Addendum 6 056-E-001_199704.pdf

PDF 652 KB Posted

Attached to
Finished Water 1 (FW1) Pipeline
Solicitation number
22-0615-02
Issued by
Chaves County, New Mexico

About this file

The document is an electrical site plan and one-line diagram addendum (Addendum #6) dated August 2022 for the Finished Water 1 (FW1) Pipeline project by the Eastern New Mexico Water Utility Authority (ENMWUA). The electrical drawing, prepared by Jacobs, provides detailed specifications for the electrical infrastructure of the FW1 Pressure Reducing Vault, including a site plan with utility connections, a one-line electrical diagram, and a panelboard schedule. The plan outlines key electrical components such as a pole-mounted transformer, generator interlock kit, underground conduits, and telecommunications infrastructure.

The drawing includes specific technical requirements for utility coordination, particularly with FECNM (presumably a local utility provider), such as adding a midspan pole, installing a meter, and running secondary conductors underground. The electrical design emphasizes safety and compliance, with provisions for grounding, preventing utility backfeed when operating on generator power, and ensuring proper electrical service entrance. The document is part of the broader Eastern New Mexico Rural Water System Project, which involves installing approximately 15.5 miles of 39-inch diameter welded steel pipeline and associated infrastructure.

View the file

Other files

File Type Posted
Westphal AC- PE Signed(Recorded)Completed.pdf PDF
Shoenail Ranch M,N,O,P- TCE Signed(Recorded)Completed.pdf PDF
Jones AA- Memorandum of Agreement.pdf PDF
RFP 22-0615-02 Addendum 3.pdf PDF
ENMRWS - Environmental Assessment.pdf PDF
Jones X- TCE Signed(Recorded)Completed.pdf PDF
ENMRWS_BP_1_120401225413200_D_Rowlett_PE_Recorded_Easement.pdf PDF
Westphal D- TCE Signed(Recorded)Completed.pdf PDF
Westphal B- PE Signed(Recorded)Completed.pdf PDF
ENMRWS_BP_1_120401225413200_D_Rowlett_TCE_Recorded_Easement.pdf PDF
Tumbleweed U- PE Signed(Recorded)Completed.pdf PDF
Jones AA- PE Signed(Recorded)Completed.pdf PDF
Carpenter QQ- TCE (signed,recorded,completed).pdf PDF
Jones Y- TCE Signed(Recorded)Completed.pdf PDF
Davis_Chavez L- TCE Signed(Recorded)Completed.pdf PDF
Starbuck E _ H- PE Signed(Recorded)Completed.pdf PDF
Davis_Chavez L- PE Signed(Recorded)Completed.pdf PDF
de Maio Farms _ Ranches II- TCE Signed(Recorded)Completed.pdf PDF
Westphal B- TCE Signed(Recorded)Completed.pdf PDF
ENMWUA_FW-1_VOL3_Drawings_BID-DOC.pdf PDF
EMRWS_BP_1_120401126439600_G_Wall_TCE_Recorded_Easement.pdf PDF
2022-04-25 WPD CPB ENMWUA FW1 Bid Docs approved-pn.pdf PDF
2022-05-26 WPD DWB_ENMWUA, NM3500505_Certificate of Project Approval-FW1.pdf PDF
Jones Y- PE Signed(Recorded)Completed.pdf PDF
Jones V- Memorandum of Agreement.pdf PDF
RFP 22-0615-02 Addendum 6.pdf PDF
Jones V- PE Signed(Recorded)Completed.pdf PDF
Jones Y- Memorandum of Agreement.pdf PDF
RFP 22-0615-02 Addendum 2.pdf PDF
Jones X- Memorandum of Agreement.pdf PDF
List of Proposed Subcontractors.docx DOCX document
R39524 Executed Grant.pdf PDF
Curry County Roads _ R-O-W Agreement - Amednement 3 6-23-2022.pdf PDF
Shoenail Ranch M,N,O,P- PE Signed(Recorded)Completed.pdf PDF
de Maio Farms _ Ranches KK- PE Signed(Recorded)Completed.pdf PDF
USACE 2021-68.NPR Letter.pdf PDF
RFP_22-0615-02_Addendum_4_21JUL2022.pdf PDF
Jones AA- TCE Signed(Recorded)Completed.pdf PDF
Tumbleweed U- TCE Signed(Recorded)Completed.pdf PDF
TM_BP1_07_Geotechnical_Data_Report_Mar_2014_Final.pdf PDF
Shaw GG- PE (signed,recorded,completed).pdf PDF
Eaton- EE PE Signed(Recorded)Completed.pdf PDF
de Maio Farms _ Ranches KK- TCE Signed(Rcorded)Completed.pdf PDF
de Maio Farms _ Ranches II- PE Signed(Recorded)Completed.pdf PDF
Shaw GG- TCE (signed,recorded,completed).pdf PDF
Finished Water 1 Easement Site Certificate signed 5-26-2022.pdf PDF
RFP 22-0615-02 Addendum 7.pdf PDF
ENM_FW1_Specs_Vol1_Final_07JUN2022.pdf PDF
ENM_FW1_Specs_Vol2_Final_07JUN2022.pdf PDF
Starbuck E _ H- TCE Signed(Recorded)Completed.pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FILENAME: PLOT DATE: PLOT TIME:2022\08\04 1:58:46 PM

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A of

F

IN

IS

H E

D W

A T

E R O

N E P

IP

E L

IN

E

D3299313

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S c J

A C

O B

S

A

L L R

IG

H T S R

E S

E R

V E

D

JUNE 2022

B

ID

D

O C

U M

E N

T S

G

G

CE

CE

G

056-E-001_199704.dgn

N

J H

O N

E A

E L E

C T

R

IC

A L

J C

A S

T A

N O

S A C

U G

L

IA

T

FW1-E-01

A N

D S

C H

E D

U L E

S

S

IT

E P

L A

N

O N

E -L

IN

E D

IA

G R

A M

1"=10'-0"

C U

R R

Y R

D

CURRY ROAD R

FW1 PRV VAULT ELECTRICAL PLAN

J L

A N

D M

A N

TELEPHONE

TELECOMMUNICATIONS

EXISTING 1.5" PLATEAU

LP-1

N

G

[3"C]

[3/4"C, 2#6, 1#10G]

INLET BOX

GENERATOR

2605-400

2605-201

[1-1/2"C, 3#2, 1#8G]

ONE LINE DIAGRAM

NTS

NTS

LP-1 PANELBOARD SCHEDULE

100A/2P

FW-E-02 FOR DETAILS

VAULT. REFER TO DWG

FW1 PRESSURE REDUCING

98 117

UTLITY TO SPLICE INTO OVERHEAD LINE.

POWER.

PREVENT BACKFEED TO UTILITPROVIDE Y WHEN ON GENERATOR

CANNOT BE CLOSED AT THE SAME TIME. THE INTERLOCK KIT WILL

SWTICH SO THAT UTILITY AND GENERATOR CIRCUIT BREAKERS

GENERATOR INTERLOCK KIT WHICH ACTS AS MANUAL TRANSFER

PROVIDE #2 BARE COPPER GROUNDING ELECTRODE CONDUCTOR.

KEY NOTES:

TRANSFORMER

POLE-MOUNTED

FIBER OPTIC

TELECOMMUNICATIONS

EXISTING 2.5" PLATEAU

120/240V, 1PH, 3W

FROM UTILITY

(GENERAL NOTE 2)

UTILITY STANDARD

METER/MAIN PER

REGARDING THE SERVICE.

ENTRANCE. COORDINATE ALL UTILITY REQUIREMENTS WITH FECNM

UNDERGROUND CONDUITS TO LP-1, SERVING AS THE SERVICE

INSTALL A METER ON THAT POLE. RUN SECONDARY CONDUCTORS IN

FECNM TO ADD A POLE MIDSPAN OF EXISTING POLES IN LINE, AND 2.

VAULT. PEDESTAL SHALL FACE ROADWAY.

LOCATE METER/MAIN PEDESTAL APPROXIMATELY 10' AWAY FROM 1.

GENERAL NOTES:

E F

H I

/2

A D

D E

N D

U M

FECNM OH LINE (EXST)

File details come from the government source that posted it. Updated .