Design Charrette for Repair Consolidated Support Building 20245
Closed Solicitation Posted
- Solicitation number
- FA9401-21-R-0003
- Agency
-
Nuclear Weapons Center
Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541330 Engineering Services
- Place of performance
- Kirtland Afb Nm 87117 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks architectural and engineering design services to conduct a facility sustainment, restoration, and modernization planning charrette and produce related planning documents for repairs to Building 20245 at Kirtland Air Force Base in New Mexico. The selected firm will provide a final planning charrette report, 35% conceptual design, specifications, cost estimate and other documents. The Department of the Air Force Materiel Command Nuclear Weapons Center is the contracting agency. A mandatory site visit will be held on February 17, 2021 and proposals are due by March 2, 2021. Evaluation will be based on qualifications with price as a tiebreaker.
The opportunity is set aside 100% for small businesses. The place of performance is Kirtland Air Force Base. The solicitation requires the selected firm to deliver planning documents in accordance with Air Force standards within 180 days of award. The estimated value is $8.3 million to repair building systems including HVAC, electrical and communications infrastructure. Interested parties must attend the mandatory site visit and submit a completed SF1442 proposal by the specified deadline.
Notice text
5 versions
Update #5 · Latest ·
The Statement of Objectives (SOO) defines the scope for this project as follows:
Provide a final Facility Sustainment Restoration Modernization Planning Charrette Report (FSRM PCR) report in accordance with
FY22-26 Business Rules, financial documents (DD1391 and DD1391c), Design, Specifications to include front end specs, Design
Analysis, and Construction Cost Estimate and a 35% conceptual design to Repair Building and System for B20245 Consolidated
Support in support of the Air Force Civil Engineer’s Sustainment, Restoration and Modernization (SRM) program. A-E services to
provide a final and tailored Project and Front End Specification to this specific project. Please fill out attached SF 1442. Please read the attached combined synopsis/solicitation document. Please download all attachments that comes along with the SF 1442. Also, please fill out attached SF 330 and return it along with your bid. Please note that site visit is NOT mandatory in order for you to place your bid. Please disregard what the attachment says about mandatory site visits.
The SF 1442 has been amended three times. Please read, sign, and return all three amendmendments along with SF 1442 and your proposal..
Update #4 ·
The Statement of Objectives (SOO) defines the scope for this project as follows:
Provide a final Facility Sustainment Restoration Modernization Planning Charrette Report (FSRM PCR) report in accordance with
FY22-26 Business Rules, financial documents (DD1391 and DD1391c), Design, Specifications to include front end specs, Design
Analysis, and Construction Cost Estimate and a 35% conceptual design to Repair Building and System for B20245 Consolidated
Support in support of the Air Force Civil Engineer’s Sustainment, Restoration and Modernization (SRM) program. A-E services to
provide a final and tailored Project and Front End Specification to this specific project. Please fill out attached SF 1442. Please read the attached combined synopsis/solicitation document. Please download all attachments that comes along with the SF 1442. Also, please fill out attached SF 330 and return it along with your bid. Please note that site visit is NOT mandatory in order for you to place your bid. Please disregard what the attachment says about mandatory site visits.
The SF 1442 has been amended twice. Please read, sign, and return Amendment #1 and Amendment #2 along with your bid.
Update #3 ·
The Statement of Objectives (SOO) defines the scope for this project as follows:
Provide a final Facility Sustainment Restoration Modernization Planning Charrette Report (FSRM PCR) report in accordance with
FY22-26 Business Rules, financial documents (DD1391 and DD1391c), Design, Specifications to include front end specs, Design
Analysis, and Construction Cost Estimate and a 35% conceptual design to Repair Building and System for B20245 Consolidated
Support in support of the Air Force Civil Engineer’s Sustainment, Restoration and Modernization (SRM) program. A-E services to
provide a final and tailored Project and Front End Specification to this specific project. Please fill out attached SF 1442. Please read the attached combined synopsis/solicitation document. Please download all attachments that comes along with the SF 1442. Also, please fill out attached SF 330 and return it along with your bid. Please note that site visit is NOT mandatory in order for you to place your bid. Please disregard what the attachment says about mandatory site visits.
The SF 1442 has been amended. Please read, sign, and return the SF 30 along with your bid.
Update #2 ·
The Statement of Objectives (SOO) defines the scope for this project as follows:
Provide a final Facility Sustainment Restoration Modernization Planning Charrette Report (FSRM PCR) report in accordance with
FY22-26 Business Rules, financial documents (DD1391 and DD1391c), Design, Specifications to include front end specs, Design
Analysis, and Construction Cost Estimate and a 35% conceptual design to Repair Building and System for B20245 Consolidated
Support in support of the Air Force Civil Engineer’s Sustainment, Restoration and Modernization (SRM) program. A-E services to
provide a final and tailored Project and Front End Specification to this specific project. Please fill out attached SF 1442. Please read the attached combined synopsis/solicitation document and note that there is a mandatory site visit. Please download all attachments that comes along with the SF 1442. Also, please fill out attached SF 330 and return it along with your bid.
The SF 1442 has been amended. Please read, sign, and return the SF 30 along with your bid.
Update #1 ·
The Statement of Objectives (SOO) defines the scope for this project as follows:
Provide a final Facility Sustainment Restoration Modernization Planning Charrette Report (FSRM PCR) report in accordance with
FY22-26 Business Rules, financial documents (DD1391 and DD1391c), Design, Specifications to include front end specs, Design
Analysis, and Construction Cost Estimate and a 35% conceptual design to Repair Building and System for B20245 Consolidated
Support in support of the Air Force Civil Engineer’s Sustainment, Restoration and Modernization (SRM) program. A-E services to
provide a final and tailored Project and Front End Specification to this specific project. Please fill out attached SF 1442. Please read the attached combined synopsis/solicitation document and note that there is a mandatory site visit. Please download all attachments that comes along with the SF 1442.
Files
Show all 31
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Request for information/sources sought | ENDIST Albuquerque | No set-aside | |
| Request for Qualification - MHMV230026 Construct Permanent Party Enlisted Dorm at Kirtland AFB, New Mexico | Nuclear Weapons Center | No set-aside | |
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business | |
| Renovate Suite H8, Building 3 | Air Force Research Laboratory | Total Small Business | |
| PKA Relocatable Facility | Global Strike Command | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity