Jones AA- PE Signed(Recorded)Completed.pdf
PDF 531 KB Posted
- Attached to
- Finished Water 1 (FW1) Pipeline
- Solicitation number
- 22-0615-02
- Issued by
- Chaves County, New Mexico
About this file
I apologize, but the document appears to be unreadable. The pages contain only a series of repeated "d" characters, which suggests either a corrupted file or an error in document processing. Without being able to read the actual content of the "Jones AA- PE Signed(Recorded)Completed.pdf" file, I cannot provide a meaningful summary of its contents.
The only substantive information available is from the external description of the state and local contract opportunity, which indicates this is related to the Eastern New Mexico Rural Water System (ENMRWS) Project, specifically the FW1 Pipeline. The project involves installing approximately 15.5 miles of 39-inch diameter welded steel pipe, along with associated infrastructure like valve assemblies, vaults, and fiber optic conduit for the Eastern New Mexico Water Utility Authority (ENMWUA).
View the file
Other files
Show 40 more
Latest 50 of 65 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .