIONS)

MOVABLE STORAGE CONSOLE -

SEE 2/A-502

R14 '-2

6' -2

FI

EL

D

V

ER

IF

Y

AD

JU

ST

A S

N

EE

D

ED

13'-2 1/2"

FIELD VERIFY

- ADJUST AS

NEEDED

AK

S/

M H

B

1/ 8/

C O

L_ G

LO

BA

L_ I-5

I-501

IN

TE

R

IO

R S

EN

LA

R G

ED

F

U R

N

IT

U R

E D

ET

AI

LS

BL

D

G

- S

EC

JE

S

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

:M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

H C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

FY

C O

L D

IS

A

G

LO

BA

L

FU

R

N

IT

U R

E

N /A

N /A

N /A

N /A

N

/A AS

S H

O W

N

BU

IL

D

IN

G

D

AT

A

C

EN

TE

R

C O

LU

M

BU

S

D

EF

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

2 S

. W

ILLO

W

DR

. ST

E. 2

G

R

EE

N W

O O

D V

IL

LA

G E, C O

LO

R

AD

O

1/ 8/

I-501

BATTLE CAPTAIN STATIONS - PLAN

SCALE : 1/4"= 1'-0" 0 2' 4' 8'

I-501

BATTLE CAPTAIN PLATFORM - PLAN

SCALE : 1/4"= 1'-0" 0 2' 4' 8'

14'-0"

3'-6"

10'-6"

5' -9

/2

7' -8

/2

6 1/2"

CANILEVERED WORK SURFACE, TYPICAL

GALLERY TRANSACTION TOP - 8" WIDE

ADJACENT CONSOLE WHERE OCCURS

UPPER GALLERY WALL (+/- 4.5"

THICK - BELOW TRANSACTION

TOP). SLAT WALL AT AREA

BEHIND MONITORS.

(4) SINGLE MONITOR ARMS, SLAT WALL MOUNTED.

PROVIDE PROPER SEPARATION BETWEEN MONITORS

BASED ON CLASSIFICATIONS OF DATA DISPLAYED.

ACCESS PANEL TO CABLE TRAY (HATCHED AREA).

PROVIDE WITH 4 WIRE MANAGEMENT GROMMETS.

(A

PP

R O

XI

M

AT

E

LI

N

EA

R

D

IM

EN

SI

O N

AT

G

AL

LE

R Y

PA

N

EL

FLAT SEGMENTED

PANELS REQUIRED FOR

SLAT WALL ATTACHMENT

RAISED PLATFORM AT BATTLE CAPTAIN STATIONS

ADJACENT CONSOLE WHERE OCCURS

FACE OF GALLERY

PANEL (BASED ON

ARC LAYOUT)

CENTER OF BATTLE

CAPTAIN STATION

LAYOUT AND CENTER

OF RAISED PLATFORM

ALL ELECTRICAL AND COMMUNICATION CABLES SHALL BE ROUTED TO

BATTLE CAPTAIN BRIDGE CONSOLE UNITS FROM UNDER THE RAISED FLOOR

PLATFORM. CABLES SHALL BE ROUTED FROM ABOVE THE CEILING AND

THROUGH THE UTILITY CABINETS BEFORE BEING ROUTED UNDER THE

RAISED FLOOR PLATFORM.

2' -5

ADJACENT CONSOLE WHERE OCCURS

EXISTING CEILING GRID AND ACOUSTICAL

LAY-IN TILES

9' -0

(F

IE

LD

V

ER

IF

Y)

1' -1

UPPER GALLERY PANEL WITH PLASTIC LAMINATE

VENEER

(4) MONITORS, BEHIND UPPER GALLERY PANEL

FEATURE REVEAL BAND

NEW RAISED FLOOR PLATFORM

BUILT-IN PC CABINET BEHIND GALLERY PANEL

EXISTING CONCRETE SLAB ON GRADE (REMOVE

EXISTING CARPET UNDER AREA OF NEW RAISED

FLOOR PLATFORM

GALLERY TRANSACTION TOP - 8" WIDE

CABLE TRAY BEHIND GALLERY PANEL

LOWER GALLERY PANEL WITH PLASTIC LAMINATE

VENEER

1' -0

BACK PANEL WITH SLAT WALL AT MONITORS

(4) SINGLE MONITOR ARMS, SLAT WALL MOUNTED

CANILEVERED WORK SURFACE WITH PLASTIC

LAMINATE VENEER

NEW RAISED FLOOR PLATFORM

WIRE MESH CABLE TRAY

REMOVABLE PANEL TO ACCESS TO CABLE TRAY

1'-6" 2'-0"

3' -6

2' -5

/2

BUILT-IN PC CABINET

EXISTING CONCRETE SLAB ON GRADE (REMOVE

EXISTING CARPET UNDER AREA OF NEW RAISED

FLOOR PLATFORM

EXISTING CEILING GRID AND ACOUSTICAL

LAY-IN TILES

9' -0

(F

IE

LD

V

ER

IF

Y)

1' -5

/2

1' -0

3'-6"2"

GALLERY TRANSACTION TOP - 8" WIDE

1/

2"

VENTED ACCESS DOORS

UPPER GALLERY PANEL WITH

PLASTIC LAMINATE VENEER

FEATURE REVEAL

LOWER GALLERY PANEL

WITH PLASTIC LAMINATE

VENEER

PRE-FINISHED METAL SKIRT

(CLOSURE PANEL AT RAISED

PLATFORM PERIMETER)

4" TALL VINYL COVE BASE

EXISTING CARPET

2' -5

ADJACENT CONSOLE WHERE OCCURS

EXISTING CEILING GRID AND ACOUSTICAL

LAY-IN TILES

9' -0

(F

IE

LD

V

ER

IF

Y)

1' -1

BACK PANEL WITH SLAT WALL AT MONITORS

(4) SINGLE MONITOR ARMS, SLAT WALL MOUNTED

CANILEVERED WORK SURFACE, TYPICAL

NEW RAISED FLOOR PLATFORM

BUILT-IN PC CABINET WITH VENTED ACCESS

DOORS

EXISTING CONCRETE SLAB ON GRADE (REMOVE

EXISTING CARPET UNDER AREA OF NEW RAISED

FLOOR PLATFORM

GALLERY TRANSACTION TOP - 8" WIDE

END PANEL

1' -0

LINE OF PARTITIONS BELOW

1/4" x 2" ROLLED ALUMINUM BAR EDGE TRIM

STORAGE CONSOLE UNIT - BUILT IN 2-PIECES TO ALLOW

FOR REMOVAL VIA RAMP IF REQUIRED. PROVIDE

ATTACHMENT METHOD TO SECURE 2 SECTIONS INTO A

"SINGLE UNIT" FOR TYPICAL OPERATIONAL USAGE - YET

ALLOW FOR QUICK SEPARATION WHEN REQUIRED.

LINE OF ADJUSTABLE SHELF BELOW

1/4" TEMPERED GLASS TOP (BACK-PAINTED WHITE)

SET OVER SUBSTRATE.

LINE OF GLASS TOP AND BASE BELOW

LINE OF THEORETICAL RADIUS (FOR

PARTITION LAYOUT

2'- 6"

1'- 3"

1'- 3"

ALL EXPOSED SURFACES (NOT COVERED WITH GLASS OR

EDGE TRIM) TO BE PLASTIC LAMINATE VENEER.

BOTTOM OF STORAGE CONSOLE

1/4" x 2" ROLLED ALUMINUM BAR EDGE TRIM

STORAGE CONSOLE UNIT - BUILT IN 2-PIECES TO ALLOW

FOR REMOVAL VIA RAMP IF REQUIRED. PROVIDE

ATTACHMENT METHOD TO SECURE 2 SECTIONS INTO A

"SINGLE UNIT" FOR TYPICAL OPERATIONAL USAGE - YET

ALLOW FOR QUICK SEPARATION WHEN REQUIRED.

GLAS TOP. 1/4" TEMPERED GLASS TOP

(BACK-PAINTED WHITE) SET OVER SUBSTRATE.

NEW RAISED FLOOR PLATFORM

EXISTING CONCRETE SLAB ON GRADE (REMOVE

EXISTING CARPET UNDER AREA OF NEW RAISED

FLOOR PLATFORM

CASTER WHEELS (8 TOTAL) - 2 LOCKING WHEELS PER

EACH INDIVIDUAL HALF OF CONSOLE UNIT

BACK PARTITION (FIXED PANEL)

SIDE PARTITION (FIXED PANEL)

ADJUSTABLE SHELF

"QUICK-RELEASE" LATCHES

(OR THRU-BOLT

MECHANISM)TO SECURE 2

HALVES TOGETHER

3' -0

ALL EXPOSED SURFACES (NOT COVERED WITH GLASS OR

EDGE TRIM) TO BE PLASTIC LAMINATE VENEER.

FINISHES TO MATCH BATTLE CAPTAIN STATIONS.

AK

S/

M H

B

1/ 8/

C O

L_ G

LO

BA

L_ I-5

I-502

IN

TE

R

IO

R S

EN

LA

R G

ED

F

U R

N

IT

U R

E D

ET

AI

LS

BL

D

G

- S

EC

JE

S

A I-502

I-502

TYPICAL BATTLE CAPTAIN BRIDGE CONSOLE - PLAN

SCALE : 3/8"= 1'-0" 0 2' 4' 6'

BATTLE CAPTAIN CONSOLE - ELEVATION FROM GALLERY

SCALE : 3/8"= 1'-0" 0 2' 4' 6'

A I-502

I-500

STORAGE CONSOLE --- PLAN

SCALE : 3/8"= 1'-0" 0 2' 4' 6'

SHEET

IDENTIFICATION

D

ES

IG

N

B Y:

D R

AW

N

B Y:

SU

BM

IT

TE

D B

Y:

PL

O

T

SC

AL

E:

SI

ZE

AN

SI

D

C H

EC

KE

D B

Y:

PL

O

T D

AT

E:

FI

LE

N

AM

E:

SU

BM

IT

TA

L D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

:M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E:

AP

PR

B

C

D

1 2 3 4 5

1 2 3 4 5

Defense Information Systems Agency A Combat Support Agency

A

B

D

C

H C

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

A

FY

C O

L D

IS

A

G

LO

BA

L

FU

R

N

IT

U R

E

N /A

N /A

N /A

N /A

N

/A AS

S H

O W

N

BU

IL

D

IN

G

D

AT

A

C

EN

TE

R

C O

LU

M

BU

S

D

EF

EN

SE

S U

PP

LY

C

EN

TE

R

C O

LU

M

BU

S

2 S

. W

ILLO

W

DR

. ST

E. 2

G

R

EE

N W

O O

D V

IL

LA

G E, C O

LO

R

AD

O

1/ 8/

D I-502

STORAGE CONSOLE - ELEVATION

SCALE : 3/8"= 1'-0" 0 2' 4' 6'

C I-502

BATTLE CAPTAIN CONSOLE - SECTION

SCALE : 3/8"= 1'-0" 0 2' 4' 6'

B I-502

BATTLE CAPTAIN CONSOLE - ELEVATION FROM PLATFORM

SCALE : 3/8"= 1'-0" 0 2' 4' 6'

C I-502

A I-502

C I-502

B I-502

B I-502

B I-502

D I-502

ITEMS WITH COST CONSIDERATIONS

1. POSSIBLE COST SAVING. UTILITY CABINETS AT ENDS OF WORKSTATIONS (DETAIL 2/I-501) MAY POSSIBLY BE REPLACED BY FULL-HEIGHT PRE-FINISHED METAL RACEWAY UNITS (FROM CEILING TO FLOOR). COORDINATE RACEWAY CROSS SECTION SIZE WITH CABLE MINIMUM BEND RADIUS AND DETAILING OF CONSOLE UNITS. IF THIS OPTION IS CHOSEN - ELECTRICAL J-BOXES (POWER FOR WORKSTATIONS) SHALL BE INSTALLED ABOVE THE CEILING, AND THE ELECTRICAL WHIPS (OF THE CONSOLE UNITS) WILL NEED TO BE LONGER TO REACH THE J-BOXES ABOVE THE CEILING. ENSURE THE WHIPS ARE DETAILED TO BE COMPLIANT WITH ELECTRICAL CODE REQUIREMENTS. THE EXTENDED LENGTH OF THESE WHIPS MAY NOT BE ALLOWED BY CODE.

2. POSSIBLE COST SAVING. THE 1/4" TEMPERED GLASS TRANSACTION CAP AT THE BATTLE CAPTAIN BRIDGE CONSOLES - AND THE 1/4" GLASS TOP OF THE STORAGE CONSOLE, COULD BE REPLACED BY OTHER MATERIALS. CONSIDER REPLACING GLASS WITH STONE (GRANITE, MARBLE), SYNTHETIC STONE (QUARTZ MAN-MADE CONGLOMERATE), SOLID-SURFACE MATERIAL ("CORIAN" OR

EQUAL), SOLID WOOD, OR OTHER MATERIAL AS RECOMMENDED BY CONSOLE FABRICATOR.

3. POSSIBLE COST SAVING. THE BATTLE CAPTAIN BRIDGE CONSOLES ARE DESIGNED WITH A CIRCULAR FRONT PANEL, IT MAY BE LESS EXPENSIVE (MAYBE NOT) TO CONSTRUCT THESE UNITS WITH SEGMENTED FRONT PANELS - WHILE KEEPING THE GLASS

TRANSACTION CAP AS A CIRCULAR ITEM.

4. POSSIBLE COST SAVING. THIS SET OF PLANS HAS OMITTED REMOVABLE PANELS FROM THE GALLERY WALL OF THE BATTLE CAPTAIN BRIDGE CONSOLES (REMOVABLE PANELS ARE STILL PROVIDED UNDER THE DESKTOP OF THE CONSOLES). ON PREVIOUS PROJECTS - THE GALLERY PANEL OF THE BATTLE CAPTAIN BRIDGE CONSOLES WERE DETAILED WITH REMOVABLE PANELS.

PROVIDING FIXED FRONT PANELS WILL PROVIDE A COST SAVING - BUT ONLY IF IT IS ACCEPTABLE TO DISA-GLOBAL.

ITEMS WITH DESIGN CONSIDERATIONS

1. CONSIDER INSTALLING ADJUSTABLE SHELVES TO THE SIDEWALLS OF THE BUILT-IN STORAGE CABINET UNDER THE CONSOLES.

THESE SHELVES MIGHT ONLY BE 6" TO 8" DEEP - TO PROVIDE SPACE FOR SMALLER EQUIPMENT (ONT, COMM DROP, ETC.).

2. IS UPS POWER REQUIRED FOR THE CONSOLES? IS UPS (OR GENERATOR BACKUP) POWER AVAILABLE IN BUILDING 10, SECTION 12? WILL A STAND-ALONE UPS BATTERY PACK BE REQUIRED FOR EACH CONSOLE? WOULD THESE STAND-ALONE UNITS NEED TO

BE PLACED INSIDE THE BUILT-IN STORAGE CABINET UNDER THE CONSOLE STATIONS?

3. THE SLAT WALL PANELS (UTILIZED FOR MONITOR MOUNTING) PROBABLY NEED TO BE INSTALLED TO A FLAT SURFACE. IT MAY NOT BE POSSIBLE TO BEND THE SLAT WALL INTO AN ARC. THE BATTLE CAPTAIN BRIDGE CONSOLES ARE CURRENTLY SHOWN WITH A

SEGMENTED (FLAT SECTIONS) SURFACE FOR THE AREA TO RECEIVE SLAT WALL.

4. EVEN IF THE UTILITY CABINETS (SHOWN IN 2/I-501) ARE OMITTED (SEE NOTE #1 TO THE LEFT) - THE UTILITY CABINETS BETWEEN THE CONSOLES AND BATTLE CAPTAIN PLATFORM (SHOWN IN 3/I-501) SHOULD BE RETAINED. THE UTILITY CABINET (3/I-501) PROVIDES A TRANSITION FROM THE FLAT END PANELS OF THE ADJACENT CONSOLE - TO THE ROUNDED PLATFORM OF THE BATTLE CAPTAIN BRIDGE CONSOLES. THE UTILITY CABINET ALSO PROVIDES WORKING SPACE AND TRANSITIONAL SPACE FOR ELECTRICAL AND COMMUNICATION CABLES BETWEEN THE FLOOR-MOUNTED CONSOLES AND THE RAISED PLATFORM.

5. THE STORAGE CONSOLE (LOCATED IN THE CENTER OF THE RAISED PLATFORM HAS BEEN DESIGNED ON THIS SET OF PLANS AS A UNIT THAT CAN BE SPLIT IN HALF - SO THAT IT CAN BE MOVED OFF THE PLATFORM (VIA THE 4' WIDE RAMP). IS THIS STORAGE

CONSOLE REQUIRED BY DISA-GLOBAL?

6. STORAGE ALONG THE RIGHT WALL OF THE ROOM (NOTED WITH KEYNOTE 5, ON SHEET I-101) HAS BEEN INCLUDED AS AN ALTERNATE BID ITEM. THIS STORAGE COULD BE LOCKERS OR OPEN CUBICLES - INTENDED FOR STORAGE OF OCCUPANTS PERSONAL ITEMS (COATS, BACKPACKS, ETC.). IF DISA-GLOBAL WISHES TO PURSUE TO THIS CONCEPT - FURTHER INFORMATION

WILL BE REQUIRED (HOW MANY UNITS, WHAT SIZE, ETC.).

COL_G-001-G-001
Sheets and Views
G-001
COL_ID-101-ID-101
Sheets and Views
ID-101
COL_I-101-I-101
Sheets and Views
I-101
COL_GLOBAL_I-500-I-500
Sheets and Views
I-500
COL_GLOBAL_I-500-I-501
Sheets and Views
I-501
COL_GLOBAL_I-500-I-502
Sheets and Views
I-502

File details come from the government source that posted it. Updated .