ATTACH - List of Attachments Draft (Updated 12 July 2022).pdf

PDF 107 KB Posted

Attached to
T-6A Avionics System Replacement Request For Information (RFI) Federal contract opportunity
Solicitation number
WLDW1
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to T-6A Avionics System Replacement Request For Information (RFI), newest first.
File Type Posted
LOI ACA Update.pdf PDF
T-6A ARP Section L- Instructions to Offerors_31 Oct.pdf PDF
Pre-Soliciation Conference Industry Questions-Responses_Part VI.pdf PDF
RFI_LOI_ACA.pdf PDF
RFI_Incentive Plan.pdf PDF
Pre-Soliciation Conference Industry Questions_Responses_Part V.pdf PDF
T-6A_ARP_SectionL_InstructionsToOfferors_15Sep.pdf PDF
FA810622R0004_DRAFT II.pdf PDF
ARP_Incentive_v18_16-Sep-22.pdf PDF
T-6A_ARP_SectionM-EvaluationFactorsForAward_15Sep.pdf PDF
LIST_OF_ATTACHMENTS_20 Sep 22.pdf PDF
ARP_CDRL_NSP_DRAFT_PACKAGE_14Sep2022.pdf PDF
Pre-Solicitation Conference Industry Questions-Responses Part II.pdf PDF
RFI IV - ARP SRD Due NLT 8Aug22.pdf PDF
Pre-Solicitation Conference Industry Questions-Responses.pdf PDF
DRAFT RFP FA8106-22-R-0004_1 August 2022.pdf PDF
DRAFT RFP FA8106-22-R-0004_25 July 2022.pdf PDF
Pre-Solicitation Conferencce 11 July 20 FINAL.pdf PDF
Pre-Solicitation Conference Registration Form.pdf PDF
ATTACH - List of Attachments Draft.pdf PDF
APPENDIX A - T-6A ARP SOW Draft.pdf PDF
ATTACH - T-6 ARP Section M Draft.pdf PDF
ATTACH - ARP Incentive Fee Plan Draft.pdf PDF
APPENDIX B - T-6A ARP Pricing Matrix Draft.xlsx XLSX spreadsheet
ATTACH - T-6 ARP Section L Draft.pdf PDF
ATTACH - List of Attachments Draft.pdf PDF
DRAFT RFP FA8106-22-R-0004.pdf PDF
RFI III - Section II HUD Rev1 Due NLT 18May22.pdf PDF
RFI III - Section I ARP Due NLT 18May22.pdf PDF
RFI III - Section I ARP Due NLT 11May22.pdf PDF
RFI III - Section II HUD Due NLT 18May22.pdf PDF
RFI II - Section IV - Ver2.pdf PDF
RFI II - Section IV.pdf PDF
T-6A ARP Industry Day Brief 7_Mar_22_Final.pdf PDF
RFI II - Section IV.pdf PDF
Registration Form_ARP Ind_Day_3_7_2022_Final.pdf PDF
RFI II - Section III.pdf PDF
RFI II - Section III.pdf PDF
Nov Industry Questions (Gvt Response Nov 2021).pdf PDF
T-6A ARP RFI II.pdf PDF
Preliminary ARP SRD Industry Survey Matrix v2.xlsx XLSX spreadsheet
T-6A ARP RFI II.pdf PDF
CFIT-P SRD T-6A_B 13MAR2020.pdf PDF
ARP hit list of Obsolete components.pdf PDF
ARP Industry Day Contractors.xlsx XLSX spreadsheet
T-6A Questions and Answers 3192021.pdf PDF
T-6A ARP Industry Day 20210319.pptx PPTX presentation
T-6A Avionics System (1-on-1 Meetings) signed.pdf PDF
T-6A Avionics Industry Day Registration Form.pdf PDF
T-6A Avionics System Replacement ARP RFI.pdf PDF
Show all 50

T-6A Avionics System Replacement Request For Information (RFI) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIST OF ATTACHMENTS*

(As of 12 July 2022)

APPENDICES/ATTACHMENTS TITLES NOMENCLATURE

Appendix A Statement of Work (SOW) T-6A ARP SOW Appendix B Pricing Matrix (Protected) Appendix C Contract Data Requirements List

(CDRLs) – Separately Priced CDRLs Separately Priced

Exhibit A, B, C (COMING SOON) Contract Data Requirements List (CDRLs) – Not Separately Priced

CDRLs Not Separately Priced

Attachment Section L Instructions, Conditions, and Notices to Respondents for Proposal Preparation Using Tradeoff Source Selection Procedures

Attachment Section M Evaluation Factors for Award Attachment Incentive Plan

*All documents are in draft form of the date of this release.

CONTROLLED DOCUMENTS**

**This solicitation contains the DFARS clause 252.204-7008, Compliance with Safeguarding Covered Defense Information Controls. In order to receive any technical data related to this acquisition, offerors must send an email request to Welth Cooper at Welth.Cooper@us.af.mil. Release of any data is subject to applicable data rights. The request shall include the applicable solicitation number, the specific data needed (including TO and/or drawing numbers), and a copy of the current, approved DD Form 2345.

The form, including instructions for completing the form, is available at:

https://www.esd.whs.mil/Directives/forms/ or https://www.esd.whs.mil/Portals/54/Documents/DD/forms/dd/dd2345.pdf. The Government is not responsible for incomplete, misdirected, or untimely requests.**

To access Controlled Documents:

1. Submit approved DD Form 2345 via email to Welth Cooper (Welth.Cooper@us.af.mil)

2. Ensure your company is registered on the Joint Certification Program (JCP) website at https://www.dla.mil/Logistics-Operations/Services/JCP/.

If assistance is needed with JCP, the Help phone number is 1-877-352-2255.

3. Once steps 1) and 2) above are completed, the DATA CUSTODIAN listed in DD Form 2345 Block 3 should request access to Controlled documents on www.SAM.gov. All other requesters will be rejected.

If assistance is needed with www.SAM.gov, the Help phone number is 1-866-606-8220.

*Please allow 5 business days for processing of each request.

mailto:Welth.Cooper@us.af.mil https://www.esd.whs.mil/Directives/forms/ mailto:Welth.Cooper@us.af.mil http://www.sam.gov/ http://www.sam.gov/

APPENDICES/ATTACHMENTS TITLES NOMENCLATURE

Attachment System Requirements Document

(SRD)

T-6A ARP SRD

Attachment Section L Engineering Tables (Protected)

Engineering Tables

Attachment Contract Data Requirements List (CDRLs) – Separately Priced

CDRLs Separately Priced

Attachment Prime Item Product Function Specification (PIPFS)

PIPFS

Attachment Operational Requirements Document ORD Attachment MIL-HDBK-516C Airworthiness

Certification Criteria

Attachment MIL-HDBK-516C Airworthiness Certification Criteria – Certification Basis and Compliance Report Template

Attachment HQ AFFSA White Paper: Primary Flight Reference Endorsement Process

Primary Flight Reference Endorsement Process

Attachment Avionics Replacement Program Crew Station Working Group Charter Version 1, dated 25 August 2021

Crew Station Working Group Charter

File details come from the government source that posted it. Updated .