This is a combined synopsis/solicitation for design charrette services to produce a Facility Sustainment Restoration Modernization Planning Charrette Report for Repair Building and System for B20245 Consolidated Support. The Air Force Materiel Command Nuclear Weapons Center is seeking these A-E services, including a final Project and Front End Specification tailored to this specific project. Interested parties must fill out the attached SF 1442 and attend a mandatory site visit. All attachments accompanying the SF 1442 should be downloaded. The response is due by the date listed on the SF 1442. The services required include a final FSRM PCR report in accordance with specified Business Rules, financial documents, 35% conceptual design, specifications, and construction cost estimate.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USACE / NAVFAC / AFCEC / NASA UFGS- 00 01 15 ( Febr uar y 2011) Change 1 - 08/ 14 Pr epar i ng Act i v i t y: NAVFAC Super sedi ng UFGS- 00 01 15 ( Januar y 2007)
UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS
1.3 SUPPLEMENTARY DRAWINGS
1.3.1 Reference Drawing[s]
1.3.2 Boring Logs
1.3.3 Subsurface Data
-- End of Section Table of Contents --
DOCUMENT 00 01 15 Page 1
USACE / NAVFAC / AFCEC / NASA UFGS- 00 01 15 ( Febr uar y 2011) Change 1 - 08/ 14 Pr epar i ng Act i v i t y: NAVFAC Super sedi ng UFGS- 00 01 15 ( Januar y 2007)
UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
NOTE: Thi s gui de speci f i cat i on cover s t he r equi r ement s f or l i s t s t he dr awi ngs f or t he pr oj ect .
Adher e t o UFC 1-300-02 Uni f i ed Faci l i t i es Gui de Speci f i cat i ons ( UFGS) For mat St andar d when edi t i ng t hi s gui de speci f i cat i on or pr epar i ng new pr oj ect speci f i cat i on sect i ons. Edi t t hi s gui de speci f i cat i on f or pr oj ect speci f i c r equi r ement s by addi ng, del et i ng, or r evi s i ng t ext . For br acket ed i t ems, choose appl i cabl e i t em( s) or i nser t appr opr i at e i nf or mat i on.
Remove i nf or mat i on and r equi r ement s not r equi r ed i n r espect i ve pr oj ect , whet her or not br acket s ar e present.
Comment s, suggest i ons and r ecommended changes f or t hi s gui de speci f i cat i on ar e wel come and shoul d be submi t t ed as a Criteria Change Request (CCR) .
NOTE: Cont r act s per sonnel wi l l i nser t t hi s sect i on i n t he appr opr i at e l ocat i on wi t hi n t he sol i c i t at i on package. I ncl ude t hi s sect i on wi t h t he ot her SpecsI nt act Sour ce Document Fi l es pr ovi ded as par t of t he pr oj ect El ect r oni c Desi gn Del i ver abl es package.
NOTE: For NAVFAC Sout heast pr oj ect s, t he A/ E shal l pr epar e t hi s sect i on f or each pr oj ect , but i t i s not t o be l i s t ed i n t he Tabl e of Cont ent s of t he speci f i cat i ons. NAVFAC Sout heast wi l l i nser t t hi s sect i on i n t he appr opr i at e l ocat i on wi t hi n t he sol i c i t at i on package. A/ E shal l al so i ncl ude t hi s sect i on wi t h t he SPECSI NTACT el ect r oni c sour ce f i l es required."
DOCUMENT 00 01 15 Page 2
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
NOTE: Use r evi s i on col umn onl y i f dr awi ngs show a r evi s i on dat e. Li st t he 7- di gi t NAVFAC dr awi ng number i n t he t hi r d col umn.
I mpor t t he Li st of Dr awi ngs as an Excel XML Spr eadsheet wi t hi n t he Tabl e bel ow
Contract drawings are as follows:
DRAWING NO. [REVISION NO.] NAVFAC DWG NO. TITLE
1.3 [ SUPPLEMENTARY DRAWINGS
These supplementary drawings may not be a part of the contract but are included with the drawings for information.
1.3.1 [ Reference Drawing[s]
NOTE: Use onl y when r ef er ence dr awi ngs must be i ncl uded i n t he pr oj ect .
The following reference drawing[s] [is] [are] intended only to show the original construction. Drawing[s] [is] [are] the property of the Government and shall not be used for any purpose other than that intended by the contract. [The drawing[s] [is] [are] [half] [full] size.
Full-size drawings are available at the bidder's or Contractor's expense.
[Information on procuring these full-size drawings may be obtained from the Contracting Officer.] [Full size drawings may be inspected during regular working hours at [the office of the Contracting Officer.] [the station.]]
NAVFAC DWG NO. TITLE
]] 1.3.2 [ Boring Logs
NOTE: Sel ect t hi s par agr aph or t he par agr aph bel ow ent i t l ed " Subsur f ace Dat a, " i f t he bor i ng l ogs and subsur f ace i nf or mat i on ar e not al r eady i ncor por at ed
DOCUMENT 00 01 15 Page 3 i n t he dr awi ngs. Use t he f i r st par agr aph i f bor i ng l ogs ar e avai l abl e and t he second, i f t hey ar e i ncor por at ed i nt o a soi l s r epor t or i f onl y a soi l s r epor t i s avai l abl e.
NOTE: Do not use t hi s par agr aph f or NAVFAC Sout heast cont r act s.
The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.
[Subsurface data, not specified or indicated, have been obtained by the Government at this station. The data are available for examination by prospective bidders [in the office of the Contracting Officer] [at the station].]
] 1.3.3 [ Subsurface Data
NOTE: Do not use t hi s par agr aph f or NAVFAC Sout heast cont r act s.
Subsurface data, not specified or indicated, have been obtained by the Government at the station. The data are available for examination by prospective bidders [in the office of the Contracting Officer] [at the station]. [The soils report is included as part of the solicitation].
] -- End of Document --
DOCUMENT 00 01 15 Page 4
UFGS TABLE OF CONTENTS - May 2020
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/11 LIST OF DRAWINGS
00 22 13.00 20 02/14 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
00 73 04 08/08 SUPPLEMENTARY CONDITIONS FOR PROJECTS IN
MEDITERRANEAN AREA
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15 SUMMARY OF WORK
01 14 00 11/11 WORK RESTRICTIONS
01 20 00.00 20 11/11 PRICE AND PAYMENT PROCEDURES
01 22 00.00 10 08/15 PRICE AND PAYMENT PROCEDURES
01 30 00 08/15 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 05/17 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT
CONTRACT MANAGEMENT SYSTEM
01 32 01.00 10 02/15 PROJECT SCHEDULE
01 32 16.00 20 08/18 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
01 32 17.00 20 05/18 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 08/18 SUBMITTAL PROCEDURES
01 33 16.00 10 05/16 DESIGN DATA (DESIGN AFTER AWARD)
01 33 23.33 08/18 AVIATION FUEL SYSTEM SPECIFIC SUBMITTAL
REQUIREMENTS
01 33 29 02/17 SUSTAINABILITY REPORTING
01 35 13 11/11 SPECIAL PROJECT PROCEDURES
01 35 13.43 10 08/15 SPECIAL PROJECT PROCEDURES FOR CONTAMINATED
SITES
01 35 26 11/15 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 29.13 11/15 HEALTH, SAFETY, AND EMERGENCY RESPONSE
PROCEDURES FOR CONTAMINATED SITES
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 02/14 METRIC MEASUREMENTS
01 45 00.00 10 11/16 QUALITY CONTROL
01 45 00.00 20 11/11 QUALITY CONTROL
01 45 00.00 40 11/17 QUALITY CONTROL
01 45 00.10 20 02/10 QUALITY CONTROL FOR MINOR CONSTRUCTION
01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS
CM)
01 45 35 02/20 SPECIAL INSPECTIONS
01 50 00 05/18 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 11/15 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 11/15 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19 PROJECT IDENTIFICATION
01 74 19 02/19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 05/19 CLOSEOUT SUBMITTALS
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
01 78 23.33 08/18 OPERATION AND MAINTENANCE MANUALS FOR AVIATION
FUEL SYSTEMS
01 78 24.00 10 05/18 FACILITY DATA REQUIREMENTS
01 78 24.00 20 02/15 FACILITY ELECTRONIC OPERATION AND MAINTENANCE
SUPPORT INFORMATION (eOMSI)
01 83 00.07 40 02/18 RELIABILITY CENTERED ACCEPTANCE FOR FACILITY
SHELLS
01 83 13.07 40 02/18 RELIABILITY CENTERED ACCEPTANCE FOR
SUPERSTRUCTURE PERFORMANCE REQUIREMENTS
01 86 12.07 40 02/18 RELIABILITY CENTERED ACCEPTANCE FOR MECHANICAL
SYSTEMS
01 86 26.07 40 02/18 RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL
SYSTEMS
01 91 00.15 02/19 TOTAL BUILDING COMMISSIONING
01 91 00.15 10 05/19 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 32 00 05/10 SUBSURFACE DRILLING, SAMPLING, AND TESTING
02 35 27 05/10 SOIL-BENTONITE (S-B) SLURRY TRENCH
02 41 00 05/10 [DEMOLITION][ AND ][DECONSTRUCTION]
02 42 51 11/19 CARPET REMOVAL AND RECLAMATION
02 42 91 11/18 REMOVAL AND SALVAGE OF HISTORIC CONSTRUCTION
MATERIALS
02 51 13 05/10 PRECIPITATION/COAGULATION/FLOCCULATION WATER
TREATMENT
02 53 16 02/10 REMEDIATION OF CONTAMINATED SOILS BY THERMAL
DESORPTION
02 54 20 02/10 BIOREMEDIATION OF SOILS USING LANDFARMING
SYSTEMS
02 54 21 02/10 BIOREMEDIATION OF SOILS USING WINDROW COMPOSTING
02 54 23 02/10 SOIL WASHING THROUGH SEPARATION/SOLUBILIZATION
02 55 00 02/10 SOLIDIFICATION/STABILIZATION (S/S) OF
CONTAMINATED MATERIAL
02 56 13 02/10 WASTE CONTAINMENT GEOMEMBRANE
02 56 14 02/10 CLAY BARRIER LAYER
02 56 15 02/10 GEOSYNTHETIC CLAY LINER (GCL)
02 61 13 02/10 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 61 23 04/06 REMOVAL AND DISPOSAL OF PCB CONTAMINATED SOILS
02 62 13.00 10 08/18 AIR AND STEAM STRIPPING
02 62 16.13 10 08/18 OPERATION, MAINTENANCE, AND PROCESS MONITORING
FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS
02 62 16.16 10 08/18 COMMISSIONING AND DEMONSTRATION FOR SOIL VAPOR
EXTRACTION (SVE) SYSTEMS
02 65 00 02/10 UNDERGROUND STORAGE TANK REMOVAL
02 66 00 02/10 SELECT FILL AND TOPSOIL FOR LANDFILL COVER
02 66 10 02/10 TEST FILL
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF HAZARDOUS
MATERIALS
02 82 00 11/18 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND LAMPS
CONTAINING PCBs AND MERCURY
02 84 33 05/20 REMOVAL AND DISPOSAL OF POLYCHLORINATED
BIPHENYLS (PCBs)
02 85 00 11/18 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 01 00 02/18 REHABILITATION OF CONCRETE
03 23 00 05/16 STRESSED TENDON REINFORCING
03 30 00 02/19 CAST-IN-PLACE CONCRETE
03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 31 29 02/19 MARINE CONCRETE WITH SERVICE LIFE MODELING
03 31 30 02/19 MARINE CONCRETE
03 33 00 11/09 CAST-IN-PLACE ARCHITECTURAL CONCRETE
03 37 00 11/09 PREPLACED-AGGREGATE CONCRETE
03 37 13 02/18 SHOTCRETE
03 37 23 11/09 ROLLER-COMPACTED CONCRETE FOR MASS CONCRETE
CONSTRUCTION
03 37 29 11/09 CONCRETE FOR CONCRETE CUTOFF WALLS
03 41 16.08 11/19 PRECAST CONCRETE ROOF SLABS (MAX. SPAN 8 FEET
O.C.)
03 41 33 11/16 PRECAST STRUCTURAL PRETENSIONED CONCRETE
03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
03 44 00 02/13 REINFORCED AUTOCLAVE AERATED CONCRETE PANELS
03 45 00 05/16 PRECAST ARCHITECTURAL CONCRETE
03 45 33 05/16 PRECAST[ PRESTRESSED] STRUCTURAL CONCRETE
03 47 13 08/16 TILT-UP CONCRETE
03 51 13 05/16 CEMENTITIOUS WOOD FIBER DECKS
03 52 00 08/11 LIGHTWEIGHT CONCRETE ROOF INSULATION
03 52 16 04/08 LIGHTWEIGHT INSULATING CONCRETE
03 52 16.19 08/11 LIGHTWEIGHT INSULATING CONCRETE OVERLAY
03 53 14.00 20 02/10 LIGHT REFLECTIVE NONFERROUS METALLIC AGGREGATE
FLOOR SYSTEM
03 62 16 02/18 METALLIC NON-SHRINK GROUTING
03 70 00 02/10 MASS CONCRETE
DIVISION 04 - MASONRY
04 01 20.73 11/15 MASONRY STRENGTHENING USING FRP BARS
04 01 20.75 11/15 MASONRY STRENGTHENING USING SURFACE APPLIED FRP
COMPOSITES
04 03 00 11/17 CONSERVATION TREATMENT FOR PERIOD MASONRY
04 20 00 11/15 UNIT MASONRY
04 23 00 11/15 GLASS UNIT MASONRY
DIVISION 05 - METALS
05 05 23.13 10 08/18 ULTRASONIC INSPECTION OF WELDMENTS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18 STRUCTURAL STEEL
05 14 00.13 11/19 WELDING STRUCTURAL ALUMINUM FRAMING
05 21 00 05/15 STEEL JOIST FRAMING
05 30 00 05/15 STEEL DECKS
05 40 00 05/15 COLD-FORMED METAL FRAMING
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 50 14 08/18 STRUCTURAL METAL FABRICATIONS
05 50 15 08/18 CIVIL WORKS FABRICATIONS
05 51 00 02/17 METAL STAIRS
05 51 33 02/16 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
05 59 10 08/18 ROLLING COVER FOR AVIATION REFUELING VAULTS
05 59 20 08/18 FABRICATION OF HYDRAULIC STEEL STRUCTURES
05 72 00 05/18 DECORATIVE METAL SPECIALTIES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16 ROUGH CARPENTRY
06 13 33 11/16 PIER TIMBERWORK
06 17 19 11/16 CROSS-LAMINATED TIMBER
06 18 00 08/16 GLUED-LAMINATED CONSTRUCTION
06 20 00 08/16 FINISH CARPENTRY
06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 08/10 SOLID SURFACING FABRICATIONS
06 71 33 05/18 FIBERGLASS REINFORCED PLASTIC (FRP) LADDERS
06 73 01 05/18 FIBERGLASS REINFORCED PLASTIC (FRP) GRATING
06 82 14 05/18 FIBERGLASS REINFORCED PLASTIC (FRP) PIPE AND
TUBE RAILINGS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR
TIGHTNESS
07 11 13 08/11 BITUMINOUS DAMPPROOFING
07 12 00 02/16 BUILT-UP BITUMINOUS WATERPROOFING
07 13 53 02/16 ELASTOMERIC SHEET WATERPROOFING
07 14 00 02/12 FLUID-APPLIED WATERPROOFING
07 16 19 01/07 METALLIC OXIDE WATERPROOFING
07 17 00 02/16 BENTONITE WATERPROOFING
07 19 00 05/11 WATER REPELLENTS
07 21 13 02/16 BOARD AND BLOCK INSULATION
07 21 16 11/11 MINERAL FIBER BLANKET INSULATION
07 21 23 05/11 LOOSE FILL THERMAL INSULATION
07 22 00 02/16 ROOF AND DECK INSULATION
07 24 00 05/11 EXTERIOR INSULATION AND FINISH SYSTEMS
07 27 10.00 10 08/19 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17 SELF-ADHERING AIR BARRIERS
07 27 26 05/17 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 05/17 SPRAY FOAM AIR BARRIERS
07 31 13 08/16 ASPHALT SHINGLES
07 31 26 08/09 SLATE SHINGLES
07 32 13 04/06 ROOF TILES
07 32 14 04/06 CLAY TILE ROOFING REPLACEMENT OR REPAIR
07 41 13 05/11 METAL ROOF PANELS
07 41 13.16 08/09 COPPER ROOF PANELS
07 41 63 11/16 FABRICATED ROOF PANEL ASSEMBLIES
07 42 13 05/11 METAL WALL PANELS
07 42 63 05/11 FABRICATED WALL PANEL ASSEMBLIES
07 51 13 05/12 BUILT-UP ASPHALT ROOFING
07 52 00 05/12 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 53 23 05/12 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 54 19 02/13 POLYVINYL-CHLORIDE ROOFING
07 55 00 08/09 PROTECTED MEMBRANE ROOFING
07 57 13 05/11 SPRAYED POLYURETHANE FOAM (SPF) ROOFING
07 60 00 05/17 FLASHING AND SHEET METAL
07 61 14.00 20 08/16 STEEL STANDING SEAM ROOFING
07 61 15.00 20 08/16 ALUMINUM STANDING SEAM ROOFING
07 62 13 08/09 COPPER SHEET METAL FLASHING AND TRIM
07 72 20 08/09 GRAVITY-TYPE ROOF VENTILATORS
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 01 52 08/09 OPERATION AND MAINTENANCE OF WOOD WINDOWS
08 11 13 02/10 STEEL DOORS AND FRAMES
08 11 16 05/17 ALUMINUM DOORS AND FRAMES
08 11 69 02/10 METAL STORM DOORS
08 11 73 01/07 SLIDING FIRE DOORS
08 13 73 02/11 SLIDING METAL DOORS
08 14 00 08/16 WOOD DOORS
08 22 20 11/19 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS AND
FRAMES
08 31 00 05/17 ACCESS DOORS AND PANELS
08 32 13 11/08 ALUMINUM SLIDING GLASS DOORS
08 33 13 05/09 COILING COUNTER DOORS
08 33 23 11/19 OVERHEAD COILING DOORS
08 34 01 08/09 FORCED ENTRY RESISTANT COMPONENTS
08 34 02 08/09 BULLET-RESISTANT COMPONENTS
08 34 16 05/17 CORROSION CONTROL HANGAR DOORS
08 34 16.10 05/17 STEEL SLIDING HANGAR DOORS
08 34 16.20 05/14 VERTICAL LIFT FABRIC DOORS
08 34 19.10 20 02/12 ROLLING SERVICE [AND FIRE] DOORS
08 34 49.00 20 04/06 HEMP SHIELDED DOOR
08 34 58 08/08 FILE ROOM DOORS AND FRAMES
08 34 59 08/08 VAULT DOORS AND DAY GATES
08 34 63 05/11 DETENTION HOLLOW METAL FRAMES, DOORS, AND DOOR
FRAMES
08 34 73 11/19 SOUND CONTROL DOOR ASSEMBLIES
08 36 13 08/11 SECTIONAL OVERHEAD DOORS
08 36 19 11/11 VERTICAL LIFT DOORS
08 39 53 02/19 BLAST RESISTANT DOORS (EARTH COVERED MAGAZINES)
08 39 54 08/09 BLAST RESISTANT DOORS
08 41 13 08/18 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 05/19 ALUMINUM WINDOWS
08 51 23 08/11 STEEL WINDOWS
08 51 69.10 04/06 ALUMINUM STORM WINDOWS
08 52 00 08/11 WOOD WINDOWS
08 53 00 08/11 PLASTIC WINDOWS
08 56 46.10 20 08/11 RADIO FREQUENCY SHIELDED ENCLOSURES,
DEMOUNTABLE TYPE
08 56 46.20 20 08/11 RADIO FREQUENCY SHIELDED ENCLOSURES, WELDED TYPE
08 56 53 08/11 BLAST RESISTANT TEMPERED GLASS WINDOWS
08 56 63 04/06 DETENTION AND SECURITY WINDOWS
08 60 45 02/12 [SKYLIGHTS][ AND ][TRANSLUCENT PANELS]
08 71 00 02/16 DOOR HARDWARE
08 71 63 04/06 DETENTION HARDWARE
08 71 63.10 04/06 ELECTRICAL LOCKING CONTROL FOR BRIGS
08 81 00 05/19 GLAZING
08 87 23.13 08/09 SAFETY FILMS
08 88 53 05/11 DETENTION AND SECURITY GLAZING
08 88 58 05/14 AIR TRAFFIC CONTROL TOWER CAB GLASS
08 91 00 05/11 METAL [WALL] [AND] [DOOR] LOUVERS
DIVISION 09 - FINISHES
09 01 90.50 05/09 PREPARATION OF HISTORIC WOOD AND METAL SURFACES
FOR PAINTING
09 06 00 05/09 SCHEDULES FOR FINISHES
09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 22 36 01/08 LATH
09 23 00 08/16 GYPSUM PLASTERING
09 23 82 11/19 FIREPROOF GYPSUM PLASTERING
09 24 23 08/17 CEMENT STUCCO
09 26 00 08/16 VENEER PLASTER
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/17 CERAMIC, QUARRY, AND GLASS TILING
09 35 16 08/16 CHEMICAL-RESISTANT QUARRY TILING
09 51 00 08/17 ACOUSTICAL CEILINGS
09 62 38 08/17 STATIC-CONTROL FLOORING
09 64 00 08/16 PORTABLE (DEMOUNTABLE) WOOD FLOORING
09 64 23 08/16 WOOD PARQUET FLOORING
09 64 29 08/16 WOOD STRIP AND PLANK FLOORING
09 64 66 08/16 WOOD ATHLETIC FLOORING
09 65 00 08/10 RESILIENT FLOORING
09 65 66 08/16 RESILIENT ATHLETIC FLOORING
09 66 13 08/16 PORTLAND CEMENT TERRAZZO FLOORING
09 66 16 08/16 TERRAZZO FLOOR TILE
09 66 23 08/16 RESINOUS MATRIX TERRAZZO FLOORING
09 67 23.13 11/19 STANDARD RESINOUS FLOORING
09 67 23.14 08/16 CHEMICAL RESISTANT RESINOUS FLOORING
09 67 23.15 08/10 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
09 67 23.16 08/10 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
09 68 00 11/17 CARPETING
09 69 13 11/15 RIGID GRID ACCESS FLOORING
09 69 19 11/15 STRINGERLESS ACCESS FLOORING
09 72 00 08/17 WALLCOVERINGS
09 84 20 08/16 ACOUSTICAL WALL PANELS
09 90 00 05/11 PAINTS AND COATINGS
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
09 96 59 05/11 HIGH-BUILD GLAZE COATINGS
09 97 02 02/20 PAINTING: HYDRAULIC STRUCTURES
09 97 10.00 10 05/09 METALLIC COATINGS FOR HYDRAULIC STRUCTURES
09 97 13.00 40 11/19 STEEL COATINGS
09 97 13.15 02/15 LOW VOC POLYSULFIDE INTERIOR COATING OF WELDED
STEEL PETROLEUM FUEL TANKS
09 97 13.16 05/11 INTERIOR COATING OF WELDED STEEL WATER TANKS
09 97 13.17 02/10 THREE COAT EPOXY INTERIOR COATING OF WELDED
STEEL PETROLEUM FUEL TANKS
09 97 13.25 05/11 MAINTENANCE, REPAIR, AND COATING OF TALL
ANTENNA TOWERS
09 97 13.26 02/16 COATING OF STEEL WATERFRONT STRUCTURES, ZERO
VOC, (SZC) SPLASH ZONE COATING
09 97 13.27 10/16 EXTERIOR COATING OF STEEL STRUCTURES
09 97 13.28 02/10 PROTECTION OF BURIED STEEL PIPING AND STEEL
BULKHEAD TIE RODS
09 97 23 08/18 METALLIC TYPE CONDUCTIVE/SPARK RESISTANT
CONCRETE FLOOR FINISH
09 97 23.16 11/10 LINSEED OIL PROTECTION OF CONCRETE SURFACES
09 97 23.17 08/16 CORROSION INHIBITOR COATING OF CONCRETE SURFACES
DIVISION 10 - SPECIALTIES
10 11 00 08/17 VISUAL DISPLAY UNITS
10 14 00.10 08/17 EXTERIOR SIGNAGE
10 14 00.20 08/17 INTERIOR SIGNAGE
10 14 53 02/15 TRAFFIC SIGNAGE
10 21 13 08/17 TOILET COMPARTMENTS
10 21 23.16 04/06 CUBICLE TRACK AND HARDWARE
10 22 13 08/16 WIRE MESH PARTITIONS
10 22 19 08/17 DEMOUNTABLE AND MOVABLE PARTITIONS
10 22 26.13 08/16 ACCORDION FOLDING PARTITIONS
10 22 26.23 08/16 COILING PARTITIONS
10 22 39 08/17 FOLDING PANEL PARTITIONS
10 22 43 08/16 SLIDING PARTITIONS
10 26 00 08/17 WALL AND DOOR PROTECTION
10 28 13 08/17 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 05/11 METAL LOCKERS
10 56 13 04/06 STEEL SHELVING
10 71 13.13 04/06 STORM SHUTTERS
DIVISION 11 - EQUIPMENT
11 05 40 08/17 COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT
11 06 40.13 08/17 FOODSERVICE EQUIPMENT SCHEDULE
11 11 37 11/18 ELECTRIC VEHICLE SUPPLY EQUIPMENT
11 13 19.13 08/09 LOADING DOCK LEVELERS
11 27 13 04/06 RADIOGRAPHIC DARKROOM EQUIPMENT
11 31 13 08/17 ELECTRIC KITCHEN EQUIPMENT
11 41 11 08/17 REFRIGERATED AND FROZEN FOOD STORAGE EQUIPMENT
11 42 00 08/17 FOOD PREPARATION EQUIPMENT
11 44 00 08/17 FOOD COOKING EQUIPMENT
11 46 00 01/08 FOOD DISPENSING EQUIPMENT
11 47 00 08/17 ICE MACHINES
11 48 00 08/17 CLEANING AND DISPOSAL EQUIPMENT
11 53 00 05/11 LABORATORY EQUIPMENT AND FUMEHOODS
11 68 13 08/17 PLAYGROUND EQUIPMENT
11 70 00 05/20 GENERAL REQUIREMENTS FOR MEDICAL AND DENTAL
EQUIPMENT
11 71 00 05/20 STERILIZERS AND ASSOCIATED EQUIPMENT
11 72 13 05/20 MEDICAL EQUIPMENT, MISCELLANEOUS
11 74 00 05/20 DENTAL EQUIPMENT
11 82 19 05/20 PACKAGED INCINERATORS
DIVISION 12 - FURNISHINGS
12 21 00 08/17 WINDOW BLINDS
12 22 00 08/16 CURTAINS AND DRAPES
12 24 13 08/17 ROLLER WINDOW SHADES
12 31 00 11/14 MANUFACTURED METAL CASEWORK
12 32 00 11/16 MANUFACTURED WOOD CASEWORK
12 34 00 08/17 MANUFACTURED PLASTIC CASEWORK
12 35 30.23 20 08/11 BATHROOM CASEWORK
12 35 39 08/17 COMMERCIAL KITCHEN CASEWORK
12 35 70 08/16 HEALTHCARE CASEWORK
12 36 00 08/18 COUNTERTOPS
12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES
12 50 00.13 10 08/17 FURNITURE AND FURNITURE INSTALLATION
12 55 00 04/06 DETENTION FURNITURE AND ACCESSORIES
12 59 00 08/17 SYSTEMS FURNITURE
12 61 13 08/17 UPHOLSTERED AUDIENCE SEATING
12 93 00 08/17 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 17 43 05/20 HYDROTHERAPY EQUIPMENT
13 21 26 02/16 COLD-STORAGE ROOMS (PREFABRICATED PANEL TYPE)
13 21 48 04/06 PREFABRICATED AUDIOMETRIC ROOMS
13 34 19 11/11 METAL BUILDING SYSTEMS
13 48 73 05/20 SEISMIC CONTROL FOR MISCELLANEOUS EQUIPMENT
13 49 10 02/09 X-RAY SHIELDING
13 49 20.00 10 10/07 RFI/EMI SHIELDING
DIVISION 14 - CONVEYING EQUIPMENT
14 21 13 05/16 ELECTRIC TRACTION FREIGHT ELEVATORS
14 21 23 05/16 ELECTRIC TRACTION PASSENGER ELEVATORS
14 24 13 05/16 HYDRAULIC FREIGHT ELEVATORS
14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS
14 92 00 02/09 PNEUMATIC-TUBE SYSTEM
DIVISION 21 - FIRE SUPPRESSION
21 12 00 05/11 STANDPIPE SYSTEMS
21 13 00.00 40 08/13 FIRE-SUPPRESSION SPRINKLER SYSTEMS
21 13 13.00 10 05/09 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 13.00 20 04/08 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 16.00 20 04/06 DRY-PIPE FIRE SPRINKLER SYSTEMS
21 13 17.00 10 05/09 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 18.00 10 05/09 PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 13 19.00 20 11/09 [DELUGE] [PREACTION] FIRE SPRINKLER SYSTEMS
21 13 20.00 20 11/09 FOAM FIRE EXTINGUISHING FOR AIRCRAFT HANGARS
21 13 21.00 20 11/09 FOAM FIRE EXTINGUISHING FOR FUEL TANK PROTECTION
21 13 22.00 20 11/09 FOAM FIRE EXTINGUISHING FOR HAZ/FLAM MATERIAL
FACILITY
21 13 24.00 10 10/07 AQUEOUS FILM-FORMING FOAM (AFFF) FIRE
PROTECTION SYSTEM
21 13 25 02/19 HIGH-EXPANSION FOAM SYSTEM, FIRE PROTECTION
21 13 26.00 40 08/16 DELUGE FIRE-SUPPRESSION SPRINKLER SYSTEMS
21 21 00 04/06 FIRE EXTINGUISHING SPRINKLER SYSTEMS
(RESIDENTIAL)
21 21 00.00 40 11/16 CARBON-DIOXIDE FIRE-EXTINGUISHING SYSTEMS
21 21 01.00 20 11/09 CARBON DIOXIDE FIRE EXTINGUISHING (HIGH
PRESSURE)
21 21 02.00 20 11/09 CARBON DIOXIDE FIRE EXTINGUISHING (LOW PRESSURE)
21 21 03.00 10 02/09 WET CHEMICAL FIRE EXTINGUISHING SYSTEM
21 22 00.00 20 05/11 HALON 1301 FIRE EXTINGUISHING
21 22 00.00 40 05/16 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
21 23 00.00 20 04/06 WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN
CABINET
21 30 00 04/08 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
22 00 70 05/20 PLUMBING FOR HEALTHCARE FACILITIES
22 05 48.00 20 04/06 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 05 83.63 11/16 CURED-IN-PLACE PIPE (CIPP) LINING
22 07 19.00 40 08/16 PLUMBING PIPING INSULATION
22 13 29 02/11 SANITARY SEWERAGE PUMPS
22 13 36 02/09 PNEUMATIC SEWAGE EJECTORS
22 14 29.00 40 05/17 SUMP PUMPS
22 15 09.00 40 11/16 GENERAL SERVICE COMPRESSED-AIR SYSTEMS CLEANING
PROCEDURES
22 15 13.16 40 11/17 HIGH-PRESSURE COMPRESSED-AIR PIPING, PIPING
COMPONENTS, AND VALVES, STAINLESS
22 15 14.00 40 11/17 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW
PRESSURE
22 15 19.13 20 11/09 LARGE NONLUBRICATED RECIPROCATING AIR
COMPRESSORS (OVER 300 HP)
22 15 19.19 20 05/11 NONLUBRICATED ROTARY SCREW AIR COMPRESSORS (100
HP AND LARGER)
22 15 26.00 20 04/06 HIGH AND MEDIUM PRESSURE COMPRESSED AIR PIPING
22 16 19.26 20 11/09 LARGE CENTRIFUGAL AIR COMPRESSORS (OVER 200 HP)
22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)
22 33 30.00 10 04/08 SOLAR WATER HEATING EQUIPMENT
22 60 70 05/20 GAS AND VACUUM SYSTEMS FOR HEALTHCARE FACILITIES
22 66 53.00 40 08/15 LABORATORY CHEMICAL-WASTE AND VENT PIPING
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 01 30.41 02/15 HVAC SYSTEM CLEANING
23 03 00.00 20 08/10 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 02/14 COMMON PIPING FOR HVAC
23 05 48.00 40 08/15 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING
AND EQUIPMENT
23 05 48.19 05/18 [SEISMIC] BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 01.00 20 04/06 TESTING INDUSTRIAL VENTILATION SYSTEMS
23 09 00 02/19 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 13.34 40 02/17 CONTROL VALVES, SELF-CONTAINED
23 09 23.01 02/19 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND
OTHER BUILDING CONTROL SYSTEMS
23 09 23.02 02/19 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND
OTHER BUILDING CONTROL SYSTEMS
23 09 33.00 40 11/15 ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC
23 09 53.00 20 02/10 SPACE TEMPERATURE CONTROL SYSTEMS
23 09 93 11/15 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 11 20 05/20 FACILITY GAS PIPING
23 21 13.00 20 04/06 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 13.23 20 07/07 [HIGH][MEDIUM] TEMPERATURE WATER SYSTEM WITHIN
BUILDINGS
23 21 23 08/17 HYDRONIC PUMPS
23 22 13.35 40 02/17 STEAM TRAPS
23 22 23.00 40 08/15 STEAM CONDENSATE PUMPS
23 22 25.00 40 11/17 STEAM VALVES
23 22 26.00 20 02/10 STEAM SYSTEM AND TERMINAL UNITS
23 23 00 10/07 REFRIGERANT PIPING
23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR MECHANICAL
SYSTEMS
23 30 00 05/20 HVAC AIR DISTRIBUTION
23 31 13.00 40 05/16 METAL DUCTS
23 33 56 02/09 SELF-ACTING BLAST VALVES
23 34 23.00 40 02/17 HVAC POWER VENTILATORS
23 35 16.17 10 05/20 MECHANICAL ENGINE[ AND WELDING FUME] EXHAUST
SYSTEMS
23 35 19.00 20 02/10 INDUSTRIAL VENTILATION AND EXHAUST
23 36 00.00 40 05/16 AIR TERMINAL UNITS
23 37 13.00 40 05/15 DIFFUSERS, REGISTERS, AND GRILLS
23 41 13.00 40 02/16 PANEL FILTERS
23 44 00.00 10 02/16 CHEMICAL, BIOLOGICAL, AND RADIOLOGICAL (CBR)
AIR FILTRATION SYSTEM
23 50 52.00 10 02/16 CENTRAL HIGH TEMPERATURE WATER (HTW) GENERATING
PLANT AND AUXILIARIES
23 51 43.00 20 02/10 DUST AND GAS COLLECTOR, DRY SCRUBBER AND FABRIC
FILTER TYPE
23 51 43.01 20 04/06 MECHANICAL CYCLONE DUST COLLECTOR OF FLUE GAS
PARTICULATES
23 51 43.02 20 04/06 ELECTROSTATIC DUST COLLECTOR OF FLUE GAS
PARTICULATES
23 51 43.03 20 02/10 FABRIC FILTER DUST COLLECTOR OF FLY ASH
PARTICLES IN FLUE GAS
23 52 00 04/08 HEATING BOILERS
23 52 30.00 10 05/20 HEAT RECOVERY BOILERS
23 52 30.01 10 05/20 CENTRAL COAL-FIRED STEAM-GENERATING SYSTEM
23 52 30.02 10 05/20 CENTRAL STEAM GENERATING SYSTEM - COMBINATION
GAS AND OIL FIRED
23 52 33.01 20 11/08 STEAM HEATING PLANT WATERTUBE (SHOP ASSEMBLED)
COAL/OIL OR COAL
23 52 33.02 20 11/08 STEAM HEATING PLANT WATERTUBE (FIELD ERECTED)
COAL/OIL OR COAL
23 52 33.03 20 11/08 WATER-TUBE BOILERS, OIL/GAS OR OIL
23 52 43.00 20 05/15 LOW PRESSURE WATER HEATING BOILERS (UNDER
800,000 BTU/HR OUTPUT)
23 52 46.00 20 05/15 LOW PRESSURE WATER HEATING BOILERS (OVER
800,000 BTU/HR OUTPUT)
23 52 49.00 20 11/08 STEAM BOILERS AND EQUIPMENT (500,000 -
18,000,000 BTU/HR)
23 52 53.00 20 04/06 STEAM BOILERS AND EQUIPMENT (18,000,000 -
60,000,000 BTU/HR)
23 54 19 11/08 BUILDING HEATING SYSTEMS, WARM AIR
23 57 10.00 10 11/19 FORCED HOT WATER HEATING SYSTEMS USING WATER
AND STEAM HEAT EXCHANGERS
23 58 00.00 10 05/20 CENTRAL STEAM HEATING AND UTILITIES SYSTEMS
23 63 00.00 10 10/07 COLD STORAGE REFRIGERATION SYSTEMS
23 64 00 11/16 PACKAGED WATER CHILLERS, ABSORPTION TYPE
23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09 CHILLED, CHILLED-HOT, AND CONDENSER WATER
PIPING SYSTEMS
23 65 00 11/16 COOLING TOWERS AND REMOTE EVAPORATIVELY-COOLED
CONDENSERS
23 69 00.00 20 07/06 REFRIGERATION EQUIPMENT FOR COLD STORAGE
23 71 19 05/18 THERMAL ENERGY STORAGE SYSTEM: ICE-ON-COIL
23 72 00.00 10 01/08 ENERGY RECOVERY SYSTEMS
23 73 13.00 40 05/17 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING
UNITS
23 74 33.00 40 05/17 PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP
AIR-CONDITIONERS
23 75 15 02/20 CUSTOM-PACKAGED, AIRCRAFT PRE-CONDITIONED AIR
UNITS
23 76 00.00 10 04/08 EVAPORATIVE COOLING SYSTEMS
23 76 00.00 20 07/06 EVAPORATIVE COOLING SYSTEM
23 80 20.00 10 05/20 GAS-FIRED HEATING EQUIPMENT
23 81 00 05/18 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 00.00 20 11/09 UNITARY AIR CONDITIONING EQUIPMENT
23 81 23.00 20 02/10 COMPUTER ROOM AIR CONDITIONING UNITS
23 81 29 02/20 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS
23 81 47 08/08 WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS
23 82 00.00 20 02/16 TERMINAL HEATING UNITS
23 82 01.00 10 04/08 WARM AIR HEATING SYSTEMS
23 82 16.00 40 05/16 AIR COILS
23 82 19.00 40 05/17 FAN COIL UNITS
23 82 23.00 40 05/17 UNIT VENTILATORS
23 82 43.00 40 05/17 ELECTRIC DUCT HEATERS
23 82 46.00 40 05/17 ELECTRIC UNIT HEATERS
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
23 84 19.00 02/18 DESICCANT COOLING SYSTEMS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 11/17 CYBERSECURITY FOR FACILITY-RELATED CONTROL
SYSTEMS
25 08 10 04/06 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 02/19 UTILITY MONITORING AND CONTROL SYSTEM (UMCS)
FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 05 00.00 40 08/19 COMMON WORK RESULTS FOR ELECTRICAL
26 05 13.00 40 05/20 MEDIUM-VOLTAGE CABLES
26 05 19.10 10 05/16 INSULATED WIRE AND CABLE
26 05 26.00 40 08/19 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 33 01/07 DOCKSIDE POWER CONNECTION STATIONS
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 05 70.00 40 05/19 HIGH VOLTAGE OVERCURRENT PROTECTIVE DEVICES
26 05 71.00 40 02/17 LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES
26 08 00 08/08 APPARATUS INSPECTION AND TESTING
26 09 23.00 40 08/19 LIGHTING CONTROL DEVICES
26 11 13.00 20 04/07 PRIMARY UNIT SUBSTATION
26 11 14.00 10 10/07 MAIN ELECTRIC SUPPLY STATION AND SUBSTATION
26 11 16 02/10 SECONDARY UNIT SUBSTATIONS
26 12 19.00 40 11/14 PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE
TRANSFORMERS
26 12 19.10 05/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 12 21 05/17 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS
26 13 00 11/14 SF6/HIGH-FIREPOINT FLUIDS INSULATED PAD-MOUNTED
SWITCHGEAR
26 13 01 08/13 PAD-MOUNTED DEAD-FRONT AIR INSULATED SWITCHGEAR
26 18 23.00 40 08/16 MEDIUM-VOLTAGE SURGE ARRESTERS
26 20 00 08/19 INTERIOR DISTRIBUTION SYSTEM
26 22 00.00 10 10/07 480-VOLT STATION SERVICE SWITCHGEAR AND
TRANSFORMERS
26 23 00 05/15 LOW-VOLTAGE SWITCHGEAR
26 23 00.00 40 11/17 SWITCHBOARDS AND SWITCHGEAR
26 24 13 05/15 SWITCHBOARDS
26 24 16.00 40 08/19 PANELBOARDS
26 24 19.00 40 05/19 MOTOR CONTROL CENTERS
26 27 13.10 30 10/07 ELECTRIC METERS
26 27 14.00 20 02/11 ELECTRICITY METERING
26 27 29 04/06 MARINA ELECTRICAL WORK
26 28 00.00 10 10/07 MOTOR CONTROL CENTERS, SWITCHBOARDS AND
PANELBOARDS
26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION
26 28 21.00 40 05/17 AUTOMATIC TRANSFER SWITCHES
26 29 01.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL INDUCTION TYPE
26 29 02.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL SYNCHRONOUS
TYPE
26 29 23 02/20 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600
VOLTS
26 31 00 05/15 SOLAR PHOTOVOLTAIC (PV) COMPONENTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY 15-2500 KW,
WITH AUXILIARIES
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS)
26 35 33.00 40 08/19 POWER FACTOR CORRECTION EQUIPMENT
26 35 43 05/11 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER
26 35 44.00 20 02/18 270 VDC SOLID STATE GROUND POWER UNIT
26 36 23 05/20 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 42 13.00 20 04/06 CATHODIC PROTECTION BY GALVANIC ANODES
26 42 14.00 10 08/09 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 42 15.00 10 02/13 CATHODIC PROTECTION SYSTEM (STEEL WATER TANKS)
26 42 17.00 10 11/08 CATHODIC PROTECTION SYSTEM (IMPRESSED CURRENT)
26 42 19.00 20 04/06 CATHODIC PROTECTION BY IMPRESSED CURRENT
26 42 19.10 11/08 CATHODIC PROTECTION SYSTEMS (IMPRESSED CURRENT)
FOR LOCK MITER GATES
26 42 22.00 20 01/08 CATHODIC PROTECTION SYSTEM FOR STEEL WATER TANKS
26 51 00 05/20 INTERIOR LIGHTING
26 52 00.00 40 11/17 EMERGENCY LIGHTING
26 53 00.00 40 11/15 EXIT SIGNS
26 55 53.00 40 11/14 SECURITY LIGHTING
26 55 80.00 20 04/06 SURGICAL LIGHTING FIXTURES
26 56 00 05/20 EXTERIOR LIGHTING
26 56 13.00 40 11/14 LIGHTING POLES AND STANDARDS
26 56 19.00 40 05/20 ROADWAY LIGHTING
26 56 20 02/19 AIRFIELD AND HELIPORT LIGHTING AND VISUAL
NAVIGATION AIDS
26 56 36.00 40 05/20 FLOOD LIGHTING
26 60 13.00 40 05/19 LOW-VOLTAGE MOTORS
DIVISION 27 - COMMUNICATIONS
27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM
27 05 28.36 40 05/17 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 05 29.00 10 08/11 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR
SIPRNET COMMUNICATION SYSTEMS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 13 23.00 40 11/14 COMMUNICATIONS OPTICAL BACKBONE CABLING
27 21 00.00 20 04/06 INTERCOMMUNICATION SYSTEM
27 21 00.00 40 02/16 INTERCOMMUNICATION SYSTEM
27 21 10.00 40 05/16 FIBER OPTIC DATA TRANSMISSION SYSTEM
27 51 16 05/20 PUBLIC ADDRESS SYSTEMS
27 51 23.10 05/11 INTERCOMMUNICATION SYSTEM
27 52 24 08/17 NURSE CALL SYSTEM
27 53 19.13 05/20 FIRST RESPONDER DISTRIBUTED ANTENNAE SYSTEMS
(DAS)
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 20 02 11/08 CENTRAL MONITORING SERVICES FOR ELECTRONIC
SECURITY SYSTEMS
28 31 00.00 10 11/08 FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT
LOOP
28 31 02.00 20 02/10 FIRE ALARM REPORTING SYSTEMS - DIGITAL
COMMUNICATORS
28 31 13.00 40 02/17 FIRE DETECTION AND ALARM CONTROL, GUI, AND
LOGIC SYSTEMS
28 31 33.00 10 11/08 FIRE ALARM REPORTING SYSTEM, RADIO TYPE
28 31 33.13 20 04/06 EXTERIOR FIRE REPORTING SYSTEM, RADIO TYPE
28 31 49 04/06 CARBON MONOXIDE DETECTORS
28 31 63.00 20 10/07 ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM
28 31 64.00 10 08/09 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
28 31 73.00 20 02/10 EXTERIOR FIRE ALARM SYSTEM, CLOSED CIRCUIT
TELEGRAPHIC TYPE
28 31 74.00 20 02/10 INTERIOR FIRE DETECTION AND ALARM SYSTEM
28 31 75.00 10 11/08 CENTRAL FIRE ALARM SYSTEM, DIGITAL ALARM
COMMUNICATOR TYPE
28 31 76 08/11 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
28 33 00.00 40 02/17 FUEL-GAS DETECTION AND ALARM
DIVISION 31 - EARTHWORK
31 00 00 08/08 EARTHWORK
31 05 19 08/08 GEOTEXTILE
31 05 20 08/08 GEOSYNTHETIC DRAINAGE LAYER
31 05 21 08/08 GEOGRID SOIL REINFORCEMENT
31 05 22 08/08 GEOTEXTILES USED AS FILTERS
31 10 00 08/08 CLEARING FOR CIVIL WORKS
31 11 00 11/18 CLEARING AND GRUBBING
31 21 00 08/08 PIPING; OFF-GAS
31 21 13 11/18 RADON MITIGATION
31 23 00.00 20 02/11 EXCAVATION AND FILL
31 31 16.13 08/16 CHEMICAL TERMITE CONTROL
31 31 16.19 02/16 TERMITE CONTROL BARRIERS
31 32 23 08/08 FOUNDATION DRILLING AND GROUTING
31 32 39 08/08 BIOENGINEERING PRACTICES FOR STREAM BANK AND
SHORELINE STABILIZATION
31 36 00 08/08 WIRE MESH GABIONS[ AND MATTRESSES]
31 41 16 08/09 METAL SHEET PILING
31 60 00 11/08 FOUNDATION PREPARATION
31 62 13.13 04/06 CAST-IN-PLACE CONCRETE PILES
31 62 13.20 08/09 PRECAST/PRESTRESSED CONCRETE PILES
31 62 13.24 08/11 CONCRETE CYLINDER PILES
31 62 13.26 04/06 PRESSURE-INJECTED FOOTINGS
31 62 16.16 11/11 STEEL H-PILES
31 62 19 01/08 TIMBER PILES
31 62 19.13 11/16 TIMBER MARINE PILES
31 62 21 11/08 PILING: COMPOSITE, WOOD AND CAST IN-PLACE
CONCRETE
31 62 23.13 11/08 CAST-IN-PLACE CONCRETE PILES, STEEL CASING
31 63 16 11/08 AUGER CAST GROUT PILES
31 63 26 08/08 DRILLED CAISSONS
31 63 29 11/19 DRILLED CONCRETE PIERS AND SHAFTS
31 68 13 11/08 SOIL AND ROCK ANCHORS
31 73 00 11/08 TUNNEL AND SHAFT GROUTING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 11.51 05/16 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS
32 01 13.62 05/18 ASPHALT SURFACE TREATMENT
32 01 13.63 02/16 GILSONITE MODIFIED ASPHALT EMULSION SEAL COATS
32 01 13.64 02/17 BITUMINOUS PAVEMENT LIQUID REJUVENATING
32 01 16.70 05/18 COLD-MIX REUSED ASPHALT PAVING
32 01 16.71 02/17 COLD MILLING ASPHALT PAVING
32 01 16.74 05/18 IN PLACE HOT REUSED ASPHALT PAVING
32 01 16.75 02/17 HEATER SCARIFYING OF ASPHALT PAVING
32 01 17.61 05/17 SEALING CRACKS IN ASPHALT PAVING
32 01 17.62 05/20 PAVING FABRIC INTERLAYER
32 01 18.71 05/17 GROOVING OF AIRFIELD PAVING
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 01 29.61 05/17 PARTIAL DEPTH PATCHING OF RIGID PAVING
32 01 29.62 11/18 CONCRETE PAVEMENT RAISING
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 13.13 11/19 LIME TREATED SUBGRADE
32 11 13.16 05/20 BITUMINOUS-STABILIZED SUBGRADE
32 11 20 08/17 [BASE COURSE FOR RIGID][ AND ][SUBBASES FOR
FLEXIBLE] PAVING
32 11 23 08/17 AGGREGATE BASE COURSES
32 11 23.23 08/17 BASE COURSE DRAINAGE LAYERS
32 11 26 05/20 HOT-MIX BITUMINOUS BASE COURSE FOR ROADS AND
STREETS
32 11 26.19 05/20 BITUMINOUS-STABILIZED BASE AND SUBBASE COURSES
32 11 33 08/08 CEMENT STABILIZED [BASE] [SUBBASE] COURSE AT
AIRFIELDS AND ROADS
32 11 33.13 05/20 PORTLAND CEMENT-STABILIZED BASE COURSES
32 11 36.13 11/19 LEAN CONCRETE BASE COURSE
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 11/17 ASPHALT PAVING FOR AIRFIELDS
32 12 15.16 02/19 STONE MATRIX ASPHALT (SMA) FOR AIRFIELD PAVING
32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS
32 12 16.19 11/19 COLD-MIX ASPHALT PAVING
32 12 19.16 11/19 RESIN-MODIFIED ASPHALT PAVING WEARING COURSES
32 12 36.13 05/17 ASPHALTIC SEAL AND FOG COATS
32 12 36.26 10 05/20 POLYMER CONCRETE MICRO-OVERLAY (PCMO) FOR FUEL
AND ABRASION RESISTANT WEARING SURFACES
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND
SITE FACILITIES
32 13 13.43 02/18 HIGH TEMPERATURE CONCRETE PAVING FOR AIRFIELDS
USING LIGHTWEIGHT AND TRAPROCK AGGREGATES
32 13 14.13 08/19 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY
DUTY PAVEMENTS
32 13 15.20 11/10 CONCRETE PAVEMENT FOR CONTAINMENT DIKES
32 13 16.16 11/08 ROLLER COMPACTED CONCRETE (RCC) PAVEMENT
32 13 43 05/20 PERVIOUS CONCRETE PAVING
32 13 73.19 11/19 COMPRESSION CONCRETE PAVING JOINT SEALANT
32 14 13.13 11/19 INTERLOCKING PRECAST CONCRETE UNIT PAVING
32 15 00 05/17 AGGREGATE SURFACING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16 PAVEMENT MARKINGS
32 18 16.13 08/17 PLAYGROUND PROTECTIVE SURFACING
32 31 13 11/16 CHAIN LINK FENCES AND GATES
32 31 13.53 02/20 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
32 31 26 02/20 WIRE FENCES AND GATES
32 32 23.13 02/20 SEGMENTAL CONCRETE BLOCK RETAINING WALL
32 84 23 04/08 UNDERGROUND SPRINKLER SYSTEMS
32 84 24 08/11 IRRIGATION SPRINKLER SYSTEMS
32 92 19 08/17 SEEDING
32 92 23 04/06 SODDING
32 92 26 08/17 SPRIGGING
32 93 00 08/17 EXTERIOR PLANTS
32 96 00 08/17 TRANSPLANTING EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 01 30.16 08/16 TV INSPECTION OF SEWER PIPELINES
33 01 30.72 05/16 RELINING SEWERS
33 01 50.31 02/20 LEAK DETECTION FOR FUELING SYSTEMS
33 01 50.60 11/18 CLEANING OF PETROLEUM STORAGE TANKS
33 01 98 05/13 SLIP LINING OF EXISTING PIPING FOR LEVEE
APPLICATIONS
33 05 23 08/15 TRENCHLESS UTILITY INSTALLATION
33 05 23.13 11/19 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 08 53 08/18 AVIATION FUEL DISTRIBUTION SYSTEM START-UP
33 08 55 08/19 FUEL DISTRIBUTION SYSTEM START-UP (NON-HYDRANT)
33 09 52 11/18 FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM
(NON-HYDRANT)
33 09 53 08/18 AVIATION FUEL PUMP CONTROL AND ANNUNCIATION
SYSTEM
33 09 54 08/18 AVIATION FUEL PUMP CONTROL AND ANNUNCIATION
SYSTEM (TYPE [IV][V])
33 09 55 08/18 AVIATION FUEL PUMP CONTROL AND ANNUNCIATION
SYSTEM (CUT AND COVER TANKS)
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 11 13 08/17 POTABLE WATER SUPPLY WELLS
33 11 23 11/09 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 16 13.16 04/06 WIRE-WOUND CIRCULAR PRESTRESSED-CONCRETE WATER
TANK
33 16 15 04/08 WATER STORAGE STEEL TANKS
33 26 00.00 10 04/08 RELIEF WELLS
33 30 00 05/18 SANITARY SEWERAGE
33 31 23.00 10 08/18 SANITARY SEWER FORCE MAIN PIPING
33 32 16 11/19 PACKAGED UTILITY WASTEWATER PUMPING STATIONS
33 34 56.00 10 08/18 DRAINAGE FIELD DOSING CHAMBERS
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 46 13 05/20 FOUNDATION DRAINAGE
33 46 16 05/18 SUBDRAINAGE PIPING
33 47 13 11/14 POND AND RESERVOIR LINERS
33 51 13.00 30 05/10 NATURAL-GAS METERING
33 51 15 08/19 NATURAL-GAS / LIQUEFIED PETROLEUM GAS
DISTRIBUTION PIPELINES
33 51 39 08/17 MONITORING WELLS
33 52 10 11/18 FUEL SYSTEMS PIPING (SERVICE STATION)
33 52 23.15 11/18 POL SERVICE PIPING WELDING
33 52 40 11/18 FUEL SYSTEMS PIPING (NON-HYDRANT)
33 52 43.11 08/18 AVIATION FUEL MECHANICAL EQUIPMENT
33 52 43.12 08/18 AVIATION FUEL PANTOGRAPHS
33 52 43.13 08/18 AVIATION FUEL PIPING
33 52 43.14 08/18 AVIATION FUEL CONTROL VALVES
33 52 43.23 08/18 AVIATION FUEL PUMPS
33 52 43.28 08/18 FILTER SEPARATOR, AVIATION FUELING SYSTEM
33 52 80 02/10 LIQUID FUELS PIPELINE COATING SYSTEMS
33 56 10 05/19 FACTORY-FABRICATED FUEL STORAGE TANKS
33 56 19 05/15 FUEL IMPERMEABLE LINER SYSTEM
33 56 21.17 11/18 SINGLE WALL ABOVEGROUND FIXED ROOF STEEL POL
STORAGE TANK
33 56 21.18 11/18 SINGLE WALL POL TANK UNDERTANK INTERSTITIAL
SPACE
33 56 53 05/20 COMPRESSED GASES STORAGE TANKS
33 57 55 11/18 FUEL SYSTEM COMPONENTS (NON-HYDRANT)
33 60 02 04/08 ABOVEGROUND HEAT DISTRIBUTION SYSTEM
33 61 13 08/10 PRE-ENGINEERED UNDERGROUND HEAT DISTRIBUTION
SYSTEM
33 61 13.13 02/16 PREFABRICATED UNDERGROUND HYDRONIC ENERGY
DISTRIBUTION
33 61 13.19 02/16 VALVES, PIPING, AND EQUIPMENT IN VALVE MANHOLES
33 61 14 02/10 EXTERIOR BURIED PREINSULATED WATER PIPING
33 63 13 04/06 EXTERIOR UNDERGROUND STEAM DISTRIBUTION SYSTEM
33 63 13.19 02/16 CONCRETE TRENCH HYDRONIC AND STEAM ENERGY
DISTRIBUTION
33 63 14 04/06 EXTERIOR BURIED PUMPED CONDENSATE RETURN
33 63 16 07/06 EXTERIOR SHALLOW TRENCH STEAM DISTRIBUTION
33 63 23 04/06 EXTERIOR ABOVEGROUND STEAM DISTRIBUTION
33 71 01 05/19 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 01.00 40 11/14 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION
33 73 00.00 40 05/19 UTILITY TRANSFORMERS
33 75 00.00 40 11/14 SWITCHGEAR AND PROTECTION DEVICES
33 77 19.00 40 08/16 MEDIUM-VOLTAGE SWITCH
33 77 36.00 40 05/17 MEDIUM-VOLTAGE UTILITY FUSES
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 - TRANSPORTATION
34 11 00 04/08 RAILROAD TRACK AND ACCESSORIES
34 11 19.00 20 08/18 WELDING CRANE AND RAILROAD RAIL - THERMITE
METHOD
34 71 13.16 02/15 VEHICLE CRASH BARRIERS
34 71 13.19 02/20 CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS
34 73 13 11/19 AIRCRAFT TIEDOWNS
34 73 16 11/19 AIRFIELD GROUNDING
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 01 41.00 10 11/14 ELECTROMECHANICAL OPERATING MACHINERY FOR LOCKS
AND DAMS
35 01 70.13 05/14 WIRE ROPE FOR GATE OPERATING DEVICES
35 05 40.14 10 11/18 HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS
STRUCTURES
35 05 40.17 05/14 SELF-LUBRICATED MATERIALS, FABRICATION,
HANDLING, AND ASSEMBLY
35 20 14 04/08 STOPLOGS
35 20 15 08/18 FRP COMPOSITES FOR LOW-HEAD WATER CONTROL
STRUCTURES
35 20 16.33 01/08 MITER GATES
35 20 16.39 01/08 SECTOR GATES
35 20 16.46 01/08 TAINTER GATES AND ANCHORAGES
35 20 16.53 01/08 VERTICAL LIFT GATES
35 20 16.59 01/08 CLOSURE GATES
35 20 20 01/08 ELECTRICAL EQUIPMENT FOR GATE HOIST
35 20 23 04/06 DREDGING
35 31 19 01/08 STONE, CHANNEL, SHORELINE/COASTAL PROTECTION
FOR STRUCTURES
35 31 19.20 01/08 ARTICULATING CONCRETE BLOCK REVETMENTS
35 41 00 11/18 LEVEE CONSTRUCTION
35 42 34 01/08 REINFORCED SOIL SLOPE
35 45 01 02/16 VERTICAL PUMPS, AXIAL-FLOW AND MIXED-FLOW
IMPELLER-TYPE
35 45 02.00 10 02/16 SUBMERSIBLE PUMP, AXIAL-FLOW AND MIXED-FLOW TYPE
35 45 03.00 10 02/16 SPEED REDUCERS FOR STORM WATER PUMPS
35 51 13.00 20 04/06 CONCRETE FLOATING PIER FOR SMALL CRAFT
35 59 13.13 08/09 PRESTRESSED CONCRETE FENDER PILING
35 59 13.14 20 02/18 POLYMERIC PILES
35 59 13.16 05/11 MARINE FENDERS
35 59 13.19 04/06 ARCH-TYPE RUBBER MARINE FENDERS
35 73 13 11/18 EMBANKMENT FOR EARTH AND ROCKFILL DAMS
DIVISION 40 - PROCESS INTERCONNECTIONS
40 05 13 10/07 PIPELINES, LIQUID PROCESS PIPING
40 05 13.96 05/10 WELDING PROCESS PIPING
40 17 26.00 20 04/06 WELDING PRESSURE PIPING
40 17 30.00 40 05/16 WELDING GENERAL PIPING
40 18 00.00 40 05/17 VACUUM SYSTEMS PROCESS PIPING
40 60 00 05/20 PROCESS CONTROL
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 11/19 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP RUNNING
41 22 13.15 02/20 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING
41 22 13.16 04/08 GANTRY CRANES
41 22 13.33 05/10 PORTAL CRANE TRACK INSTALLATION
41 22 23.19 05/20 MONORAIL HOISTS
41 24 26 05/20 HYDRAULIC POWER SYSTEMS
41 36 30.00 10 01/08 ULTRASONIC INSPECTION OF PLATES
41 65 10.00 10 05/09 [DIESEL][NATURAL GAS] FUELED ENGINE PUMP DRIVES
DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
42 22 00.00 40 05/17 PROCESS CHILLERS AND COOLERS
42 22 13.00 40 08/17 CENTRIFUGAL PROCESS CHILLERS AND COOLERS
42 22 16.00 40 08/17 RECIPROCATING PROCESS CHILLERS AND COOLERS
42 23 13.00 40 08/17 PROCESS CONDENSERS
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE
EQUIPMENT
43 11 00.10 05/20 OFF-GAS FANS, BLOWERS AND PUMPS
43 15 00.00 20 04/06 LOW PRESSURE COMPRESSED AIR PIPING
(NON-BREATHING AIR TYPE)
43 21 29 04/06 FLOW MEASURING EQUIPMENT [POTABLE WATER]
[SEWAGE TREATMENT PLANT]
43 31 13.13 10 08/18 ACTIVATED CARBON-GAS AND LIQUID PURIFICATION
FILTERS
43 41 16.16 40 08/17 VERTICAL ATMOSPHERIC TANKS AND VESSELS
DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT
44 10 00 10/07 AIR POLLUTION CONTROL
44 13 10.13 05/20 VAPOR PHASE ACTIVATED CARBON ADSORPTION UNITS
44 13 51 05/20 THERMAL OXIDATION EQUIPMENT
44 41 00.00 20 05/20 WATER POLLUTION CONTAINMENT AND CLEANUP
EQUIPMENT
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
46 07 53 02/20 PACKAGED WASTEWATER TREATMENT EQUIPMENT
46 07 53.19 02/11 COMPOSTING TOILET
46 20 20 02/11 SEWAGE BAR SCREEN AND MECHANICAL SHREDDER
46 23 00 02/20 GRIT REMOVAL AND HANDLING EQUIPMENT
46 24 16 02/11 COMMINUTORS
46 25 14 02/11 COALESCING [OR VERTICAL TUBE] OIL-WATER
SEPARATORS
46 30 00 08/17 WATER AND WASTEWATER CHEMICAL FEED SYSTEMS
46 30 13 02/11 ADVANCED OXIDATION PROCESSES (AOP)
46 31 11 08/17 CHLORINE GAS FEED EQUIPMENT
46 43 21 02/20 CIRCULAR CLARIFIER EQUIPMENT
46 51 00.00 10 02/11 AIR AND GAS DIFFUSION EQUIPMENT
46 53 22 05/18 TRICKLING FILTER
46 53 62 02/11 CONTINUOUS LOOP REACTOR WASTEWATER TREATMENT
SYSTEM
46 61 00 02/11 FILTRATION EQUIPMENT
46 66 56 02/11 OPEN-CHANNEL DISINFECTION EQUIPMENT
46 71 16 02/11 GRAVITY BELT THICKENERS
DIVISION 48 - ELECTRICAL POWER GENERATION
48 06 15 05/14 TURBINE OIL
48 14 00 05/17 SOLAR PHOTOVOLTAIC SYSTEMS
48 14 13.00 20 05/15 SOLAR LIQUID FLAT PLATE AND EVACUATED TUBE
COLLECTORS
48 15 00 05/17 WIND GENERATOR SYSTEM
48 16 00 05/17 LANDFILL GAS SYSTEMS
-- End of Master Table of Contents --
Repair building and systems for B20245 Consolidated Support “Welcome Center”
MHMV100050
Section 01 11 00
SECTION 01 11 00
SUMMARY OF WORK
08/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM E 2114 (2017) Standard Terminology for Sustainability Relative to the Performance of Buildings
GREEN BUILDING INITIATIVE (GBI)
Green Globes (2004; R 2014) Green Globes(tm) US Green Building Rating System www.thegbi.org
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED (2002; R 2017) Leadership in Energy and Environmental Design(tm) Green Building Rating System for New Construction (LEED-NC)
LEED AF SDD Implementing Guidance dated 02 Jun
1.2 DEFINITIONS
Definitions pertaining to sustainable development are as defined in ASTM E 2114, Section 01 35 40.00 20 ENVIRONMENTAL MANAGEMENT, and as specified.
a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.
b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.
c. "Operational performance" is the functional behavior of the building as a whole or of the building components.
d. "Sustainability" is the balance of environmental, economic, and societal considerations.
http://www.thegbi.org/
MHMV100050
Section 01 11 00
1.3 SUBMITTALS
The following shall be submitted in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Upon receipt of Government Furnished Equipment, the Contractor shall submit records in accordance with paragraph entitled, "Government Furnished Property," of this section.
Submit the following items to the Contracting Officer:
Utility Outage Requests
Utility Connection Requests
Landfill Permit
Site Specific Safety Plan
Quality Control Plan
1.4 WORK COVERED BY CONTRACT DOCUMENTS
1.4.1 PROJECT DESCRIPTION
The work includes replacing and relocating heat and smoke detectors and incidental related work.
1.4.2 LOCATION
The work shall be located at KUMMSC Bldg. 27496, KAFB. The exact location will be shown by the Contracting Officer.
1.5 WORK RESCHEDULING
Contractor shall allow for a maximum of 42 calendar days where construction activity is prohibited. Government will provide 24 hour notification each time the restrictions are invoked.
Normal duty hours for work shall be from 7:00 a.m. to 4:00 p.m., Monday through Friday. Requests for additional work shall require written approval from the Contracting Officer 7 calendar days in advance of the proposed work period.
1.6 PROJECT ENVIRONMENTAL GOALS
Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a building that meets the functional program needs and incorporates the principles of sustainability.
Specifically:
a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.
b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.
c. Use environmentally preferable products and decrease toxicity level of materials used.
MHMV100050
Section 01 11 00
d. Use renewable energy and material resources.
e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended. Consider the durability, maintainability, and flexibility of building systems.
f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.
g. Reduce construction waste through reuse, recycling, and supplier take-back.
1.6.1 INDEPENDENT VERIFICATION
1.6.1.1 US GREEN BUILDING COUNCIL (USGBC) - LEED(TM) RATING SYSTEM
Provide work consistent with USGBC LEED level silver (at a minimum) requirements.