TM_BP1_07_Geotechnical_Data_Report_Mar_2014_Final.pdf

PDF 22 MB Posted

Attached to
Finished Water 1 (FW1) Pipeline
Solicitation number
22-0615-02
Issued by
Chaves County, New Mexico

About this file

This document is a Geotechnical Data Report prepared by AMEC for the Eastern New Mexico Rural Water Authority (ENMRWA) in March 2014, focusing on the Finished Water Two (FW2) and Cannon Lateral Pipeline Alignments for Bid Package No. 1. The technical memorandum presents results of a geotechnical field exploration conducted to collect data supporting pipeline final design and construction, with specific details including 13 soil borings across multiple locations in Curry County, New Mexico, ranging in ground elevation from approximately 4264.7 to 4322.6 feet and boring depths between 20.5 and 31.5 feet.

The report includes comprehensive laboratory analyses of soil samples, utilizing various ASTM standards to test moisture content, dry densities, grain-size distribution, Atterberg limits, consolidation, direct shear, triaxial tests, expansion index, soil pH, resistivity, and chemical concentrations. Piezometer readings from February 2003 indicated dry or minimal moisture conditions in the investigated wells. The geotechnical investigation was performed to support the broader Eastern New Mexico Rural Water System project, with testing results and detailed findings documented in the report's appendices to inform subsequent design and construction phases of the pipeline infrastructure.

View the file

Other files

File Type Posted
Westphal AC- PE Signed(Recorded)Completed.pdf PDF
Shoenail Ranch M,N,O,P- TCE Signed(Recorded)Completed.pdf PDF
Jones AA- Memorandum of Agreement.pdf PDF
RFP 22-0615-02 Addendum 3.pdf PDF
ENMRWS - Environmental Assessment.pdf PDF
Jones X- TCE Signed(Recorded)Completed.pdf PDF
ENMRWS_BP_1_120401225413200_D_Rowlett_PE_Recorded_Easement.pdf PDF
Westphal D- TCE Signed(Recorded)Completed.pdf PDF
Westphal B- PE Signed(Recorded)Completed.pdf PDF
ENMRWS_BP_1_120401225413200_D_Rowlett_TCE_Recorded_Easement.pdf PDF
Tumbleweed U- PE Signed(Recorded)Completed.pdf PDF
Jones AA- PE Signed(Recorded)Completed.pdf PDF
Carpenter QQ- TCE (signed,recorded,completed).pdf PDF
Jones Y- TCE Signed(Recorded)Completed.pdf PDF
Davis_Chavez L- TCE Signed(Recorded)Completed.pdf PDF
Starbuck E _ H- PE Signed(Recorded)Completed.pdf PDF
Davis_Chavez L- PE Signed(Recorded)Completed.pdf PDF
de Maio Farms _ Ranches II- TCE Signed(Recorded)Completed.pdf PDF
Westphal B- TCE Signed(Recorded)Completed.pdf PDF
ENMWUA_FW-1_VOL3_Drawings_BID-DOC.pdf PDF
EMRWS_BP_1_120401126439600_G_Wall_TCE_Recorded_Easement.pdf PDF
2022-04-25 WPD CPB ENMWUA FW1 Bid Docs approved-pn.pdf PDF
2022-05-26 WPD DWB_ENMWUA, NM3500505_Certificate of Project Approval-FW1.pdf PDF
Jones Y- PE Signed(Recorded)Completed.pdf PDF
Jones V- Memorandum of Agreement.pdf PDF
RFP 22-0615-02 Addendum 6.pdf PDF
Jones V- PE Signed(Recorded)Completed.pdf PDF
Jones Y- Memorandum of Agreement.pdf PDF
RFP 22-0615-02 Addendum 2.pdf PDF
Jones X- Memorandum of Agreement.pdf PDF
List of Proposed Subcontractors.docx DOCX document
R39524 Executed Grant.pdf PDF
Curry County Roads _ R-O-W Agreement - Amednement 3 6-23-2022.pdf PDF
Shoenail Ranch M,N,O,P- PE Signed(Recorded)Completed.pdf PDF
de Maio Farms _ Ranches KK- PE Signed(Recorded)Completed.pdf PDF
USACE 2021-68.NPR Letter.pdf PDF
RFP_22-0615-02_Addendum_4_21JUL2022.pdf PDF
Jones AA- TCE Signed(Recorded)Completed.pdf PDF
Tumbleweed U- TCE Signed(Recorded)Completed.pdf PDF
Shaw GG- PE (signed,recorded,completed).pdf PDF
Eaton- EE PE Signed(Recorded)Completed.pdf PDF
de Maio Farms _ Ranches KK- TCE Signed(Rcorded)Completed.pdf PDF
de Maio Farms _ Ranches II- PE Signed(Recorded)Completed.pdf PDF
Shaw GG- TCE (signed,recorded,completed).pdf PDF
Finished Water 1 Easement Site Certificate signed 5-26-2022.pdf PDF
RFP 22-0615-02 Addendum 7.pdf PDF
ENM_FW1_Specs_Vol1_Final_07JUN2022.pdf PDF
ENM_FW1_Specs_Vol2_Final_07JUN2022.pdf PDF
Starbuck E _ H- TCE Signed(Recorded)Completed.pdf PDF
Addendum 6 056-E-001_199704.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FINALFINAL_ENMRWS_GEOTECHNICAL_DATA_REPORT_BP1_MAR2014.DOCX BP1-07-1

T E C H N I C A L M E M O R A N D U M B P 1 - 0 7

Eastern New Mexico Rural Water System Bid Package 1 – Finished Water Two Pipeline and Cannon Lateral Pipeline Geotechnical Data Report

PREPARED FOR: Eastern New Mexico Rural Water Authority

PREPARED BY: AMEC a subconsultant to CH2M HILL

DATE: March 7, 2014

The purpose of this Technical Memorandum (TM) is to present the results of the geotechnical field exploration performed by AMEC Environment & Infrastructure, Inc.

(AMEC) along the proposed Finished Water Two (FW2) and Cannon Lateral Pipeline Alignments for the Eastern New Mexico Rural Water System (ENMRWS) Bid Package No. 1. The objective of this exploration was to collect geotechnical data to support development of pipeline final design and construction.

CH2M Hill Finished Water Pipeline, Bid Package 1 Eastern New Mexico Rural Water System Curry County, New Mexico AMEC Project No. 13-517-00005 18 September 2013

Table 3.1 Soil Boring Data

Boring No.

Northing

Easting Ground

Elevation (ft) Boring

Depth (ft)

FW2-P-17 1238541.048 869057.890 4303.1 20.5

FW2-P-18 1238390.067 870459.047 4294.5 25.5

FW2-P-19 1237738.972 873601.686 4272.9 21.5

FW2-P-20 1236306.626 873673.674 4264.7 26.5

FW2-P-21 1240714.340 842954.130 4316.3 21.3

FW2-P-22 1240651.950 845143.450 4311.8 21.5

FW2-J-23 1240577.290 846832.790 4322.3 31.5

FW2-J-24 1240400.260 846854.370 4322.0 31.5

FW2-J-25 1240266.820 847242.710 4322.6 31.5

FW2-J-26 1239987.500 847229.520 4321.7 31.5

CL-P-1 1239515.036 847699.906 4318.9 21.5

CL-J-2 1238616.305 847808.266 4312.3 31.5

CL-J-3 1238185.057 847476.960 4302.6 31.5

CL-P-4 1237686.984 847123.209 4305.2 21.5

3.2 PIEZOMETER READINGS

On February 1, 2003 AMEC performed a reconnaissance to obtain depth to water readings in three piezometers, J-15, J-21 and J-23. The piezometers were installed during our original geotechnical investigation, AMEC Project No. 8-517-00079. Each piezometer was either dry or contained only trace moisture at the bottom. No additional piezometer readings have been obtained since our first site visit.

3.3 LABORATORY ANALYSIS

Moisture content determinations (ASTM D2216) were made on selected open-end drive samples recovered. Dry densities (ASTM D2937) were determined on selected relatively undisturbed 2.42-inch I.D. "ring" samples. Results of these tests are shown on the boring logs.

Grain-size analysis (ASTM D422), hydrometer tests (ASTM D422-63) and Atterberg limits tests (ASTM D4318) were performed on selected samples to aid in soil classification. Consolidation (ASTM D5333), direct shear tests (ASTM D3080) and unconsolidated-undrained (UU) triaxial tests (ASTM D2850) were performed on relatively undisturbed "ring" samples or Shelby tube samples.

Expansion Index tests (ASTM D4829) were performed on remolded bulk samples. In addition, the soil pH (SM4500-H+B) (ASTM G51), resistivity (ASTM G187), and the sulfate and chloride (EPA 300.0) concentrations were determined on select bulk samples. Modified Proctor tests (ASTM D1557) were performed on select samples. Test results are presented in Appendix B, along with a brief description of soil mechanics testing procedures. A summary sheet presenting all of the test results is also included in Appendix B.

File details come from the government source that posted it. Updated .