Specs_07_27_10.00_10.pdf

PDF 31 KB Posted

Attached to
Aircraft Alert Shelters Federal contract opportunity
Solicitation number
W9136419B8001
Issued by
Department of the Army Ohio Army National Guard

About this file

Section 07 27

View the file

Other files for this federal contract opportunity

Other files attached to Aircraft Alert Shelters, newest first.
File Type Posted
Bid_opening_attendance.pdf PDF
1.Abstract_of_offers-Shelter.pdf PDF
PROJECT_TOC_updated_11-29-18.pdf PDF
W9136419B8001-0004_ACA_Shelter_Amend_04.pdf PDF
Arktite-200a-plugs-receptacles-connectors.pdf PDF
Sec_32_13_14.13_concrete.pdf PDF
Draw_EP101_601,_ES106_401.pdf PDF
Draw_S005.pdf PDF
Draw_A-701_Locked.pdf PDF
Draw_Electrical_-_Set-11.pdf PDF
MNS_Klaxon_asbuilt.pdf PDF
Draw_CP101_JOINT_LAYOUT_GRID_1.pdf PDF
Shelter_Phone_info.pdf PDF
W9136419B8001-0003_ACA_Shelter_Amend_03.pdf PDF
Specs_07_92_00.pdf PDF
W9136419B8001-0002_ACA_Shelter_Amend_02.pdf PDF
Draw_102134_Arch_Amend_2_A_set_Nov_15_2018.pdf PDF
Specs_07_61_14.00_20.pdf PDF
Draw_102134_S_set.pdf PDF
Specs_13_34_19.pdf PDF
Specs_05_50_13.pdf PDF
Temp_Shelter_HEATING_SYSTEM.doc DOC document
Draw_CU504_UTILITY_DETAILS_SHEET_5_OF_5.pdf PDF
Draw_CU502_UTILITY_DETAILS_SHEET_3_OF_5.pdf PDF
Temp_SHELTERS_SPECS..doc DOC document
Temp_Shelter_Top_Plate_Layout.pdf PDF
Draw_CG110_EROSION_CONTROL_PLAN.pdf PDF
Draw_S-101_and_S-102_foundation.pdf PDF
Draw_A-601_door_schedule.pdf PDF
W9136419B8001-0001_ACA_Shelter_Amend_01.pdf PDF
Spec_26_35_43_converters.pdf PDF
Draw_CG500_EROSION_CONTROL_DETAILS.pdf PDF
Pre-Bid_Conference_19B8001.pptx PPTX presentation
Shelter_PreBid_attendance.pdf PDF
Bid_Sched_B3.pdf PDF
A2.SHELTER_DWGS_Oct_2018-1.pdf PDF
W9136419B8001_ACA_Shelter.pdf PDF
A4.Shelter_Specs_VOL2_OCT_2018.pdf PDF
A1.01800_Base_Enviromental.pdf PDF
A3.Shelter_Specs_VOL1_OCT_2018.pdf PDF
Shelter_RFI_template.doc DOC document
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACA Al er t Ai r cr af t Shel t er s WYTD079031 Tol edo Expr ess Ai r por t , OH

SECTI ON 07 27 10. 00 10

BUI LDI NG AI R BARRI ER SYSTEM

05/14

PART 1 GENERAL

**AM002**

1. 1 SUMMARY

Thi s Sect i on speci f i es t he const r uct i on and qual i t y cont r ol of t he i nst al l at i on of an ai r bar r i er syst em. Const r uct t he ai r bar r i er syst em i ndi cat ed, t aki ng r esponsi bi l i t y f or t he means, met hods, and wor kmanshi p of t he i nst al l at i on of t he ai r bar r i er syst em. The ai r bar r i er must be cont i guous and connect ed acr oss al l sur f aces of t he encl osed ai r bar r i er envel ope i ndi cat ed. The maxi mum l eakage r equi r ement s of i ndi v i dual ai r bar r i er component s and mat er i al s ar e speci f i ed i n t he ot her Speci f i cat i on Sect i ons cover i ng t hese i t ems.

Thi s Sect i on al so def i nes t he maxi mum al l owabl e l eakage of t he f i nal ai r bar r i er syst em. The wor kmanshi p must be adequat e t o meet t he maxi mum al l owabl e l eakage r equi r ement s of t hi s Speci f i cat i on. Test t he assembl ed ai r bar r i er syst em t o demonst r at e t hat t he bui l di ng envel ope i s pr oper l y seal ed and i nsul at ed. Passi ng t he ai r bar r i er syst em l eakage t est and t her mogr aphy t est wi l l r esul t i n syst em accept ance. Conf or m ai r bar r i er syst em l eakage and t her mogr aphy t est i ng and r epor t i ng t o t he r equi r ement s of Sect i on 07 05 23 PRESSURE TESTI NG AN AI R BARRI ER SYSTEM FOR AI R

TIGHTNESS.

**AM002**

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s Speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er enced wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASTM I NTERNATI ONAL ( ASTM)

ASTM D4541 ( 2009; E 2010) Pul l - Of f St r engt h of Coat i ngs Usi ng Por t abl e Adhesi on Test er s

1. 3 DEFINITIONS

The f ol l owi ng t er ms as t hey appl y t o t hi s Sect i on:

1. 3. 1 Ai r Bar r i er Accessor y

Pr oduct s desi gnat ed t o mai nt ai n ai r t i ght ness bet ween ai r bar r i er mat er i al s, ai r bar r i er assembl i es and ai r bar r i er component s, t o f ast en t hem t o t he st r uct ur e of t he bui l di ng, or bot h ( e. g. , seal ant s, t apes, backer r ods, t r ansi t i on membr anes, f ast ener s, st r appi ng, pr i mer s) .

1. 3. 2 Ai r Bar r i er Assembl y

The combi nat i on of ai r bar r i er mat er i al s and ai r bar r i er accessor i es t hat

SECTI ON 07 27 10. 00 10 Page 1 Amendment 0002 ar e desi gnat ed and desi gned wi t hi n t he envi r onment al separ at or t o act as a cont i nuous bar r i er t o t he movement of ai r t hr ough t he envi r onment al separator.

1. 3. 3 Ai r Bar r i er Component

Pr e- manuf act ur ed el ement s such as wi ndows, door s, damper s, and ser v i ce el ement s t hat ar e i nst al l ed i n t he envi r onment al separ at or .

1. 3. 4 Ai r Bar r i er Envel ope

The combi nat i on of ai r bar r i er assembl i es and ai r bar r i er component s, connect ed by ai r bar r i er accessor i es t hat ar e desi gned t o pr ovi de a cont i nuous bar r i er t o t he movement of ai r t hr ough an envi r onment al separ at or . Ther e may be mor e t han one ai r bar r i er envel ope i n a s i ngl e bui l di ng. Al so known as Ai r Bar r i er Syst em.

1. 3. 5 Ai r Bar r i er Mat er i al

A bui l di ng mat er i al t hat i s desi gned and const r uct ed t o pr ovi de t he pr i mar y r esi st ance t o ai r f l ow t hr ough an ai r bar r i er assembl y.

1. 3. 6 Ai r Bar r i er Syst em

Same as AI R BARRI ER ENVELOPE.

1. 3. 7 Ai r Leakage Rat e

The r at e of ai r f l ow ( CFM) dr i ven t hr ough a uni t sur f ace ar ea ( sq. f t . ) of an assembl y or syst em by a uni t st at i c pr essur e di f f er ence ( Pa) acr oss t he assembl y. ( exampl e: 0. 25 CFM/ sq. f t . @ 75 Pa)

1. 3. 8 Ai r Leakage

The t ot al ai r f l ow ( CFM) dr i ven t hr ough t he ai r bar r i er syst em by a uni t st at i c pr essur e di f f er ence ( Pa) acr oss t he ai r bar r i er envel ope. ( exampl e:

6500 CFM @ 75 Pa)

1. 3. 9 Ai r Per meance

The r at e of ai r f l ow ( CFM) t hr ough a uni t ar ea ( sq. f t . ) of a mat er i al dr i ven by uni t st at i c pr essur e di f f er ence ( Pa) acr oss t he mat er i al . ( exampl e:

0. 004 CFM/ sq. f t . @ 75 Pa)

1. 3. 10 Envi r onment al Separ at or

The par t s of a bui l di ng t hat separ at e t he cont r ol l ed i nt er i or envi r onment f r om t he uncont r ol l ed ext er i or envi r onment , or t hat separ at e spaces wi t hi n a bui l di ng t hat have di ssi mi l ar envi r onment s. Al so known as t he Cont r ol Layer.

1. 4 PREPARATORY PHASE OR PRECONSTRUCTI ON CONFERENCE

Or gani ze pr e- const r uct i on conf er ences bet ween t he ai r bar r i er i nspect or and t he Subcont r act or s i nvol ved i n t he const r uct i on of or penet r at i on of t he ai r bar r i er syst em t o di scuss wher e t he wor k of each Subcont r act or begi ns and ends, t he sequence of i nst al l at i on, and each Subcont r act or ' s r esponsi bi l i t y t o ensur e ai r t i ght j oi nt s, j unct ur es, penet r at i ons and t r ansi t i ons bet ween mat er i al s. Di scuss t he pr oduct s, and assembl i es of

SECTI ON 07 27 10. 00 10 Page 2 pr oduct s speci f i ed i n t he di f f er ent sect i ons t o be i nst al l ed by t he di f f er ent Subcont r act or s.

**AM002**

1. 5 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 04 Sampl es

Mock- Up; G

Bui l d one as speci f i ed pr i or t o bui l di ng const r uct i on.

SD- 06 Test Repor t s

Desi gn Revi ew Repor t ; G, DO

Two copi es not l at er t han 14 days af t er appr oval of t he Ai r Bar r i er I nspect or Qual i f i cat i ons.

Test i ng and I nspect i on; G, RO

SD- 07 Cer t i f i cat es

Ai r Bar r i er I nspect or ; G, RO

Two copi es 30 days af t er Not i ce t o Pr oceed.

**AM002**

1. 6 AI R BARRI ER ENVELOPE SURFACE AREA AND LEAKAGE REQUI REMENTS

The bui l di ng ai r bar r i er syst ems must meet t he f ol l owi ng l eakage r equi r ement s. The al l owabl e l eakage r at e and t he maxi mum l eakage ar e at a di f f er ent i al t est pr essur e of 75 Pa.

Ai r Bar r i er Envel ope 1 and 2

Sur f ace Ar ea ( each) 44, 915 squar e f eet

Ar chi t ect ur al Onl y Test :

Al l owabl e l eakage r at e 0. 40 CFM/ sq. f t

Ai r Bar r i er Envel ope 3

Sur f ace Ar ea 7, 872 squar e f eet

SECTI ON 07 27 10. 00 10 Page 3

Ar chi t ect ur al Onl y Test :

Al l owabl e l eakage r at e 0. 40 CFM/ sq. f t

Ai r Bar r i er Envel ope 4

Sur f ace Ar ea 6, 406 squar e f eet

Ar chi t ect ur al Onl y Test :

Al l owabl e l eakage r at e 0. 40 CFM/ sq. f t

**AM002**

1. 7 AI R BARRI ER I NSPECTOR

Empl oy a desi gnat ed Ai r Bar r i er I nspect or on t hi s Pr oj ect . The Ai r Bar r i er I nspect or per f or ms a Desi gn Revi ew, over sees qual i t y cont r ol t est i ng speci f i ed i n t hese Speci f i cat i ons, per f or ms qual i t y cont r ol ai r bar r i er i nspect i on as speci f i ed, i nt er f aces wi t h t he desi gner and pr oduct manuf act ur er ' s r epr esent at i ves t o assur e al l i nst al l at i on r equi r ement s ar e met , and coor di nat es ef f or t s bet ween al l wor ker s i nst al l i ng or penet r at i ng t he ai r bar r i er mat er i al s. Qual i f i cat i on f or t he Ai r Bar r i er I nspect or ar e as f ol l ows:

a. Tr ai ni ng and cer t i f i cat i on as an Ai r Bar r i er I nst al l er f r om t he Ai r Bar r i er Associ at i on of Amer i ca ( ABAA) or ot her t hi r d par t y ai r bar r i er association.

b. Exper i ence coor di nat i ng and i nst r uct i ng per sonnel i nvol ved i n t he i nst al l at i on, j oi ni ng, and seal i ng of ai r bar r i er mat er i al s and components.

**AM002**

1. 8 DESI GN REVI EW

Revi ew t he Cont r act Pl ans and Speci f i cat i ons and advi se t he Cont r act i ng Of f i cer of any def i c i enci es t hat woul d pr event t he const r uct i on of an ef f ect i ve ai r bar r i er syst em. Pr ovi de a Desi gn Revi ew Repor t i ndi v i dual l y l i s t i ng each def i c i ency and t he cor r espondi ng pr oposed cor r ect i ve act i on necessar y f or pr oper ai r bar r i er syst em.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTI ON

3. 1 QUALI TY CONTROL

3. 1. 1 Document at i on and Repor t i ng

Document t he ent i r e i nst al l at i on pr ocess on dai l y j ob s i t e r epor t s. These r epor t s i ncl ude i nf or mat i on on t he I nst al l er , subst r at es, subst r at e pr epar at i on, pr oduct s used, ambi ent and subst r at e t emper at ur e, t he l ocat i on of t he ai r bar r i er i nst al l at i on, t he r esul t s of t he qual i t y cont r ol

SECTI ON 07 27 10. 00 10 Page 4 pr ocedur es, and t est i ng r esul t s.

**AM002**

3. 1. 2 Const r uct i on Mock- Up

a. Pr epar e a const r uct i on mock- up t o demonst r at e pr oper i nst al l at i on of t he ai r bar r i er assembl i es and component s. I ncl ude ai r bar r i er syst em connect i ons bet ween f l oor and wal l , wal l and wi ndow, wal l and r oof .

Al so, i ncl ude t he seal i ng met hod bet ween membr ane j oi nt s at t r ansi t i ons f r om one mat er i al or component t o anot her , at pi pe or condui t penet r at i ons of t he wal l and r oof , and at duct penet r at i on of t he wal l and r oof . Wor k wi l l not begi n unt i l t he mock- up i s sat i sf act or y t o t he Cont r act i ng Of f i cer .

b. Si ze t he mock- up t o appr oxi mat el y 8 f eet l ong by 8 f eet hi gh. The mock- up must be r epr esent at i ve of pr i mar y ext er i or wal l assembl i es and gl azi ng component s i ncl udi ng backup wal l and t ypi cal penet r at i ons as accept abl e t o t he Cont r act i ng Of f i cer . A cor ner of t he act ual bui l di ng may be used as t he mock- up.

c. Mock- Up Test s f or Adhesi on: Test t he mock- up of mat er i al s f or adhesi on i n accor dance wi t h manuf act ur er ' s r ecommendat i ons. Per f or m t he t est af t er t he cur i ng per i od r ecommended by t he manuf act ur er . Recor d t he mode of f ai l ur e and t he ar ea whi ch f ai l ed i n accor dance wi t h ASTM D4541.

When t he ai r bar r i er mat er i al manuf act ur er has est abl i shed a mi ni mum adhesi on l evel f or t he pr oduct on t he par t i cul ar subst r at e, t he i nspect i on r epor t must i ndi cat e whet her t hi s r equi r ement has been met .

Wher e t he manuf act ur er has not decl ar ed a mi ni mum adhesi on val ue f or t hei r pr oduct / subst r at e combi nat i on, s i mpl y r ecor d t he val ue.

**AM002**

3. 1. 2 Qual i t y Cont r ol Test i ng And I nspect i on

Conduct t he f ol l owi ng t est s and i nspect i ons as appl i cabl e i n t he pr esence of t he Cont r act i ng Of f i cer dur i ng i nst al l at i on of t he ai r bar r i er syst em, and submi t qual i t y cont r ol r epor t s as i ndi cat ed bel ow.

a. Pr ovi de a Dai l y Repor t of Obser vat i ons wi t h a copy t o t he Cont r act i ng Of f i cer .

b. I nspect t o assur e cont i nui t y of t he ai r bar r i er syst em t hr oughout t he bui l di ng encl osur e and t hat al l gaps ar e cover ed, t he cover i ng i s st r uct ur al l y sound, and al l penet r at i ons ar e seal ed al l owi ng f or no i nf i l t r at i on or exf i l t r at i on t hr ough t he ai r bar r i er syst em.

c. I nspect t o assur e st r uct ur al suppor t of t he ai r bar r i er syst em t o wi t hst and desi gn ai r pr essur es.

d. I nspect t o assur e masonr y sur f aces r ecei v i ng ai r bar r i er mat er i al s ar e smoot h, c l ean, and f r ee of cavi t i es, pr ot r usi ons and mor t ar dr oppi ngs, wi t h mor t ar j oi nt s st r uck f l ush or as r equi r ed by t he manuf act ur er of t he ai r bar r i er mat er i al .

e. I nspect and t est t o assur e Si t e condi t i ons f or appl i cat i on t emper at ur e, and dr yness of subst r at es ar e wi t hi n gui del i nes.

f . I nspect t o assur e subst r at e sur f aces ar e pr oper l y pr i med i f appl i cabl e

SECTI ON 07 27 10. 00 10 Page 5 and i n accor dance wi t h manuf act ur er ' s i nst r uct i ons. Pr i mi ng must ext end at l east 2 i nches beyond t he ai r bar r i er mat er i al t o make i t obvi ous t hat t he pr i mer was appl i ed t o t he subst r at e bef or e t he ai r bar r i er mat er i al .

g. I nspect t o assur e l aps i n mat er i al s ar e at l east a 2- i nch mi ni mum, shi ngl ed i n t he cor r ect di r ect i on or mast i c appl i ed i n accor dance wi t h manuf act ur er ' s r ecommendat i ons, and wi t h no f i shmout hs.

h. I nspect t o assur e t hat a r ol l er has been used t o enhance adhesi on.

I dent i f y any def ect s such as f i shmout hs, wr i nkl es, ar eas of l ost adhesi on, and i mpr oper cur i ng. Not e t he i nt ended r emedy f or t he deficiencies.

i . Measur e appl i cat i on t hi ckness of l i qui d appl i ed mat er i al s t o assur e t hat manuf act ur er ' s speci f i cat i ons f or t he speci f i c subst r at e ar e met .

j . I nspect t o assur e t hat t he cor r ect mat er i al s ar e i nst al l ed f or compatibility.

k. I nspect t o assur e pr oper t r ansi t i ons f or change i n di r ect i on and st r uct ur al suppor t at gaps.

l . I nspect t o assur e pr oper connect i on bet ween assembl i es ( membr ane and seal ant s) f or c l eani ng, pr epar at i on and pr i mi ng of sur f aces, st r uct ur al suppor t , i nt egr i t y, and cont i nui t y of seal .

m. Per f or m adhesi on t est s f or f l ui d- appl i ed and sel f - adher ed ai r bar r i er membr anes t o assur e t hat t he manuf act ur er ' s speci f i ed adhesi on st r engt h pr oper t i es ar e met . Det er mi ne t he bond st r engt h of coat i ngs t o subst r at e i n accor dance wi t h ASTM D4541.

n. Pr ovi de wr i t t en t est r epor t s of al l t est s per f or med.

**AM002**

3. 2 REPAI R AND PROTECTI ON

Upon compl et i on of i nspect i on, testing, sampl e r emoval and si mi l ar ser vi ces, r epai r damaged const r uct i on and r est or e subst r at es, coat i ngs, and f i ni shes. Pr ot ect const r uct i on exposed by or f or qual i t y cont r ol ser vi ce act i v i t i es, and pr ot ect r epai r ed const r uct i on.

**AM002**

- - End of Sect i on - -

SECTI ON 07 27 10. 00 10 Page 6

File details come from the government source that posted it.