2022-04-25 WPD CPB ENMWUA FW1 Bid Docs approved-pn.pdf
PDF 204 KB Posted
- Attached to
- Finished Water 1 (FW1) Pipeline
- Solicitation number
- 22-0615-02
- Issued by
- Chaves County, New Mexico
About this file
This document is an approval letter from the New Mexico Environment Department (NMED) Construction Programs Bureau (CPB) dated April 25, 2022, addressing the Eastern New Mexico Water Utility Authority's Finished Water 1 Pipeline Project (WPF-5416). The letter confirms that NMED has reviewed and approved revised plans, specifications, and contract documents prepared by Jacobs on April 15, 2022, which addressed previous review comments from January 6, 2022. The project involves the construction of approximately 15.5 miles of 39-inch diameter welded steel pipe, including combination air release and vacuum valve assemblies, blowoff assemblies, isolation valve vault, pressure reducing vault, and fiber optic conduit.
The letter explicitly notes that the review is solely for compliance with contractual requirements of the applicable funding source and does not evaluate the technical integrity, feasibility, or cost-effectiveness of the project. NMED emphasizes that the review does not relieve the owner or engineer of legal responsibilities for the project's overall integrity, design adequacy, or regulatory compliance. The approval does not make NMED responsible for any increased costs resulting from potential defects in the plans, specifications, or contract documents. The project is being overseen by Peter Nathanson, P.E., who can be contacted at (505) 470-9341 or peter.nathanson@state.nm.us for any questions.
View the file
Other files
Show 40 more
Latest 50 of 65 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCIENCE | INNOVATION | COLLABORATION | COMPLIANCE
Construction Programs Bureau | 1190 Saint Francis Drive, PO Box 5469, Santa Fe, New Mexico 87502-5469 | www.env.nm.gov/construction-programs/
MICHELLE LUJAN GRISHAM JAMES C. KENNEY
GOVERNOR CABINET SECRETARY
April 25, 2022
Angela Quintana New Mexico Finance Authority 207 Shelby Street Santa Fe, New Mexico 87501
RE: Approval of Plans, Specifications, and Contract Documents for Eastern New Mexico Water Utility Authority
Finished Water 1 Pipeline Project (WPF-5416)
Angela Quintana, The New Mexico Environment Department (NMED) Construction Programs Bureau (CPB) has reviewed the revised Plans, Specification and Contract Documents for the referenced project which were prepared by Jacobs and received on April 15, 2022. The Jacobs response letter dated April 15, 2022 and revised documents have addressed the NMED CPB review comments in the Agency letter dated January 6, 2022, and the documents are approved.
Please note that the review of these plans and specifications is only for compliance with contractual requirements of the applicable funding source or sources. The technical integrity, feasibility, or cost effectiveness of the project have not been evaluated. Review of these plans and specifications does not relieve the owner or engineer of legal responsibilities for the overall integrity of the project, adequacy of the design, or compliance with all applicable regulations. The NMED is not responsible for increased costs resulting from defects in the plans, specifications, or other contract documents.
Please contact me at (505) 470-9341 or peter.nathanson@state.nm.us if you have any questions.
Sincerely, Peter Nathanson, P.E.
Project Manager cc: Orlando Ortega, Administrator (ENMWUA, e-mail) Jim Honea, P.E. (Jacobs, e-mail) Emily Worthen, P.E. (NMED DWB, e-mail) http://www.env.nm.gov/construction-programs/ http://www.env.nm.gov/construction-programs/ mailto:peter.nathanson@state.nm.us
| 2022-04-25T15:04:04-0600 | |
| Peter Nathanson |
File details come from the government source that posted it. Updated .