Westphal B- PE Signed(Recorded)Completed.pdf
PDF 800 KB Posted
- Attached to
- Finished Water 1 (FW1) Pipeline
- Solicitation number
- 22-0615-02
- Issued by
- Chaves County, New Mexico
About this file
The document appears to be related to a professional services or construction contract for the Eastern New Mexico Rural Water System (ENMRWS) Project, specifically the Finished Water 1 (FW1) Pipeline, involving the Eastern New Mexico Water Utility Authority (ENMWUA). The project scope includes the installation of approximately 15.5 miles of 39-inch diameter welded steel pipe, along with associated infrastructure such as combination air release and vacuum valve assemblies, vaults, blowoff assemblies, an isolation valve vault, a pressure reducing vault, and fiber optic conduit. The project is located in New Mexico and represents a significant infrastructure development for the region's water system.
While specific pricing details are not visible in the provided image, the project appears to be a significant public infrastructure investment aimed at improving water distribution capabilities in eastern New Mexico. The Request for Proposals (RFP) suggests a competitive bidding process for the construction project, likely funded through a combination of local, state, and potentially federal water infrastructure resources. The comprehensive nature of the pipeline installation indicates a strategic approach to enhancing water utility infrastructure, which may involve multiple stakeholders and funding sources to support the region's water management and distribution needs.
View the file
Other files
Show 40 more
Latest 50 of 65 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .