APPENDIX B - T-6A ARP Pricing Matrix Draft.xlsx
XLSX spreadsheet 49 KB Posted
- Attached to
- T-6A Avionics System Replacement Request For Information (RFI) Federal contract opportunity
- Solicitation number
- WLDW1
View the file
Other files for this federal contract opportunity
Show all 50
T-6A Avionics System Replacement Request For Information (RFI) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Calculation Methodology T-6A Avionics Replacement Program (ARP)
| CLIN | Description | Calculation Methodology |
| 0001 | Aircraft Technology Maturation Risk Reduction (TMRR) | The proposed unit price per month for the Basic Period is multiplied by the evaluation quantity per Basic Period to establish the extended price for these CLINs. |
| 0002 | ATD Technology Maturation Risk Reduction (TMRR) | |
| 0003 | Long Lead Parts/Material - EMD (Insert Total Price from Tab CLIN 0003 Long Lead EMD) | The proposed unit price per Basic Period is multiplied by the proposed Quantity per Basic Period as applicable in the "CLIN 0003 Long Lead EMD" tab. The total price per Basic Period is entered into the T-6A ARP Pricing Matrix tab and multiplied by a quantity of 1 (one) per Basic Period to establish the extended total price for the Basic Period for this CLIN. |
| 0004 | Long Lead Parts/Material - Production Lot 1 (Insert Total Price from Tab CLIN 0004 Long Lead Prod Lot 1) | The proposed unit price per Basic Period is multiplied by the proposed Quantity per Basic Period as applicable in the "CLIN 0004 Long Lead Prod 1" tab. The total price per Basic Period is entered into the T-6A ARP Pricing Matrix tab and multiplied by a quantity of 1 (one) per Basic Period to establish the extended total price for the Basic Period for this CLIN. |
| 0005 | Virtual Prototype Delivery (Aircraft System) | Not Evaluated |
| 0006 | Aircraft Delivery Incentives, Preliminary Design Review (PDR) | |
| 0007 | Aircraft Engineering and Manufacturing Development (EMD) | The proposed unit price per month for the Basic Period is multiplied by the evaluation quantity per Basic Period to establish the extended price for these CLINs. |
| 0008 | T-2 Flight and Telemetry | The proposed unit price per Basic Period is multiplied by the evaluation quantity per Basic Period to establish the extended price for these CLINs. |
| 0009 | Physical Prototype and Mock-up Delivery (Aircraft) | |
| 0010 | Aircraft Delivery Incentives, Critical Design Review (CDR) | Not Evaluated |
| 0011 | Avionics System Integration Lab (ASIL) Delivery | The proposed unit price per Basic Period is multiplied by the evaluation quantity per Basic Period to establish the extended price for these CLINs. |
| 0012 | ASIL Testing and Government Acceptance Support (Aircraft) | |
| 0013 | First Article Kit Buy (Aircraft) - 3 Kit Buy | |
| 0014 | Prototype Installation/Delivery (Aircraft) | |
| 0015 | Aircraft Delivery Incentives, Technical Readiness Review (TRR) | Not Evaluated |
| 0016 | Developmental Testing Support (Aircraft) | The proposed unit price per Basic Period is multiplied by the evaluation quantity per Basic Period to establish the extended price for this CLIN. |
| 0017 | Virtual Prototype Delivery (ATD) | Not Evaluated |
| 0018 | ATD Delivery Incentives, Preliminary Design Review (PDR) | |
| 0019 | ATD Engineering and Manufacturing Development (EMD) | The proposed unit price per month for the Basic Period is multiplied by the evaluation quantity per Basic Period to establish the extended price for this CLIN. |
| 0020 | Kit Proof Install/Delivery (Aircraft) - 1 Kit | The proposed unit price per Basic Period is multiplied by the evaluation quantity per Basic Period to establish the extended price for this CLIN. |
| 0021 | Operational Testing Support | The proposed unit price per month for the Basic Period is multiplied by the evaluation quantity per Basic Period to establish the extended price for this CLIN. |
| 0022 | VAL/VER Install/Delivery (Aircraft) - 1 Kit | The proposed unit price per Basic Period is multiplied by the evaluation quantity per Basic Period to establish the extended price for these CLINs. |
| 0023 | Digital Twin Delivery (Aircraft) | |
| 0024 | Physical Prototype Delivery (ATD) | |
| 0025 | ATD Delivery Incentives, Critical Design Review (CDR) | Not Evaluated |
| 0026 | Aircraft Production Lot 1 Kit Buy (119 each) | The proposed unit price per Basic Period is multiplied by the evaluation quantity per Basic Period to establish the extended price for these CLINs/SubCLINs. |
| 0027 | ATD Modification Testing & Support (ATD) | |
| 0028 | Cadre ATD Modification Install/Delivery (ATD) | |
| 0029 | Aircraft Production Lot 1 Kit Installation (106 each) | |
| 0030 | ATD Production Lot 1 Kit Buy | |
| 0030AA | ATD Production Lot 1 Kit Buy (15 each) | |
| 0030AB | ATD Production Lot 1 Kit Buy (20 each) | |
| 0030AC | ATD Production Lot 1 Kit Buy (25 each) | |
| 0031 | ATD Production Lot 1 Kit Installation | |
| 0031AA | ATD Production Lot 1 Kit Installation (15 each) | |
| 0031AB | ATD Production Lot 1 Kit Installation (20 each) | |
| 0031AC | ATD Production Lot 1 Kit Installation (25 each) | |
| 0032 | Over and Above – Material Markup Rate (See Note 1 Below) | The proposed Material Markup Rate per Basic Period is multiplied by the Evaluation Material Dollars per Basic Period to establish the extended price for the Basic Period for this CLIN. |
| 0033 | Over and Above – Labor Rates (See Note 2 Below) | The proposed Hourly Labor Rate per Basic Period is multiplied by the Evaluation Labor Hours per Basic Period to establish the extended price for the Basic Period for this CLIN. |
| Mechanic - Regular | ||
| Mechanic - Overtime | ||
| Mechanic - Premium | ||
| Logistician - Regular | ||
| Logistician - Overtime | ||
| Logistician - Premium | ||
| Engineer - Regular | ||
| Engineer - Overtime | ||
| Engineer - Premium | ||
| 0034 | Travel G&A (See Note 1 Below) | The proposed Travel G&A Rate per Basic Period is multiplied by the Evaluation Travel Dollars per Basic Period to establish the extended price for the Basic Period for this CLIN. |
| 0035 | Data (Contract Data Requirements List) | The proposed unit price per Basic Period is multiplied by the evaluation quantity per Basic Period to establish the extended price for these SubCLINs. |
| 0035AA | CDRL A018 System Engineering Management Plan (SEMP) | |
| 0035AB | CDRL A019 System/Subsystem Specification (SSS) | |
| 0035AC | CDRL A023 Airworthiness Specification, Certification Basis | |
| 0035AD | CDRL A035 Technical Data Package (TDP) | |
| 0035AE | CDRL A049 Management Plan, Airworthiness | |
| 0035AF | CDRL A051 Commercial Derivative Aircraft (CDS) Airworthiness Certification | |
| 0035AG | CDRL A052 Airworthiness Certification Criteria Report, Compliance Report | |
| 0035AH | CDRL A060 Spectrum Certification Spectral Characteristics Data | |
| 0035AJ | CDRL A087 Digital System Model | |
| 0035AK | CDRL A088 Acquisition and Sustainment Data Package (ASDP) Product Engineering Design Data and Associated Lists (EDDAL) | |
| 0035AL | CDRL A089 Reliability and Maintainability (R&M) Block Diagrams and Mathematical Models Report | |
| 0035AM | CDRL A091 Reliability and Maintainability Predictions Report | |
| 0035AN | CDRL A093 Technical Report – Study/Services, Primary Flight Reference (PFR) Endorsement – Display Information Package | |
| 0035AP | CDRL A096 As Built Configuration List (ABCL) – Modified Item and Funding Source | |
| 0035AQ | CDRL A097 Open Systems Management Plan (OSMP). | |
| 0035AR | CDRL A105 Human Systems Integration Report | |
| 0035AS | CDRL A108 Training Materials | |
| 0035AT | CDRL A109 Department of Defense (DOD) Modeling and Simulation (M&S) Verification and Validation (V&V) Plan | |
| 0035AU | CDRL A110 Department of Defense (DOD) Modeling and Simulation (M&S) Verification and Validation (V&V) Report | |
| 0035AV | CDRL A117 Technical Manual Contract Requirements (TMCR) | |
| 0036 | Data (Contract Data Requirements List) - ATD | Not Evaluated |
| 0037 | Data (Contract Data Requirements List) - Aircraft System | Not Evaluated |
| TOTAL PRICE BASIC PERIOD | The sum of all CLINs/SubCLINs listed above equals the Total Price for the Basic Period |
| OPTION I and 6 Month Extension | ||
| CLIN | Description | Calculation Methodology |
| 1001 | Aircraft Production Lot 2 Kit Buy (121 each) | The proposed unit price per Option I and the 6 Month Extension is multiplied by the evaluation quantity per Option I and 6 month extension as applicable to establish the extended price for these CLINs for Option I and the 6 month extension. |
| 1002 | Aircraft Production Lot 2 Kit Install (120 each) | |
| 1003 | Aircraft Production Lot 3 Kit Buy (120 each) | |
| 1004 | Aircraft Production Lot 3 Kit Install (120 each) | |
| 1005 | Aircraft Production Lot 4 Kit Buy (81 each) | |
| 1006 | Aircraft Production Lot 4 Kit Install (95 each) | |
| 1007 | ATD Production Lot 2 Kit Buy | The proposed unit price per Option I and the 6 Month Extension is multiplied by the evaluation quantity per Option I and the 6 month extension as applicable to establish the extended price for these CLINs/SubCLINs for Option I and the 6 month extension. |
| 1007AA | ATD Production Lot 2 Kit Buy (15 each) | |
| 1007AB | ATD Production Lot 2 Kit Buy (20 each) | |
| 1007AC | ATD Production Lot 2 Kit Buy (25 each) | |
| 1008 | ATD Production Lot 2 Kit Install | |
| 1008AA | ATD Production Lot 2 Kit Install (15 each) | |
| 1008AB | ATD Production Lot 2 Kit Install (20 each) | |
| 1008AC | ATD Production Lot 2 Kit Install (25 each) | |
| 1009 | ATD Production Lot 3 Kit Buy | |
| 1009AA | ATD Production Lot 3 Kit Buy (15 each) | |
| 1009AB | ATD Production Lot 3 Kit Buy (20 each) | |
| 1009AC | ATD Production Lot 3 Kit Buy (25 each) | |
| 1010 | ATD Production Lot 3 Kit Install | |
| 1010AA | ATD Production Lot 3 Kit Install (15 each) | |
| 1010AB | ATD Production Lot 3 Kit Install (20 each) | |
| 1010AC | ATD Production Lot 3 Kit Install (25 each) | |
| 1011 | ATD Production Lot 4 Kit Buy | |
| 1011AA | ATD Production Lot 4 Kit Buy (15 each) | |
| 1011AB | ATD Production Lot 4 Kit Buy (20 each) | |
| 1011AC | ATD Production Lot 4 Kit Buy (25 each) | |
| 1012 | ATD Production Lot 4 Kit Install | |
| 1012AA | ATD Production Lot 4 Kit Install (15 each) | |
| 1012AB | ATD Production Lot 4 Kit Install (20 each) | |
| 1012AC | ATD Production Lot 4 Kit Install (25 each) | |
| 1013 | Over and Above – Material Markup Rate (See Note 1 Below) | The proposed Material Markup Rate per Option I and the 6 month extension is multiplied by the Evaluation Material Dollars per Option I and the 6 month extension as applicable to establish the extended price for Option I and the 6 month extension for this CLIN. |
| 1014 | Over and Above – Labor Rates (See Note 2 Below) | The proposed Hourly Labor Rate per Option I and the 6 month extension is multiplied by the Evaluation Hours per Option I and the 6 month extension as applicable to establish the extended price for Option I and the 6 month extension for this CLIN. |
| Mechanic - Regular | ||
| Mechanic - Overtime | ||
| Mechanic - Premium | ||
| Logistician - Regular | ||
| Logistician - Overtime | ||
| Logistician - Premium | ||
| Engineer - Regular | ||
| Engineer - Overtime | ||
| Engineer - Premium | ||
| 1015 | Travel G&A (See Note 1 Below) | The proposed Travel G&A Rate per Option I and the 6 month extension is multiplied by the Evaluation Travel Dollars per Option I and the 6 month extension to establish the extended price for Option I and the 6 month Extension for this CLIN. |
| 1016 | Data (Contract Data Requirements List) | Not Evaluated |
| TOTAL PRICE OPTION I AND 6 MONTH EXTENSION | The sum of all CLINs/SubCLINs listed above equals the Total Price for Option I and the 6 month extension as applicable. | |
| TOTAL EVALUATED PRICE (TEP) | The sum of all CLINs/SubCLINs listed above for the Basic Period, Option I, and the 6 month extension equals the Total Evaluated Price. |
RFP FA8106-22-R-0004 APPENDIX B
| &A | SOURCE SELECTION INFORMATION |
| SEE FAR 2.101 & 3.104 | &P |
T-6A ARP Pricing Matrix Instructions: Input proposed prices and rates in the yellow highlighted cells (Column E). The Pricing Matrix must be completely filled out to be acceptable. Any proposed zero dollars or zero rates must be fully explained in the Price Volume. The proposed pricing for the 6 month extension (Column H) shall equal the proposed price in Option I (Column E).
| Offeror: | Insert Offeror Name | Note: The evaluation quantities listed as TBD will be updated with release of the final RFP |
| Date: | Insert Date Completed |
| PRICING MATRIX DRAFT 29 JUNE 22 | ||||||
| BASIC PERIOD | ||||||
| T-6A Avionics Replacement Program (ARP) | 1 Sep 2023 - 30 Nov 2026 | |||||
| CLIN | Description | Contract Type | Unit of Issue | Proposed Unit Price | Evaluation Quantity | Extended Total |
| 0001 | Aircraft Technology Maturation Risk Reduction (TMRR) | FFP | MO | 7 | $ - 0 | |
| 0002 | ATD Technology Maturation Risk Reduction (TMRR) | FFP | MO | 20 | $ - 0 | |
| 0003 | Long Lead Parts/Material - EMD (Insert Total Price from Tab CLIN 0003 Long Lead EMD) | FFP | EA | 1 | $ - 0 | |
| 0004 | Long Lead Parts/Material - Production Lot 1 (Insert Total Price from Tab CLIN 0004 Long Lead Prod Lot 1) | FFP | EA | 1 | $ - 0 | |
| 0005 | Virtual Prototype Delivery (Aircraft System) | NSP | EA | 1 | $ - 0 | |
| 0006 | Aircraft Delivery Incentives, Preliminary Design Review (PDR) | |||||
| 0007 | Aircraft Engineering and Manufacturing Development (EMD) | FFP | MO | TBD | ||
| 0008 | T-2 Flight and Telemetry | FFP | EA | TBD | ||
| 0009 | Physical Prototype and Mock-up Delivery (Aircraft) | FFP | EA | TBD | ||
| 0010 | Aircraft Delivery Incentives, Critical Design Review (CDR) | |||||
| 0011 | Avionics System Integration Lab (ASIL) Delivery | FFP | EA | TBD | ||
| 0012 | ASIL Testing and Government Acceptance Support (Aircraft) | FFP | EA | TBD | ||
| 0013 | First Article Kit Buy (Aircraft) - 3 Kit Buy | FFP | EA | TBD | ||
| 0014 | Prototype Installation/Delivery (Aircraft) | FFP | EA | TBD | ||
| 0015 | Aircraft Delivery Incentives, Technical Readiness Review (TRR) | |||||
| 0016 | Developmental Testing Support (Aircraft) | FFP | MO | TBD | ||
| 0017 | Virtual Prototype Delivery (ATD) | NSP | EA | 1 | $ - 0 | |
| 0018 | ATD Delivery Incentives, Preliminary Design Review (PDR) | |||||
| 0019 | ATD Engineering and Manufacturing Development (EMD) | FFP | MO | TBD | ||
| 0020 | Kit Proof Install/Delivery (Aircraft) - 1 Kit | FFP | EA | 1 | $ - 0 | |
| 0021 | Operational Testing Support | FFP | MO | TBD | ||
| 0022 | VAL/VER Install/Delivery (Aircraft) - 1 Kit | FFP | EA | 1 | $ - 0 | |
| 0023 | Digital Twin Delivery (Aircraft) | FFP | EA | 1 | $ - 0 | |
| 0024 | Physical Prototype Delivery (ATD) | FFP | EA | 1 | $ - 0 | |
| 0025 | ATD Delivery Incentives, Critical Design Review (CDR) | |||||
| 0026 | Aircraft Production Lot 1 Kit Buy (119 each) | FFP | LO | 1 | $ - 0 | |
| 0027 | ATD Modification Testing & Support (ATD) | FFP | EA | 1 | $ - 0 | |
| 0028 | Cadre ATD Modification Install/Delivery (ATD) | FFP | EA | 1 | $ - 0 | |
| 0029 | Aircraft Production Lot 1 Kit Installation (106 each) | FFP | LO | 1 | $ - 0 | |
| 0030 | ATD Production Lot 1 Kit Buy | |||||
| 0030AA | ATD Production Lot 1 Kit Buy (15 each) | FFP | LO | 1 | $ - 0 | |
| 0030AB | ATD Production Lot 1 Kit Buy (20 each) | FFP | LO | 1 | $ - 0 | |
| 0030AC | ATD Production Lot 1 Kit Buy (25 each) | FFP | LO | 1 | $ - 0 | |
| 0031 | ATD Production Lot 1 Kit Installation | |||||
| 0031AA | ATD Production Lot 1 Kit Installation (15 each) | FFP | LO | 1 | $ - 0 | |
| 0031AB | ATD Production Lot 1 Kit Installation (20 each) | FFP | LO | 1 | $ - 0 | |
| 0031AC | ATD Production Lot 1 Kit Installation (25 each) | FFP | LO | 1 | $ - 0 | |
| 0032 | Over and Above – Material Markup Rate (See Note 1 Below) | FFP | % | $ 10,000 | $ - 0 | |
| 0033 | Over and Above – Labor Rates (See Note 2 Below) | |||||
| Mechanic - Regular | FFP | Hourly | 100 | $ - 0 | ||
| Mechanic - Overtime | FFP | Hourly | 100 | $ - 0 | ||
| Mechanic - Premium | FFP | Hourly | 100 | $ - 0 | ||
| Logistician - Regular | FFP | Hourly | 100 | $ - 0 | ||
| Logistician - Overtime | FFP | Hourly | 100 | $ - 0 | ||
| Logistician - Premium | FFP | Hourly | 100 | $ - 0 | ||
| Engineer - Regular | FFP | Hourly | 100 | $ - 0 | ||
| Engineer - Overtime | FFP | Hourly | 100 | $ - 0 | ||
| Engineer - Premium | FFP | Hourly | 100 | $ - 0 | ||
| 0034 | Travel G&A (See Note 1 Below) | FFP | % | $ 10,000 | $ - 0 | |
| 0035 | Data (Contract Data Requirements List) | |||||
| 0035AA | CDRL A018 System Engineering Management Plan (SEMP) | FFP | EA | TBD | ||
| 0035AB | CDRL A019 System/Subsystem Specification (SSS) | FFP | EA | TBD | ||
| 0035AC | CDRL A023 Airworthiness Specification, Certification Basis | FFP | EA | TBD | ||
| 0035AD | CDRL A035 Technical Data Package (TDP) | FFP | EA | TBD | ||
| 0035AE | CDRL A049 Management Plan, Airworthiness | FFP | EA | TBD | ||
| 0035AF | CDRL A051 Commercial Derivative Aircraft (CDS) Airworthiness Certification | FFP | EA | TBD | ||
| 0035AG | CDRL A052 Airworthiness Certification Criteria Report, Compliance Report | FFP | EA | TBD | ||
| 0035AH | CDRL A060 Spectrum Certification Spectral Characteristics Data | FFP | EA | TBD | ||
| 0035AJ | CDRL A087 Digital System Model | FFP | EA | TBD | ||
| 0035AK | CDRL A088 Acquisition and Sustainment Data Package (ASDP) Product Engineering Design Data and Associated Lists (EDDAL) | FFP | EA | TBD | ||
| 0035AL | CDRL A089 Reliability and Maintainability (R&M) Block Diagrams and Mathematical Models Report | FFP | EA | TBD | ||
| 0035AM | CDRL A091 Reliability and Maintainability Predictions Report | FFP | EA | TBD | ||
| 0035AN | CDRL A093 Technical Report – Study/Services, Primary Flight Reference (PFR) Endorsement – Display Information Package | FFP | EA | TBD | ||
| 0035AP | CDRL A096 As Built Configuration List (ABCL) – Modified Item and Funding Source | FFP | EA | TBD | ||
| 0035AQ | CDRL A097 Open Systems Management Plan (OSMP). | FFP | EA | TBD | ||
| 0035AR | CDRL A105 Human Systems Integration Report | FFP | EA | TBD | ||
| 0035AS | CDRL A108 Training Materials | FFP | EA | TBD | ||
| 0035AT | CDRL A109 Department of Defense (DOD) Modeling and Simulation (M&S) Verification and Validation (V&V) Plan | FFP | EA | TBD | ||
| 0035AU | CDRL A110 Department of Defense (DOD) Modeling and Simulation (M&S) Verification and Validation (V&V) Report | FFP | EA | TBD | ||
| 0035AV | CDRL A117 Technical Manual Contract Requirements (TMCR) | FFP | EA | TBD | ||
| 0036 | Data (Contract Data Requirements List) - ATD | NSP | EA | |||
| 0037 | Data (Contract Data Requirements List) - Aircraft System | NSP | EA | |||
| TOTAL PRICE BASIC PERIOD | $ - 0 |
| OPTION I | Option I (1 Dec 2026 - 30 Nov 2030) | 6 Month Extension | Total | |||||||||
| CLIN | Description | Contract Type | Unit of Issue | Proposed Unit Price | Evaluation Quantity | Option I | ||||||
| Extended Total | 6 Mo. Ext (See Note 3) | Evaluation Quantity | 6 Mo Ext | |||||||||
| Extended Total | Total Opt I & 6 Mo. Ext | |||||||||||
| 1001 | Aircraft Production Lot 2 Kit Buy (121 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1002 | Aircraft Production Lot 2 Kit Install (120 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1003 | Aircraft Production Lot 3 Kit Buy (120 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1004 | Aircraft Production Lot 3 Kit Install (120 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1005 | Aircraft Production Lot 4 Kit Buy (81 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1006 | Aircraft Production Lot 4 Kit Install (95 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1007 | ATD Production Lot 2 Kit Buy | |||||||||||
| 1007AA | ATD Production Lot 2 Kit Buy (15 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1007AB | ATD Production Lot 2 Kit Buy (20 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1007AC | ATD Production Lot 2 Kit Buy (25 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1008 | ATD Production Lot 2 Kit Install | |||||||||||
| 1008AA | ATD Production Lot 2 Kit Install (15 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1008AB | ATD Production Lot 2 Kit Install (20 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1008AC | ATD Production Lot 2 Kit Install (25 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1009 | ATD Production Lot 3 Kit Buy | |||||||||||
| 1009AA | ATD Production Lot 3 Kit Buy (15 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1009AB | ATD Production Lot 3 Kit Buy (20 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1009AC | ATD Production Lot 3 Kit Buy (25 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1010 | ATD Production Lot 3 Kit Install | |||||||||||
| 1010AA | ATD Production Lot 3 Kit Install (15 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1010AB | ATD Production Lot 3 Kit Install (20 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1010AC | ATD Production Lot 3 Kit Install (25 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1011 | ATD Production Lot 4 Kit Buy | |||||||||||
| 1011AA | ATD Production Lot 4 Kit Buy (15 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1011AB | ATD Production Lot 4 Kit Buy (20 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1011AC | ATD Production Lot 4 Kit Buy (25 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1012 | ATD Production Lot 4 Kit Install | |||||||||||
| 1012AA | ATD Production Lot 4 Kit Install (15 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1012AB | ATD Production Lot 4 Kit Install (20 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1012AC | ATD Production Lot 4 Kit Install (25 each) | FFP | LO | 1 | $ - 0 | $ - 0 | 1 | $ - 0 | $ - 0 | |||
| 1013 | Over and Above – Material Markup Rate (See Note 1 Below) | FFP | % | $ 10,000 | $ - 0 | $ - 0 | $ 5,000 | $ - 0 | $ - 0 | |||
| 1014 | Over and Above – Labor Rates (See Note 2 Below) | |||||||||||
| Mechanic - Regular | FFP | Hourly | 100 | $ - 0 | $ - 0 | 50 | $ - 0 | $ - 0 | ||||
| Mechanic - Overtime | FFP | Hourly | 100 | $ - 0 | $ - 0 | 50 | $ - 0 | $ - 0 | ||||
| Mechanic - Premium | FFP | Hourly | 100 | $ - 0 | $ - 0 | 50 | $ - 0 | $ - 0 | ||||
| Logistician - Regular | FFP | Hourly | 100 | $ - 0 | $ - 0 | 50 | $ - 0 | $ - 0 | ||||
| Logistician - Overtime | FFP | Hourly | 100 | $ - 0 | $ - 0 | 50 | $ - 0 | $ - 0 | ||||
| Logistician - Premium | FFP | Hourly | 100 | $ - 0 | $ - 0 | 50 | $ - 0 | $ - 0 | ||||
| Engineer - Regular | FFP | Hourly | 100 | $ - 0 | $ - 0 | 50 | $ - 0 | $ - 0 | ||||
| Engineer - Overtime | FFP | Hourly | 100 | $ - 0 | $ - 0 | 50 | $ - 0 | $ - 0 | ||||
| Engineer - Premium | FFP | Hourly | 100 | $ - 0 | $ - 0 | 50 | $ - 0 | $ - 0 | ||||
| 1015 | Travel G&A (See Note 1 Below) | FFP | % | $ 10,000 | $ - 0 | $ - 0 | $ 5,000 | $ - 0 | $ - 0 | |||
| 1016 | Data (Contract Data Requirements List) | NSP | ||||||||||
| TOTAL PRICE OPTION I AND 6 MONTH EXTENSION | $ - 0 | $ - 0 | $ - 0 | |||||||||
| $ - 0 | crosscheck | |||||||||||
| Note 1: | All percentages (Material Markup Rate and Travel G&A) should be entered as 1 plus the percentage amount. For example 8.25% should be entered as 1.0825. The material markup rate shall be inclusive of all markups applied to direct material costs. | TOTAL BASIC PRICE | $ - 0 | |||||||||
| Note 2: | All labor rates should be proposed sufficiently to ensure adequate coverage of all labor costs, all indirect costs, including G&A, COM, and so forth as well as prime and subcontractor profit in every contract out-year. | TOPTAL OPTION I PRICE | $ - 0 | |||||||||
| Note 3: | The proposed prices for the 6 month extension shall equal the proposed prices for Option I. | TOTAL 6 MONTH EXT PRICE | $ - 0 | |||||||||
| TOTAL EVALUATED PRICE (TEP) | $ - 0 |
RFP FA8106-22-R-0004 &"-,Bold"&UT-6A ARP APPENDIX B
| &A | SOURCE SELECTION INFORMATION |
| SEE FAR 2.101 & 3.104 | &P |
CLIN 0003 Long Lead EMD
| Offeror: | Insert Offeror Name | PRICING MATRIX DRAFT 29 JUNE 22 |
| INSTRUCTIONS - Complete the yellow highlighted cells as follows: | ||
| Insert Description of Long Lead Parts/Materials EMD items in Column C, insert Proposed Unit Price for the Basic Period in Column E, and Proposed Quantity for the Basic Period in Column F. There are pre-populated formulas in Column G to calculate the extended totals for each item for the Basic Period (proposed unit price x proposed quantity). | ||
| The Total Price for the Basic Period is calculated in Column G, Row 64 (this cell reference could change based on the number of items proposed and priced by the Offeror). |
Insert the Total Price from Column G, Row 64 on the "T-6A ARP Pricing Matrix" Tab, Column E, Row 12.
Note: Provide the long lead parts/materials to support EMD for the full contract IAW SOW Paragraph 4.10.1 Long Lead Procurement
| T-6A Avionics Replacement Program (ARP) | BASIC PERIOD | |||||
| CLIN | Contract Type | Description | Unit of Issue | Proposed Unit Price | Proposed Quantity | Extended Total |
| 0003 | FFP | Long Lead Parts/Material - EMD | EA | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| 0003 | FFP | EA | $ - 0 | |||
| Total CLIN 0003 Long Lead Parts/Materials EMD | $ - 0 |
FA8106-22-R-0004 &"-,Bold"&UT-6A ARP APPENDIX B
| &A | SOURCE SELECTION INFORMATION |
| SEE FAR 2.101 & 3.104 | &P |
CLIN 0004 Long Lead Prod Lot 1
| Offeror: | Insert Offeror Name | PRICING MATRIX DRAFT 29 JUNE 22 |
| INSTRUCTIONS - Complete the yellow highlighted cells as follows: | ||
| Insert Description of Long Lead Parst/Materials Production Lot 1 items in Column C, insert Proposed Unit Price for the Basic Period in Column E, and Proposed Quantity for the Basic Period in Column F. There are pre-populated formulas in Column G to calculate the extended totals for each item for the Basic Period (proposed unit price x proposed quantity). | ||
| The Total Price for the Basic Period is calculated in Column G, Row 64 (this cell reference could change based on the number of items proposed and priced by the Offeror). |
Insert the Total Price from Column G, Row 64 on the "T-6A ARP Pricing Matrix" Tab, Column E, Row 13.
Note: Provide the long lead parts/materials to support Production Lot 1 for the full contract IAW SOW Paragraph 4.10.1 Long Lead Procurement
| T-6A Avionics Replacement Program (ARP) | BASIC PERIOD | |||||
| CLIN | Contract Type | Description | Unit of Issue | Proposed Unit Price | Proposed Quantity | Extended Total |
| 0004 | FFP | Long Lead Parts/Material - Production Lot 1 | EA | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| 0004 | FFP | EA | $ - 0 | |||
| Total CLIN 0004 Long Lead Parts/Materials Production Lot 1 | $ - 0 |
FA8106-22-R-0004 &"-,Bold"&UT-6A ARP APPENDIX B
| &A | SOURCE SELECTION INFORMATION |
| SEE FAR 2.101 & 3.104 | &P |
File details come from the government source that posted it. Updated .