This schedule of design submittals outlines the required submissions for a design charrette project to repair Building 20245 at an Air Force facility. Key deliverables include 35% and 100% conceptual design plans at various stages, a Facility Sustainment Restoration and Modernization Planning Charrette Report at 50%, 95%, and 100% completion, design analysis, cost estimates, schedules and specifications. Submissions are due between 45-81 days after the design charrette depending on the deliverable. The solicitation requires a mandatory site visit and responses on the SF1442 form. The opportunity is available through the Department of the Air Force Materiel Command Nuclear Weapons Center to provide architectural and engineering services for the repair and system replacement of the Consolidated Support Building 20245 in accordance with the Statement of Objectives.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF FORM 66, OCT 99 Previous Edition Will Be Used
LI
N
E N
U M
B ER Note: 2 copies required per submittal. Government will retain all submittals. D
R
AW
IN
G
S
SP
EC
IF
IC
AT
IO
N S
D
ES
IG
N
A N
AL
YS
IS
C O
LO
R
B O
AR
D
S
G
EO
SP
AT
IA
L
D
AT
A
C O
ST
E
ST
IM
AT
E
ES
TI
M
AT
ED
C
O N
ST
. B
ID
S
C H
ED
U
LE
ES
TI
M
AT
ED
C
O N
ST
. S
C H
ED
U
LE
D R
AF
T
FR
EE
Z O
N E
PE
R
M
IT
FI
N
AL
F
R
EE
Z O
N E
PE
R
M
IT
C O
N
ST
R U
C
TI
O N
A F6
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E
TO
C O
N
TR
AC
TI
N G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
S
AP
PR
O
VE
D
D
IS
AP
PR
O
VE
D
C O
N
TR
AC
TO
R S
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
REMARKS
DESIGN
All submissions to comply with Standards, Formats, and Quantities as described in Chapters 3 and 4 of the Statement of Work
Type A NA
35% Conceptual Plans Design @ 50% X X Post Charrette +45 days
35% Conceptual Plans Design @ 95% X X Post Charrette +45 days
35% Conceptual Plans Design @ 100% X X Post Charrette +81 days
50% Facility Sustainment, Restoration and Modernization Planning Charrette Report (FSRM
PCR)
X X X X X X Post Charrette +45 days
95% Facility Sustainment, Restoration and Modernization Planning Charrette Report (FSRM
PCR)
X X X X X X Post Charrette +45 days
100% Facility Sustainment, Restoration and Modernization Planning Charrette Report (FSRM
PCR)
X X X X X X Post Charrette +81 days
SCHEDULE OF DESIGN SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER
MHMV100050CR Repair B20245 consolidated Support TBD
Submittal 1