A2.SHELTER_DWGS_Oct_2018-1.pdf
PDF 35 MB Posted
- Attached to
- Aircraft Alert Shelters Federal contract opportunity
- Solicitation number
- W9136419B8001
About this file
Shelter Drawing Oct 2018
View the file
Other files for this federal contract opportunity
Show all 41
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
P Y
R
IG
H T
B
U R
N S
M c D
O N
N E
L L E
N G
IN
E
E R
IN
G
C O
M P
A N
Y
IN
C
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
180th FIGHTER WING
SWANTON, OHIO
PROJECT WYTD079031 CONTRACT W9133L-15-D-0003-9M03
CONSTRUCT ACA AIRCRAFT SHELTERS
OCTOBER 2018
PROJECT NO. 102134
TYPE B-3 SUBMITTAL
C O
P Y
R
IG
H T
B
U R
N S
M c D
O N
N E
L L E
N G
IN
E
E R
IN
G
C O
M P
A N
Y
IN
C
INDEX SHEET
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
CONSTRUCT ACA AIRCRAFT SHELTERS
PROJECT NO. 102134
DWG NO. SHEET TITLE
G000 COVER SHEET
G001 INDEX SHEET
GC001 PROJECT LOCATION PLAN
GC002 CIVIL LEGEND SHEET
GC003 GENERAL CIVIL NOTES
GC004 ACCESS, STAGING AND SAFETY PLAN
GC005 ACCESS AND SAFETY NOTES
GC010 CONSTRUCTION PHASE 1
GC011 CONSTRUCTION PHASE 2
GC500 ACCESS AND SAFETY DETAILS
A-001 AIRCRAFT CLEARANCE PLAN & SECTIONS
A-002 AIR BARRIER ENCLOSURE PLAN & BUILDING SECTIONS
A-010 OVERALL FLOOR PLAN
A-021 OVERALL ROOF PLAN
A-101 FLOOR PLAN - AREA A
A-102 FLOOR PLAN - AREA B
A-151 REFLECTED CEILING PLAN - AREA A
A-152 REFLECTED CEILING PLAN - AREA B
A-201 EXTERIOR BUILDING ELEVATIONS
A-301 BUILDING SECTIONS
A-311 WALL SECTIONS
A-501 PARTITION TYPES
A-521 LOUVER & PENETRATION DETAILS
A-551 MISCELLANEOUS DETAILS
A-571 ROOF DETAILS
A-601 DOOR SCHEDULES AND TYPES
A-621 DOOR DETAILS
A-622 HANGAR DOOR DETAILS
A-701 ROOM FINISH SCHEDULE
DWG NO. SHEET TITLE
P-001 GENERAL INFORMATION - PLUMBING
P-101 FLOOR PLAN - AREA A - PLUMBING
P-102 FLOOR PLAN - AREA B - PLUMBING
P-501 DETAILS - PLUMBING
DWG NO. SHEET TITLE
M-001 GENERAL INFORMATION - MECHANICAL
M-101 FLOOR PLAN - AREA A - MECHANICAL
M-102 FLOOR PLAN - AREA B - MECHANICAL
M-501 DETAILS - MECHANICAL
M-601 SCHEDULES - MECHANICAL
M-701 CONTROLS - MECHANICAL
GENERAL CIVIL
ARCHITECTURAL
PLUMBING
MECHANICAL
DWG NO. SHEET TITLE
V-100 EXISTING CONDITIONS PLAN
DWG NO. SHEET TITLE
AG001 ARCHITECTURAL LEGEND AND ABBREVIATIONS
AG002 ARCHITECTURAL GENERAL NOTES
DWG NO. SHEET TITLE
FA001 FIRE ALARM NOTES, LEGEND AND ABBREVIATIONS
FA101 FIRE ALARM PLAN - AREA A
FA102 FIRE ALARM PLAN - AREA B
FA501 FIRE ALARM DETAILS
FA601 FIRE ALARM RISER
FA602 FACU MATRIX
FA603 RSFACU MATRIX
FIRE PROTECTION
DWG NO. SHEET TITLE
E-001 ELECTRICAL SYMBOLS, LEGEND
E-002 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES
E-003 HAZARDOUS LOCATION PLAN
DWG NO. SHEET TITLE
T-001 COMMUNICATIONS SYMBOLS LEGEND AND ABBREVIATIONS
T-002 SYSTEM INTEGRATION NOTES
TN101 COMMUNICATIONS PLAN - AREA A
TN102 COMMUNICATIONS PLAN - AREA B
TN401 COMMUNICATIONS ENLARGED PLANS
TN501 COMMUNICATIONS DETAILS
TN502 COMMUNICATIONS DETAILS
TN701 COMMUNICATIONS RISER DIAGRAMS
TY101 SECURITY PLAN - AREA A
TY102 SECURITY PLAN - AREA B
TELECOMELECTRICAL
F-001 LIFE SAFETY CODE AND CRITERIA
F-010 OVERALL LIFE SAFETY FLOOR PLAN
ES101 ELECTRICAL DEMOLITION SITE PLAN
ES102 ELECTRICAL DEMOLITION SITE PLAN
ES103 ELECTRICAL DEMOLITION SITE PLAN
ES104 ELECTRICAL NEW WORK SITE PLAN
ES105 ELECTRICAL NEW WORK SITE PLAN
ES106 ELECTRICAL NEW WORK SITE PLAN
ES401 ELECTRICAL ENLARGED PLAN
ES501 SITE DETAILS
ES502 SITE DETAILS
EL101 LIGHTING PLAN - AREA A
EL102 LIGHTING PLAN - AREA B
EL501 LIGHTING DETAILS
EL502 LIGHTING DETAILS
EL503 LIGHTING SCHEDULE
EL504 LIGHTING CONTROLS PLAN
EP101 POWER PLAN - AREA A
EP102 POWER PLAN - AREA B
EP401 POWER ENLARGED PLANS
EP501 ELECTRICAL DETAILS
EP502 ELECTRICAL DETAILS
EP601 ONE-LINE DIAGRAM
EP602 PANELBOARD SCHEDULES
EP603 PANELBOARD SCHEDULES
EP604 PANELBOARD SCHEDULES
EP605 MECHANICAL EQUIPMENT SCHEDULE
EA101 DEMOLITION AIRFIELD LIGHTING PLAN
EA102 DEMOLITION AIRFIELD LIGHTING PLAN
EA103 NEW WORK AIRFIELD LIGHTING PLAN
EA104 NEW WORK AIRFIELD LIGHTING PLAN
EA501 AIRFIELD LIGHTING DETAILS
EA502 AIRFIELD LIGHTING DETAILS
EG101 GROUNDING PLAN
EG102 LIGHTNING PROTECTION PLAN
EG103 LIGHTNING PROTECTION ROLLING BALL DETAIL
EG501 GROUNDING DETAILS
EG502 GROUNDING DETAILS
EG503 TYPICAL GROUNDING RISER DIAGRAM
B-100 BORING LOCATION PLAN
CD100 OVERALL DEMOLITION PLAN
CD101 DEMOLITION PLAN GRID 1
CD102 DEMOLITION PLAN GRID 2
CD103 DEMOLITION PLAN GRID 4
CD104 DEMOLITION PLAN GRID 5
CS100 OVERALL SITE PLAN
CS101 SITE PLAN GRID 1
CS102 SITE PLAN GRID 4
CS103 SITE PLAN GRID 5
CS500 SITE DETAILS SHEET 1 OF 3
CS501 SITE DETAILS SHEET 2 OF 3
CS502 SITE DETAILS SHEET 3 OF 3
CP101 JOINT LAYOUT PLAN GRID 1 PHASE 1
CP102 JOINT LAYOUT PLAN GRID 4 PHASE 1
CP103 JOINT LAYOUT PLAN GRID 1 PHASE 2
CP110 JOINT ELEVATION PLAN GRID 1 PHASE 1
CP111 JOINT ELEVATION PLAN GRID 4 PHASE 1
CP112 JOINT ELEVATION PLAN GRID 1 PHASE 2
CG100 OVERALL GRADING PLAN
CG101 GRADING PLAN GRID 1
CG102 GRADING PLAN GRID 4
CU100 OVERALL UTILITY PLAN
CU101 UTILITY PLAN GRID 1
CU102 UTILITY PLAN GRID 4
CU201 STORM PROFILE 1
CU202 STORM PROFILE 2
CU500 UTILITY DETAILS SHEET 1 OF 5
CU501 UTILITY DETAILS SHEET 2 OF 5
CU502 UTILITY DETAILS SHEET 3 OF 5
CU503 UTILITY DETAILS SHEET 4 OF 5
CU504 UTILITY DETAILS SHEET 5 OF 5
FX001 FIRE SUPPRESSION NOTES, LEGEND AND ABBREVIATIONS
FX101 FIRE SUPPRESSION PLAN - AREA A
FX102 FIRE SUPPRESSION PLAN - AREA B
FX401 FIRE PUMP ROOM ENLARGED PLAN
FX601 FIRE SUPPRESSION ONE LINE DIAGRAM
STRUCTURAL
DWG NO. SHEET TITLE
S-001 GENERAL NOTES - SHEET 1
S-002 GENERAL NOTES - SHEET 2
S-003 LEGEND & ABBREVIATIONS
S-004 STANDARD CONCRETE DETAILS
S-005 STANDARD CONCRETE DETAILS
S-006 STANDARD CONCRETE DETAILS
S-007 STANDARD STEEL DETAILS
S-100 OVERALL FOUNDATION AND SLAB PLAN
S-101 FOUNDATION AND SLAB PLAN A
S-102 FOUNDATION AND SLAB PLAN B
S-200 FOUNDATION SECTIONS AND DETAILS
S-201 FOUNDATION SECTIONS AND DETAILS
CBR 2
CBR 1
CBR 6
CBR 7A
CBS 12
SAN LIFT STATION
SAN MH 15
SAN PUMP
SAN MH 14
4' WIDE HEADWALL
I.E. 18" COR. METAL NE = 660.93
12" STORM
4" DI
SAN CO
CBS 14
CBS 15
CBS 13
TR
EN
CH
D
RA
IN
ST MH 1
12" STORM
TRENCH DRAIN
OVERHEAD STEAM SUPPLY
TRENCH DRAIN
TR
EN
CH
D
RA
IN
I.E. 18" COR. METAL NE = 661.47
SAN LIFT STATION
YW TAXI LIGHT
YW TAXI LIGHT
A1
A3
A4
A5
A6
A2
T
T
T
T
US 20A
LC
SO
UT
H
EB
ER
R
OA
D C
SO
UT
H
EB
ER
R
OA
D
L
TRUE POINT OF BEGINNING
UTILITY EASMENT
TRUE POINT OF BEGINNING
UTILITY EASMENT (WATER LINE)
US 20A
MAUMEE WESTERN RD
W
HI
TE
HO
US
E-
SP
EN
CE
R
RD
AIRPORT HIGHWAY
OHIO TURNPIKE
W
IL
KI
NS
R D.
AIRPORT HIGHWAY
S.
R.
S.
R.
AI
R
CA
RG
O
PK
W Y.
GARDEN RD.
T
T
T
T T
T
W
W
W W
N
Sc al e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
no. date descriptionby ckd
J
H
G
F
E
D
C
B
A
C O
PY
R
IG
H
T
BU
R
N S
M cD O
N N
EL
L
EN
G
IN
EE
R
IN
G C
O M
PA
N
Y, IN
C
2/
/2
9:
:1
AM
180TH FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
180th Fighter Wing Toledo Express Airport, OH
9400 WARD PARKWAY
KANSAS CITY, MO 64114
(816) 333-9400
REVISIONS
K
Construct ACA Shelters
1 1098765432
WYTD079031 W9133L-15-D-0003-9M03
PROJECT LOCATION PLAN
GC001
PROJECT LOCATION PLAN
02/12/18 C. FRANZEN
A. DORMAN C. STEWART
\\BMCD\DFS\CLIENTS\ANF\USNGB\ANG\OH\102134_OHANGALRTSHLTB\DESIGN\CIVIL\SHEETS\102134GC001.DWG 7/26/2018 12:01 PM CFRANZEN
0 600' 1200'
PROJECT LOCATION
SWANTON
TOLEDO
HOLLAND
A1 PROJECT LOCATION PLAN
SCALE: 1" = 600'
PROJECT
AREA
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text
TC
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TXY B
AutoCAD SHX Text
TXY B
AutoCAD SHX Text
TXY B
AutoCAD SHX Text
TXY B
AutoCAD SHX Text
TXY B
AutoCAD SHX Text
TXY B
AutoCAD SHX Text
TXY A
AutoCAD SHX Text
TXY B1
AutoCAD SHX Text
TXY B1
AutoCAD SHX Text
TXY N
AutoCAD SHX Text
TXY B9
AutoCAD SHX Text
TXY B11
AutoCAD SHX Text
TXY B13
AutoCAD SHX Text
TXY B14
AutoCAD SHX Text
TXY D14
AutoCAD SHX Text
TXY D13
AutoCAD SHX Text
TXY D11
AutoCAD SHX Text
TXY D9
AutoCAD SHX Text
TXY D6
AutoCAD SHX Text
TXY N
AutoCAD SHX Text
TXY N
AutoCAD SHX Text
TXY B6
AutoCAD SHX Text
TXY D
AutoCAD SHX Text
TXY D
AutoCAD SHX Text
TXY D
AutoCAD SHX Text
TXY D
AutoCAD SHX Text
TXY D
AutoCAD SHX Text
TXY D
AutoCAD SHX Text
TXY D
AutoCAD SHX Text
TXY D1
AutoCAD SHX Text
TXY N
AutoCAD SHX Text
TXY N3
AutoCAD SHX Text
TXY N2
AutoCAD SHX Text
RUNWAY 7-25
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
Sc al e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
no. date descriptionby ckd
J
H
G
F
E
D
C
B
A
C O
PY
R
IG
H
T
N S
M cD O
N N
EL
L
EN
G
IN
EE
R
IN
G C
O M
PA
N
Y, IN
C
2/
/2
9:
:1
AM
180TH FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
180th Fighter Wing Toledo Express Airport, OH
9400 WARD PARKWAY
KANSAS CITY, MO 64114
(816) 333-9400
REVISIONS
K
Construct ACA Shelters
1 1098765432
WYTD079031 W9133L-15-D-0003-9M03
CIVIL LEGEND SHEET
GC002
CIVIL LEGEND SHEET
02/12/18 C. FRANZEN
A. DORMAN C. STEWART
\\BMCD\DFS\CLIENTS\ANF\USNGB\ANG\OH\102134_OHANGALRTSHLTB\DESIGN\CIVIL\SHEETS\102134GC002.DWG 10/9/2018 1:07 PM CFRANZEN
SECTION AND DETAIL IDENTIFICATION
DRAWING NUMBER WHERE
DETAIL IS DRAWN
NUMBER INDICATES DETAIL
LETTER INDICATES SECTION
DRAWING NUMBER WHERE
SECTION IS DETAILED
DISCIPLINE DESIGNATOR
P= M=
L=
A=
E=
C= CIVIL
ELECTRICAL
ARCHITECTURAL
LANDSCAPING
MECHANICAL HVAC
MECHANICAL PLUMBING
S= STRUCTURAL
DISCIPLINE DESIGNATOR
EXISTING NEW
LP1
CMH
CO
A
02-CS100
A
02-CS100
CS100
SECTION
IDENTIFICATION
DISCIPLINE
DESIGNATOR
T
W
C
E
WSIGN
POWER POLE
LIGHT POLE
PAD MOUNTED TRANSFORMER
ELECTRIC BOX
GENERATOR
COMMUNICATION MANHOLE
COMMUNICATION BOX
WATER VALVE
DOMESTIC
WATER METER
LOW PROFILE
FIRE HYDRANT
POST INDICATOR
VALVE
LID
BOLLARD
LID FOR UNKNOWN UTILITY
GEN
CO CLEAN OUT
RIPRAP
EXISTING NEW
SDMHSTORM DRAIN MANHOLE
ROOF DRAIN
LEGEND
APRON CONCRETE PAVEMENT
APRON ASPHALT PAVEMENT
UNDERGROUND ELECTRIC
UNDERGROUND COMM
GAS LINE
STORM DRAIN PIPE
CULVERT PIPE
WATER LINE
SANITARY SEWER LINE
TREE LINE
SHRUB LINE
TREES
6" SS
EXISTING NEW
BUILDING / AWNING
PAVEMENT MARKING REMOVAL
WETLANDS MITIGATION AREA
CONCRETE DEMOLITION
ASPHALT DEMOLITION
GRAVEL DEMOLITION
BUILDING DEMOLITION
ASPHALT DEMOLITION
FULL DEPTH SAW CUT
MISCELLANEOUS
STRUCTURE / TREE
DEMOLITION
B2BORING
ABI ADDITIVE BID ITEM
BM BENCHMARK
C/COMM COMMUNICATIONS
CE CIVIL ENGINEER
CMH COMMUNICATIONS MANHOLE
CONC CONCRETE
CCO CLEAN OUT
COR CONTRACTING OFFICER'S REPRESENTATIVE
CL CENTERLINE
DEPT DEPARTMENT
DEQ DEPARTMENT OF ENVIRONMENTAL QUALITY
DIA DIAMETER
DIP DUCTILE IRON PIPE
DS DOWNSPOUT
E ELECTRICAL
ELEC ELECTRICAL
EL/ELEV ELEVATION
EMH ELECTRICAL MANHOLE
FES FLARED END SECTION
FF FINISH FLOOR
FH FIRE HYDRANT
FL FLOW LINE
FOD FOREIGN OBJECT DEBRIS
FT FOOT
FW FIREWATER
FY FISCAL YEAR
G GAS
GOVT (GOV) GOVERNMENT
GPM GALLONS PER MINUTE
HW HEADWALL
IDS INTRUSION DETECTION SYSTEM
INV INVERT
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
PCC PORTLAND CEMENT CONCRETE
POV PRIVATELY OWNED VEHICLE
PVC POLYVINYL CHLORIDE
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
SAN SANITARY SEWER
SD STORM DRAIN
SDI STORM DRAIN INLET
SDMH STORM DRAIN MANHOLE
SS SANITARY SEWER
SSMH SANITARY SEWER MANHOLE
SWPPP STORM WATER POLLUTION PREVENTION PLAN
TELE TELEPHONE
TEMP TEMPORARY
TYP TYPICAL
W, WA WATER
WM WATER METER
WV WATER VALVE
WWF WELDED WIRE FABRIC
XFMR ELECTRICAL TRANSFORMER
ABBREVIATIONS DESCRIPTION
FIRE WATER LINE
LEGEND LEGEND
FENCE
FW
DRAWING PACKAGE
DETAIL
IDENTIFICATION
LIGHTNING PROTECTION POLE
M
W WATER VALVE
FIRE WATER
E
12" WA1
2" NG1
12" SD2
ASPHALT SHOULDER REMOVAL
UTILITY DEMOLITION/
ABANDON IN PLACE
BUILDING DEMOLITION
GUARDRAIL REMOVAL
AIRCRAFT RATED
TRENCH DRAIN
FLARED END SECTION
ROOF DRAIN
12" SD2
2" COMM
AutoCAD SHX Text D
AutoCAD SHX Text X
X e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
no. date descriptionby ckd
J
H
G
F
E
D
C
B
A
C O
PY
R
IG
H
T
N S
M cD O
N N
EL
L
EN
G
IN
EE
R
IN
G C
O M
PA
N
Y, IN
C
2/
/2
9:
:1
AM
180TH FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
180th Fighter Wing Toledo Express Airport, OH
9400 WARD PARKWAY
KANSAS CITY, MO 64114
(816) 333-9400
REVISIONS
K
Construct ACA Shelters
1 1098765432
WYTD079031 W9133L-15-D-0003-9M03
GENERAL CIVIL NOTES
GC003
GENERAL CIVIL NOTES
02/12/18 C. FRANZEN
A. DORMAN C. STEWART
\\BMCD\DFS\CLIENTS\ANF\USNGB\ANG\OH\102134_OHANGALRTSHLTB\DESIGN\CIVIL\SHEETS\102134GC003.DWG 7/26/2018 11:56 AM CFRANZEN
GENERAL CIVIL NOTES:
1. CONTRACTOR SHALL OBTAIN ALL REQUIRED DIGGING AND EARTHWORK PERMITS FROM
THE CITY, STATE, AIRPORT, AND OHIO AIR NATIONAL GUARD. THIS MAY TAKE
APPROXIMATELY 3 WEEKS OR MORE TO COMPLETE. UPON COMPLETION, CONTRACTOR
SHALL CALL OHIO UTILITIES PROTECTION SERVICE FOR UTILITY LOCATE SERVICES AT
1-800-362-2764.
2. CONTRACTOR IS REQUIRED TO FILE FAA FORM 7460-1 IN REFERENCE TO THE
CONTRACTOR'S SITE CONSTRUCTION EQUIPMENT. MAXIMUM EQUIPMENT HEIGHT IS
150-FEET. CONTRACTOR SHALL COORDINATE WITH BASE CE OFFICE AND AIRPORT FOR ANY
TEMPORARY AIRPORT WAIVERS.
3. CONTRACTOR SHALL COMPLETE THE STORMWATER POLLUTION PREVENTION PLAN
(SWPPP). REFER TO THE SPECIFICATIONS FOR DETAILS ON STORMWATER POLLUTION
PREVENTION MEASURES FOR THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR
FOLLOWING ALL OHIO DEQ REQUIREMENTS FOR EROSION CONTROL.
4. CONTRACTOR SHALL STOP WORK IMMEDIATELY AND CONTACT THE CONTRACTING
OFFICER IF A UTILITY LINE IS DISTURBED.
5. CONTRACTORS SHALL KEEP ALL ROADS AND STREETS CLEAN OF CONSTRUCTION DEBRIS,
MUD, ETC. AT ALL TIMES. CONTRACTOR SHALL PROVIDE EQUIPMENT AND PERSONNEL TO
CLEAN ANY STREETS AS REQUESTED BY THE CONTRACTING OFFICER. CONTRACTOR IS
RESPONSIBLE FOR ALL REPAIRS TO STREETS, PARKING AREAS, AND AIRPORT OR
GOVERNMENT PROPERTY, DUE TO DAMAGE BY THEIR CONSTRUCTION ACTIVITIES.
CONTRACTOR SHALL PROVIDE PHOTOGRAPHS AND/OR VIDEO RECORDING OF THE
EXISTING STATE FOR THE PROJECT LIMITS. ACCESS POINTS, HAUL ROUTES, LAYDOWN
AREA AND ANY OTHER AREAS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED TO
THEIR ORIGINAL CONDITION OR BETTER TO THE SATISFACTION OF THE CONTRACTING
OFFICER. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER FOR A
PRECONSTRUCTION VIDEO DETAILING THE EXISTING CONDITION OF ACCESS POINTS, HAUL
ROUTES, AND LAYDOWN AREAS TO BE PERFORMED.
6. ALL WORK WILL BE SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL OF STATE,
LOCAL, AND GOVERNMENT REGULATORY AGENCIES AND THE CONTRACTING OFFICER.
7. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS,
STATE, LOCAL, AND GOVERNMENT CODES, ORDINANCES, AND REGULATIONS. IN CASE OF
CONTRADICTION OR DISCREPANCY BETWEEN REQUIREMENTS, CONTRACTOR SHALL
INCORPORATE WHICHEVER IS MOST STRINGENT. WHERE A QUESTION REMAINS ON WHICH
REQUIREMENT IS MOST STRINGENT, CONTRACTOR SHALL SUBMIT ISSUE TO THE
CONTRACTING OFFICER IN WRITING. THE DECISION OF THE CONTRACTING OFFICER WILL BE
CONSIDERED FINAL.
8. INSTALL A TEMPORARY CHAIN-LINK FENCE PER DETAIL E1 ON SHEET GC500 AROUND THE
CONSTRUCTION FREE ZONE STAGING AREA AND LAYDOWN AREAS AS NEEDED FOR
SECURITY OF EQUIPMENT AND MATERIALS AS DIRECTED BY CONTRACTING OFFICER. LIMITS
OF FENCE SHALL BE A COMBINATION OF NEW AND EXISTING FENCES.
9. COORDINATE THE DISCONNECTION OF UTILITIES THROUGH THE CONTRACTING OFFICER.
DEMOLITION SHALL NOT BEGIN UNTIL WRITTEN BASE APPROVAL IS RECEIVED. ALL EXISTING
UTILITIES ARE TO BE TERMINATED AT THEIR POINT OF CONNECTION TO THE MAINS. WHERE
CONNECTIONS OF NEW UTILITIES TO EXISTING UTILITIES ARE SHOWN ON THE PLANS, THE
CONTRACTOR SHALL EXPOSE THE EXISTING LINES AT THE PROPOSED CONNECTIONS TO
VERIFY THE LOCATIONS AND DEPTHS PRIOR TO EXCAVATION FOR THE NEW LINES.
10.THE CONTRACTOR SHALL EXPOSE, VERIFY AND BACKFILL ALL EXISTING UNDERGROUND
UTILITIES AND STRUCTURES AT UTILITY CROSSINGS PRIOR TO EXCAVATION OF PIPELINE
TRENCH. UTILITY CROSSINGS AT A DEPTH GREATER THAN 12-INCHES BELOW TRENCH
BOTTOM DO NOT NEED TO BE EXPOSED. UTILITY ALIGNMENT AND GRADE MAY BE CHANGED
IF THERE ARE CONFLICTS WITH ANY EXISTING UNDERGROUND UTILITIES AND STRUCTURES,
WHETHER SHOWN ON THE PLANS OR NOT. COORDINATE WITH THE CONTRACTING OFFICER
AND DESIGN ENGINEER.
11.FACILITIES IN THE UTILITY CORRIDOR SHALL BE RESTORED UPON COMPLETION OF
CONSTRUCTION. SCREEN WALLS, FENCES, RETENTION WALLS, VEGETATION, AND OTHER
LANDSCAPING SHALL BE REPLACED IN LIKE KIND TO THE ORIGINAL FEATURES AND TO THE
APPROVAL OF THE CONTRACTING OFFICER. COORDINATE WITH CONTRACTING OFFICER
AND DESIGN ENGINEER.
12.CONTRACTOR IS RESPONSIBLE FOR MOWING AND MAINTAINING ALL AREAS WITHIN THE
PROJECT LIMITS EXCEPT WORK AREAS FOR OTHER CONTRACTS AS COORDINATED WITH
CONTRACTING OFFICE. FROM NOTICE-TO-PROCEED DATE THROUGH THE DURATION OF THE
PROJECT.
13.EROSION CONTROL DEVICES SHALL BE USED FOR THE STAGING AREA AND ANY MATERIAL
STOCK PILES WHEN NECESSARY TO CONTROL EROSION AND STORM WATER RUNOFF, IN
ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS.
RECORD DRAWING NOTES:
1. CONTRACTOR SHALL MAINTAIN UPDATED RECORD DRAWINGS AT ALL TIMES THROUGH THE
DURATION OF THE PROJECT. CONSTRUCTION RECORD DRAWINGS IN CADD AND GIS
FORMAT, SHALL BE SUBMITTED TO THE CONTRACTING OFFICER. AS-BUILTS FOR ALL
UTILITY SYSTEMS AND BUILDING STRUCTURES SHALL BE FIELD SURVEYED AND STAMPED
BY A LICENSED SURVEYOR IN THE STATE OF OHIO.
2. DURING CONSTRUCTION OF THE PROJECT, CONTRACTOR SHALL BE RESPONSIBLE FOR
KEEPING TRACK OF ANY CONTRACTING OFFICER APPROVED FIELD CONSTRUCTION
REVISIONS TO THE DESIGN DEPICTED ON APPROVED CONSTRUCTION DRAWINGS. THESE
REVISIONS SHALL BE USED TO PREPARE RECORD DRAWINGS OF COMPLETED
CONSTRUCTION.
3. ALL VARIATIONS IN PROJECT CONDITIONS, LOCATIONS, AND CONFIGURATIONS, AND ANY
OTHER CHANGES OR DEVIATIONS FROM THE INFORMATION PRESENTED ON THE ORIGINAL,
APPROVED CONSTRUCTION DRAWINGS SHALL BE NOTED. THIS INCLUDES BURIED OR
CONCEALED CONSTRUCTION AND UTILITY FEATURES THAT WERE REVEALED DURING
CONSTRUCTION.
AIRPORT OPERATIONS COORDINATION NOTES:
1. CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS INDICATED IN FEDERAL AVIATION
ADMINISTRATION (FAA) ADVISORY CIRCULAR (AC) 150/5370-2G, OPERATIONAL SAFETY ON
AIRPORTS DURING CONSTRUCTION (CURRENT EDITION).
2. CONTRACTOR SHALL NOT ACCESS THE AIRCRAFT OPERATIONS AREA WITHOUT CLEARANCE
FROM TOLEDO - EXPRESS AIRPORT OPERATIONS, THE OHIO AIR NATIONAL GUARD, AND THE
CONTRACTING OFFICER, AND SHALL CONDUCT WORK IN SUCH A MANNER TO ENSURE A
MINIMUM HINDRANCE TO AVIATION OPERATIONS. CONTRACTOR SHALL PROVIDE A MINIMUM
NOTICE OF 21 DAYS TO TOLEDO - EXPRESS AIRPORT OPERATIONS AND THE OHIO AIR
NATIONAL GUARD FOR ACCESS TO AN AIRCRAFT OPERATIONS AREA. PEDESTRIAN TRAFFIC
AND PRIVATELY OWNED VEHICLES SHALL NOT BE ALLOWED IN THE AIRCRAFT OPERATIONS
AREA. CONSTRUCTION ACTIVITY AFFECTING AIRCRAFT MOVEMENT AREAS AND AIRPORT
SAFETY REQUIREMENTS SHALL BE COORDINATED WITH TOLEDO - EXPRESS AIRPORT
OPERATIONS, THE OHIO AIR NATIONAL GUARD, AND THE CONTRACTING OFFICER. NO
AIRCRAFT OPERATIONS AREA SHALL BE CLOSED WITHOUT APPROVAL FROM TOLEDO -
EXPRESS AIRPORT OPERATIONS AND THE OHIO AIR NATIONAL GUARD.
3. VEHICLES AND EQUIPMENT SHALL BE IDENTIFIED BY AN APPROPRIATELY SIZED FLASHING
OR STEADY BURNING AMBER BEACON MOUNTED ON THE UPPER MOST PART OF THE
VEHICLE OR EQUIPMENT SUCH THAT IT IS CONSPICUOUS FROM ANY DIRECTION INCLUDING
FROM THE AIR. IF A VEHICLE OR PIECE OF EQUIPMENT IS NOT FURNISHED WITH SUCH A
BEACON, IT MUST BE ESCORTED AT ALL TIMES INTO THE AIRCRAFT OPERATIONS AREA BY A
PROPERLY LIT VEHICLE.
4. NOTICES TO AIRMEN (NOTAMS) SHALL BE ISSUED IN ACCORDANCE WITH AC 150/5370-2G
OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION, AND AC 150/5200-28D
NOTICES TO AIRMEN FOR AIRPORT OPERATORS. ALL NOTAMS SHALL BE COORDINATED
WITH TOLEDO - EXPRESS AIRPORT OPERATIONS AND THE CONTRACTING OFFICER. THE
NOTAM INFORMATION SHALL INCLUDE PORTIONS OF THE AIRFIELD THAT ARE CLOSED OR
DISPLACED, THE DATE AND TIME OF THE BEGINNING AND ENDING OF WORK, AND THE
DURATION OF THE WORK.
5. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 21 DAYS TO BASE-AIRFIELD
OPERATIONS REGARDING THE NEED FOR NOTICES TO AIRMEN (NOTAMS). CONTRACTOR
SHALL NOT COMMENCE WORK ACTIVITIES ON AIRFIELD AREAS UNTIL APPROPRIATE
NOTAMS HAVE BEEN ISSUED TO IDENTIFY WORK ACTIVITIES.
6. CONTRACTOR SHALL PROTECT FROM DAMAGE ALL NAVIGATIONAL AID (NAVAID) EQUIPMENT
AND ALL ASSOCIATED STRUCTURES AND UTILITIES. CONTRACTOR SHALL IMMEDIATELY
NOTIFY THE CONTRACTING OFFICER IF CONSTRUCTION ACTIVITY DISRUPTS NAVAID
EQUIPMENT. THE CONTRACTOR SHALL REPAIR AND/OR REPLACE ANY DAMAGED NAVAID
EQUIPMENT WITH QUALIFIED TRADESMEN TO THE SATISFACTION OF THE CONTRACTING
OFFICER AND AT NO ADDITIONAL COST TO THE GOVERNMENT OR AIRPORT. ANY DAMAGE
TO EXISTING AIRFIELD LIGHTING, AIRCRAFT NAVIGATIONAL AIDS (NAVAIDS), OR AIRFIELD
PAVEMENTS-TO-REMAIN DUE TO CONSTRUCTION SHALL BE COMMUNICATED TO THE
CONTRACTING OFFICER AND SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR TO
THE SATISFACTION OF THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE
GOVERNMENT OR AIRPORT.
7. APRON CLEARANCE AREAS SHALL BE MARKED IN THE FIELD BY THE CONTRACTOR, WITH
APPROVAL FROM THE CONTRACTING OFFICER, TO SERVE AS AN AID TO KEEP EQUIPMENT
AND PERSONNEL FROM INADVERTENTLY ENTERING THESE AREAS. CONTRACTOR SHALL
REFER TO UFC 3-260-01 AND AFI 32-1042.
8. DEBRIS, WASTE, AND LOOSE MATERIALS CAPABLE OF CAUSING DAMAGE TO AIRCRAFT
SHALL NOT BE LEFT WITHIN ACTIVE AIRCRAFT OPERATION AREAS. CONTRACTOR IS
REQUIRED TO IMMEDIATELY CLEAN ANY DEBRIS CARRIED ONTO THE AIRFIELD FROM
CONTRACTOR'S EQUIPMENT OR OPERATIONS TO PREVENT FOREIGN OBJECT DAMAGE
(FOD). MATERIAL DROPPED WITHIN THESE AREAS SHALL BE CONTINUOUSLY REMOVED BY
APPROVED METHODS DURING WORKING HOURS. STOCKPILED MATERIAL SHALL BE
CONSTRAINED IN A MANNER TO PREVENT MOVEMENT RESULTING FROM AIRCRAFT
PROPWASH OR JET BLAST. CONTRACTOR SHALL HAVE A FULLY OPERATIONAL VACUUM
TRUCK ON SITE AT ALL TIMES TO CLEAN ADJACENT AIRFIELD PAVEMENTS ON A DAILY BASIS
AND AS REQUIRED BY THE CONTRACTING OFFICER AND AIRFIELD OPERATIONS.
COORDINATION AND COMMUNICATION:
1. CONTRACTOR SHALL APPOINT A CONSTRUCTION SUPERINTENDENT, SUBJECT TO THE
APPROVAL OF THE CONTRACTING OFFICER, WHO SHALL BE PRESENT ON THE
CONSTRUCTION SITE AT ALL TIMES DURING WORKING HOURS WHILE JOB IS IN PROGRESS.
THE SUPERINTENDENT SHALL BE DESIGNATED THE RESPONSIBLE CONTRACTOR'S
REPRESENTATIVE WHO SHALL BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE
CONTRACTOR'S REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN
ALTERNATE REPRESENTATIVE SHALL BE PROVIDED. CONTRACTOR SHALL PROVIDE NAMES
AND CONTACT INFORMATION OF REPRESENTATIVES TO THE CONTRACTING OFFICER PRIOR
TO THE START OF CONSTRUCTION ACTIVITIES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION
BETWEEN ANY SUBCONTRACTORS AND THE CONTRACTING OFFICER. ALL CONSTRUCTION
ACTIVITIES PLANNED BY THE CONTRACTOR SHALL BE REVIEWED AND APPROVED BY THE
CONTRACTING OFFICER.
EXISTING CONDITION NOTES:
1. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS INDICATED HAVE BEEN
OBTAINED FROM EXISTING RECORDS AND FIELD SURVEYS. UNDERGROUND STRUCTURES
AND UTILITIES MAY BE PRESENT WHICH ARE NOT DOCUMENTED OR LOCATED.
2. THE CONTRACTOR SHALL FIELD-CHECK ALL EXISTING CONDITIONS AND BE THOROUGHLY
FAMILIAR WITH THE SITE BEFORE ANY WORK COMMENCES. ANY DISCREPANCIES IN THE
DRAWINGS SHALL BE IMMEDIATELY REPORTED TO THE COR BEFORE ANY FURTHER WORK
COMMENCES.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD-VERIFY EXISTING STRUCTURES, UTILITIES, AND SURVEY INFORMATION, AND TO TAKE NECESSARY PRECAUTIONS DURING
DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL VERIFY EXISTENCE AND MARK
LOCATIONS OF ALL UTILITIES, INCLUDING SERVICE WORK. CONTRACTOR SHALL CONTACT
THE BASE, AIRPORT, AND ALL ASSOCIATED UTILITY COMPANIES AND AGENCIES TO IDENTIFY
THE LOCATION OF UTILITIES.THERE IS NO GUARANTEE, EITHER EXPRESSED OR IMPLIED,
THAT THE LOCATIONS, SIZE AND TYPE OF MATERIAL OF EXISTING UNDERGROUND UTILITIES
INDICATED ARE REPRESENTATIVE OF THOSE TO BE ENCOUNTERED DURING
CONSTRUCTION.
4. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT TO BE DAMAGED DURING
DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE
DAMAGED OR DISTURBED ITEMS TO THE SATISFACTION OF THE COR.
5. SPECIAL HANDLING AND CONSIDERATION WILL BE REQUIRED FOR EXCAVATED SOILS
THOUGHT TO CONTAIN CONTAMINATED SUBSTANCES. CONTRACTOR SHALL PERIODICALLY
MONITOR EXCAVATED SOILS. SOILS SHALL BE TREATED ON SITE OR DISPOSED OF
PROPERLY IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL REQUIREMENTS AND
THE PROJECT SPECIFICATIONS. CONTRACTOR SHALL COORDINATE REMOVAL OF
CONTAMINATED MATERIALS WITH THE CONTRACTING OFFICER.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEANUP OF ANY SEWAGE SPILLS
CAUSED DURING CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE
CONTRACTING OFFICER AND THE STATE DEPARTMENT OF HEALTH. ALL CLEANUP EFFORTS
SHALL BE IN STRICT COMPLIANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS.
SURVEY AND SUBSURFACE INVESTIGATION NOTES:
1. THE SURVEY WAS PERFORMED BY NORTHWEST CONSULTANTS, INC. IN DECEMBER 2017.
2. CONTRACTOR SHALL RETAIN A LICENSED SURVEYOR TO SURVEY PROJECT
IMPROVEMENTS. IF BENCHMARKS SHOWN ARE IN AREAS THAT REQUIRE DEMOLITION,
OTHER BENCHMARKS SHALL BE ESTABLISHED BEFORE DEMOLITION AND CONSTRUCTION
WORK BEGINS. CONTRACTOR SHALL SUPPLY CERTIFIED, CONTROL POINT DATA TO THE
COR AFTER COMPLETION OF CONSTRUCTION.
3. HORIZONTAL DATUM: NAD83(2011)
VERTICAL DATUM: NAVD88
4. THE SUBSURFACE GEOTECHNICAL INVESTIGATION WAS PERFORMED BY TTL ASSOCIATES,
IN OCTOBER 2017. THE RESULTS OF THE INVESTIGATION ARE CONTAINED IN THE PROJECT
GEOTECHNICAL REPORT.
CAPTIVATION REQUIREMENTS:
HIGH NOISE LEVEL, CHARACTERISTIC OF JET ENGINES, PRODUCES HIGH VIBRATING FORCES
WHICH MAY RESULT IN THE LOOSENING OF SCREWS, BOLTS, NUTS AND FASTENERS. THE HIGH
VOLUME OF AIR MOVEMENT CAN DRAW THESE LOOSENED ITEMS INTO JET ENGINES (POSSIBLY
DESTROYING THE ENGINE OR INJURING PERSONNEL). CAPTIVATION METHODS ARE NECESSARY
TO PREVENT THESE ITEMS FROM LOOSENING. THE REQUIREMENTS ARE AS FOLLOWS:
1. THREADED PARTS OF INTERIOR EXPOSED BOLTED OR SCREWED CONNECTIONS AND
FASTENERS FOR THE BUILDING SIDING, ANCHOR BOLTS, EQUIPMENT AND ACCESSORIES IN
THE ALERT SHELTER SHALL BE COATED WITH THE GE SILICONE RTV 108 OR APPROVED
EQUAL.
2. THREADED CONNECTIONS OF FITTINGS OR DEVICES OF PIPING AND TUBING SYSTEMS,
SUCH AS COUPLINGS, NIPPLES, UNIONS, CAPS, PLUGS, ETC. SHALL BE COATED WITH THE
GE SILICONE RTV 108 OR APPROVED EQUAL.
3. THREADED CONDUIT CONNECTIONS AT COUPLINGS, FIXTURES, JUNCTION BOXES, DEVICES,
ETC. SHALL BE COATED WITH THE GE SILICONE RTV 108 OR APPROVED EQUAL.
4. THREADED PARTS OF CONNECTIONS OF HANGERS AND SUPPORTS FOR EQUIPMENT,
PIPING AND CONDUIT SHALL BE COATED WITH GE SILICONE RTV 108 OR APPROVED EQUAL.
POINT NORTHING EASTING ELEVATION DESCRIPTION
538928.16
538840.90
539688.34
1423733.23
1422684.63
1423940.04
728.27
736.26
705.11
PK NAIL
PK NAIL
PK NAIL
AC
ACAC
AC
AC
SWALE
BLDG #127
SHED
LANDSCAPE
CANOPY
SHED
BL
D
G
MONITORING
WELLS
SW
AL
E
SW
AL
E
BLDG #125
OVERHEAD STEAM SUPPLY
AC
AC
SHED
SHED
SHED
ASPHALT PARKING AREA
BLDG #113
BLDG #114
BLDG #110
BLDG #112
BLDG #101
BLDG #321
BLDG #102
BLDG #124
BLDG #313
BLDG #103
SW
AL
E
SW
AL
E
CANOPY
1345678
3 2456 1
A1 A3 A4
A5
A6
A2
F
F
BLDG #148
E
E
BLDG
#601
ACA ALERT CREW QUARTERS
HAUL ROUTE
5.00' PATHWAY FOR
CREW ACCESS TO
ACTIVE APRON
CONSTRUCTION
FENCING (TYP)
XX
XX
XX
TAXIWAY DELTA
ENTRANCE GATE. SEE NOTE 7
XX
LOW PROFILE
BARRICADES
N 702921.35 E 1613344.18
N 703039.70 E 1613635.64
N 702743.03 E 1613626.49
N 702695.25 E 1613508.08
N 702823.07 E 1614144.06
N 702817.11 E 1614027.95
N 702752.66 E 1613863.30
N 702848.84 E 1613824.48 N 702792.81
E 1613965.87
N 702790.97 E 1613961.16
FA
LC
O N
D R
IV
E
NORTHGATE ROAD
SO
U
TH
G
AT
E
R O
AD
M
IN
U
TE
M
AN
R O
AD
SLUFF DRIVE
N 702992.33 E 1613519.47
N 702946.57 E 1613406.71
0.
N
Sc al e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
no. date descriptionby ckd
J
H
G
F
E
D
C
B
A
C O
PY
R
IG
H
T
N S
M cD O
N N
EL
L
EN
G
IN
EE
R
IN
G C
O M
PA
N
Y, IN
C
2/
/2
9:
:1
AM
180TH FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
180th Fighter Wing Toledo Express Airport, OH
9400 WARD PARKWAY
KANSAS CITY, MO 64114
(816) 333-9400
REVISIONS
K
Construct ACA Shelters
1 1098765432
WYTD079031 W9133L-15-D-0003-9M03
ACCESS, STAGING, AND SAFETY PLAN
GC004
ACCESS, STAGING, AND SAFETY PLAN
02/12/18 C. FRANZEN
A. DORMAN C. STEWART
\\BMCD\DFS\CLIENTS\ANF\USNGB\ANG\OH\102134_OHANGALRTSHLTB\DESIGN\CIVIL\SHEETS\102134GC004.DWG 7/26/2018 11:52 AM CFRANZEN
A1 ACCESS, STAGING, AND SAFETY PLAN
SCALE: 1" = 80' 80' 160'0
LEGEND
CONTRACTOR
STAGING/
LAYDOWN AREA
SECURITY PERIMETER
HAUL ROUTE
JERSEY BARRIERS
CONSTRUCTION
FENCING
LOW PROFILE
BARRICADES
GENERAL ACCESS NOTES:
1. SEE DRAWING GC005 FOR ACCESS AND
SAFETY NOTES.
2. CONTRACTOR IS RESPONSIBLE FOR
MAINTAINING SECURITY WITHIN THEIR
RESPECTIVE CONSTRUCTION AREA AT ALL
TIMES. IF NEEDED, CONTRACTOR SHALL DAISY
CHAIN THEIR OWN LOCK WITH BASE SECURITY
FORCES PAD LOCK PRIOR TO CONSTRUCTION.
3. ALL WORK IS ANTICIPATED TO BE INSIDE BASE
SECURITY FENCE AND REQUIRES BADGED
PERSONNEL AND ALL EQUIPMENT TO BE
PROCESSED THROUGH BASE SECURITY
GATES.
4. CONTRACTOR TO RESTORE DISTURBED AREAS
TO PRE-CONSTRUCTION CONDITIONS UPON
COMPLETION OF SITE WORK. ALL AREAS OF
SITE DEMOLITION TO BE SEEDED UNLESS
INDICATED FOR SOME OTHER TYPE OF
SURFACING. CONTRACTOR SHALL CONSTRUCT
TEMPORARY FENCES AS NEEDED TO MAINTAIN
THE SAFETY AND SECURITY OF THEIR
EQUIPMENT, WORK, AND MATERIALS.
5. CLEAR ACCESS FOR ALL EQUIPMENT,
DELIVERIES, AND PERSONNEL FOR ADJACENT
PROJECT. WORK AREAS SHALL BE MAINTAINED
THROUGHOUT CONSTRUCTION ON HAUL
ROUTES.
6. CONTRACTOR WORK VEHICLES AND
CONSTRUCTION EQUIPMENT PARKING SHALL
BE WITHIN THE LIMITS OF THE STAGING AND
LAYDOWN AREA. INDIVIDUAL AND PRIVATE
VEHICLES SHALL BE PARKED IN LOTS OUTSIDE
OF THE SECURITY FENCE FOR THE AIRCRAFT
APRON.
7. CONTRACTOR SHALL COORDINATE ENTRANCE
GATE ACCESS WITH BASE SECURITY AND COR
PRIOR TO CONSTRUCTION.
XX
A6
GC500
GC500
E1
AutoCAD SHX Text 4"
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text 5"
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text 18"
AutoCAD SHX Text G
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 7"
AutoCAD SHX Text 6"
AutoCAD SHX Text 5"
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 7"
AutoCAD SHX Text 6"
AutoCAD SHX Text 5"
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text 34-16
AutoCAD SHX Text 34-16
AutoCAD SHX Text G
AutoCAD SHX Text 11"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 2"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text 4"
AutoCAD SHX Text 7"
AutoCAD SHX Text 8"
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text
NZ2271
AutoCAD SHX Text
WALLA
AutoCAD SHX Text
MATERIAL:CONCRETE LOCATION:FACE
AutoCAD SHX Text 174.8440
AutoCAD SHX Text
NZ2272
AutoCAD SHX Text
WALLA
AutoCAD SHX Text
MATERIAL:CONCRETE LOCATION:FACE
AutoCAD SHX Text 175.0915
AutoCAD SHX Text
NZ3090
AutoCAD SHX Text
WALLA
AutoCAD SHX Text
MATERIAL:STEEL
AutoCAD SHX Text 174.7678
AutoCAD SHX Text
NZ3091
AutoCAD SHX Text
WALLA
AutoCAD SHX Text
MATERIAL:STEEL
174.9601 e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
no. date descriptionby ckd
J
H
G
F
E
D
C
B
A
C O
PY
R
IG
H
T
N S
M cD O
N N
EL
L
EN
G
IN
EE
R
IN
G C
O M
PA
N
Y, IN
C
2/
/2
9:
:1
AM
180TH FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
180th Fighter Wing Toledo Express Airport, OH
9400 WARD PARKWAY
KANSAS CITY, MO 64114
(816) 333-9400
REVISIONS
K
Construct ACA Shelters
1 1098765432
WYTD079031 W9133L-15-D-0003-9M03
ACCESS AND SAFETY NOTES
GC005
ACCESS AND SAFETY NOTES
02/12/18 C. FRANZEN
A. DORMAN C. STEWART
\\BMCD\DFS\CLIENTS\ANF\USNGB\ANG\OH\102134_OHANGALRTSHLTB\DESIGN\CIVIL\SHEETS\102134GC005.DWG 7/26/2018 11:51 AM CFRANZEN
ACCESS AND SAFETY NOTES:
1. ACCESS TO THE PROJECT FOR ALL CONTRACTOR PERSONNEL, VEHICLES, AND EQUIPMENT IS
ILLUSTRATED ON DRAWINGS. ACCESS ROUTES MAY BE SUBJECT TO CHANGE, SCHEDULE IMPACTS
SHALL BE COORDINATED WITH THE CONTRACTING OFFICER.
2. THE EXISTING AIRPORT ROAD SPEED LIMITS AND LOAD LIMITS ARE STRICTLY ENFORCED. ALL
CONCRETE TRUCKS SHALL PUT DOWN EXTRA AXLES WHEN TRAVELING ON AIRPORT OR BASE
PROPERTY.
3. CONTRACTOR SHALL PROVIDE AND INSTALL A PROFESSIONALLY PAINTED SIGN, MEETING
CONTRACTING OFFICER APPROVAL, AT THE TEMPORARY CONSTRUCTION ENTRANCE TO DIRECT
MATERIAL SUPPLIERS AND EMPLOYEES TO THE CONSTRUCTION SITE. CONTRACTOR SHALL PROVIDE
A MINIMUM NOTICE OF 48 HOURS TO THE CONTRACTING OFFICER REGARDING OVERSIZED OR
CONSTRUCTION DELIVERIES TO THE BASE TRUCK GATE PRIOR TO THOSE DELIVERIES. DELIVERIES
SHALL BE SCHEDULED MONDAY - FRIDAY, 0600 TO 1800. CONTRACTOR SHALL COORDINATE
DELIVERIES WITH BASE SECURITY FORCES BY SUBMISSION OF THE CORRECT ENTRY PASS
PAPERWORK VIA THE CONTRACTING OFFICER.
4. CONTRACTOR'S STAGING AREA AND POV EMPLOYEE PARKING WILL BE LOCATED AS INDICATED ON
SHEET GC005 OR AS DIRECTED BY THE CONTRACTING OFFICER. CONTRACTOR MAY SUBMIT
ALTERNATIVES TO STAGING AREA LOCATIONS AS SHOWN. CONTRACTOR'S STAGING AREA SHALL BE
SUBJECT TO APPROVAL OF CONTRACTING OFFICER'S REPRESENTATIVE. LOCATION OF
CONTRACTOR'S STAGING AREA SHALL BE WITHIN THE PROJECT WORK AREA. SUBMIT PROJECT
OFFICE/MATERIAL STAGING AREA REQUEST TO THE CONTRACTING OFFICER AT LEAST 30 DAYS PRIOR
TO REQUIRED OCCUPANCY DATE.
5. EXISTING AIRPORT ROADS USED AS HAUL ROADS SHALL BE MAINTAINED SUCH THAT UNOBSTRUCTED ACCESS WILL BE PROVIDED AT ALL TIMES FROM THE ROAD TO THE STAGING AREA AND FROM THE STAGING AREA TO THE WORK SITE AND FACILITATE GOVERNMENT ACCESS TO THE BASE AT ALL TIMES. THE HAUL ROAD LOCATIONS SHALL BE AS INDICATED IN SHEET GC004 AND APPROVED BY THE
CONTRACTING OFFICER.
6. CONTRACTOR SHALL COORDINATE ACTIVITIES THROUGHOUT THE PROJECT IN A MANNER THAT
ALLOWS EMERGENCY ACCESS TO ALL EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAYS TO
EMERGENCY VEHICLE'S RESPONSE TIME.
7. CONTRACTOR SHALL MAINTAIN THE ACCESS ROUTE TO BE FREE FROM DEBRIS CAUSED FROM
CONSTRUCTION ACTIVITIES ON A DAILY BASIS.
8. STAGING AREA AND ANY OTHER AREA DISTURBED BY CONTRACTOR DURING CONSTRUCTION SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION OF EXISTING SITE. CONTRACTOR SHALL PROVIDE PHOTOGRAPHS AND VIDEO RECORDING OF THE SITE CONDITIONS BEFORE CONSTRUCTION WITHIN
THE PROJECT LIMITS.
9. ALL AREAS DISTURBED BY ANY CONSTRUCTION ACTIVITIES INCLUDING BORROW AREAS, STOCKPILE
AREAS, MATERIAL LAYDOWN , EQUIPMENT PARKING, CONTRACTOR PARKING, EARTHWORK
ACTIVITIES, UTILITY TRENCHING, OVERHEAD UTILITY WORK, ETC SHALL BE RESTORED TO BETTER THAN EXISTING CONDITIONS. ALL AREAS NOT DESIGNATED FOR PAVEMENT OR GRAVEL SURFACING SHALL BE COVERED WITH A MINIMUM 4-INCHES OF TOPSOIL, SEEDED, AND IRRIGATED/MAINTAINED
FOR A MINIMUM OF 12 MONTHS OR UNTIL 95% COVERAGE OF GROUND COVER PER THE
SPECIFICATIONS.
10. ALL CONTRACTOR VEHICLES AND PERSONNEL MAY BE SEARCHED BY OHIO AIR NATIONAL GUARD
SECURITY POLICE WHEN ENTERING THE BASE AND MAY EXPERIENCE DELAYS. ALL PERSONNEL
ENTERING THE BASE MUST HAVE A VALID PHOTO ID PER SECURITY REQUIREMENTS. ALL VEHICLES ENTERING THE BASE MUST HAVE CURRENT/VALID REGISTRATION, CURRENT/VALID INSURANCE, AND
CURRENT/VALID DRIVER'S LICENSE FOR THE OPERATOR. ALL CONTRACTOR VEHICLES AND
PERSONNEL SHALL BE RESPONSIBLE FOR COORDINATING WITH THE BASE SECURITY OFFICER IN
OBTAINING PROPER SECURITY CLEARANCE AND BADGING PRIOR TO ENTERING SECURE AREAS.
11. MISCELLANEOUS CONTRACTOR ACCESS PROCEDURES: PERIODIC AIR FORCE EXERCISES MAY OR MAY NOT IMPACT DAILY ENTRY PROCEDURES TO WORK AREAS AT TOLEDO EXPRESS AIRPORT. IN ADDITION, ALL CONTRACTOR PERSONNEL MAY BE REQUIRED TO LEAVE AN AREA AND REACCOMPLISH
ENTRY PROCEDURES. IN THE EVENT OF AN EMERGENCY THAT REQUIRES EVACUATION FROM THE
AREA, CONTRACTOR SHALL COMPLY WITH THE INSTRUCTIONS FROM SECURITY FORCES.
12. CONTRACTOR SHALL PROVIDE ALL NECESSARY WATER AND TOILET FACILITIES FOR HIS WORKERS
WITHIN THE CONSTRUCTION ZONE. CONTRACTOR WORKERS SHALL NOT USE GOVERNMENT OR
AIRPORT FACILITIES UNLESS SPECIFICALLY INDICATED OTHERWISE. LOCATIONS OF FACILITIES SHALL
BE COORDINATED WITH CONTRACTING OFFICER.
13. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, THE CONTRACTOR'S CONSTRUCTION
EQUIPMENT AND VEHICLES SHALL BE PARKED WITHIN THE WORK AREA/STAGING AREA.
14. CONTRACTOR SHALL COORDINATE WITH CONTRACTING OFFICER'S REPRESENTATIVE CONCERNING
ANY GOVERNMENT OWNED EQUIPMENT REQUIRING RELOCATION TO COMPLETE PROJECT.
15. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION ACTIVITIES, CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER, POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER
EMERGENCY SERVICES OF THE CLOSURE.
TRAFFIC CONTROL:
1. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH COMPANY DESIGNS,
INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY VISIBLE. CONTRACTOR SHALL PROVIDE EACH
CRANE OPERATION VEHICLE WORKING INSIDE THE AIRPORT SECURITY FENCE WITH A FLAG
ATTACHED TO THE VEHICLE WHICH SHOULD BE AT LEAST 3-FOOT SQUARE HAVING INTERNATIONAL
ORANGE AND WHITE CHECKERED PATTERN SO THAT THE FLAG IS EASILY VISIBLE.
2. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO SOUND AN ALARM
WHEN MOVING IN REVERSE.
3. ONLY RUBBER-TIRE OR RUBBER-TRACKED VEHICLES WILL BE ALLOWED ON EXISTING
PAVEMENT-TO-REMAIN.
4. CONTRACTOR SHALL PROVIDE A MINIMUM 21 DAY NOTICE TO TOLEDO EXPRESS AIRPORT, THE OHIO AIR NATIONAL GUARD, AND THE CONTRACTING OFFICER PRIOR TO ANY REQUESTED ROAD CLOSURE.
THE 21 DAY ADVANCE NOTICE DOES NOT MEAN THE REQUEST WILL BE AUTOMATICALLY APPROVED.
THE 21 DAYS PROVIDES NECESSARY TIME FOR OHIO AIR NATIONAL GUARD CE TO COORDINATE AND VERIFY IF CLOSURE IS ACCEPTABLE. CONTRACTOR SHALL WORK WITH THE OHIO AIR NATIONAL GUARD CE AND CONTRACTING OFFICER TO FINALIZE DATES IF THE AIRPORT OR BASE HAS CONFLICTS
WITH OTHER ACTIVITIES.
5. CONTRACTOR SHALL ATTEND ANY TOLEDO EXPRESS AIRPORT VEHICLE OPERATOR OR FOREIGN
OBJECT DEBRIS (FOD) CONTROL TRAINING COURSE.
6. CONTRACTOR IS REQUIRED TO IMMEDIATELY CLEAN ANY DEBRIS DEPOSITED ONTO THE SITE, ROADS, ETC FROM CONTRACTOR'S EQUIPMENT OR OPERATIONS. MATERIAL DROPPED WITHIN THESE AREAS
SHALL BE CONTINUOUSLY REMOVED BY SURFACE SWEEPERS OR OTHER APPROVED METHODS
DURING WORKING HOURS. CONTRACTOR TO MAINTAIN ONE FULLY OPERATIONAL STREET
SWEEPER/VAC TRUCK ON SITE AT ALL TIMES.
7. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT RESULTING
FROM AIRCRAFT PROPWASH OR JET BLAST.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING AND SUBMITTING OUTAGE REQUEST WITH OHIO AIR NATIONAL GUARD CE OFFICE FOR ANY WORK BLOCKING TEN OR MORE EXISTING PARKING
SPACES.
TEMPORARY CONSTRUCTION CRANE AND STOCKPILE HEIGHT:
1. TEMPORARY OBSTRUCTIONS, SUCH AS CRANES, MUST BE MARKED AND LIGHTED IN ACCORDANCE
WITH FAA AC 70/7460. ALL HAZARDOUS AREAS (SUCH AS EXCAVATIONS OR STOCKPILED MATERIALS) ON THE AIRFIELD MUST BE DELINEATED WITH LIGHTED BARRICADES ON ALL EXPOSED (VISIBLE OR ACCESSIBLE) SIDES. CONTRACTOR SHALL PROVIDE ALL NECESSARY INFORMATION TO THE OHIO AIR
NATIONAL GUARD CE FOR CONSTRUCTION CRANES, EQUIPMENT, AND RELATED EQUIPMENT, AND
RELATED ACTIVITIES. ALL FORMS SHALL BE APPROVED PRIOR TO USING OR BRINGING EQUIPMENT ON SITE. OHIO AIR NATIONAL GUARD CE TO SUBMIT 7460-1 FORMS TO FAA FOR PERMANENT BUILDING.
CONTRACTOR TO SUBMIT 7460-1 FORMS TO FAA FOR ALL TEMPORARY CONSTRUCTION.
2. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION EQUIPMENT OPERATING IN AN AIRCRAFT OPERATIONS AREA IS GOVERNED BY FAA AC 150/5370-2G AND AC 150/5300-13A (CURRENT EDITIONS).
TEMPORARY OBSTRUCTIONS, SUCH AS CRANES AND EQUIPMENT LESS THAN 200'-0" IN HEIGHT
REQUIRE ADDITIONAL LOCAL APPROVAL AS WELL AS FAA 7460-1 APPROVAL. COORDINATE WITH OHIO
AIR NATIONAL GUARD CE OFFICE FOR LOCAL OBSTRUCTION APPROVAL. WHEN EQUIPMENT IS
EXPECTED TO PENETRATE THE AIRFIELD APPROACH SURFACES OR WHEN CRANES WILL BE USED
ON-SITE, CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 45 DAYS TO THE CONTRACTING
OFFICER, THE OHIO AIR NATIONAL GUARD, AND TOLEDO EXPRESS AIRPORT OPERATIONS PRIOR TO THE START OF CONSTRUCTION TO COORDINATE THE SUBMITTAL OF FAA FORM 7460-1 TO THE FAA REGIONAL OFFICE. PERMISSION TO USE CRANES SHALL BE ISSUED BY TOLEDO EXPRESS AIRPORT OPERATIONS, THE OHIO AIR NATIONAL GUARD, AND THE CONTRACTING OFFICER AFTER APPROVAL BY
THE FAA.
3. OBSTRUCTION LIGHT FIXTURES SHALL BE AVIATION RED INCANDESCENT STEADY BURNING
COMPLYING WITH FAA AC 150/5345-43, TYPE L-810. AIR FORCE POLICY DOES NOT ALLOW USE OF LED
FIXTURES FOR OBSTRUCTION LIGHTING.
4. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES SHALL HAVE BOOMS OR ARMS LOWERED TO
THEIR LOWEST ELEVATION.
5. CONTRACTOR SHALL NOT STOCKPILE CONSTRUCTION MATERIALS, SPOILS, OR DEBRIS IN ANY AREA
WHERE SUCH STOCKPILES WOULD PENETRATE AVIATION SURFACES. A 360 DEGREE RED
OBSTRUCTION LIGHT SHALL BE PLACED AT THE HIGHEST POINT OF THE STOCKPILE. STOCKPILING OF
MATERIAL WITHIN THE AIRPORT SAFETY AREAS IS PROHIBITED.
EXCAVATION AND TRENCHES:
1. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT EDITION OF OSHA REGULATIONS, THE STATE
OF OHIO LAWS CONCERNING EXCAVATION, AND USACE EM 385-1-1 SAFETY AND HEALTH
REQUIREMENT MANUAL.
2. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED
WITH ORANGE BARRICADES WITH FLASHING RED LIGHTS ACCEPTABLE TO THE CONTRACTING
OFFICER.
3. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 72 HOURS TO THE CONTRACTING OFFICER AND
ASSOCIATED UTILITY COMPANIES AND AGENCIES BEFORE PROCEEDING WITH ANY EXCAVATION.
4. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON-HAND AND READY FOR PLACING THEREIN.
AS SOON AS POSSIBLE AFTER THE MATERIAL HAS BEEN PLACED AND WORK APPROVED, BACKFILL
AND COMPACT TRENCHES AS SPECIFIED.
5. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE REQUIRED.
6. STRUCTURES AND UTILITIES TO BE REMOVED SHALL BE BACKFILLED IN ACCORDANCE WITH
SPECIFICATION SECTION 31 00 00.
OTHER SAFETY REQUIREMENTS:
1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION (OSHA) REGULATIONS, AND USACE EM 385-1-1 SAFETY AND HEALTH
REQUIREMENTS MANUAL.
2. THE CONTRACTOR SHALL PERFORM ON-SITE INSPECTIONS DAILY AND PRIOR TO LEAVING THE SITE
EACH DAY TO REMEDY ANY SAFETY CONCERNS IMMEDIATELY.
3. THERE SHALL BE NO PERMANENT WASTE SITES ON AIRPORT PROPERTY. ANY TEMPORARY WASTE AREA SHALL BE APPROVED BY THE CONTRACTING OFFICER AND SHALL BE KEPT IN AN ORDERLY
CONDITION. REMOVAL OF WASTE THAT IS NOT PROPERLY MAINTAINED IS SUBJECT TO THE
DIRECTION OF THE CONTRACTING OFFICER.
4. CONTRACTOR SHALL COORDINATE THE RELOCATION AND SALVAGE OF ANY GOVERNMENT OR
AIRPORT OWNED EQUIPMENT WITH THE CONTRACTING OFFICER.
5. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO CONTROL/PREVENT DUST CAUSED BY
CONSTRUCTION ACTIVITIES TO A LIMIT ACCEPTABLE TO TOLEDO EXPRESS AIRPORT, THE OHIO AIR NATIONAL GUARD, AND THE CONTRACTING OFFICER. THE CONTRACTOR SHALL CONTROL/PREVENT
BLOWING DUST ON THE PROJECT SITE FROM ANY HAUL ROUTE OR WORK AREA REGARDLESS OF
SOURCE.
6. GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING FROM CONTRACTOR'S
OPERATIONS OR ACTIVITIES SHALL BE PROPERLY DISPOSED OF IN ACCORDANCE WITH THE
SPECIFICATIONS AND LOCAL REGULATORY REQUIREMENTS AND PROPERLY REMOVED FROM THE
PROJECT PROPERTY. IF HAZARDOUS MATERIALS ARE ENCOUNTERED OR UNCOVERED DURING
CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER.
7. FAILURE TO COMPLY WITH BASE OPERATIONS AND THE CONTRACTING OFFICER SAFETY
REQUIREMENTS SHALL RESULT IN THE SUSPENSION OF CONSTRUCTION ACTIVITIES UNTIL ALL
SAFETY CONCERNS ARE ADDRESSED BY THE CONTRACTOR TO THE SATISFACTION OF THE
CONTRACTING OFFICER.
8. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY PLAN OR BASE SHALL
IMMEDIATELY BE REMOVED FROM THE WORK AREA AND SHALL NOT BE PERMITTED TO RETURN
THROUGHOUT THE REMAINDER OF THE PROJECT.
9. ALL TEMPORARY CONSTRUCTION LIGHTING SHALL BE COORDINATED WITH BASE SECURITY FOR
APPROVAL OF LOCATIONS, HEIGHT, AND DIRECTION.
SECURITY REQUIREMENTS NOTES:
1. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS AND PROCEDURES OF “IAW AFFAR
5353.242-9000, CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS”, IN ACCORDANCE WITH THE SITE
ACCESS AS INDICATED ON GC004 BASE BID CONSTRUCTION ACCESS.
2. ALL CONTRACTOR EMPLOYEES SHALL CARRY CONTRACTOR PHOTO IDENTIFICATION AT ALL TIMES
WHILE WORKING INSIDE THE TOLEDO EXPRESS AIRPORT SECURE PERIMETER.
3. CONTRACTOR EMPLOYEES SHALL COMPLY WITH ANY INTEGRATED DEFENSE MEASURES THAT MAY BE NECESSARY DURING CONTINGENCY OPERATIONS. THIS INCLUDES, BUT IS NOT LIMITED TO, VEHICLE
INSPECTIONS, IDENTIFICATION CHECKS, ETC.
4. CONTRACTOR AND EMPLOYEE IDENTIFICATION CREDENTIALS: DUE TO THE NATURE OF THE MILITARY MISSION OPERATED BY THE OHIO AIR NATIONAL GUARD, STRINGENT SECURITY PROCEDURES ARE
ESTABLISHED TO ENSURE MISSION SUCCESS. PART OF THE MISSION ASSURANCE PIECE IS TO
CONDUCT IDENTITY PROOFING AND VETTING OF ALL CONTRACTORS WHO ENTER THE INSTALLATION.
THE VETTING PROCESS INCLUDES AN EXTENSIVE CRIMINAL HISTORY CHECK TO DETERMINE THE
INDIVIDUAL'S FITNESS FOR AUTHORIZATION TO ENTER THE INSTALLATION. THE PRIMARY
CONTRACTOR WILL ENSURE ALL EMPLOYEES WORKING INSIDE THE OHIO AIR NATIONAL GUARD
SECURITY PERIMETER POSSESS PROPER CREDENTIALS ALLOWING THEM TO WORK IN THE UNITED
STATES. EXECUTIVE ORDER 12989 REQUIRES CONTRACTORS TO USE THE DEPARTMENT OF
HOMELAND SECURITY'S E-VERIFY SYSTEM FOR ALL EMPLOYEES WORKING ON FEDERAL CONTRACTS.
SEE PROJECT SPECIFICATIONS AND OHIO AIR NATIONAL GUARD SECURITY FOR FULL LISTING OF ALL
REQUIREMENTS.
5. EMPLOYEES WILL BE IDENTITY-PROOFED AND VETTED EACH TIME A PASS AND/OR CREDENTIAL IS ISSUED. SECURITY FORCES PERSONNEL MAY ALSO CONDUCT RANDOM SCREENING AT ANY TIME. IF DISQUALIFYING INFORMATION IS FOUND, EMPLOYEES MAY BE DENIED ACCESS TO THE INSTALLATION AND THE CONTRACTING OFFICER OR CONTRACT ADMINISTRATOR WILL BE NOTIFIED OF THE DENIAL.
DUE TO MANDATES OF USC 552A (B) (3) AS RELATED TO PRIVACY ACT 1974 AS AMENDED, THE INFORMATION CAN ONLY BE DISCUSSED WITH THE EMPLOYEE AND WILL NOT BE EXPRESSED OUTSIDE
OF LAW ENFORCEMENT.
6. BASE ACCESS CREDENTIALS: THE CONTRACTOR SHALL SUBMIT ALL APPROPRIATE FORMS AT LEAST 7 DAYS PRIOR TO, IF THE EMPLOYEE WILL BE REQUIRED TO DRIVE ON THE INSTALLATION, HE/SHE
MUST PRESENT A VALID DRIVER'S LICENSE, STATE VEHICLE REGISTRATION AND PROOF OF
INSURANCE. FURTHER, THE VEHICLES AND EQUIPMENT MAY BE ESCORTED DURING EXERCISE
OPERATIONS AND MAY BE RENDERED IMMOBILE WHEN NOT IN OPERATION BY THE REMOVAL OF
IGNITION KEYS OR BY OTHER READILY REVERSIBLE MEANS. CONTRACTOR VEHICLES ARE SUBJECT TO SEARCH PRIOR TO ENTERING, WHILE TRANSITING AND/OR WHILE EXITING THE INSTALLATION.
7. IF THE CONTRACT REQUIRES WORK TO BE DONE IN CONTROLLED OR RESTRICTED AREAS ON THE INSTALLATION, ACCESS TO THOSE AREAS WILL REQUIRE COORDINATION WITH AND APPROVAL BY ORGANIZATIONS CONTROLLING THOSE AREAS. MORE DETAILED INFORMATION MAY BE REQUESTED
FROM THE CONTRACTING OFFICER UPON AWARD OF THE CONTRACT.
CONTRACTOR SAFETY PLAN SUBMITTALS:
1. CONTRACTOR SHALL FURNISH A CONSTRUCTION SAFETY PLAN AND PROPOSED PROJECT SCHEDULE
TO THE CONTRACTING OFFICER FOR APPROVAL. THE SAFETY PLAN SHALL IDENTIFY THE FOLLOWING
ITEMS:
A. PROPOSED ACCESS POINTS, HAUL ROUTES, AND STAGING AREA.
B. TEMPORARY MARKING AND SIGNAGE TO BE USED.
C. LOCATION AND TYPE OF BARRICADES OR OTHER TRAFFIC CONTROL DEVICES.
D. METHODS BY WHICH THE CONTRACTOR SHALL COMMUNICATE WITH TOLEDO EXPRESS AIRPORT
AND THE CONTRACTING OFFICER.
E. CONSTRUCTION SUPERINTENDENT
F. SITE SAFETY MANAGER
CONTRACTOR PERMITTING REQUIREMENTS:
1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING A STORM WATER PERMIT FOR LAND DISTURBANCE OF
MORE THAN 1 ACRE PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR COORDINATING
WITH THE CONTRACTING OFFICER TO COMPLETE AND SUBMIT THE STORM WATER POLLUTION
PREVENTION PLAN (SWPPP) TO THE STATE OF OHIO FOR APPROVAL.
2. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS TO COMPLY WITH ALL FEDERAL, STATE, AND LOCAL REGULATORY REQUIREMENTS. THE PERMITTING PROCESS MAY INCLUDE THE
SUBMISSION OF THE FOLLOWING TYPES OF PERMITS:
A. EROSION AND SEDIMENT CONTROL.
B. STORMWATER MANAGEMENT.
C. SOLID AND HAZARDOUS WASTE.
D. DIGGING.
E. TRAFFIC.
F. WELDING PERMIT FOR ANY WELDING OR CUTTING OPERATIONS CAN BE OBTAINED AT THE
180TH FW FIRE DEPARTMENT.
G. FAA FORM 7460-1
H. CONFINED SPACE ENTRY PERMITS WILL BE COORDINATED THROUGH THE 180TH FW
OCCUPATIONAL SAFETY OFFICE.
SW
AL
E
BLDG
#601
ACA ALERT CREW QUARTERS
BA
SE
B
ID
PH
AS
E
W O
R K
AR
EA
BASE BID
PHASE 1 WORK AREA
ABI #1
PHASE 2
WORK AREA
0.
38.67'
N
Sc al e Fo r M ic ro fil m in g In ch es
M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file
no. date descriptionby ckd
J
H
G
F
E
D
C
B
A
C O
PY
R
IG
H
T
N S
M cD O
N N
EL
L
EN
G
IN
EE
R
IN
G C
O M
PA
N
Y, IN
C
2/
/2
9:
:1
AM
180TH FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
180th Fighter Wing Toledo Express Airport, OH
9400 WARD PARKWAY
KANSAS CITY, MO 64114
(816) 333-9400
REVISIONS
K
Construct ACA Shelters
1 1098765432
WYTD079031 W9133L-15-D-0003-9M03
CONSTRUCTION PHASE 1
GC010
CONSTRUCTION PHASE 1
02/12/18 C. FRANZEN
A. DORMAN C. STEWART
\\BMCD\DFS\CLIENTS\ANF\USNGB\ANG\OH\102134_OHANGALRTSHLTB\DESIGN\CIVIL\SHEETS\102134GC010.DWG 7/26/2018 11:49 AM CFRANZEN
D1 CONSTRUCTION PHASE 1
SCALE: 1" = 80' 40' 80'0
GENERAL PHASING NOTES:
1. PHASING PLAN SHOWN IS
CONCEPTUAL AND FOR
INFORMATION ONLY. CONTRACTOR
MAY SUBMIT ALTERNATIVE PHASING
PLANS FOR APPROVAL BY THE
CONTRACTING OFFICER AND THE
INSTALLATION.
2. CONTRACTOR SHALL DELINEATE A
CONSTRUCTION ZONE OR WORK
AREA AROUND THE PROJECT
PERIMETER FOR THE ENTIRE
DURATION OF CONSTRUCTION AS
INDICATED ON SHEET GC004.
CONTRACTOR IS REQUIRED TO
MAINTAIN CONSTRUCTION
SAFETY/SECURITY FENCES AROUND
THEIR WORK AREAS TO PROTECT
AGAINST DAMAGE OR THEFT OF
MATERIALS AND EQUIPMENT.
3. CONTRACTOR SHALL NOT CROSS
ESTABLISHED AIRFIELD SECURITY
PERIMETER FENCE WITHOUT
COORDINATING WITH BASE
SECURITY AND AIRFIELD
OPERATIONS.
4. CONTRACTOR SHALL MAINTAIN
ADEQUATE ACCESS FOR
SEMI-TRUCK DELIVERIES AND
PERSONNEL ACCESS TO ALL
EXISTING SITE FACILITIES
THROUGHOUT CONSTRUCTION.
5. CONTRACTOR SHALL COORDINATE
WITH THE INSTALLATION ON ISSUING
A NOTICE TO AIRMEN (NOTAM) TO
CLOSE TAXIWAY DELTA WHEN WORK
IS WITHIN THE TAXIWAY DELTA
OBJECT FREE AREA, 200-FEET FROM
THE TAXIWAY CENTERLINE.
CONTRACTOR SHALL PHASE THE
WORK SO ONE NOTAM IS ISSUED
AND THE WORK WITHIN THE TAXIWAY
DELTA OBJECT FREE AREA CAN
COMPLETE.
PHASE 1 NOTES:
1. INSTALL CONSTRUCTION FENCING,
LOW PROFILE BARRICADES, AND
JERSEY BARRIERS PER SHEET
GC004.
2. DEMOLISH AND/OR SALVAGE
EXISTING MATERIALS AND
EQUIPMENT PER CIVIL AND
ELECTRICAL DEMOLITION SHEETS.
DO NOT DEMOLISH EXISTING
PAVEMENT OR UTILITIES NEXT TO
THE EXISTING ACA ALERT
SHELTERS. ALL ACA UTILITIES WILL
REMAIN IN PLACE UNTIL PHASE 2.
3. INSTALL ALL UTILITIES THAT ARE TO
BE UNDERNEATH THE PROPOSED
APRON PAVEMENT SECTION AS
SHOWN ON THE DESIGN DRAWINGS.
4. INSTALL APRON PAVEMENT PER
CIVIL DRAWINGS AROUND THE
LIMITS OF PHASE 1 DEMOLITION.
COORDINATE WITH PHASE 2 LIMITS
FOR PAVEMENT INSTALLATION NEAR
THE…