GENERAL ROOM FINISH SCHEDULE NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
REFER TO SPECIFICATIONS FOR THE BASIS OF DESIGN OR
EQUIVALENT MANUFACTURER TECHNICAL REQUIREMENTS.
REFER TO REFLECTED CEILING DRAWINGS AND ENLARGED PLAN
DRAWINGS FOR ADDITIONAL FINISH PLACEMENT INFORMATION.
REFER TO ELECTRICAL DRAWINGS, MECHANICAL DRAWINGS,
STRUCTURAL DRAWINGS AND COMMUNICATION DRAWINGS
FOR COORDINATION OF BUILDING FINISHES TO BUILDING
SYSTEMS.
UNLESS NOTED OTHERWISE, ALL EXPOSED STRUCTURAL
STEEL TO BE PAINTED.
ALL DOOR FRAMES TO BE FACTORY PAINTED.
INTERIOR CAULKING TO MATCH ADJACENT WALL FINISH COLOR.
ALL EXPOSED CONCRETE FLOORS SHALL BE SEALED.
PAINT ALL EXPOSED STRUCTURAL STEEL ELEMENTS,
MISCELLANEOUS STEEL, PIPING, HANGERS, VALVES AND
CONDUITS EXCEPT PRE-FINISHED PANELS AND FOAM
GENERATORS. THE PAINT COLOR SHALL BE AS INDICATED
ON SCHEDULE. ALL FIRE PROTECTION PIPING COLOR SHALL
BE SAFETY RED.
ALL EXPOSED MECHANICAL AND ELECTRICAL EQUIPMENT AND
ASSOCIATED SUPPORTING EQUIPMENT TO BE PAINTED UNLESS
OTHERWISE REQUIRED BY CODE.
COORDINATE WITH MECHANICAL / ELECTRICAL FOR FINISHES
ON MECHANICAL OR ELECTRICAL EQUIPMENT.
DO NOT PAINT PRE-FINISHED ITEMS, FINISHED METAL
SURFACES, OPERATING PARTS, LABELS OR WARNINGS.
REFER TO SPECIFICATION 13 34 19 FOR EXTERIOR COLORS.
S c a le
F o r
M ic ro fi lm in g
In c h e s
M ill im e te rs date detailed checkeddesigned project contract rev.drawing file
no. date descriptionby ckd
J
H
G
F
E
D
C
B
A
C O
P Y
R
IG
H T
B
U R
N S
M
C D
O N
N E
L L E
N G
IN
E
E R
IN
G
C O
M P
A N
Y
IN
C
W9133L-15-D-0003-9M03
180TH FIGHTER WING
OHIO AIR NATIONAL GUARD
TOLEDO EXPRESS AIRPORT
SWANTON, OHIO
180th Fighter Wing Toledo Express Airport, OH
9400 WARD PARKWAY
KANSAS CITY, MO 64114
(816) 333-9400
REVISIONS
WYTD079031
K
Construct ACA Shelters
1 1098765432
/2 /2
:1
:1
A
M
102134_A_CENTRAL
A-701
ROOM FINISH SCHEDULE
30 JULY 2018
Designer Checker
Author
ROOM FINISH SCHEDULE
ROOM
NUMBER ROOM NAME FLOOR WALL MATERIAL
WALL
FINISH Ceiling Finish REMARKS
101 HANGAR BAY 1 CS-1 Gypsum Board PA-1 Exposed Structure Painted 6,583 SF
102 HANGAR BAY 2 CS-1 Gypsum Board PA-1 Exposed Structure Painted 6,569 SF
103 HANGAR BAY 3 CS-1 Gypsum Board PA-1 Exposed Structure Painted 6,610 SF
104 HANGAR BAY 4 CS-1 Gypsum Board PA-1 Exposed Structure Painted 6,583 SF
105 VESTIBULE CS-1 Gypsum Board PA-1 Exposed Structure Painted 180 SF
106 COMM ROOM CS-1 Gypsum Board PA-1 Exposed Structure Painted 101 SF
107 ELECTRICAL ROOM CS-1 Gypsum Board PA-1 Exposed Structure Painted 429 SF
108 FIRE SUPPRESSION ROOM CS-1 Gypsum Board PA-1 Exposed Structure Painted 856 SF
FINISH LEGEND - BASIS OF DESIGN OR EQUIVALENT
MATERIAL MANUF.
MODEL
NUMBER
PRODUCT
NUMBER COLOR DESCRIPTION REMARKS
CONCRETE
CS-1 SEALED
PAINT
PA-1 ACRYLIC / LATEX
11/16/18 JST JLC AMENDMENT 0002
2 11/21/18 JST JLC AMENDMENT 0003
| Sheets |
| A-701 - ROOM FINISH SCHEDULE |
| 2018-11-20T15:33:48-0500 | |
| Cole, Lee |