13b. HVAC Waste Water Discharge Request Form.pdf
PDF 113 KB Posted
- Solicitation number
- FA9401-21-R-0003
About this file
This document contains a request form and federal contract opportunity related to HVAC wastewater discharge services at Kirtland Air Force Base. The request form outlines the process for contractors to request approval and schedule HVAC wastewater discharges, including providing key details like building number, system capacity, proposed discharge amount and date, and requiring signature approval from the 377th Mission Support Group Civil Engineer Installation Emergency Management Center. Contractors must then complete the form after approved discharges and submit shipping paperwork within seven days or request an extension. The related federal contract opportunity is a solicitation for design charrette services to develop a 35% conceptual design, specifications, cost estimate and other documents to repair Building 20245 at the base in support of the Air Force's facility sustainment and modernization program. Interested parties must attend a mandatory site visit, and the combined synopsis/solicitation document and SF-1442 form should be reviewed for additional requirements and response instructions.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
20212rc
Kirtland AFB HVAC Wastewater Discharge Request Form Requestor: Complete Blocks A and B and submit to 377 MSG/CEIEC not less than 7 business days prior to proposed discharge date. 377 MSG/CEIEC will review and return written approval or denial in Block C. All HVAC discharge dates must be coordinated to ensure compliance with Kirtland AFB Discharge Permit. Requestor must then complete Block D and submit to 377 MSG/CEIEC or request an extension in writing/email not later than 7 business days after date in Block C. Failure to complete discharge on approved discharge date and return completed form may result in notice of violation and monetary fine (to be paid by contractor).
A – Contact Information (to be completed by requestor) Requesting Organization: Contact Name:
Contact Phone Number:
Date of request: Contact email:
B – Project Information (to be completed by requestor) KAFB Building #: System Capacity
(gal):
Proposed discharge (gal):
Description of wastewater proposed for discharge:
Reason for proposed discharge:
Proposed Discharge Date: Proposed Discharge Location:
C – Approval/Denial (to be completed by 377 MSG/CEIEC) Proposed discharge is approved to occur on
________________. Any change of discharge date must be approved by 377 MSG/CEIE in advance.
Proposed discharge is denied
Approving Official: Signature/Date:
Comments:
D – Action Taken (to be completed by requestor) Approved Discharges ONLY Denied Discharges ONLY
Date of Discharge: Date Shipped for Disposal:
Start & End Time of Discharge:
Actual Amount of Discharge: Disposal Facility:
Actual Location of Discharge: Date Shipping Paperwork Provided to 377 MSG/CEIEC:
Technician Name (print and sign):
File details come from the government source that posted it. Updated .