ACA Shelter Amendment 03

View the file

Other files

File Type Posted
1.Abstract_of_offers-Shelter.pdf PDF
Bid_opening_attendance.pdf PDF
Arktite-200a-plugs-receptacles-connectors.pdf PDF
PROJECT_TOC_updated_11-29-18.pdf PDF
W9136419B8001-0004_ACA_Shelter_Amend_04.pdf PDF
Sec_32_13_14.13_concrete.pdf PDF
Draw_EP101_601,_ES106_401.pdf PDF
Draw_S005.pdf PDF
MNS_Klaxon_asbuilt.pdf PDF
Draw_Electrical_-_Set-11.pdf PDF
Draw_A-701_Locked.pdf PDF
Shelter_Phone_info.pdf PDF
Draw_CP101_JOINT_LAYOUT_GRID_1.pdf PDF
Temp_Shelter_HEATING_SYSTEM.doc DOC document
Specs_07_61_14.00_20.pdf PDF
Temp_SHELTERS_SPECS..doc DOC document
Draw_CU502_UTILITY_DETAILS_SHEET_3_OF_5.pdf PDF
Temp_Shelter_Top_Plate_Layout.pdf PDF
W9136419B8001-0002_ACA_Shelter_Amend_02.pdf PDF
Specs_05_50_13.pdf PDF
Draw_102134_Arch_Amend_2_A_set_Nov_15_2018.pdf PDF
Specs_07_92_00.pdf PDF
Specs_07_27_10.00_10.pdf PDF
Draw_102134_S_set.pdf PDF
Draw_CU504_UTILITY_DETAILS_SHEET_5_OF_5.pdf PDF
Specs_13_34_19.pdf PDF
Spec_26_35_43_converters.pdf PDF
Draw_A-601_door_schedule.pdf PDF
Draw_CG500_EROSION_CONTROL_DETAILS.pdf PDF
Draw_CG110_EROSION_CONTROL_PLAN.pdf PDF
Draw_S-101_and_S-102_foundation.pdf PDF
W9136419B8001-0001_ACA_Shelter_Amend_01.pdf PDF
Pre-Bid_Conference_19B8001.pptx PPTX presentation
Shelter_PreBid_attendance.pdf PDF
A3.Shelter_Specs_VOL1_OCT_2018.pdf PDF
W9136419B8001_ACA_Shelter.pdf PDF
Bid_Sched_B3.pdf PDF
A4.Shelter_Specs_VOL2_OCT_2018.pdf PDF
A1.01800_Base_Enviromental.pdf PDF
Shelter_RFI_template.doc DOC document
A2.SHELTER_DWGS_Oct_2018-1.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F9F3CE8165AW01 WYTD079031

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment 03 is to answ er Q&A's and to incorporate 13 draw ing revisions. adding as built for MNS_Klaxon and Shelter phone info. This w ill also extend the Bid opening date to 10 November at 200pm EST to allow for final amendment for Q&A and bidder processing. There are no other chnages at this time.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Nov-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9136419B8001

X 9B. DATED (SEE ITEM 11)

23-Oct-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Nov-2018

CODE

180 FW CONTRACTING OFFICE

2660 S EBER ROAD

SWANTON OH 43558-8752

W91364 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9136419B8001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 29-Nov-2018 02:00 PM to 10-Dec-2018 02:00 PM.

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

Q&A SET 3

AMENDMENT/ADDENDUM 03

W91364-19-B-8001 FOR ACA Shelter

AT 180TH FIGHTER WING

REMINDER: Last Day for RFIs is 23 November 2018 per Sec 00100 note 4.3 (this is NOT extended)

ATTENTION: the Bid opening date has BEEN extended in Block 13 of the SF1442.

The new Bid Opening date is now 10 December 2018 at 200PM EST.

***** One Final amendment will be 27/28 Nov to answer last of the RFIs*****

Q78: We reviewed CD100 Notes and Specification Section 02 41 00 Page 6 for the details of the pavement demolition.

a. What is the thickness of the pavement to be demoed?

b. What is the reinforcing in the pavements to be demoed?

A78: A&E Response: a. Existing pavement to be demolished is approximately 11-inches of concrete on 9 inches of crushed stone.

b. Reinforcement is unknown.

Q79: Section 02 41 00 3.5.3 Removal to Spoil Areas on Government property a.This section states that non-combustible materials to be removed to designated spoils areas on government property. What materials does this include? Concrete pavement? Please provide location of spoil areas.

A79: Base Response: Materials found by the engineer to be acceptable for reuse on the project may temporarily store on site. Location TBD after award. Materials that are not to be reused will be removed off site and disposed of properly by the contractor. Any area used to store materials shall be restored to its original condition by the contractor before completion of the work.

Q80: A few of the specification sections reference sustainability reporting. Example - Section 03 35 00.00

10. Is sustainability reporting required on this job?

A80: A&E Response: Only as necessary to comply with UFC 1-200-02 as applicable.

Q81: Drawing CU-102 - Site Gas Piping U/G a.Could you please provide the size of pipe we will be making connection into – Drawing CU-102 / Detail in CU-501 is unclear as to the size of connection and pressure of Gas Main?

A81: A&E Response: The pipe size is 2-inches

Q82: Site Gas Piping

a. Could you please provide a model # for the type of gas meter that is needed for the install of gas piping per detail H2 – Gas Meter?

A82: A&E Response: The natural gas meter shall be Series B3 Roots Meter (Dresser Industries) or other approved equal. The meter shall be provided by the contractor and connected to the installation’s building automation system (Johnson Controls Metasys) for remote reading of meter.

Q83: Drawing S-005 shows detail for exterior door stoop and refers to architectural and civil drawings, the drawings do not show stoops at exterior doors, please clarify if stoops are required?

A83: A&E Response: If and where required provide stoops per S-005.

Q84: Reference to drawing S-101, note 14 indicated slab dowels, the plan shows these dowels at CTJ-2 (control joint) location, while dowels are only shown in detail CJ-2 (construction joint) in drawing S-005, are dowels required for both construction joints and control joints (CTJ-2) or only construction joints (CJ- 2)?

A84: A&E Response: Detail correct on S-005 dowels on plan should be at CJ-2 in lieu of CTJ-2

Q85: Reference to drawing ES104, plan shows partial concrete encased conduit for area lighting, please clarify extent of partial encasement.

A85: A&E Response: Duct is assumed to be concrete encased under pavement areas. Extent of concrete encasement is unclear past the paved areas.

Q86: Reference to drawing ES105, are the conduits shown in this plan concrete encased?

A86: A&E Response: All buried conduit on this sheet shall be concrete encased, including unpaved areas.

Q87: Reference to specification section 033000, subsection 2.8 in page 16 list floor hardener, please confirm floor hardener is required for interior slabs?

A87: A&E Response: Coating specified by Arch in finish schedule on A-701. See finish schedule for coating if used.

Q88: Reference to specification section 033500, subsection 2.1 lists Dry Shake Floor Topping material, please clarify if Dry Shake floor topping is required for interior slabs?

A88: A&E Response: Coating specified by Arch in finish schedule on A-701. See finish schedule for coating if used.

Q89: Please confirm that interior slabs on grade for shelter building follow specification section 033000.

A89: A&E Response: YES. Confirmed.

Q90: Reference to drawings CP101 and CP102, Please confirm that only shaded areas require reinforcement.

A90: A&E Response: All shaded slabs shall be reinforced. Un-shaded slabs are not.

Q91: Reference to hanger bay slab on grade, please confirm only the edge panels are reinforced per note 15.

A91: A&E Response: YES. Confirmed.

Q92: Reference to specification section 321314.13, sub section 1.3.6.1 Pilot lane, states "construct test section of one paving lane at least 400' long" please clarify if this pilot lane is required for this project, same applies to sub section 1.3.6.2 Fill In Lane.

A92: A&E Response: Yes. Test sections are required.

Q93: After review of the spec section 22 no direction can be found stating what material the natural gas piping should be either above or below ground. Also, please confirm if gas piping 2" and under is to be screwed and 2" above is to be welded.

A93: A&E Response: Please refer to specification section 23 11 25 - Facility Gas Piping and 33 51 15 - Natural Gas Piping requirements.

Q94: Per sheet CD100 we are to supply a bid alternate to demolish 1 of the existing aircraft hangers closes to the new hanger location. Is this hanger on its own gas and electrical service and meter? Will the demolition of the 1 hanger per the plans have any effect on the remaining 3 hangers? If so please clarify what effects these are and how you would like them address in the bid package?

A94: BASE Response: If ABI 01 is taken, it would be part of final phase of the new shelters and the demolition will terminate all electrical and gas to the other Temp Shelters, contractor shall disconnect all utilities between shelters 1 and 2. The remaining shelters (2,3 & 4) shall not be reconnected to the base utilities.

Q95: Per sheet A-002, Air Barrier Legend note C, we are to utilize spray foam insulation. Please clarify the location where spray foam insulation is to be utilized?

A95: A&E Response: The Air Barrier Legend has been edited to remove spray foam insulation.

Q96: Detail G5/CU500 is showing some utilities being encased in concrete. Are there going to be any utilities encased in concrete.

A96: A&E Response: Electrical lines will be concrete encased as indicated on electrical drawings.

Q97: Spec Section 32 13 14.13 - 2.11.5.4 Other Types of Finishing Equipment

a. Are vibrating screeds permitted on the exterior site concrete pavement?

b. Are vibrating screeds permitted on the interior SOG?

A97: A&E Response:

a) Please provide the exact screed to be used for review and all manufacturer information.

b) Please provide the exact screed to be used for review and all manufacturer information.

Q98: -A-151 Ceiling legend shows open structure to be painted. Drawing A-571 shows 10” batt insulation with membrane between purlins at the roof deck. Please confirm there is bat insulation and if the deck needs to be painted above the bat insulation.

A98: A&E Response: Detail G5 on sheet A-571 shows the membrane and insulation correctly. The note on the Ceiling Plan sheets is insure that there are not any elements left unfinished on the ceilings.

Q99: Is the street sweeper required once the building is enclosed while finishes are being completed?

A99: FOD control is required throughout project completion. All exterior pavement shall be swept to keep foreign object debris at a minimum since the eastern portion of the apron will still be active.

Q100: Note 10 CD100 states that all structures, valves shall remain protected and adjusted to finish grade. Can you identify the structures and valves located in the work area on one of the site drawings so we can quantify what is required?

A100: A&E Response: Existing structures can be seen on the site plans. It is unknown the exact number of structures as the survey may have not picked them all up. This shall be field verified.

Q101: What is the top of the concrete wall elevation on Detail A4/S-200.

A101: A&E Response: Per A4/S-200, TOC EL = 100’ -0”

Q102: Please provide rebar sizes and spacing for SOG 14.5” and 8” slabs.

A102: A&E Response: See Notes 10 & 15 on S-100 and S-101 for perimeter slab and edge hangar slab panels (locations called out on plan) for reinforcement.

Q103: -A1/CU500 calls out pipe embedment materials “as specified” and trench width as specified. . I reviewed specification section 33 11 00 and did not see any notes. Please provide water line and storm line embedment details.

A103: A&E Response: Material information is within specification 31 00 00 Earthwork.

Q104: On EA drawings the scale notes 1”=20’ but the scales labeled near the compass looks to be 1”=40’. Please verify scales on drawings.

A104: A&E Response: The scale on EA sheets is 1”= 20’, as shown under the view title. The scale bar shall be edited next to the compass to reflect this in an amendment.

Q105: A-710, General Room finish Schedule notes: Note 10. Finish Legend denotes that concrete floors are CS-1: Sealed, but notes Flooring as EF-1: Epoxy. Which floors, if any, are to be epoxy flooring?

A105: A&E Response: Epoxy flooring has been removed from note 10.

Q106: Note 14. Refers to 09 06 90 Please verify the Spec section as it does not seem to be in the Bid Set.

A106: A&E Response: Specification Section 09 06 90 has been replaced with Section 13 34 19 for the location of the Exterior Colors.

Q107: Note 2. Refers to reflected ceiling, floor finish, enlarged plan and interior detail drawings. Please verify the Sheet #’s as they don’t seem to be in the Bid Set.

A107: A&E Response: Note 2 has been edited to remove Interior Elevations, Floor Finish Drawings, Wall Finish Drawings and Interior Detail Drawings. All other drawings referenced are in the bid set.

Q108: Note 4. Refers to floor finish drawings and transition details. Please verify the Sheet #’s as they don’t seem to be in the Bid Set.

A108: A&E Response: Note 4 has been removed from the sheet.

Q109: Note 5. Refers to finish drawings and interior elevations for finish extents, corner guards, signage, art, and specialty wall finish locations. Please verify the Sheet #’s as they don’t seem to be in the Bid Set.

A109: A&E Response: Note 5 has been removed from the sheet.

Q110: Note 6 & 11. Refer to painting of all structural steel. Does this include painting of the underside of the roof deck (blanket insulation is used here) and/or the inside of the metal wall panels (blanket insulation is used here). Does this include the purlin and girts or just the column/beam frames? Please clarify.

A110: A&E Response: Notes 6 and 11 are to ensure that all exposed equipment and structural elements are painted if not already covered by other elements of the building.

Q111: Reference Drawing FA-601: In reaching out to Monaco to get clarification on the FACU equipment they have indicated that we need to provide a part number. Please provide part numbers for all required equipment.

A111: A&E Response: The fire protection contract documents are performance based. The FACU equipment is to be determined by the contractor to meet the requirements of the project construction documents.

Q112: Specification 13 34 19 Metal Building Systems, Section 1.4.7 state to provide manufacturers standard vertical-rib standing seam roof panels. Does this take preference over specification 07 61 14.00 20 Steel Standing Seam Roofing? Is the separate standing seam roofing specification not applicable on this project.

A112: A&E Response: Specification section 13 94 16 gives only a brief description of the roof panel and section 07 16 45 provides more specific requirements. There are no contradictions in the two specifications sections. In general, if there are two places that describe similar elements, the more restrictive is to be followed. If any perceived contradictions are found, please provide an RFI with the perceived contradictory language from both sections.

Q113: Reference to specification section 321314.13 concrete paving, sub section 2.9 dowels refer to epoxy coated dowels, the plans do not show any epoxy coated dowel, bars or welded wire fabric, please clarify any epoxy coated reinforcing requirements for pavement.

A113: A&E Response: Reinforcement shall be per the project specifications.

Q114: Reference sheet GC003, existing condition note no. 5 calls for special handling and consideration will be required for excavated soils thought to contain contaminated substance. Contractor shall periodically monitor excavated soils. Soils shall be treated on site or disposed of properly. It is almost impossible to figure the cost of this work without knowing where exactly this condition exists. Should the assumption be all the excavated soil is contaminated? What is it contaminated with. This needs to be an allowance or unit price in the bid form as it is unknown at this time. Please advise.

A114: A&E Response: There is no anticipated contaminated soils on the site. This note is for the encounter of contaminated soils during construction that was not known during the design process. If it is encountered, the direction of this note shall apply and potential for Unforeseen Conditions change order.

Q115: Reference geotechnical exploration note 4 on sheet B-100, note states that additional information are in the engineer's subsurface information document, which is available to bidders. Please issue this document.

A115: A&E Response: See response to Q&A#9, amendment 01

Q116: Section 320119 did not specify any products of Joint Sealant for the Interior slab on grade & the exterior concrete pavement joints. It only includes the primers, backup materials. Please advise.

A116: A&E Response: Please see section 2.1 – Sealants. Sealants shall be per ASTM D5893

Q117: EP101 and EP102 Note 4 Should read the same as they are both referring to the receptacles in the hangar area. EP101 calls for all receptacles in hangar areas to be weatherproof gfci. EP102 calls for all receptacles in hangar areas to be explosionproof. The panels in these areas are just NEMA 1 so neither the weatherproof nor explosion proof makes sense.

A117: A&E Response: The panelboards in the hangar bays 101, 102, 103, and 104 shall be NEMA 3R rated. All receptacles in these areas shall be weatherproof and GFCI. (will be shown in amendment)

Q118: Prints EP101 and EP102 both show electrical feeds to Hangar Door Control Panels. Neither print shows connection to electric operators or pushbutton stations. Are we as electrical contractors responsible for any pipe, wire, connections, etc beyond the control panels?

A118: A&E Response: Connections past the hangar door controller will need to be coordinated with what is being provided by the hangar door manufacturer.

Q119: EP101 shows Fire Pump Control Panel. What is conduit and feeder size to Fire Pump and any associated controls?

A119: A&E Response: Fire pump and controller feeder sizes are as indicated on sheet EP601: 2 sets of 3- 500 KCMIL and 1- 250 KCMIL GND in 4” conduit. This is the same size connection to the controller and to the fire pump. (Additional keyed note for wire wise between controller and fire pump will be shown in amendment)

Q120: FX 401 shows a Jockey Pump Control Panel that is not on the Electrical prints.

A120: A&E Response: Jockey pump control panel will be shown on sheet EP101. Power requirements for jockey pump remain the same. (will be shown in amendment)

Q121: EP101 Note 5 Concerning ABI #2: Request more information on the specifications of the invertors that we may be required to provide as well as wiring requirements and what “accessories” may be needed. Clarification on the invertors we are to remove from the temporary shelters… note says to remove cords, connect to new invertors and test. What can we expect as far as necessary material to make these connections for the said test? Without details on the existing as well as new invertors, I cannot comprehend the connection of the two units for a test.

A121: A&E Response: Information on the existing 400Hz invertors in the temporary shelters is as follows:

Existing inverter (from the data plate):

EPU-6/E

Manufactured by Controlled Systems Inc.

Input: 50/60 hz, 240, 360 or 480 V, 3 phase Output: 50kW 400 hz, 120/208V Size: 4' x 4' x 5' tall If ABI#2 is funded, contractor will need to coordinate with owner and manufacturer of 400Hz invertors and provide all connections and accessories needed to make unit functional. Additional details of inverter and cable reels for each bay has been provided on sheet EP501. Keyed notes 2 and 3 on sheets EP101 and EP103, respectively, indicate to remove the existing power cords in the temporary shelters for the 400Hz inverters and connect them to the new inverters in the alert shelter. These will need to be tested upon connection to the new inverters to verify functionality and connectivity.

Q122: For the Joint Layout Plan Grid 1.Per Drawing CP101 between Columns (CE) and Rows (2-4) the joints are not labeled.

A122: A&E Response: Will provide joint in an amended drawing.

Q123: Our manufacturer solely purchases All Weather Insulated Panels for their systems and would not be able to directly purchase Kingspan Panels. I did not see an actual manufacturer for these panels in the specifications, but Addendum #2 specifically mentions Kingspan.

A123: A&E/Base Response: Government was not suggesting any Vendors for Metal Panels. Q48 was in reference to PEMB and single source supplier, it does not require the PEMB vendor to manufacture all parts but supply them.

Q124: Is there any electrical work associated with ABI#1? Grid 2 where the shelter is located is not included in the electrical demo prints.

A124: A&E Response: The contractor shall disconnect all utilities between shelters 1 and 2. The remaining shelters (2,3 & 4) shall not be reconnected to the base utilities. all lighting, conduit and wiring, general receptacles, and any additional electrical or communications equipment in existing shelter 1 shall be disconnected and demolished. The existing 400Hz converters shall be salvaged and returned to the owner.

Q125: Latest additions to Addendum #2 address the fabric hangar doors and that they can be controlled at the door and at a remote location. Where is this remote location?

A125: Base Response: The remote location is in the current ACA Crew quarters. See Sheet ES104 for approximate location. It is in the west hallway near the NW corner of the facility.

Q126: Drawing CU100 shows the waterline tie in point. Could you provide more detail on this location? Is there any pavement cutting / patching required? The existing drawings are hard to read.

A126: Base Response: There is no pavement to the west of our fence line, which is where the water line tie in goes.

Q127: Plans call for and reference an IDS (Intrusion Detection System). Specific information detailing what this system consists of seems to be vague. There is also a reference to an appendix on sheet ES102, Note #2, that we do not seem to have. Please provide additional information for the IDS and a possible appendix.

A127: A&E Response: Please see sheet T-002 for general information regarding the modifications to the IDS system. The reconnection of the IDS system shall be executed under a separate contract. The contractor is responsible for installing any necessary pathways and power for modifications to the IDS system onsite.

Q128: Specification section 13 34 19 paragraph 1.10.1 calls for a “No-Dollar Limit” warranty for the entire metal building system. These types of warranties are only associated with the roof panel system. A standard warranty of 1 year applies to the structural steel components. A standard finish warranty is available for both the roof and wall panels. And you can purchase optional weathertight warranties for the roof as requested in section1.10.2 of the specifications. Please confirm this is acceptable.

A128: A&E Response: Bid as specified.

Q129: According to the drawings, as part of the technology scope we are to “provide one pair of MM fiber from ACA shelter Communications room to SFS BDOC Communications room”. Where is the “SFS BDOC Communications room”. And what is the pathway to get the fiber there?

A129: A&E Response: Unsure of where this is called out. The MM fiber to be provided for the ACA Alert shelter shall be terminated in the Alert Crew Quarters Building 600.

Q130: Where does the communication backbone go once it leaves the new ACA?

A130: A&E Response: The fiber backbone and 200-pair copper route to and terminate in the Alert Crew Quarters Building 600.

Q131: On Print T-002 General Notes: Klaxon Alert System – please provide additional information regarding this system.

•Note 5 refers to an Appendix that we cannot find in the documents.

•Who installed the original Klaxon system?

•Please provide spec and part numbers

A131: A&E Response: Information for the Alert/Klaxon system can be found on sheet T-002. Additional information and as built drawings are attached for reference.

Q132: On Print TN501 Keyed Notes #2 ask contractor to provide a 2500 series wall phone. Please provide manufacturer.

A132: A&E Response: See attached information for shelter phone.

Q133: On Print TN401 the drawing shows what looks like ladder tray in the communication room however the description is 12” wide by 4” makes me believe the reference is to basket tray. Please clarify which item is desired. Ladder tray does not have dies on it so it will not be 4” deep.

A133: A&E Response: Cable tray to be provided in Room 106 shall be ladder cable tray, as indicated in specification 26 20 00.

Q134: Please provide the sectional thickness for the Exterior Pavement Demolition.

A134: A&E Response: The existing pavement anticipated to be demolished is 11 inches of Concrete.

Base material and thickness is unknown. Borings in the area indicate approximately 36 inches of rock material under the concrete pavement, however the base course thickness could vary across the pavement demolition limits.

AMENDMENT 0003 CHANGES

DRAWINGS REMARKS

CP101 – Joint Layout Plan Grid 1 Added missing joint callouts.

A-701 ROOM FINISH SCHEDULE Revised General Room Finish Schedule Notes.

ES- sheets Removed general note #2 with reference to IDS as built drawings.

ES102 Included information for ABI#1 electrical demolition.

ES103 Note added for klaxon alert system clarification ES104 Note added for comm installation ES105 Note added for concrete encasing conduits shown on plan.

ES106 Included conduit notation and routing information for klaxon alert system wiring through building

600 and HH10.

EP101 Showed jockey pump controller on plan EP102 General note #4 change for receptacles in hangar bays.

EP601 Added keyed note 1 between fire pump controller and fire pump on one-line.

EP603 Panelboard enclosure type change to NEMA 3R.

T-002 Clarification added to cable termination locations for klaxon alert system.

SPECIFICATIONS REMARKS

None

(End of Summary of Changes)