Draw_Electrical_-_Set-11.pdf

PDF 1 MB Posted

Attached to
Aircraft Alert Shelters Federal contract opportunity
Solicitation number
W9136419B8001
Issued by
Department of the Army Ohio Army National Guard

About this file

Draw Electrical Set

View the file

Other files for this federal contract opportunity

Other files attached to Aircraft Alert Shelters, newest first.
File Type Posted
Bid_opening_attendance.pdf PDF
1.Abstract_of_offers-Shelter.pdf PDF
PROJECT_TOC_updated_11-29-18.pdf PDF
W9136419B8001-0004_ACA_Shelter_Amend_04.pdf PDF
Draw_S005.pdf PDF
Arktite-200a-plugs-receptacles-connectors.pdf PDF
Sec_32_13_14.13_concrete.pdf PDF
Draw_EP101_601,_ES106_401.pdf PDF
Draw_A-701_Locked.pdf PDF
MNS_Klaxon_asbuilt.pdf PDF
Draw_CP101_JOINT_LAYOUT_GRID_1.pdf PDF
Shelter_Phone_info.pdf PDF
W9136419B8001-0003_ACA_Shelter_Amend_03.pdf PDF
Specs_07_92_00.pdf PDF
W9136419B8001-0002_ACA_Shelter_Amend_02.pdf PDF
Specs_07_27_10.00_10.pdf PDF
Draw_102134_Arch_Amend_2_A_set_Nov_15_2018.pdf PDF
Specs_07_61_14.00_20.pdf PDF
Temp_Shelter_HEATING_SYSTEM.doc DOC document
Draw_102134_S_set.pdf PDF
Specs_13_34_19.pdf PDF
Specs_05_50_13.pdf PDF
Draw_CU504_UTILITY_DETAILS_SHEET_5_OF_5.pdf PDF
Draw_CU502_UTILITY_DETAILS_SHEET_3_OF_5.pdf PDF
Temp_SHELTERS_SPECS..doc DOC document
Temp_Shelter_Top_Plate_Layout.pdf PDF
Draw_CG110_EROSION_CONTROL_PLAN.pdf PDF
W9136419B8001-0001_ACA_Shelter_Amend_01.pdf PDF
Spec_26_35_43_converters.pdf PDF
Draw_S-101_and_S-102_foundation.pdf PDF
Draw_A-601_door_schedule.pdf PDF
Draw_CG500_EROSION_CONTROL_DETAILS.pdf PDF
Pre-Bid_Conference_19B8001.pptx PPTX presentation
Shelter_PreBid_attendance.pdf PDF
Bid_Sched_B3.pdf PDF
A2.SHELTER_DWGS_Oct_2018-1.pdf PDF
W9136419B8001_ACA_Shelter.pdf PDF
A4.Shelter_Specs_VOL2_OCT_2018.pdf PDF
A1.01800_Base_Enviromental.pdf PDF
A3.Shelter_Specs_VOL1_OCT_2018.pdf PDF
Shelter_RFI_template.doc DOC document
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A1

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

ALALALALALALALALALALAL

AL

AL

AL

AL

AL

Sc al e Fo r M ic ro fil m in g In ch es

M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

no. date descriptionby ckd

J

H

G

F

E

D

C

B

A

C O

PY

R

IG

H

T

BU

R

N S

M cD O

N N

EL

L

EN

G

IN

EE

R

IN

G C

O M

PA

N

Y, IN

C

2/

/2

9:

:1

AM

180TH FIGHTER WING

OHIO AIR NATIONAL GUARD

TOLEDO EXPRESS AIRPORT

SWANTON, OHIO

9400 WARD PARKWAY

KANSAS CITY, MO 64114

(816) 333-9400

REVISIONS

K

1 1098765432

WYTD079031 W9133L-15-D-0003-9M03

ELECTRICAL DEMOLITION SITE PLAN

ES101 1

102134_ES101.dwg

19 MAR 2018 Z. MATHEWS

A. NELSON J. SANBORN

(1) 4" CONDUIT

(PRIMARY POWER)

(1) 2" PVC CONDUIT LOW

VOLTAGE RELAY (EASY BUTTON)

(1) 4" PVC CONDUIT

COMMUNICATION

(1) 2-1/2" PVC PARTIAL

CONCRETE ENCASED

AIRFIELD LIGHTING

(TO REMAIN)

EXISTING

COMM HH-16

EXISTING

COMM HH-15

SECTOR 6 (SC2)

(TO REMAIN)

SECTOR 5 (SC2)

(TO REMAIN)

LIGHT POLE #7

(TO REMAIN) LIGHT POLE #6

(TO REMAIN)

SECTOR 7 (SC2)

SECTOR 8 (SC2)

BLDG 600

NOTES:

1. UNLESS OTHERWISE NOTED, ALL

BOLD AND HATCHED EQUIPMENT

AND UTILITY RUNS SHOWN SHALL

BE DEMOLISHED. ALL HALFTONE

EQUIPMENT AND UTILITY RUNS

ARE EXISTING TO REMAIN.

2. REFERENCE SHEETS GC010 AND

GC011 FOR CONSTRUCTION

PHASING INFORMATION.

KEYED NOTES:

DISCONNECT UTILITY IN PHASE

2 OF CONSTRUCTION AND

ABANDON UTILITY LINE IN

PLACE. DISCONNECTION OF

UTILITY SHALL BE

COORDINATED WITH

CONNECTION OF NEW UTILITY

LINE AT ALERT SHELTER.

IDS IN SECTORS 7 AND 8

SHALL BE DISCONNECTED AND

REMOVED TO ADJUST FOR

PAVEMENT MODIFICATION.

COORDINATE DISCONNECTION

DURING CONSTRUCTION WITH

BASE SECURITY PERSONNEL.

A1 ELECTRICAL DEMOLITION SITE PLAN

SCALE: 1"=20'-0"

N

20' 40'0

-1

-1

N

GRID 4

MATCHLINE SEE SHEET ES102 FOR CONTINUATION

M

AT

C H

LI

N

E

SE

E

SH

EE

T

ES

FO

R C

O N

TI

N

U

AT

IO

N

1 11/21/18 ARN AMENDMENT 0003JCS

AL

AL

AL

AL

AL

AL

AL

AL

AL AL AL AL AL AL AL

AL

AL

AL

AL

AL

AL

AL

AL

Sc al e Fo r M ic ro fil m in g In ch es

M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

no. date descriptionby ckd

J

H

G

F

E

D

C

B

A

C O

PY

R

IG

H

T

N S

M cD O

N N

EL

L

EN

G

IN

EE

R

IN

G C

O M

PA

N

Y, IN

C

2/

/2

9:

:1

AM

180TH FIGHTER WING

OHIO AIR NATIONAL GUARD

TOLEDO EXPRESS AIRPORT

SWANTON, OHIO

9400 WARD PARKWAY

KANSAS CITY, MO 64114

(816) 333-9400

REVISIONS

K

1 1098765432

WYTD079031 W9133L-15-D-0003-9M03

ELECTRICAL DEMOLITION SITE PLAN

ES102 1

102134_ES102.dwg

A1 ELECTRICAL DEMOLITION SITE PLAN

SCALE: 1"=20'-0"

LIGHT POLE #8

CAMERA POWER AND COMM TO BE

DISCONNECTED AND REMOVED BACK TO

FDB-4. CONDUIT SHALL BE ABANDONED IN

PLACE AS NECESSARY

LIGHT POLE #9

IIDS-TX

(1) 2 1/2" PVC AREA

LIGHTING CIRCUIT

(TO REMAIN)

HH-1

150 KW

EMERGENCY

GENERATOR

75 KVA

TRANSFORMER (T-4)

225 KVA

TRANSFORMER (T-3)

12-47KV: 480Y/277V

IIDS-RX

IIDS BORE

PATH

SECTOR 14

(IIDS)

POWER AND

ALARM CIRCUIT

(2 CONDUITS)

CAMERA 20

CAMERA 22

CAMERA 21

EHH-9

NOTES:

1. UNLESS OTHERWISE NOTED, ALL BOLD AND HATCHED

EQUIPMENT AND UTILITY RUNS SHOWN SHALL BE

DEMOLISHED. ALL HALFTONE EQUIPMENT AND UTILITY RUNS

ARE EXISTING TO REMAIN.

2. REFERENCE SHEETS GC010 AND GC011 FOR CONSTRUCTION

PHASING INFORMATION.

3. AS PART OF ABI#1, ALL LIGHTING, CONDUIT AND WIRING,

GENERAL RECEPTACLES, AND ANY ADDITIONAL ELECTRICAL

OR COMMUNICATIONS EQUIPMENT IN EXISTING SHELTER 1

SHALL BE DISCONNECTED AND DEMOLISHED. THE EXISTING

400HZ CONVERTERS SHALL BE SALVAGED AND RETURNED TO

THE OWNER.

N

20' 40'0

CAMERA SHALL BE DISCONNECTED AND REMOVED FROM LIGHT

POLE. SALVAGE CAMERA FOR REINSTALLATION BY CONTRACTOR

ON ALERT SHELTER AS SHOWN ON TY SHEETS.

LIGHT POLE AND FIXTURES SHALL BE DISCONNECTED AND

DEMOLISHED. CONDUCTORS AND CONDUIT SHALL REMAIN

CONNECTED FOR CIRCUIT CONTINUITY TO DOWNSTREAM

FIXTURES.

IDS TOWER SHALL BE DISCONNECTED AND DEMOLISHED. POWER

AND COMM CABLES SHALL BE PULLED BACK TO FBD-4 AND

DISCONNECTED.

SHELTER UTILITY EQUIPMENT TO BE DEMOLISHED IN PHASE 2 OF

CONSTRUCTION. GENERATOR AND TRANSFORMER T-3 SHALL BE

SALVAGED AND RETURNED TO THE GOVERNMENT. THE

REMAINING EQUIPMENT SHALL BE SALVAGED AND RETURNED AS

DETERMINED BY THE GOVERNMENT. EHH-9 AND HH-1 SHALL BE

DEMOLISHED FOLLOWING INSTALLATION OF SPARE CONDUIT AS

SHOWN ON SHEET ES105.

SALVAGE FDB-4 UPON REMOVAL FOR REINSTALLATION AS

SHOWN ON SHEET ES105.

KEYED NOTES:

XX

G

G G G G G G G G

G G

-1

-1

N

GRID 1

MATCHLINE SEE SHEET ES101 FOR CONTINUATION

A3 A4

A5

A6

A2

ST

ST ST ST ST

ST

ST

ST

ST

W W

W W W W W

ST

ST

ALALALALALALALALAL

ALALAL

W

W W

W

AL

AL

AL

AL

AL

AL

ALALALALALALALALALALALALALALALALALALALALALALALALAL

AL

AL

ALALALAL ALALALALALAL ALAL ALAL

AL AL

AL

STSTSTSTSTSTSTST

AL

AL

AL

AL

AL

AL AL AL AL AL AL

AL

AL

AL

AL

AL

ALALALALALAL

AL

AL

AL

AL

AL AL AL

ELECTRICAL DEMOLITION SITE PLAN

ES103 1

102134_ES103.dwg

EHH-8

(1) 4" CONDUIT (PRIMARY POWER)

(1) 4" PVC CONDUIT

(COMMUNICATION)

(1) 2" PVC CONDUIT LOW VOLTAGE

RELAY (EASY BUTTON)

BLDG 601

NOTES:

1. UNLESS OTHERWISE NOTED, ALL

BOLD AND HATCHED EQUIPMENT

AND UTILITY RUNS SHOWN SHALL

BE DEMOLISHED. ALL HALFTONE

EQUIPMENT AND UTILITY RUNS ARE

EXISTING TO REMAIN.

2. REFERENCE SHEETS GC010 AND

GC011 FOR CONSTRUCTION

PHASING INFORMATION.

DISCONNECT UTILITY IN PHASE 2

OF CONSTRUCTION AND

ABANDON UTILITY LINE IN PLACE.

DISCONNECTION OF UTILITY

SHALL BE COORDINATED WITH

CONNECTION OF NEW UTILITY

LINE AT ALERT SHELTER.

DISCONNECT UTILITY IN PHASE 2 OF

CONSTRUCTION AND DEMOLISH

BETWEEN TRANSFORMER AND EHH-8.

DISCONNECTION OF UTILITY SHALL BE

COORDINATED WITH CONNECTION OF

NEW UTILITY AT SECTIONALIZING

CABINET AS SHOWN ON SHEET ES106.

DISCONNECT, COIL, AND ABANDON IN

PLACE, ANY WIRING FOR KLAXON

ALERT SYSTEM EXTENDING TO

EXISTING SHELTERS THROUGH HH10.

KLAXON SYSTEM SWITCHOVER SHALL

BE COORDINATED WITH OHANG PRIOR

TO DISCONNECTION OF EXISTING

SHELTERS.

KEYED NOTES:

A1 ELECTRICAL DEMOLITION SITE PLAN

SCALE: 1"=20'-0"

N

20' 40'0

-1

-1

N

GRID 5

M

AT

C H

LI

N

E

SE

E

SH

EE

T

ES

FO

R C

O N

TI

N

U

AT

IO

N

Sc al e Fo r M ic ro fil m in g In ch es

M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

no. date descriptionby ckd

J

H

G

F

E

D

C

B

A

C O

PY

R

IG

H

T

N S

M cD O

N N

EL

L

EN

G

IN

EE

R

IN

G C

O M

PA

N

Y, IN

C

2/

/2

9:

:1

AM

180TH FIGHTER WING

OHIO AIR NATIONAL GUARD

TOLEDO EXPRESS AIRPORT

SWANTON, OHIO

9400 WARD PARKWAY

KANSAS CITY, MO 64114

(816) 333-9400

REVISIONS

K

1 1098765432

WYTD079031 W9133L-15-D-0003-9M03

HH10

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

ALALALALALALALALALALAL

AL

AL

Sc al e Fo r M ic ro fil m in g In ch es

M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

no. date descriptionby ckd

J

H

G

F

E

D

C

B

A

C O

PY

R

IG

H

T

N S

M cD O

N N

EL

L

EN

G

IN

EE

R

IN

G C

O M

PA

N

Y, IN

C

2/

/2

9:

:1

AM

180TH FIGHTER WING

OHIO AIR NATIONAL GUARD

TOLEDO EXPRESS AIRPORT

SWANTON, OHIO

9400 WARD PARKWAY

KANSAS CITY, MO 64114

(816) 333-9400

REVISIONS

K

1 1098765432

WYTD079031 W9133L-15-D-0003-9M03

ELECTRICAL NEW WORK SITE PLAN

ES104 1

102134_ES104.dwg

(1) 2 1/2" PVC CONDUIT

PARTIAL CONCRETE

ENCASED AREA LIGHTING

COMM (4) 4"

PVC CONDUITS

(4) 4" PVC CONDUITS (2)

WITH FIBER-MESH

INNER-DUCT

ALERT CREW QUARTERS

BUILDING 600

SECTOR 7

NEW IDS LAYOUT

SECTOR 8

NEW EHH NO. 11

(2) 5" PVC CONDUIT

(PRIMARY POWER)

CONCRETE ENCASED

HH15

SECTOR 5

HH16

SECTOR 6

(4) 4" PVC CONDUITS (2)

FIBER-MESH INNER-DUCT, (1) 3"

PVC CONDUIT FOR EASY BUTTON

NOTES:

1. UNLESS OTHERWISE NOTED, ALL BOLD AND

HATCHED EQUIPMENT AND UTILITY RUNS SHOWN

SHALL BE DEMOLISHED. ALL HALFTONE EQUIPMENT

AND UTILITY RUNS ARE EXISTING TO REMAIN.

2. REFERENCE SHEETS GC010 AND GC011 FOR

CONSTRUCTION PHASING INFORMATION.

3. REFER TO CIVIL SHEETS FOR PAD MOUNTING DETAIL.

4. REFER TO ELECTRICAL ONE-LINE DIAGRAM ON

SHEET EP601 FOR FEEDER SIZES AND ADDITIONAL

INFORMATION

SPARE 4" COMM CONDUIT ACROSS

APRON FOR FUTURE EXPANSION.

KEYED NOTES:

PROVIDE (1) 3" CONDUIT FROM "EASY BUTTON"

CONTROLLER IN BUILDING 600 AND ROUTE TO COMM

DUCTBANK FOR TIE-IN TO SHELTER IN PHASE 1. "EASY

BUTTON" TIE-IN SHALL OCCUR IN PHASE 2.

PROVIDE IDS TIE-IN TO EXISTING SYSTEM AS

NECESSARY FOR SECTORS 7 AND 8.

PROVIDE (1) 1" CONDUIT FROM AVAILABLE SPARE 20A

BREAKER ON PANEL AC2, TO EQUIPMENT PAD

CONVENIENCE RECEPTACLE. SEE SHEET ES401 FOR

ADDITIONAL INFORMATION.

PROVIDE (1) 3" MINIMUM CONDUIT FOR GENERATOR

REMOTE NOTIFICATION PANEL IN BUILDING 600. PANEL

LOCATION IN OLD BUILDING 600 SHALL BE

COORDINATED AND APPROVED WITH BASE PRIOR TO

INSTALL.

A HYBRID 12-STRAND SINGLE MODE/ 24-STRAND

MULTIMODE FIBER OPTIC AND 200-PAIR COPPER

CABLE SHALL BE PROVIDED BETWEEN BUILDING 600

COMMUNICATIONS ROOM AND ALERT SHELTER

COMMUNICATIONS ROOM. UTILIZE EXISTING CONDUIT

STUBBED OUT OF BUILDING 600 TO HH15 AND HH16

FOR THIS INSTALLATION.

ES501

H7

ES501

C7

ES502

A1

G

T

-1

-1

N

GRID 4

A1 ELECTRICAL NEW WORK SITE PLAN

SCALE: 1"=20'-0"

N

20' 40'0

MATCHLINE SEE SHEET ES105 FOR CONTINUATION

M

AT

C H

LI

N

E

SE

E

SH

EE

T

ES

FO

R C

O N

TI

N

U

AT

IO

N

HH17

ES401

A1

NEW EHH NO.10

ES501

C7

'-0

43'-0"

HH18

EQUIPMENT RACK

ATS

ES501

C7

M

IN 50'-0"

1 11/21/18 ARN AMENDMENT 0003JCS

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL AL AL AL AL AL AL AL AL AL AL AL AL A

AL

AL

AL

AL

AL

AL

AL

Sc al e Fo r M ic ro fil m in g In ch es

M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

no. date descriptionby ckd

J

H

G

F

E

D

C

B

A

C O

PY

R

IG

H

T

N S

M cD O

N N

EL

L

EN

G

IN

EE

R

IN

G C

O M

PA

N

Y, IN

C

2/

/2

9:

:1

AM

180TH FIGHTER WING

OHIO AIR NATIONAL GUARD

TOLEDO EXPRESS AIRPORT

SWANTON, OHIO

9400 WARD PARKWAY

KANSAS CITY, MO 64114

(816) 333-9400

REVISIONS

K

1 1098765432

WYTD079031 W9133L-15-D-0003-9M03

ELECTRICAL NEW WORK SITE PLAN

ES105 1

102134_ES105.dwg

CONNECT IDS LAYOUT INTO

EXISTING SECTOR 15 ON

SOUTH SIDE OF BLAST WALL

NEW IDS LAYOUT

NOTES:

1. UNLESS OTHERWISE NOTED, ALL

BOLD AND HATCHED EQUIPMENT

AND UTILITY RUNS SHOWN SHALL

BE DEMOLISHED. ALL HALFTONE

EQUIPMENT AND UTILITY RUNS

ARE EXISTING TO REMAIN.

2. REFERENCE SHEETS GC010 AND

GC011 FOR CONSTRUCTION

PHASING INFORMATION.

3. ALL CONDUIT SHOWN ON THIS

SHEET SHALL BE CONCRETE

ENCASED.

4" PVC COMM CONDUIT FOR

FUTURE EXPANSION

(2) 5" PVC ELECTRICAL CONDUIT FOR

FUTURE EXPANSION

KEYED NOTES:

PROVIDE CONDUIT AS SHOWN

AND CONNECT TO EXISTING

UTILITY RUN FOR FUTURE

EXPANSION. HANDHOLE SHALL

BE DEMOLISHED IN PHASE 2

FOLLOWING INSTALLATION OF

CONDUIT.

PROVIDE NEW IDS TIE-IN TO

EXISTING SYSTEM AS SHOWN.

FDB-4 FOR THE IDS SYSTEM

WILL BE RELOCATED HERE

AND IDS SYSTEM WILL USE

NEW 4" CONDUITS TO TIE INTO

THIS RELOCATED BOX.

CONDUIT FOR FUTURE

EXPANSION SHALL TIE IN TO

ABANDONED UTILITY FEED

PRIOR TO DEMOLITION OF

HANDHOLE.

SPARE 4" COMMUNICATION

CONDUIT FOR FUTURE

EXPANSION.

2 1

A1 ELECTRICAL NEW WORK SITE PLAN

SCALE: 1"=20'-0"

N

20' 40'0

-1

-1

N

GRID 1

MATCHLINE SEE SHEET ES104 FOR CONTINUATION

EXISTING IDS LAYOUT

1 11/21/18 ARN AMENDMENT 0003JCS

A3

A4

A5

A6

A2

AL

AL

AL

AL

Sc al e Fo r M ic ro fil m in g In ch es

M illi m et er s date detailed checkeddesigned ofsheet sheets project contract rev.drawing file

no. date descriptionby ckd

J

H

G

F

E

D

C

B

A

C O

PY

R

IG

H

T

N S

M cD O

N N

EL

L

EN

G

IN

EE

R

IN

G C

O M

PA

N

Y, IN

C

2/

/2

9:

:1

AM

180TH FIGHTER WING

OHIO AIR NATIONAL GUARD

TOLEDO EXPRESS AIRPORT

SWANTON, OHIO

9400 WARD PARKWAY

KANSAS CITY, MO 64114

(816) 333-9400

REVISIONS

K

1 1098765432

WYTD079031 W9133L-15-D-0003-9M03

ELECTRICAL NEW WORK SITE PLAN

ES106 1

102134_ES106.dwg

NOTES:

1. UNLESS OTHERWISE NOTED, ALL

BOLD AND HATCHED EQUIPMENT

AND UTILITY RUNS SHOWN SHALL

BE DEMOLISHED. ALL HALFTONE

EQUIPMENT AND UTILITY RUNS

ARE EXISTING TO REMAIN.

(1) 4"PVC CONDUIT

#2 15KV (PRIMARY POWER)

CONCRETE ENCASED

BLDG 601

KEYED NOTES:

PROVIDE SECTIONALIZING

CABINET (12.47KV) WITH SPACE

FOR NEW AND EXISTING

SHELTER. RECONNECT EXISTING

SHELTERS IN PHASE 1 TO

PROVIDE SERVICE THROUGH

PHASE 2.

SPLICE AND EXTEND EXISTING

MEDIUM - VOLTAGE CABLE

FEEDING T-3 FROM ELECTRICAL

HANDHOLE TO SECTIONALIZING

CABINET IN PHASE 1. UPON

DISCONNECTION OF UTILITIES

FROM EXISTING SHELTER IN

PHASE 2, DISCONNECT MEDIUM

VOLTAGE CABLES HERE.

PROVIDE NEW MEDIUM-VOLTAGE

CABLE FROM TRANSFORMER TO

SECTIONALIZING CABINET

DURING PHASE 1 OF

CONSTRUCTION TO PROVIDE

POWER TO NEW SHELTERS AND

EXISTING SHELTERS DURING

PHASE 1 OF CONSTRUCTION.

UTILIZE SPARE 4" CONDUIT FOR

ROUTING AND RECONNECTION

OF KLAXON ALERT SYSTEM

WIRING FROM BUILDING 600

COMMUNICATIONS ROOM HH10.

N

20' 40'0

-1

-1

N

GRID 5

A1 ELECTRICAL NEW WORK SITE PLAN

SCALE: 1"=20'-0"

M

AT

C H

LI

N

E

SE

E

SH

EE

T

ES

FO

R C

O N

TI

N

U

AT

IO

N

1 11/21/18 ARN AMENDMENT 0003JCS

HH10

File details come from the government source that posted it.