WWYK263009_65 Redlined Specifications_Part1.pdf
PDF 16 MB Posted
- Solicitation number
- W912BV25S0014
About this file
This is a specifications document (redlined version) related to a Special Notice for the construction of a Bomber Agile Common Hangar (BACH) at Tinker Air Force Base, issued by the USACE Tulsa District. The project involves constructing a 4-dock hangar for program depot maintenance, spanning 197,003 square feet with 420,352 square feet of apron paving. The facility includes a single-story structural steel framed hangar bay with full span trusses, a single-story shop side, and a two-story administration area featuring offices, restrooms, lockers, breakroom, FEMA storm shelter, and hazardous material storage.
The estimated construction price range is $250-500 million, with NAICS code 236220 (Commercial and Institutional Building Construction). A Virtual Industry Forum is scheduled for February 18, 2025, from 9:00-10:00 AM Central Time. The project requires special deep foundations with piers and driven piles, natural gas utilities, and must comply with DoD antiterrorism/force protection requirements. Interested parties can submit questions via ProjNet from February 14-March 7, 2025. One-on-one meetings will be available for prime contractors and subcontractors who submit capability statements and relevant experience documentation by the end of the Industry Forum day.
View the file
Other files
Show 40 more
Latest 50 of 95 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MH+MH Joint Venture 1616 East 5th Street, Tulsa, OK 74120 The Mason & Hanger Group Inc. 300 West Vine Street, Suite 1500 Lexington, KY 40507 t 859.252.9980 f 859.253.0781 masonandhanger.com
Mead & Hunt Inc. 2440 Deming Way Madison, WI 53562 t 608.273.6380 f 608.273.6391 meadhunt.com
65% DESIGN SUBMITTAL
REDLINED SPECIFICATIONS
Bomber Agile Common Hangar (BACH) Tinker AFB, Oklahoma
Date:
20 November 2024
Project Number:
WWYK263009
Prepared For:
USACE Tulsa District 2488 East 81st Street Tulsa, OK 74120-6008
U.S. Army Corps of
Engineers Tulsa District
TAFB BACH 019503
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 02/24 SUMMARY OF WORK
01 14 00 11/22, CHG 3: 08/24 WORK RESTRICTIONS
01 30 00 11/20, CHG 4: 08/24 ADMINISTRATIVE REQUIREMENTS
01 30 01.00 47 10/19, CHG 1: 02/23 ADDITIONAL ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 03/22, CHG 5: 07/24 PROJECT SCHEDULE MILCON-SRM-O&M
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 26 05/24 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL
01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 35 05/24 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00.00 47 08/19, CHG 4: 06/23 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 05/23 FACILITY DATA REQUIREMENTS
01 91 00.15 05/23, CHG 3: 08/24 BUILDING COMMISSIONING
01 91 19 05/2023 BUILDING ENCLOSURE COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 9: 08/24 CAST-IN-PLACE CONCRETE
03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 45 00 05/16, CHG 2: 11/21 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 20 05/22, CHG 1: 08/24 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 08/24 MISCELLANEOUS METAL FABRICATIONS
05 51 00 08/23 METAL STAIRS
05 51 33 08/24 METAL LADDERS
05 52 00 08/23 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
PROJECT TABLE OF CONTENTS Page 1
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 08/23 BITUMINOUS DAMPPROOFING
07 21 13 08/23 BOARD AND BLOCK INSULATION
07 21 16 08/23 MINERAL FIBER BLANKET INSULATION
07 22 00 08/23 ROOF AND DECK INSULATION
07 27 10 08/23 BUILDING AIR BARRIER SYSTEM
07 27 19.01 08/23, CHG 1: 08/24 SELF-ADHERING AIR BARRIERS
07 27 26 08/23 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 08/23 SPRAY FOAM AIR BARRIERS
07 41 13 05/11, CHG 4: 02/21 METAL ROOF PANELS
07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS
07 53 23 05/12, CHG 2: 08/18 ETHYLENE-PROPYLENE-DIENE-MONOMER
ROOFING
07 60 00 08/23 FLASHING AND SHEET METAL
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/23 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS
08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS
08 34 16.10 11/21, CHG 1: 08/24 HORIZONTAL ROLLING STEEL DOORS
08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 60 45 08/20 TRANSLUCENT PANELS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 06 00 08/22 SCHEDULES FOR FINISHES
09 22 00 08/24 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/24 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 67 23.16 02/21 FUEL RESISTIVE RESINOUS FLOORING,
5-COAT SYSTEM
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 69 13 11/15, CHG 1: 08/18 RIGID GRID ACCESS FLOORING
09 72 00 08/17, CHG 1: 08/18 WALLCOVERINGS
09 90 00 02/21 PAINTS AND COATINGS
09 97 13.27 02/21, CHG 1: 08/22 HIGH PERFORMANCE COATING FOR STEEL
STRUCTURES
PROJECT TABLE OF CONTENTS Page 2
DIVISION 10 - SPECIALTIES
10 14 00.20 08/20 INTERIOR SIGNAGE
10 22 39 08/20 FOLDING PANEL PARTITIONS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 08/24 LOCKERS
DIVISION 11 - EQUIPMENT
11 24 26.13 10/20 RIGID RAIL FALL PROTECTION SYSTEMS FOR
AIRCRAFT HANGARS
11 81 29 05/20 FACILITY FALL PROTECTION
DIVISION 12 - FURNISHINGS
12 24 13 08/20 ROLLER WINDOW SHADES
12 48 13 08/23 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 - PLUMBING
22 00 00 05/24 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
22 15 19.19 20 05/11 NONLUBRICATED ROTARY SCREW AIR
COMPRESSORS (100 HP AND LARGER)
22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE
(SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 15 05/22, CHG 2: 08/24 COMMON PIPING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 08/24 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00 05/23, CHG 1: 08/24 COMMISSIONING OF MECHANICAL AND
PLUMBING SYSTEMS
23 09 00 08/24 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 08/24 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 21 23 08/17 HYDRONIC PUMPS
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 52 00 04/08, CHG 5: 11/19 HEATING BOILERS
23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09, CHG 7: 02/24 CHILLED, CHILLED-HOT, AND CONDENSER
PROJECT TABLE OF CONTENTS Page 3
WATER PIPING SYSTEMS
23 81 00 05/24 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 08/24 CYBERSECURITY FOR MODERATE IMPACT FIRE
PROTECTION SYSTEMS
25 05 11.02 08/24 CYBERSECURITY FOR MODERATE IMPACT HVAC
CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 73 08/23 POWER SYSTEM STUDIES
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 24 13 08/21 SWITCHBOARDS
26 27 13.10 30 10/07, CHG 2: 08/18 ELECTRIC METERS
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 35 43 08/21, CHG 1: 05/24 400-HERTZ (HZ) SOLID STATE FREQUENCY
CONVERTER
26 41 00 08/23 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/23 EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 63 26 08/08 DRILLED CAISSONS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 11.51 11/23 PAINT REMOVAL FROM AIRFIELD PAVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 13.13 11/19 LIME TREATED SUBGRADE
32 11 20 05/22 BASE COURSE FOR RIGID
32 11 23 05/22 GRADED CRUSHED AGGREGATE BASE COURSE
FOR FLEXIBLE PAVING
32 11 23.23 08/22 BASE COURSE DRAINAGE LAYERS
32 12 13 05/24 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 11/20, CHG 1: 05/22 ASPHALT PAVING FOR AIRFIELDS
32 13 14.13 11/22, CHG 1: 05/24 CONCRETE PAVING FOR AIRFIELDS AND
OTHER HEAVY DUTY PAVEMENTS
32 13 73.19 11/19 COMPRESSION CONCRETE PAVING JOINT
SEALANT
PROJECT TABLE OF CONTENTS Page 4
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 92 19 08/17, CHG 1: 08/21 SEEDING
DIVISION 33 - UTILITIES
33 11 00 08/24 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 32 16 11/19, CHG 1: 11/23 PACKAGED UTILITY WASTEWATER PUMPING
STATIONS
33 40 00 11/21 STORMWATER UTILITIES
33 46 16 05/18 SUBDRAINAGE PIPING
33 51 15 08/19 NATURAL-GAS DISTRIBUTION PIPELINES
33 61 14 02/10 EXTERIOR BURIED PREINSULATED WATER
PIPING
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.15 11/22, CHG 1: 02/23 BRIDGE CRANES, OVERHEAD ELECTRIC,
UNDER RUNNING TROLLEY
41 22 23.19 05/20 MONORAIL HOISTS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
SECTION 01 11 00
SUMMARY OF WORK
02/24
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Salvage Plan ; G, [_____]
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes the construction of the Bomber Agile Common Hangar (BACH) [_____] and incidental related work.
1.1.2 Location
The work is located at the Tinker Air Force Base (AFB), Oklahoma [_____] , approximately as indicated. The exact location will be shown by the Contracting Officer.
1.2 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract.[ Occupancy notifications will be posted in a prominent location in the work area.]
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
[ 1.2 EXISTING WORK
Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
] 1.3 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with
SECTION 01 11 00 Page 1
Installation requirements for locating and marking underground utilities.[ Contact local utility locating service a minimum of [48 hours][_____] prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday.] Verify existing utility locations indicated on contract drawings, within area of work.
[ Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground[, pier deck] or paved surface where existing underground utilities [or utilities encased in pier structures ]are discovered.
Verify the elevations of existing piping, utilities,and any type of underground [or encased ]obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
] 1.3.1 Notification Prior to Excavation
Notify the Contracting Officer at least [48 hours][15 days][_____] prior to starting excavation work.
[ 1.4 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
The Government will furnish the following materials and equipment for installation by the Contractor:
DESIGNATION NO. DESCRIPTION QUANTITY
Quantities indicated for the above-listed items marked with an asterisk are estimates. It is the intention of the Government to furnish all quantities of the asterisk items required to complete the work as specified, and the various quantities will be adjusted when necessary.
Quantities stated for the above items not marked with an asterisk are all that will be furnished by the Government. Provide any additional quantities that are required.
1.4.1 Delivery Schedule
[ Notify the Contracting Officer in writing at least [_____] calendar days in advance of the date on which the materials and equipment are required.
Pick up materials and equipment no later than 30 calendar days after such date. When materials and equipment are not picked up by the 30th day, the Contractor will be charged for storage at the rate of [_____] per 100 [pounds][cubic feet] per month or fraction thereof.
][ Materials and equipment will be available on or after [_____] calendar days after the award of contract.
] 1.4.2 Delivery Location
The materials and equipment[ are located at [_____]] [are located within [_____] miles of the jobsite] [will be delivered to [_____]][ the salvage
SECTION 01 11 00 Page 2 receiving point [_____]].
][ 1.5 GOVERNMENT-INSTALLED WORK
] 1.6 NAVY AND MARINE CORPS INTRANET (NMCI) COORDINATION REQUIREMENTS
1.6.1 NMCI Contractor Access
Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections.
Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NMCI Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.
1.7 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the [Government designated] storage area located within [_____] miles of the construction site.
Provide a salvage plan , listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Provide a system for property control in the salvage plan. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 3
SECTION 01 14 00
WORK RESTRICTIONS
11/22, CHG 3: 08/24
PART 1 GENERAL
[ 1.1 DEFINITIONS
1.1.1 State
"State" when used in reference to states of the United States also includes the Territory of Guam.
] [ 1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Meal Signature Record Book (MSRB)
Dining And Lodging Requirements
Housing Plan
Medical Plan
Contractor Regulations
Transportation of Personnel, Materials, and Equipment
Purchase Orders
List of Contact Personnel
Personnel List
Entry Approval for Employees ; G , [_____]
SD-07 Certificates
3Rs Explosive Safety Education Training Certificate (annual submission required)
[ Proof of IMD Ordnance Work Authorization ; G , [_____]
] ][ 1.2 SPECIAL SCHEDULING REQUIREMENTS
a. [_____] must be ready for operation as approved by Contracting Officer before work is started on [_____] which would interfere with normal operation.
SECTION 01 14 00 Page 1
b. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work. Specific items of work to which this requirement applies include:
(1) [_____]
(2) [_____]
c. The [_____] will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
d. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of [15] [_____] calendar days prior to the desired date of interruption.
[ e. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.
The following conditions apply:
(1) [_____]
(2) [_____]
[ f. Restricted Access Areas. The Government will monitor work in areas[ listed below][ indicated]. Notify Contracting Officer at least 14 calendar days prior to starting work in these areas.
] ] 1.2 GENERAL TINKER AIR FORCE BASE WORK REQUIREMENTS
Comply with the requirements listed here and attached GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE provided at the end of this section. Coordinate with the Contracting Officer in case of conflict.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. [ Ingress and egress of Contractor vehicles at the Activity is limited to the H-3 gate.][ To minimize traffic congestion, delivery of materials must be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the Contracting Officer.] Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors
SECTION 01 14 00 Page 2 including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
[ 1.3.1.2 Additional Personnel Requirements
[ 1.3.1.2.1 General Construction and Finish Work
General construction and finish work of the [secure area][controlled area][_____] must be performed by U.S. firms using U.S. citizens[ or U.S.
persons]. General construction includes construction activities such as [building sitework, utilities, foundations, structure, and ]enclosure or shell, including doors, windows and façade work. Finish Work includes construction activities such as insulation, floor, partition, and ceiling systems; cabinet work; conveyor systems; specialties; building furnishings, fixtures, and equipment; and mechanical and electrical services and equipment including those specialized for fire protection, security, communication, control, energy conservation, safety, comfort, convenience, and similar purposes.
[ 1.3.1.2.2 General Construction
General construction of the [secure area][controlled area][_____] must be performed by U.S. firms using U.S. citizens. General construction includes construction activities such as [building sitework, utilities, foundations, structure, and ]enclosure or shell, including doors, windows and façade work. Utility work that penetrates the [secure area][controlled area][_____] and installation of doors in these areas are not general construction.
][ 1.3.1.2.3 Finish Work
Finish Work within the [secure area][controlled area][_____] must be accomplished by [U.S. SECRET-cleared][U.S. TOP SECRET-cleared] personnel.
Finish Work includes construction activities such as insulation, floor, partition, and ceiling systems; cabinet work; conveyor systems;
specialties; building furnishings, fixtures, equipment; and mechanical and electrical services and equipment including those specialized for fire protection, security, communication, control, energy conservation, safety, comfort, convenience, and similar purposes.
][ 1.3.1.2.4 Electronic Security Systems Equipment
Electronic Security Systems equipment such as processing control units, workstations, field panels, sensors, high security locks, card readers, cable installation, and system programming, testing and training must be performed by [U.S. citizens who have been subjected to a trustworthiness determination] [U.S. companies using U.S. citizens who have been subjected to a trustworthiness determination] [[U.S. companies using U.S. TOP SECRET-cleared personnel] [U.S. companies using U.S. SECRET-cleared personnel]].
] ] 1.3.1.3 Installation Access
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at
SECTION 01 14 00 Page 3 https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .
No fees are associated with obtaining a DBIDS credential.
Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.
1.3.1.3.1 Registration for DBIDS
Registration for DBIDS is available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .
Procedure includes:
a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
1.3.1.3.2 DBIDS Eligibility Requirements
Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.
The Government is the final authority.
1.3.1.3.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
SECTION 01 14 00 Page 4
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
1.3.1.3.4 One-Day Passes
Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
1.3.1.4 NCACS Identification Badges and Installation Access
Application for and use of badges will be as directed. Obtain access to the installation by participating in the Navy Commercial Access Control System (NCACS), or by obtaining passes each day from the Base Pass and Identification Office. Costs for obtaining passes through the NCACS are the responsibility of the Contractor. One-day passes, issued through the Base Pass and Identification Office, will be furnished without charge.
Furnish a completed EMPLOYMENT ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9) [____ ]. Immediately report instances of lost or stolen badges to the Contracting Officer.
a. NCACS Program: NCACS is a voluntary program in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to one year, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit.
The Government performs background screening and credentialing.
Throughout the year the Contractor employee will continue to meet background screening standards. Periodic background screenings are conducted to verify continued NCACS participation and installation access privileges. Under the NCACS program, no commercial vehicle inspection is required, other than for Random Anti-Terrorism Measures (RAM) or in the case of an elevation of Force Protection Conditions (FPCON). Information on costs and requirements to participate and enroll in NCACS is available at http://www.rapidgate.com or by calling 1-877-727-4342. Contractors should be aware that the costs incurred to obtain NCACS credentials, or costs related to any means of access to a Navy Installation, are not reimbursable. Any time invested, or price(s) paid, for obtaining NCACS credentials will not be compensated in any way or approved as a direct cost of any contract with the Department of the Navy.
b. One-Day Passes: Participation in the NCACS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation.
The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the NCACS.
[ 1.3.1.5 Additional Badge Requirements - NAS Patuxent River
Identification badges will be issued to the Contractor and his employees in accordance with the Naval Air Station Security Regulations. A copy of
SECTION 01 14 00 Page 5 the security regulations may be obtained from the security office. All badges must be returned or accounted for to the department of Public Safety's Pass and Identification Office upon expiration of the badge or contract, or termination of the employee.
] [ 1.3.1.6 Employee List
The Contractor must provide to the Contracting officer, in writing, the names of two designated representatives authorized to request personnel and vehicle passes for employees and subcontractor's employees prior to commencement of work under this contract. The Contractor must adhere to the requirements of "Important Clarifications - Contractors - How to Gain Access," dated 31 October 1995, in obtaining access to the Naval Air Station complex for the life of the contract. A copy of these requirements will be provided at the preconstruction meeting.
] [ 1.3.1.7 Personnel Entry Approval
Failure to obtain entry approval will not affect the contract price or time of completion.
] 1.3.1.2 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
[ 1.3.2 Emergency Response Requirement
The Norfolk Naval Shipyard has instituted a requirement for all personnel to take shelter for personal safety in the event of certain emergencies.
This policy includes Contractors, Subcontractors, and any person who is employed by the Contractor.
The most appropriate protective action for certain emergencies is to take shelter. Personnel must immediately seek shelter while an assessment is made of the threat and determinations are being made regarding subsequent actions such as "all clear" or selected building evacuations. The following procedures have been put in place in the event of an emergent condition.
1. NOTIFICATION: The primary means of alerting personnel will be emergency alert signals. The alerting signal to seek shelter will be three steady tones that last for thirty seconds separated by ten seconds of silence. The notification for "all clear" will be three short tones repeated three times.
2. SHELTERING: When personnel hear the alert signal, the area of work must be secured in a manner that will leave the site in safe condition. Personnel must seek shelter in the nearest occupied building in calm and orderly manner. If possible, secure all windows and doors and shut off ventilation. If working aboard ship, proceed into the interior of the ship and wait for further directions from official personnel. If in a vehicle, park the vehicle so that it does not block the normally traveled portion of the road and proceed into the nearest occupied building.
SECTION 01 14 00 Page 6
3. EVACUATION: In the event of an evacuation, personnel will receive directions from team members of the Crowd Control Center (CCC) or the building custodian acting on the directions from the CCC. Contract personnel must comply with instructions given at all times.
] [ 1.3.3 Shipyard Regulations
Ensure that Contractor personnel employed on the Shipyard become familiar with and obey Shipyard regulations. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment must be conspicuously marked for identification.
Comply with the following conditions:
a. Restrict employees/representatives to the work site and control travel directly to and from the work site .
b. Restore all traffic/parking/security signs and markings, including space numbers, designations, and lines, to their original form if such signs/markings are defaced or deleted during construction/repair.
c. Be responsible for control and security of Contractor-owned equipment and materials at the work site. Report immediately missing/lost/stolen property to the Shipyard Police Department (phone 396-7266) as each case occurs.
d. Ensure that no material is stacked within 10 feet of the Controlled Industrial Area (CIA) perimeter. Remove from the work site, or secure ladders or other such equipment which could be used to climb the CIA perimeter fence. Ensure that no vehicles are parked within 10 feet of the CIA perimeter.
e. Ensure that no openings in the roof/walls/windows/fence of the building exist at the end of the workday and do not exist where penetration is possible during non-working hours. If the building cannot be secured at the end of the workday, coordinate action with the Contracting Office to notify the cognizant code to arrange for a security watch by their personnel.
f. Seventy-two hours prior to making any penetrations (such as tunneling under, cutting through a fence or building) in a restricted area, contact the Shipyard Security Office to make arrangements for a security guard or other measures required to meet all security requirements. Cost of security guard will be charged to the Contractor.
] 1.3.4 Entry to Radiologically Controlled Areas
Contractor personnel must not, under any circumstances, enter a radiologically controlled area or cross any posted radiological boundary.
This paragraph applies to all phases of contract work. Radiation areas are posted with signs consistent with OSHA requirements. Ensure that employees are familiar with the radiation signs and symbols. All personnel entering the shipyard for the first time are required to receive radiological indoctrination training.
Should contract workers encounter radiological postings or boundaries which appear to limit their ability to access or carry out their intended
SECTION 01 14 00 Page 7 work, they must notify their contract administrator for resolution of the problem.
1.3.4.1 Radioactive Materials and Equipment
All testing equipment, containing a radioactive source, must be operated in accordance with an approved radioactive equipment plan. This plan must be submitted to the Contracting Officer and approved by the Radiation Officer (Code 105.5), prior to bringing the equipment into the shipyard.
This plan must include:
a. The name and type of equipment.
b. The type and size of radiation source.
c. The dates and locations of the equipment's usage.
d. The radiological controls that the Contractor will use while operating the equipment.
A different radioactive equipment plan will be required for each different type of equipment, type of radioactive source, or size of radioactive source. A data sheet of for each piece of new radioactive equipment must be submitted to the Contracting Officer to forward to the shipyard's Radiation Safety Officer. The data sheet must contain the following information:
a. Name of equipment.
b. Name and address of equipment manufacturer.
c. Type and size of radiation source.
d. The location of the installed radioactive equipment (i.e. building no., floor, code/shop area).
1.3.2 Working Hours
Regular working hours will consist of an [8 1/2 hour] [ 9[_____] hour ] period [established by the Contracting Officer] , between [ 7 a.m. and 34: 30 0 p.m., ] [[_____] a.m. and [_____] p.m.,] [ Monday through Friday ] [[_____] through [_____]], [and 7 a.m. to 3:30 p.m. on Saturday] [[_____] a.m. and [_____] p.m. on Saturday] , excluding Government holidays.
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application [ 15] 21 [_____] calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours.
During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. [ Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise. ]
SECTION 01 14 00 Page 8
[ 1.3.4 Exclusionary Period
No work may be performed during the period [_____] to [_____], inclusive, without prior written approval of the Contracting Officer. This period has not been considered in computing the time allowed for the performance of this contract.
] [ 1.3.5 Occupied and Existing Building[s]
The Contractor shall be working [in an existing building] [around existing buildings] which [is][are] occupied.[ Do not enter the building[s] without prior approval of the Contracting Officer.]
[ The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.
][ Provide dust covers or protective enclosures to protect existing work that remains, and Government material located in the [_____] during the construction period.
] [Relocate movable furniture [approximately [6 feet] [_____] away from the Contractor's working area] [as required to perform the work], protect the furniture, and replace the furniture in [its] [their] original location[s] upon completion of the work.][ Leave attached equipment in place, and protect [it] [them] against damage, or temporarily disconnect, relocate, protect, and reinstall [it] [them] at the completion of the work.]
[ The Government will remove [and relocate] other Government property in the areas of the building[s] scheduled to receive work.
] ] 1.3.4 Utility Cutovers and Interruptions
a. Perform all cutovers and interruptions in accordance to the PLANNED AND EMERGENCY OUTAGES STANDARD OPERATING PROCEDURES attached at the end of this section.
ab. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
bc. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
cd. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air , and [_____] are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. [ Such interruptions are further limited to [_____] hours. This time limit includes time for deactivation and reactivation.]
[ de. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
SECTION 01 14 00 Page 9
e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain.[ Obtain Installation's Sanitary Sewer Connection Permit[ 2 weeks][ _____] prior to connection and in accordance with Section 33 30 00 SANITARY
SEWERAGE.]
[ 1.3.5 Shipyard Area Work Clearance Request
Coordinate excavation and electrical work, including testing and troubleshooting of circuits, within the NAVFAC Hawaii Utilities Management (UM) and PHNSY&IMF via the Contracting Officer. Furnish the:
a. Contract title and number
b. Specific location of work
c. Reason for work
d. Duration of work
[ 1.3.5.1 Shipyard Hazardous Areas
Do not enter into work areas where Shipyard personnel are using protective equipment such as respirator and masks or marked boundary areas without prior approval.
] ] [ 1.3.6 Restrictions on Use of Yellow[, Orange-Yellow, Red, and Magenta] Materials
[ Contractor must refrain from use of yellow or orange-yellow materials for the following purposes: sheeting, tarpaulins, polyethylene bottles or other containers, tapes, bags, banding of identification marks on tools, boundary markers such as ribbons. Contractor generated yellow waste materials such as torn foul weather gear must be disposed of by the Contractor off-yard. Shipyard dumpsters and trash cans must not be used for disposal of Contractor generated yellow waste materials. Yellow colored items such as described above are of specific significance within the shipyard and are subject to strict controls.
[ The use of yellow, yellow-orange, red and magenta materials for the following purposes is prohibited: sheeting, tarpaulins, polyethylene bottles or other containers, tapes, bags, banding of identification marks on tools, and boundary markers such as ribbons. Obtain Contracting Officer's prior approval for use of such colored materials for other purposes, such as buried vapor barrier membranes.
] ] 1.3.5 Material and Equipment Delivery
[Prior to accessing the site, all trucks must be inspected and approved for entry at the Tinker AFB main truck gate. Once approved for entry, the truck will be provided an allotted timeframe to reach the construction site.]
1.4 OTHER CONTRACTORS
Other Contractors may be working in the project area during construction
SECTION 01 14 00 Page 10 under this contract. The Contractor shall arrange and perform his work and store his materials in cooperation with other Contractors and as directed by the Contracting Officer.
[ 1.5 QUANTITY SURVEYS (APR 1984) (FAR 52.236-16)
1.5.1 General
Quantity surveys must be conducted, and the data derived from these surveys shall be used in computing the quantities of work performed and the actual construction completed and in place.
1.5.2 Conducting Surveys and Computations
Conduct the original and final surveys and surveys for any periods for which progress payments are requested. All these surveys must be conducted under the direction of a representative of the Contracting Officer, unless the Contracting Officer waives this requirement in a specific instance. Make the computations based on the surveys for any periods for which progress payments are requested. The Government will make such computations as are necessary to confirm the quantities of work performed or finally in place.
1.5.3 Survey Procedure
Select appropriate instrumentation and procedures to obtain the precision requirements necessary to meet or exceed Third Order Accuracy standards.
Total Station or GPS will be considered appropriate for performing the survey. Use a field crew experienced in performing the surveys as outlined in the scope of work and capable of responding to and completing work assignments within the critical time schedules allotted for this project. The standard 4 3/4-inch by 7 1/2-inch hardback field book shall be used. The party setup, weather conditions, and date shall be entered at the top of the page for each workday. The original notebook shall be turned in at the completion of the work and shall become the property of the Government. If electronic distance measuring devices and data collectors are used, the hard copy notes shall be provided with X, Y, Z coordinates of the survey data recorded at right angles to established base lines. It is also required that in addition to cross section lines that all breaklines are located and provided as X, Y, Z values and appropriately identified. A digital files in X, Y, Z format shall be provided for all data collected. All natural ground elevations shall be located to the nearest 0.1 foot and hard surfaces to the nearest 0.01 foot.
1.6 LAYOUT OF WORK (APR 1984) (FAR 52.236-17)
Lay out work from Government-established base lines and bench marks indicated on the drawings and make all measurements in connection with the layout. Furnish all stakes, templates, platforms, equipment, tools, and materials and labor required to lay out any part of the work. Execute the work to the lines and grades that may be established or indicated by the Contracting Officer. Maintain and preserve all stakes and other marks established by the Contracting Officer until authorized to remove them.
If such marks are destroyed by the Contractor before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from the Contractor.
SECTION 01 14 00 Page 11
1.7 MONUMENT REPLACEMENT
1.7.1 General
Government-established horizontal and vertical control monuments that are shown on the drawings, if destroyed shall be reestablished by the Contractor in locations as directed by the Contracting Officer. Control points set by the Contractor for the purpose of reestablishing the monuments and to properly control the work, if destroyed and not reset by the Contractor, it shall be reestablished by the Government at the Contractor's expense. Survey shall be performed by a Registered Land Surveyor.
1.7.2 Horizontal Control
Horizontal control shall be based on the State Plane Coordinate System as developed by the National Geodetic Survey. Horizontal control shall originate and close on control points established by the Government.
1.7.3 Vertical Control
Elevations shall originate and close on vertical controls established by the Government. Third Order Accuracy or better shall be maintained for all vertical survey control. Vertical error shall be adjusted for all control markers established throughout each level loop. A transcript of all adjusted vertical marks set and adjusted horizontal marks set, shall be furnished on forms furnished by the Government (SWD Form 598).
1.7.4 Monuments
Concrete monuments shall be set as control monuments, where required.
Horizontal data for monuments is based on NAD 27, and vertical data is based on NGVD 29 in US feet. The monuments shall consist of 6-inch -diameter concrete posts of standard mix and a Government-furnished bronze disk flush with top, set at least 2.6 feet into solid ground and 0.4 foot above the ground surface. A No. 4 18-inch reinforcing bar shall be cast in the top portion of the monument. Each monument shall be identified by stamping the bronze disk with steel dies, indicating thereon the name of the site and number of the monument. A Government-furnished galvanized U-channel rail steel delineator post, 6.5 feet in length with a USCE sign attached shall be set in concrete within 1 foot of each control monument.
Markers which fall in roads or improved areas shall be either buried or a disk set flush in pavement, whichever may be appropriate to the situation. Control monuments shall be referenced by chain distance and angle to at least three objects, such as blazed trees, crosses in solid rock, or other physical features in the immediate vicinity.
1.5 SECURITY REQUIREMENTS
Meet the security requirements provided in the GENERAL REQUIREMENTS FOR CONSTRUCTION ON TINKER AIR FORCE BASE provided at the end of this section.
[ Contract Clause FAR 52.204-2 Security Requirements and Alternate II and the following apply:
SECTION 01 14 00 Page 12
] [ 1.5.1 Naval Air Station (NAS), Patuxent River, MD
Foreign Nationals: The Contractor is responsible for notifying the Contracting Officer, at least five days in advance, of any foreign nationals coming into a restricted area so that proper clearance and escort procedures may be initiated.
][ 1.5.2 Naval Observatory(NOBSY), Washington, DC, Quarters "A"
Provide full name, date of birth, and social security number of all employees and representatives of the Contractor who need access to the Quarters "A" compound to the Contracting Officer at least 7 days in advance of the date on which access is desired. The Contractor will be advised should any of the proposed employees not meet security requirements for access to the Quarters "A" compound. For individual cases, access to the Quarters "A" compound can occasionally be obtained with a 4-hour advance notice; however, the Contracting Officer reserves the right to utilize the full 7 days should he determine it necessary.
[ a. Personal identification: Before entering the Quarters "A" compound, all persons must furnish personal identification and receive a badge furnished by the Government. Badges must be worn so they are clearly visible at all times. Return badges to the issuing office when leaving the Quarters "A" compound.
][ b. Security processing: Allow for a processing period of [15] [_____] minutes as employees enter the Quarters "A" compound at the beginning of each workday. All materials entering or in the Quarters "A" compound will be subject to search.
] ][ 1.5.3 Naval Surface Warfare Center (NSWC), Dahlgren, VA
A copy of the security regulations may be obtained from the security office of the station.
][ 1.5.4 Naval Surface Warfare Center (NSWC), Indian Head, MD
No employee or representative of the Contractor will be admitted to the work site unless he furnishes satisfactory proof that he is a citizen of the United States or is specifically authorized admittance by the OICC.
a. Identification Badges - A list of all employees to be engaged in the performance of work must be furnished to the Security Department. In the event employees are hired or discharged, a corrected list of employees must be furnished reflecting the change in personnel.
Identification badges for the Contractor and his employees will be furnished by the Security Department, Indian Head Division, Naval Surface Warfare Center, Indian Head, MD. Immediately report instances of lost or stolen badges to the Contracting Officer. Upon completion of the contract or termination of the service of any employee, the Contractor must return the badges to the Security Pass Office.
Compliance with this requirement is mandatory and certification thereof to the Contracting Officer is required prior to submitting final invoices. Failure to return badges will hold up Contractor's final payment.
b. Vehicles and Equipment - In addition to other conditions and requirements set forth hereinbefore, attention is invited to the fact that vehicles and equipment admitted to the Indian Head Division, SECTION 01 14 00 Page 13
Naval Surface Warfare Center, Indian Head, MD will be required to meet standards established be the Station Safety Department. The vehicular and equipment conditions must satisfactorily meet the following provisions:
(1) Steering mechanism must be satisfactory and safe condition.
(2) Horns and warning devices must be operable.
(3) Windshield wipers must be satisfactory in place, clean and unbroken.
(4) Rearview mirrors must be satisfactory in place, clean and unbroken.
(5)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .