Eaton- EE PE Signed(Recorded)Completed.pdf
PDF 645 KB Posted
- Attached to
- Finished Water 1 (FW1) Pipeline
- Solicitation number
- 22-0615-02
- Issued by
- Chaves County, New Mexico
About this file
The document appears to be a recorded and completed contract file related to the Eaton project for the Eastern New Mexico Rural Water System (ENMRWS) Project's Finished Water 1 (FW1) Pipeline. The project involves the construction of approximately 15.5 miles of 39-inch diameter welded steel pipe for the Eastern New Mexico Water Utility Authority (ENMWUA), including combination air release and vacuum valve assemblies, vaults, blowoff assemblies, isolation valve vault, pressure reducing vault, and fiber optic conduit.
While specific pricing details are not visible in the provided image, the project represents a significant infrastructure development for water system expansion in eastern New Mexico. The contract appears to be a comprehensive construction project involving specialized pipeline installation and associated infrastructure components, likely funded through a combination of local, state, and potentially federal water infrastructure funding sources. The scope of work suggests a complex engineering and construction effort aimed at improving water distribution capabilities for the rural water system in the region.
View the file
Other files
Show 40 more
Latest 50 of 65 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .