4. Bid Tab Design Charrette MHMV100050CR.pdf
PDF 160 KB Posted
- Solicitation number
- FA9401-21-R-0003
About this file
This document contains a construction cost estimate breakdown form and related federal contract opportunity for design services. The federal contract opportunity is seeking a final Facility Sustainment Restoration Modernization Planning Charrette Report, financial documents including a DD1391 and DD1391c, design and specifications including front end specifications, a design analysis, construction cost estimate, and a 35% conceptual design for the repair of Building 20245 Consolidated Support at Kirtland Air Force Base. Interested parties must attend a mandatory site visit and submit pricing using the Standard Form 1442 by the response date. The cost estimate breakdown form provides a template for documenting labor categories and rates, travel, other direct costs, subcontractors, and total pricing for the design charrette and deliverables. The Department of the Air Force Materiel Command Nuclear Weapons Center is listed as the contracting agency.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4 ) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows.
Project Number: MHMV100050 Project Title: Programming and Planning for Repair Building 20245, Consolidated Support
TOTAL LABOR COSTS $
TOTAL NON LABOR COSTS $
OVERHEAD (NON LABOR COSTS) % $
PROFIT (NON LABOR COSTS) % $
NMGRT 6.4375 % $
TOTAL PRICE $
DATE : FIRM NAME :
TITLE : BY :
(Signature)
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information) suitable for detaied review and analysis. Prior to the award of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3-807.4)
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection with any negotiations prior to contract award.
(Construction Cost Estimate Breakdown Form)
INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN FORM
Company Confidential Information
Project Number: MHMV100050 Title: Programming and Planning for Repair Building 20245, Consolidated Support
Location: Kirtland AFB NM
FY: 2021
1 2 2 3 4 5 Task 1 Task 2 Task 3 Task 4 Task 5 Task 6
LABOR CATEGORY Hrs Cost Hrs Cost Hrs Cost Hrs Cost Hrs Cost Hrs Cost Hrs Cost
TOTAL LABOR $ $ $ $ $ $ $
TRAVEL
TOTAL TRAVEL $ $ $ $ $ $ $
OTHER DIRECT COSTS
TOTAL OTHER DIRECT COSTS $ $ $ $ $ $ $
SUBCONTRACTORS
TOTAL SUBCONTRACTORS $ $ $ $ $ $ $
TOTAL $ $ $ $ $ $ $
FOR OFFICIAL USE ONLY
TotalDesign Charrette Kickoff Meeting
95% Design Submittal (35% Conceptual Plan)Project Management Site Investigation, Site Survey 50% Design Submittal (35%
Conceptual Plan) 100% Design Submittal (35%
Conceptual Plan)
LABOR CATEGORY Rate
| SUMMARY |
| Cost Breakdown |
| Labor Rates |