2022-05-26 WPD DWB_ENMWUA, NM3500505_Certificate of Project Approval-FW1.pdf
PDF 370 KB Posted
- Attached to
- Finished Water 1 (FW1) Pipeline
- Solicitation number
- 22-0615-02
- Issued by
- Chaves County, New Mexico
About this file
This document is a Certificate of Project Approval issued by the New Mexico Environment Department's Drinking Water Bureau for the Eastern New Mexico Water Utility Authority (ENMWUA), dated May 26, 2022. The project, referred to as the Finished Water One (FW1) Pipeline, involves constructing 81,672 linear feet (15.5 miles) of 39-inch diameter welded steel pipe, including 6 combination air release and vacuum valve assemblies and vaults, 4 blowoff assemblies, 1 isolation valve vault, 1 pressure reducing valve vault, and 362 linear feet of trenchless method pipeline crossings.
The project is currently in a proposed status, as the system cannot yet serve water due to the absence of a drinking water source application or connection to an existing public water system. The project requires several notifications during construction, including written notices when construction begins, for change orders, upon project completion, and for record drawing submissions. The engineering review found no regulatory deficiencies or sanitary discrepancies, and as of the approval date, there were no active violations of health-based standards for the Eastern New Mexico Water Utility Authority in the New Mexico Safe Drinking Water Information System database.
View the file
Other files
Show 40 more
Latest 50 of 65 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CERTIFICATE OF PROJECT APPROVAL
System #: NM3500505 System Name: Eastern New Mexico WUA
Date: May 26, 2022 System Contact: Orlando Ortega, oortega@ENMUA.com
Project Description: “The Finished Water One (FW1) Pipeline project consists of 81,672 linear feet (15.5 miles) of 39‐ inch diameter welded steel pipe, 6 combination air release and vacuum valve assemblies and vaults, 4 blowoff assemblies, 1 isolation valve vault, 1 pressure reducing valve vault, and 362 linear feet of trenchless method pipeline crossings.”
*The system will remain in proposed status because the scope of this water infrastructure project does not provide ENMWUA the ability to serve water because an application has not yet been submitted for any sources of drinking water or any connection to an existing public water system that would allow ENMWUA to serve water as a consecutive connection system. A capacity assessment is required prior to an engineering application for a source prior to delivering water.
A copy of this certificate shall be in the possession of the system documenting that the above project has been reviewed and approved by the department.
☒ Engineering review
☐ Notification required but approval is not required ☐ Notification nor approval is required
All plans and specifications were reviewed in accordance with the applicable design and construction guidelines found in the review references of the New Mexico Drinking Water Regulations, Section 20.7.10.104. No regulatory deficiencies, sanitary discrepancies or recommendations were identified during this review.
The written notification of the project was provided on April 15, 2022. Jim Honea, P.E., a registered professional engineer, is responsible for the project.
As of May 26, 2022, there were no active violations of any health‐based standard (action level, maximum contaminant level, or treatment technique) recorded for the Eastern New Mexico Water Utility Authority, in the New Mexico Safe
Drinking Water Information System (SDWIS State) database.
The construction phase of the project has the following requirements for written notification:
Provide written notice: NMAC citation
1. when construction begins 20.7.10.201.P
2. of change orders before they are implemented recognizing that revised plans and specifications may be required
20.7.10.201.R
3. when the project is complete 20.7.10.201.T
4. to transmit record drawings in electronic format – 120 days after completion 20.7.10.201.U
Upon completion of the project, please submit the documentation required in NMAC 20.7.10.201.T(1) through NMAC 20.7.10.201.T(6) and NMAC 20.7.10.201.U. If this project required notification, but not approval, the requirements in NMAC 20.7.10.201.T(1) and in NMAC 20.7.10.201.U would not apply. However, sealed record drawings as pdfs for NMED Drinking Water Bureau files would be appreciated if submitted.
Emily C Worthen, P.E. Date
Engineering Program Manager
New Mexico Environment Department‐ Drinking Water Bureau
05/26/2022
File details come from the government source that posted it. Updated .