Temp_Shelter_HEATING_SYSTEM.doc

DOC document 25 KB Posted

Attached to
Aircraft Alert Shelters Federal contract opportunity
Solicitation number
W9136419B8001
Issued by
Department of the Army Ohio Army National Guard

About this file

Shelter heating

View the file

Other files for this federal contract opportunity

Other files attached to Aircraft Alert Shelters, newest first.
File Type Posted
Bid_opening_attendance.pdf PDF
1.Abstract_of_offers-Shelter.pdf PDF
Draw_S005.pdf PDF
PROJECT_TOC_updated_11-29-18.pdf PDF
W9136419B8001-0004_ACA_Shelter_Amend_04.pdf PDF
Arktite-200a-plugs-receptacles-connectors.pdf PDF
Sec_32_13_14.13_concrete.pdf PDF
Draw_EP101_601,_ES106_401.pdf PDF
Draw_CP101_JOINT_LAYOUT_GRID_1.pdf PDF
Shelter_Phone_info.pdf PDF
W9136419B8001-0003_ACA_Shelter_Amend_03.pdf PDF
Draw_A-701_Locked.pdf PDF
Draw_Electrical_-_Set-11.pdf PDF
MNS_Klaxon_asbuilt.pdf PDF
Specs_07_92_00.pdf PDF
W9136419B8001-0002_ACA_Shelter_Amend_02.pdf PDF
Specs_07_27_10.00_10.pdf PDF
Draw_102134_Arch_Amend_2_A_set_Nov_15_2018.pdf PDF
Specs_07_61_14.00_20.pdf PDF
Draw_102134_S_set.pdf PDF
Specs_13_34_19.pdf PDF
Specs_05_50_13.pdf PDF
Draw_CU504_UTILITY_DETAILS_SHEET_5_OF_5.pdf PDF
Draw_CU502_UTILITY_DETAILS_SHEET_3_OF_5.pdf PDF
Temp_SHELTERS_SPECS..doc DOC document
Temp_Shelter_Top_Plate_Layout.pdf PDF
W9136419B8001-0001_ACA_Shelter_Amend_01.pdf PDF
Spec_26_35_43_converters.pdf PDF
Draw_CG110_EROSION_CONTROL_PLAN.pdf PDF
Draw_S-101_and_S-102_foundation.pdf PDF
Draw_A-601_door_schedule.pdf PDF
Draw_CG500_EROSION_CONTROL_DETAILS.pdf PDF
Shelter_PreBid_attendance.pdf PDF
Pre-Bid_Conference_19B8001.pptx PPTX presentation
Bid_Sched_B3.pdf PDF
A2.SHELTER_DWGS_Oct_2018-1.pdf PDF
W9136419B8001_ACA_Shelter.pdf PDF
A4.Shelter_Specs_VOL2_OCT_2018.pdf PDF
A1.01800_Base_Enviromental.pdf PDF
A3.Shelter_Specs_VOL1_OCT_2018.pdf PDF
Shelter_RFI_template.doc DOC document
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HEATING SYSTEM FOR STRESS TENSIONED FABRIC AIRCRAFT SHELTERS

Provide all material, equipment, labor and supplies to install the following in four shelters:

Each shelter shall have:

- Four 125K Combustion Research - Omega II - 4 inch straight 40Ft. natural gas radiant heat systems or approved equal with the following features:

- Systems are to be fully CSA Certified

- Radiant tubing constructed entirely of corrosion resistant aluminized steel and heat treated for maximum radiant output

- Power vented, unitary system

- 3 try, direct solid state spark ignition – 100% safety lockout

- Electronic flame monitoring

- Burner flame inspection window

- Burners shall have a minimum 15 second Pre-Purge before ignition cycle

- Powder coated burner housing

- 10 year warranty on radiant tubes for internal corrosion

- Seismic suspension for high wind application

- System controls are to be pre-wired 115V, 60Hz.

- Two Thermostats per shelter 115V (One per system on each side of shelter) – ref. drawing

- 6 inch vent piping installed through side wall – ref. drawing

- System steady state efficiency shall be a minimum of 77%, maximum 87%

File details come from the government source that posted it.