RFI II - Section III.pdf

PDF 252 KB Posted

Attached to
T-6A Avionics System Replacement Request For Information (RFI)
Solicitation number
WLDW1
Issued by

View the file

Other files

File Type Posted
Pre-Soliciation Conference Industry Questions-Responses_Part VII.pdf PDF
LOI ACA Update.pdf PDF
T-6A ARP Section L- Instructions to Offerors_31 Oct.pdf PDF
T-6A ARP Section M- Evaluation Factors for Award_31 Oct.pdf PDF
STC Clarification.pdf PDF
Pre-Soliciation Conference Industry Questions-Responses_Part VI.pdf PDF
RFI_LOI_ACA.pdf PDF
RFI_Incentive Plan.pdf PDF
Pre-Soliciation Conference Industry Questions_Responses_Part V.pdf PDF
Pre-Soliciation Conference Industry Questions-Responses_Part IV.pdf PDF
Pre-Soliciation Conference Industry Questions-Responses_Part III.pdf PDF
T-6A_ARP_SOW_20Sep22_DRAFT.pdf PDF
T-6A_ARP_SectionM-EvaluationFactorsForAward_15Sep.pdf PDF
LIST_OF_ATTACHMENTS_20 Sep 22.pdf PDF
ARP_Incentive_v18_16-Sep-22.pdf PDF
ARP_CDRL_NSP_DRAFT_PACKAGE_14Sep2022.pdf PDF
T6A_ARP_Pricing_Matrix_DRAFT_20Sep22-PROTECTED.xlsx XLSX spreadsheet
FA810622R0004_DRAFT II.pdf PDF
T-6A_ARP_SectionL_InstructionsToOfferors_15Sep.pdf PDF
Pre-Solicitation Conference Industry Questions-Responses Part II.pdf PDF
RFI IV - ARP SRD Due NLT 8Aug22.pdf PDF
DRAFT RFP FA8106-22-R-0004_1 August 2022.pdf PDF
Pre-Solicitation Conference Industry Questions-Responses.pdf PDF
ATTACH - List of Attachments Draft (Updated 25 July 2022).pdf PDF
ATTACH - T-6 ARP Section L Draft_25 July 2022.pdf PDF
DRAFT RFP FA8106-22-R-0004_25 July 2022.pdf PDF
ATTACH - T-6 ARP Section M Draft_25 July 2022.pdf PDF
Pre-Solicitation Conferencce 11 July 20 FINAL.pdf PDF
ATTACH - List of Attachments Draft (Updated 12 July 2022).pdf PDF
Pre-Solicitation Conference Registration Form.pdf PDF
ATTACH - List of Attachments Draft.pdf PDF
ATTACH - T-6 ARP Section L Draft.pdf PDF
APPENDIX B - T-6A ARP Pricing Matrix Draft.xlsx XLSX spreadsheet
DRAFT RFP FA8106-22-R-0004.pdf PDF
ATTACH - List of Attachments Draft.pdf PDF
ATTACH - T-6 ARP Section M Draft.pdf PDF
APPENDIX A - T-6A ARP SOW Draft.pdf PDF
ATTACH - ARP Incentive Fee Plan Draft.pdf PDF
RFI III - Section II HUD Rev1 Due NLT 18May22.pdf PDF
RFI III - Section I ARP Due NLT 18May22.pdf PDF
RFI III - Section II HUD Due NLT 18May22.pdf PDF
RFI III - Section I ARP Due NLT 11May22.pdf PDF
RFI II - Section IV - Ver2.pdf PDF
RFI II - Section IV.pdf PDF
T-6A ARP Industry Day Brief 7_Mar_22_Final.pdf PDF
RFI II - Section IV.pdf PDF
Registration Form_ARP Ind_Day_3_7_2022_Final.pdf PDF
RFI II - Section III.pdf PDF
Nov Industry Questions (Gvt Response Nov 2021).pdf PDF
T-6A ARP RFI II.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 February 2022

Request for Information (RFI) II

Avionics Replacement Program (ARP)

The purpose of this RFI is to request responses to the following sets of questions.

Section III

(Responses due on or before 12:00 pm CST on 4 February 2022)

1. Does your company intend to be the Prime for T-6 ARP? YES / NO

2. Does your company intend to be the Prime Integrator for T-6 ARP? YES / NO

3. Does your company intend to be only a Sub-Contractor for T-6 ARP? YES / NO

4. To be considered as a capable source for the purposes of this RFI, a copy of the T-6 ARP

Letter of Intent (LOI) between your company and Textron Aviation Defense (OEM) must be provided.

Note: A copy of the LOI is requested for any vendor interested in being the Prime or Prime Integrator.

Please submit the LOI via email to Welth.Cooper@us.af.mil and Gale.Vandeventer@us.af.mil.

5. Please list controls that are exclusively by touch and have no redundant entry if the pilot is unable to use touch control.

6. Are customizations for displayed data included in the TSO issued for the avionics computer performing the function? Does this include the change for requirement in ARP Systems Requirements Document (SRD) paragraph 3.6.1.1?

For Reference: 3.6.1.1 Electronic Attitude Director Indicator (EADI) Unusual Attitude Symbology The installed system shall change the eyebrow color on the ADI from black to red when passing through 25 degrees of pitch.”

7. With Prime Item Product Function Specification (PIPFS) now provided, reply with any updates to ARP Systems Requirements Document (SRD) Industry Survey Matrix v2 on TBD-PIPFS requirements.

DEPARTMENT OF THE AIR FORCE

AIR FORCE LIFE CYCLE MANAGEMENT CENTER

TINKER AIR FORCE BASE OKLAHOMA

mailto:Welth.Cooper@us.af.mil mailto:Gale.Vandeventer@us.af.mil

8. What is TRL for Large Area Displays (LAD) exampled in your response to Section II, Question 9?

For Reference: Section II Question 9. Regarding Large Area Displays; what Mean Time Between Failure (MTBF), environmental specifications, Solar exposure, Repair Turn Around Time, drop, shock, and impact can your company's products meet?

Please provide responses to RFI II – Section III questions via email to Welth Cooper at Welth.Cooper@us.af.mil and Gale Vandeventer at Gale.Vandeventer@us.af.mil on or before 12:00 pm CST on Friday, 4 February 2022.

Note: Gregory Benjamin has moved to a new position. Please do not send questions and/or inquiries to Gregory Benjamin.

mailto:Welth.Cooper@us.af.mil mailto:Gale.Vandeventer@us.af.mil

File details come from the government source that posted it. Updated .