SECTION_013100_Govt_Specific_Addendum.pdf

PDF 103 KB Posted

Attached to
Renovate Hangar 885 Federal contract opportunity
Solicitation number
W9136418B5000
Issued by
Department of the Army Ohio Army National Guard

About this file

W9136418B5000 - Project Software Specs

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Hangar 885, newest first.
File Type Posted
Bid_Opening_Sign_In_W91364-18-B-5000.pdf PDF
Final_Bid_Opening_DOC_Abstract_of_offers_18B5000.pdf PDF
26_2500_-_ENCLOSED_BUS_ASSEMBLIES.PDF PDF
Amendment_6_Drawings.pdf PDF
Amendment_6_RFI_Questions-Answers-July_20_2018.pdf PDF
W91364-18-B-5000-0006.pdf PDF
W91364-18-B-5000-0005.pdf PDF
W91364-18-B-5000-0004.pdf PDF
321216_-_ASPHALT_PAVING.pdf PDF
323113_-_CHAIN_LINK_FENCES_AND_GATES.pdf PDF
Amendment_4_RFI_Questions-Answers-July_17_2018.pdf PDF
Amendment_4_Civil_-_C300_Site_Plan.pdf PDF
Amendment_4_ARCH_-_7.17.2018.pdf PDF
Amendment_4_HVAC_-_7.17.2018.pdf PDF
Amendment_4_ELEC_-_7.17.2018.pdf PDF
ANGETL_15-01-03,_Fire_Prot_Design_Policy.pdf PDF
Amendment_4_drawing_narrative.pdf PDF
W9136418B5000-Amendment_0003.pdf PDF
OH1180099_7-06-2018_Franklin_County.pdf PDF
RFI_Questions-Answers-July_13,_2018.pdf PDF
6JUL18_885_Site_Visit_Sign_In_Sheet.pdf PDF
Pre-Bid_Conference_Renovate_Hangar_-6_Jul_18-_18B5000.pdf PDF
885F_1981Reno.pdf PDF
885S_1981Reno.pdf PDF
W9136418B5000-Amendment_0002.pdf PDF
885A_1981Reno.pdf PDF
RFI__Answer-July_10,_2018.pdf PDF
885H_1981Reno.pdf PDF
885S_1953.pdf PDF
885E__1981Reno.pdf PDF
RFI_Answers-July_7,_2018.pdf PDF
OH118_6-15-2018-Franklin.pdf PDF
W9136418B5000_Hangar_885_Survey_Reports_and_Sampling_Data.pdf PDF
W91364-18-B-5000_Amendment_0001_RENOVATE_BLDG_885.pdf PDF
27JUN18_Site_Visit_Docs.pdf PDF
NLZG102008_RenovateHangar885_specifications_Vol_02-IFB.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_02-IFB_Part_2_of_3.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_01-IFB.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_02-IFB_Part_3_of_3.pdf PDF
NLZG102008_RenovateHangar885_specifications_Vol_01-IFB.pdf PDF
W91364-18-B-5000_RENOVATE_BLDG_885.pdf PDF
18B5000_-_JA_Manaco_Fire_Alarm_System.pdf PDF
18B5000_JA_Project_Mates.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_02-IFB_Part_1_of_3_.pdf PDF
W9136418B5000-_RFI_template.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rickenbacker ANG Base Section 013300.01 Page No. 1 Renovate Hanger 885 CONSTRUCTION PROJECT MANAGEMENT December 19, 2017 Project No. NLZG102008 COLLABORATION SOFTWARE 100% DESIGN SET

SECTION 013300.01

CONSTRUCTION PROJECT MANAGEMENT COLLABORATION SOFTWARE

1. The Government REQUIRES the use of Projectmates (http://www.projectmates.com) Construction Project Collaboration Software on this project. The Contractor will pay all fees associated with use of the system, including initial training, throughout the period of performance of the project. The Government will act as the project administrator. The software shall serve as a repository for all project related documents, except for base pass requests due to privacy act information required in those forms. The Contractor will upload submittals (including technical, pre‐construction, and administrative), change proposals, photographs, reports, draft pay requests, schedules, project team contact information, and related documents as may be required by the Contracting Officer. Technical submittals, change orders, and other action documents will be processed through the system.

2. The Contractor will identify to the Contracting Officer its personnel that require access to the system. The following will be tracked in the system:

a. Project document repository

b. Administrative document repository (apprentice certifications, bond & insurance certificates, certified payrolls, SF1413s, subcontractor payment records)

c. Material testing and Special Inspection reports (concrete, pavement, steel, soil, etc.)

d. Commissioning (meeting minutes, test reports, action log)

e. HazMat Tracking (Authorization form, MSDS, Manifests, Monthly Inventory, Closeout

Certification)

f. Closeout Documents (As‐builts, O&M Manuals, Warranties, Startup Certificates, Release of Claims, etc.)

g. Discussion Forum (optional)

h. Project Schedule

i. Meeting minutes (field meetings, progress meetings, QC meetings, special meetings)

j. Action List (deficiency action log, pre‐final and final punchlist)

k. Requests for Information

l. Submittals

m. Daily Field Reports (superintendent, CQC manager, safety)

n. A/E and Government Observation Reports

o. Schedule of Values

p. Construction Change Order Requests

q. Requests for Contract Modification

r. Pencil Requisitions

s. Photos (existing conditions, progress, closeout, etc.)

t. More or less project information as may be determined by the Contracting Officer

3. Point of Contact at Projectmates

Nicole Countryman Director of Sales Systemates, Inc.

phone 214.217.4100 x117 cell 469.999.7311 email nicole.countryman@systemates.com http://www.projectmates.com/

Rickenbacker ANG Base Section 013300.01 Page No. 2 Renovate Hanger 885 CONSTRUCTION PROJECT MANAGEMENT December 19, 2017 Project No. NLZG102008 COLLABORATION SOFTWARE 100% DESIGN SET

THIS PAGE INTENTIONALLY BLANK

File details come from the government source that posted it.