W9136418B5000 - Drawings Volume 2 (file 2 of 3)
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(D)UH
EA 18x12
UP TO SECOND FLOOR
3/4"
MATCHLINE: SEE 1/ MD101-E
L
K
J
H
M
23 1A1B
N D
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:1
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
FIRST FLOOR HVAC DEMOLITION
PLAN - AREA D
MD101-D
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MD101-D
1 FIRST FLOOR HVAC DEMOLITION PLAN - AREA D
KEY NOTES
1 REMOVE HWS/R PIPING (TYPICAL).
2 REMOVE GRILLE AND/OR DUCT AT CAP. OPENING
TO BE INFILLED. REFER TO ARCHITECTUAL AND
STRUCTURAL DRAWINGS (TYPICAL).
I/R DATE DESCRIPTION
(D)TB (D)TB
(D)TB
(D)TB
(D)TB (D)TB
(D)TB
(D)TB
(D)TB
(D)CUH
(D)CUH
(D)CUH
EA 14x10
UP TO SECOND FLOOR
28x24
8"
10x6
8x6
8x6
12x10
14x10
10x10
14x8
14x8
18x20
12x12
8x10
12x12
10x6
8"
8" 14x10 10x8
12x10
3/4"
14x14
24x20
20x12
3/4"
3/4"
18x12
18x10
20x16
8x10
8x8 20x16
20x14
16"
MATCHLINE: SEE 1/ MD101-D
MATCHLINE: SEE 1/ MD101-F
H
G
F
E
D
2 22
23 1A1B
2 (TYP.)
(TYP.) (TYP.)
N
E
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:1
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
FIRST FLOOR HVAC DEMOLITION
PLAN - AREA E
MD101-E
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MD101-E
1 FIRST FLOOR HVAC DEMOLITION PLAN - AREA E
KEY NOTES
1 REMOVE GRILLE AND/OR DUCT AT CAP. OPENING
TO BE INFILLED. REFER TO ARCHITECTUAL AND
STRUCTURAL DRAWINGS (TYPICAL).
2 PATCH WALL OPENING TO MATCH EXISTING.
REFER TO ARCHITECTURAL AND STRUCTURAL
DRAWINGS (TYPICAL).
(D)TB (D)TB
EA 14x12
UP THRU CAP
(D)CUH
10x10
12x12
16"
16x14
12x12
12x10
12x12
12x10
8x8
8x8
7"
MATCHLINE: SEE 1/ MD101-E
C
B
D
A
123 1A1B
N
F
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:1
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
FIRST FLOOR HVAC DEMOLITION
PLAN - AREA F
MD101-F
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MD101-F
1 FIRST FLOOR HVAC DEMOLITION PLAN - AREA F
(D)EF
(D)EF (D)EF
(D)EF
96"X48"
OPENING
44" X 44"
DOWN
THRU CAP
44" X 44"
DOWN
THRU CAP
44" X 44"
DOWN
THRU CAP
44" X 44"
DOWN
THRU CAP
30" X 30"
DOWN
THRU CAP
36" X 36"
DOWN
THRU CAP
36" X 36"
DOWN
THRU CAP
30" X 30"
36" X 16"46" X 26"
(D)AHU
1-1/4"
HWS/R
L
K
10 6 5
J
H
M
7891D 1C
N A
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:1
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
SECOND FLOOR HVAC
DEMOLITION PLAN - AREA A
MD102-A
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MD102-A
1 SECOND FLOOR HVAC DEMOLITION PLAN - AREA A
KEY NOTES
1 REMOVE LOUVER, DAMPER AND BIRDSCREEN.
OPENING TO BE REUSED.
2 REMOVE DUCTWORK THROUGH CAP OPENING
TO BE REUSED.
3 REMOVE DUCTWORK THROUGH CAP. OPENING
TO BE INFILLED. REFER TO ARCHITECTURAL AND
STRUCTURAL DRAWINGS (TYPICAL).
MD102-A SHEET NOTES
A HVAC CONTRACTOR TO MAINTAIN ALL EXISTING
INFARED HEATERS THROUGHOUT THE HANGER
SPACE.
DN
(D)EF
(D)EF
(D)EF
36"X60" THRU WALL
56"X24" DOWN THRU CAP
56"X24" DOWN THRU CAP
(D)EF
28"X28" DOWN THRU CAP
52"X30"
OPENING
(D)ACC
(D)EF
(D)EF
(D)EF
52"X30" OA
DUCT
(D)EF
(D)EF
(D)EF
24"X56" THRU WALL
(D)EF
(D)EF
(D)AHU
EA 12" X 10"
DOWN
THRU CAP
3"
HWS/R
3" CHS/R
EA 32" X 32"
DOWN
THRU CAP
EA 26" X 26"
DOWN
THRU CAP
14" X 10"
DOWN
THRU CAP
16" X 10"
DOWN
THRU CAP
2"
HWS/R
EA 10"
DOWN
THRU CAP
56" X 24"
DOWN
THRU CAP
EA 26" X 26"
DOWN
THRU CAP
EA 26" X 26"
DOWN
THRU CAP
EA 9" DOWN
THRU CAP
EA 26" X 26"
DOWN
THRU CAP
EA 12" DOWN THRU CAP
EA 26" X 26"
DOWN
THRU CAP
2" HWS/R
24" X 24"
OPENING
BOILER
FLUE
THRU ROOF
42" X 18"
OPENING
(D)AC
3" CHS/R
(D)AC
(D)AC
(D)CHP
(D)CHP
SA 24" X 20"
DOWN
THRU CAP
RA 24" X 20"
DOWN
THRU CAP
4"
HWS/R
3" CHS/R
EA 12" X 10"
DOWN
THRU CAP
56x2656x4056x5460x60
EA 14" X 14"
DOWN THRU
CAP
56" X 24"
DOWN THRU
CAP
158"X52" OPENING
9"
10 6 5
H
G
F
E
D
9 9
7891D 1C
N
B
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:2
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
SECOND FLOOR HVAC
DEMOLITION PLAN - AREA B
MD102-B
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MD102-B
1 SECOND FLOOR HVAC DEMOLITION PLAN - AREA B
KEY NOTES
1 REMOVE LOUVER, DAMPER AND BIRDSCREEN.
OPENING TO BE REUSED.
2 REMOVE DUCTWORK, DAMPERS AND
BIRDSCREEN BEHIND LOUVERS. INSTALL
INSULATED SHEET METAL BLANK-OFF PANELS
BEHIND LOUVER AND SEAL WEATHERTIGHT.
FIELD VERIFY SIZE.
3 REMOVE TEMPERATURE CONTROL PANEL,
WIRING, DEVICES, ETC.
4 EXHAUST DUCT RUNS THROUGH HANGER ROOF
APPROXIMATELY 50 FEET AFF. REMOVE DUCT TO
UNDERSIDE OF ROOF DECK AND CAP. UNDER
ABI-2 REMOVE DUCTWORK THROUGH ROOF AND
VENT CAP ON THE ROOF.
5 REMOVE CONDENSING UNIT ASSOCIATED WITH
FURNACE BELOW INCLUDING ALL REFRIGERANT
LINES, CONTROLS, ETC.
6 REMOVE CHILLED WATER PUMPS, PADS, PIPING,
CONTROLS, ECT.
7 REMOVE TEMPERATURE CONTROLS, AIR
COMPRESSORS, FILTER DRYERS, COMPONENTS,
ETC.
8 CAP BOILER FLUE ABOVE ROOF WITH
INSTULATED STAINLESS STEEL CAP. SEAL
WEATHERTIGHT.
9 REMOVE DUCTWORK THROUGH CAP. OPENING
TO BE INFILLED. REFER TO ARCHITECTURAL AND
STRUCTURAL DRAWINGS (TYPICAL).
10 PATCH WALL OPENING TO MATCH EXISTING.
REFER TO ARCHITECTURAL AND STRUCTURAL
DRAWINGS (TYPICAL).
11 REMOVE ALL HEATING HOT WATER AND CHILLED
WATER PIPING ACROSS HANGER
APPROXIMATELY 40 FEET AFF.
MD102-B SHEET NOTES
A HVAC CONTRACTOR TO MAINTAIN ALL EXISTING
INFARED HEATERS THROUGHOUT THE HANGER
36"X36"
DOWN
THRU CAP
(D)EF
(D)EF
(D)EF
(D)EF
(D)EF
38"X38"
DOWN
THRU CAP
26"X26"
DOWN
THRU CAP
32"X32"
DOWN
THRU CAP
(D)EF
(D)EF
(D )E
F
(D)EF
(D)EF
(D)EF
(D)AHU
38"X38"
DOWN
THRU CAP
116'X52' OPENING
48'X40' OPENING
36'X22' OPENING
26" X 26"
OPENING
12" DOWN THRU CAP
12" DOWN
THRU CAP
9"
10" DOWN
THRU CAP
48" X 24" DOWN
THRU CAP
144" X 24" OPENING
36" X 24"
DOWN THRU CAP
36" X 24"
DOWN THRU
CAP
10" X 22"
DOWN THRU CAP
48" X 24"
DOWN
THRU CAP
48" X 44" OPENING
16"
2" HWS/R
MATCHLINE: SEE 1/ MD102-B
10 6 5
C
B
D
A 1
7891D 1C
N
C
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:2
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
SECOND FLOOR HVAC
DEMOLITION PLAN - AREA C
MD102-C
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MD102-C
1 SECOND FLOOR HVAC DEMOLITION PLAN - AREA C
KEY NOTES
1 REMOVE LOUVER, DAMPER AND BIRDSCREEN.
OPENING TO BE REUSED.
2 REMOVE DUCTWORK THROUGH CAP OPENING
TO BE REUSED.
3 REMOVE DUCTWORK, DAMPERS AND
BIRDSCREEN BEHIND LOUVERS. INSTALL
INSULATED SHEET METAL BLANK-OFF PANELS
BEHIND LOUVER AND SEAL WEATHERTIGHT.
FIELD VERIFY SIZE.
4 REMOVE DUCTWORK THROUGH CAP. OPENING
TO BE INFILLED. REFER TO ARCHITECTURAL AND
STRUCTURAL DRAWINGS (TYPICAL).
MD102-C SHEET NOTES
A HVAC CONTRACTOR TO MAINTAIN ALL EXISTING
INFARED HEATERS THROUGHOUT THE HANGER
EA 22" X 12"
UP THRU CAP
16x8
2"
EXISTING
FAN TO
REMAIN EXISTING
FAN TO
REMAIN
(D)EF
MATCHLINE: SEE 1/ MD102-E
L
K
5 4
J
H
M
23 1A1B
3(TYP.)
N D
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:2
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
SECOND FLOOR HVAC
DEMOLITION PLAN - AREA D
MD102-D
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MD102-D
1 SECOND FLOOR HVAC DEMOLITION PLAN - AREA D
KEY NOTES
1 REMOVE HWS/R PIPING (TYPICAL).
2 REMOVE GRILLE AND/OR DUCT AT CAP. OPENING
TO BE INFILLED. REFER TO ARCHITECTUAL AND
STRUCTURAL DRAWINGS (TYPICAL).
3 PATCH WALL OPENING TO MATCH EXISTING.
REFER TO ARCHITECTURAL AND STRUCTURAL
DRAWINGS (TYPICAL).
MD102-D SHEET NOTES
A HVAC CONTRACTOR TO MAINTAIN ALL EXISTING
INFARED HEATERS THROUGHOUT THE HANGER
(D)TB (D)TB
(D)TB
(D)AHU
(D)AHU
(D)RF
(D)
(D)
(D)
(D)
(D)
3"
HWS/R
3" CHS/R
OA 34" X 22" OPENING
OA 74" X 34" OPENING
2" HWS/R
3" CHS/R
THRU WALL AC UNIT
(TYP.OF 4)
EA 10" X 14"
UP THRU CAP
EA 12" X 8"
UP THRU CAP
EA 22" X 12"
UP THRU CAP
20x20
20x16
20x16 18x16 16x16
12x12
16x14
10x8
10x12
12x12
10x12
14x14
8x8
12x8
8x8
14x8 8x8
16x8
2"
14x12
14x8
28x24
36x24
20x20
THRU WALL AC UNIT
EXISTING EXISTING
MATCHLINE: SEE 1/ MD102-D
MATCHLINE: SEE 1/ MD102-F
H
G
F
E
D
23 1A1B
(TYP.)
6(TYP.)
N
E
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:2
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
SECOND FLOOR HVAC
DEMOLITION PLAN - AREA E
MD102-E
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MD102-E
1 SECOND FLOOR HVAC DEMOLITION PLAN - AREA E
KEY NOTES
1 REMOVE ALL HEATING HOT WATER AND CHILLED
WATER PIPING ACROSS HANGER
APPROXIMATELY 40 FEET AFF.
2 REMOVE AIR HANDLING UNITS, RETURN FAN, ALL
DUCTWORK, PIPING, ACCESSORIES, ETC.
3 REMOVE TEMPERATURE CONTROL PANEL,
WIRING, DEVICES, ETC.
4 REMOVE DUCTWORK, DAMPERS AND
BIRDSCREEN BEHIND LOUVERS. INSTALL
INSULATED SHEET METAL BLANK-OFF PANELS
BEHIND LOUVER AND SEAL WEATHERTIGHT.
FIELD VERIFY SIZE.
5 REMOVE GRILLE AND/OR DUCT AT CAP. OPENING
TO BE INFILLED. REFER TO ARCHITECTUAL AND
STRUCTURAL DRAWINGS (TYPICAL).
6 PATCH WALL OPENING TO MATCH EXISTING.
REFER TO ARCHITECTURAL AND STRUCTURAL
DRAWINGS (TYPICAL).
MD102-E SHEET NOTES
A HVAC CONTRACTOR TO MAINTAIN ALL EXISTING
INFARED HEATERS THROUGHOUT THE HANGER
EA 20" X 20" OPENING
14x12
EXISTING
FAN TO
REMAIN
EXISTING
FAN TO
REMAIN
MATCHLINE: SEE 1/ MD102-E
5 4
C
B
D
A
123 1A1B
N
F
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:3
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
SECOND FLOOR HVAC
DEMOLITION PLAN - AREA F
MD102-F
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MD102-F
1 SECOND FLOOR HVAC DEMOLITION PLAN - AREA F
KEY NOTES
1 REMOVE DUCTWORK, DAMPERS AND
BIRDSCREEN BEHIND LOUVERS. INSTALL
INSULATED SHEET METAL BLANK-OFF PANELS
BEHIND LOUVER AND SEAL WEATHERTIGHT.
FIELD VERIFY SIZE.
MD102-F SHEET NOTES
A HVAC CONTRACTOR TO MAINTAIN ALL EXISTING
INFARED HEATERS THROUGHOUT THE HANGER
UP
DN
DN
M D
BDD
BDD
HP1-A
HP2-B
HP3-C
HP4-D
FC01-A
CUH1
CUH1
CUH1 CUH1
CUH1
GUH1
CUH1
L
K
10 6 5 4
J
H
G
C
B
M
F
E
D
A
DH1
UH2
DH1
UH2
UH2
UH1
HVLV1
HVLV2
UH2
UH2
UH2
FC04-A
UH2
FC03-A
UH1
DH1
FC02-A
FC06-A
FC07-A
FC08-A
FC09-A
FC18-A
FC19-A
L1
L3
UH2
FC20-B
DH2
DH2
DH2 DH2
HVLV3
HVLV3
UH2 UH2
UH1
UH2
FC30-D
FC29-C
FC27-C
FC28-C
FC23-C
FC22-C
EF5
FC21-C
23789 1A1B1D 1C
MATCHLINE: SEE 1/ MH101-B
MATCHLINE: SEE 1/ MH101-A
MATCHLINE: SEE 1/ MH101-C
MATCHLINE: SEE 1/ MH101-B
MATCHLINE: SEE 1/ MH101-D
MATCHLINE: SEE 1/ MH101-E
MATCHLINE: SEE 1/ MH101-E
N A
B
C
D
E
F
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:1
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
FIRST FLOOR HVAC PLAN -
OVERALL
MH101
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 8 16 324
1/16" = 1'-0"MH101
1 FIRST FLOOR HVAC PLAN - OVERALL
M D
Jet Engine Inspection Shop
Welding Shop
Fabrication Shop
X-Ray Room
Dark Room
Storage
NDI Inspection Shop
Structures Office
Jet Shop Office
Jet Shop Admin
Corridor
C10
HP1-A
HP2-B
MATCHLINE: SEE 1/ MH101-B
L
K
10 6 5
J
H
M
Computer / Admin Room
Fabrication Admin
10x10
10x10
8x8
8x8
16ø
HVLV2
HVLV1
R1R1 R1
10x10
8x8
12x10
R1 S2-8ø
S2-8ø
S2-8ø
S2-8ø
S2-8ø
S2-8ø
S2-8ø 235S2-10ø
10ø
12ø
16ø
12ø
12ø
14x14
S1-12x8
(TYP. OF 4)
S1-12x8
(TYP. OF 3)
R1
R1
R1
(E)EF
(E) 6 X 10
(E)R
(E)S
(E)S
(E)E
DH1
DH1
DH1
EF2 EF3
UH2
UH1
UH2
UH2
UH1
UH2
UH2
UH2
x x
S6-30x6
(TYP. OF 5)
10ø
8ø
S6-30x6
(TYP. OF 4)
22x22
14x12S5-18x6
18x6 x x
S5-18x6
(TYP. OF 4)
14x12
S5-18x6
S5-18x6
FC04-A
FC03-A
FC02-A
16ø
FC01-A
10ø 14x14 S2-10ø
S2-10ø
T2
18x18 R2
T2
T
E1-14x14
E2-16x16
E3-44x44
E3-44x44
L3
26x26
UH2
12x12
10ø 12ø
14ø 18ø
18ø EA UP
S7-6x6
S7-6x6
S7-6x6
S7-6x6 25 S7-8x6
BS1 - A
BS3 - A
UH2
S11-12x6
(TYP OF 4)
Tool Crib
12ø
8x6
8x8
10x86x6
34x34 SA UP
32x30 SA UP
12x12
28x12
14x14
7891D 1C
E1-14x14
EDH1
EDH1
N A
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:2
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
FIRST FLOOR HVAC PLAN - AREA A
MH101-A
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MH101-A
1 FIRST FLOOR HVAC PLAN - AREA A
KEY NOTES
1 ROUTE 10" DIAMETER B-VENT FLUE FROM OWNER FURNISHED, OWNER
INSTALLED OVEN THROUGH CAP AND OUT NORTH SIDEWALL WITH VENT
CAP. FLASH AND SEAL PENETRATION WEATHERTIGHT. COORDINATE
FINAL SIZE AND LOCATION WITH OWNERS PIECE OF EQUIPMENT.
2 EXISTING HVLV FANS TO REMAIN.
3 NEW HVLV FANS. INSTALLATION OF FANS SHALL BE BY THE FAN
MANUFACTURER. FAN MANUFACTURER RESPONSIBLE FOR ALL
INSTALLATION DETAILS AND INVESTIGATION FOR INSTALLATION TO
CONCRETE CAP. HVAC CONTRACTOR TO FACILITATE COORDINATION
WITH FAN MANUACTURER AND ALL DISCIPLINES.
4 SUPPORT DOCK DOOR HEATERS FROM WALL WITH WALL BRACKETS PER
MANUFACTURES RECOMMENDATIONS.
5 UNIT HEATER MOUNTED AT 12' AFF WITH WALL BRACKET.
6 REUSE EXISTING 54"X 96" WALL OPENING. INSTALL NEW LOUVER WITH
STAINLESS STEEL BIRDSCREEN AND SHEET METAL PLENUM FULL SIZE
BEHIND LOUVER. CONNECT EXHAUST FANS EF2 AND EF3. PLENUM SHALL
BE FULLY ENCLOSED.
7 EXHAUST DUCT THROUGH CAP WITH GRILLE AT UNDERSIDE OF DECK.
8 EXHAUST DUCTWORK. DOWN TO OWNERS LASER ETCHING MACHINES.
COORDINATE FINAL LOCATION WITH OWNER.
9 SET OUTDOOR HEAT PUMP UNITS ON A CONCRETE PAD WITH A 24 INCH
ELEVATED STEEL PLATFORM TO PREVENT SNOW DRIFT.
10 10" DIAMETER EXHAUST DROP TO 7' WELDING EXHAUST EXTRACTION
ARM. MOUNT EXTRACTION ARM TO WALL. BALANCE DROP TO 1,000 CFM.
TYPICAL OF 6. OWNER WILL ONLY OPERATE A MAXIMUN OF 4 DROPS AT A
TIME.
11 LOCATE HVLV CONTROLLER WITH CONTRACTING OFFICER. FAN SHALL BE
INTEGRATED INTO THE FIRE ALARM CONTROL PANEL.
12 ROUTE 10" AL-29-4C DOUBLE WALL EXHAUST THROUGH CONCRETE CAP
TO AN EXTERIOR WALL CAP, FLASH AND SEAL WEATHERTIGHT. SEE
DETAIL 6 ON SHEET M601 FOR CAP DETAIL. EXHAUST DUCT SHALL BE 3'
ABOVE CAP.
13 SUSPEND UNITS APPROXIMATELY 12' AFF.
14 PROVIDE AND LOCATE WITH CONTRACTING OFFICER HVAC EMERGENCY
SHUTOFF SWITCH PER D.O.D. ANTITERRORISM STANDARDS FOR
BUILDINGS AT THIS APPROXIMATE LOCATION SHOWN ON PLAN.
EMERGENCY SHUTOFF SWITCH SHALL SHUTDOWN ALL HVAC AIR
HANDLING EQUIPMENT AND CLOSE OUTSIDE AIR DAMPERS. SEE DETAIL 6
ON M602.
15 EXHAUST FAN EF4 VFD. PROVIDED BY HVAC CONTRACTOR, INSTALLED
AND WIRED BY ELECTRICAL CONTRACTOR. VFD TO HAVE A NEMA 3R
ENCLOSURE RATING.
16 EXHAUST FAN CONTROLLER.
17 ALL EXHAUST DUCTWORK SHALL BE FULLY WELDED.
MH101-A SHEET NOTES
A REFER TO DUCT CONSTRUCTION DETAILS ON SHEET M601 FOR
DUCTWORK INSTALLATION REQUIREMENTS (INCLUDING DAMPERS AND
TURNING VANE REQUIREMENTS).
BDD
BDD
AMXS/CC Office
Orderly Room
Production Room
Fabrication Supervisor
Accessories Superintendent Office
Women's Toilet
Munitions
Storage
Office
Open Office
R&R Admin
Mechanical
Mech Room
Women's Locker
Break Room
Mech
MOF/CC Office
MXG/CC Office
MXS/CC Office
MOC OIC Office
MXG/DC Office
Corridor
C12
Entry
Hydraulic Admin
Mens Locker
Mechanical
Corridor
C14
Stair
S1
MATCHLINE: SEE 1/ MH101-A
MATCHLINE: SEE 1/ MH101-C
CUH1
GUH1
24x24
10 6 5
H
G
F
E
IT
RA Office
Training Manager / Testing
UDM Office
SIPR
R&R Office
137 Hydraulic Office
Office
ISO
S2-8ø
18x12 R1
R110x10
S3-6x6
S2-8ø
14ø
12ø12ø ø
14ø S4-8ø
(TYP. OF 6)
S2-12ø
(TYP. OF 2)
R1
R2
20x20
20x20
20x20
16x14
R1
R1
R1
16x10
12x8
S2-8ø S2-8ø
S2-8ø
S2-8ø
8x8
8x8
8x8
14x12
12x12
S2-8ø
R1
8x8
10x8
S2-8ø
S2-8ø
8x88x8
R1 R1
10ø
16ø
16x14
S2-8ø
R1
R2
R1 R1 R1
8x8
8ø
12ø
12ø
S2-8ø
S2-8ø 210S2-8ø
16x163
12x12 12x12
14x12
14x12
12x12
8x8 R1
R1
R1
R1
8x8
8x8
S2-10ø
S2-8ø
S2-8ø
T2
R1
R1
8x8
12x10
8x8
10x10
8ø
S2-6ø 75 S2-8ø
T1 T1
8x8
S2-8ø x
24x12
R2 16X16
S2-8ø
S2-8ø
S2-8ø
(TYP OF 5)
8ø 12x12 x
T1T1
T1T1
16x16
22x22
8ø
8ø
S2-8ø
20x20
8x82 x
R1
T2
R2
FC19-A
FC18-A
FC09-A
FC08-A
FC05-A
FC07-A
FC06-A
L1
R2 16x16
22x10
22x10
12x10
12x10
S4-8ø
(TYP. OF 4)
S4-8ø
(TYP.OF 4)
x x x
32x14
12x12
12x12
12x12
12x12
E5-14x14
8x8
8x6
S7-8x6
6x6
6x6
S7-6x6
S7-10x10
S7-10x10
S7-10x10
E5-14x14
E5-12x12
E5-14x14
6x6
S7-6x6 25 S7-6x6
8x8
E5-22x22
S7-6x6
S7-6x6
S7-6x6
S7-6x6
8x8
S7-10x8
6x66x6 6x66x6
S7-10x8
S7-6x6
(TYP. OF 2)
6x6
12x108x8
8x6
6x6
6x6
10x10
S7-8x6
S7-6x6
S7-6x6
S7-6x6
6x8
8x6
10x8
12x10
6x6
S7-8x6
10x8
S7-6x6
S7-6x6
S7-6x6
6x8
S7-6x6
S7-6x6
S7-8x8
S7-8x6
S7-8x6
S7-6x6
S7-6x6
S7-14x12
S7-14x12
S7-14x12
14x10
12x12
13 13
HP2-B
BS2 - A
T H
18x18
18x18
30x30
10x8
16x14
S4-8ø
S4-8ø
S4-8ø
S4-8ø
S4-8ø
S4-8ø
Training
S4-8ø
(TYP. OF 4)
10x8
8x8
8x8 18x12 RA
16x12
6x6
8x8
8x8
12x12
12ø12x10
12ø
Corridor
C17
Men's Toilet
Mother's Room
S4-6ø
7891D 1C
GUH1
UP
TO
EF1
Corridor
C11
N
B
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:2
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
FIRST FLOOR HVAC PLAN - AREA B
MH101-B
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MH101-B
1 FIRST FLOOR HVAC PLAN - AREA B
KEY NOTES
1 DUCTWORK UP TO FC10-B.
2 DUCTWORK UP TO FC11-B.
3 DUCTWORK UP TO FC12-B.
4 DUCTWORK UP TO FC13-B.
5 DUCTWORK UP TO FC16-B.
6 DUCTWORK UP TO FC17-B.
7 DUCTWORK UP TO FC15-B.
8 12"X 12" TRANSFER DUCT
9 16"X 16" TRANSFER DUCT.
10 SEE SHEET MH102-B FOR CONTINUATION.
11 14"X 14" EXHAUST PENETRATION THROUGH CAP.
12 12"X 12" EXHAUST PENETRATION THROUGH CAP.
13 10"X 10" OUTSIDE AIR PENETRATION THROUGH CAP.
14 10"X 8" OUTSIDE AIR PENETRATION THROUGH CAP.
15 8"X 8" OUTSIDE AIR PENETRATION THROUGH CAP.
16 DUCTWORK UP TO FC14-B.
17 NEW DDC CONTROL PANEL.
18 CENTRAL VRV TOUCH SCREEN CONTROLLER. COORDINATE FINAL
LOCATION WITH CONTRACTING OFFICER.
19 DDC TEMPERATURE AND HUMIDITY SENSORS TIED INTO THE BAS.
20 REUSE EXISTING 72" X 72" WALL OPENING. INSTALL NEW LOUVER WITH
STAINLESS STEEL BIRDSCREEN.
21 PROVIDE (1) 28"H X 72"W MOTOR OPERATED DAMPER SECTION IN
BOTTOM HALF OF LOUVER FOR SUMMER VENTILATION OUTSIDE AIR
INTAKE.
22 (2) 18" X 18" EXHAUST DUCTS FROM AIR COMPRESSORS WITH
BACKDRAFT DAMPERS. COMBINE INTO A SINGLE 30" X 30" EXHAUST
DUCT UP TO ROOF MOUNTED EXHAUST HOOD.
23 SECURE PENETRATION, SEE DETAIL 5 ON SHEET M603 FOR
REQUIREMENTS.
24 PROVIDE (2) 44"H X 36"W MOTOR OPERATED DAMPER SECTIONS IN TOP
HALF OF LOUVER. INTERLOCK DAMPER OPERATION WITH EACH
ASSOCIATED AIR COMPRESSOR.
25 SUPPORT NATURAL GAS FIRED HEATERS FROM STRUCTURE ABOVE AT
11' AFF. VENT CPVC CONCENTRIC VENT KIT THROUGH SIDE WALL PER
MANUFACTURES INSTRUCTIONS AND SIZING REQUIREMENTS. FLASH AND
SEAL WEATHERTIGHT. SEE DETAIL 2 ON SHEET M604.
MH101-B SHEET NOTES
A REFER TO DUCT CONSTRUCTION DETAILS ON SHEET M601 FOR
DUCTWORK INSTALLATION REQUIREMENTS (INCLUDING DAMPERS AND
Battery Shop
AGE Shop
Hydraulic Shop
Repair & Rec/Wheel & Tire Shop
AGE Office
MOF/CC Office
MOC OIC Office
Corridor
C13
CUH1
42x24
MATCHLINE: SEE 1/ MH101-B
10 6 5
C
B
D
A
16x14
8ø14x14 x
16x14
14x14
8ø
S3-6x6
6x6
R1
R1
8x8
S2-8ø
S2-8ø
S2-8ø
S2-8ø
FC20-B
HVLV3
HVLV3
UH1
UH2
UH2
UH2
UH2
DH2 DH2DH2
DH2
20x20
20x20 16x14
16x14
S6-30x6
(TYP. OF 2)
20x20 OA UP
20x20 OA UP
S6-30x6
(TYP. OF 2)
E8-12x12
12x12 EA UP
10ø
10ø
E9-36x24
E10-48x24
42x24
S6-30x6
(TYP OF 6)
E11-38x16
E11-38x16
S10-18x18
S9-10x10
E7-8x8
S9-10x10
6x6
S7-6x6
10 10
Entry
2HVLV3
2HVLV3
7891D 1C
8ø
10ø
8ø
Corridor
C13
N
C
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:3
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
FIRST FLOOR HVAC PLAN - AREA C
MH101-C
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MH101-C
1 FIRST FLOOR HVAC PLAN - AREA C
KEY NOTES
1 (2) NEW 3'X2' BATTERY EXHAUST HOODS WITH 10"Ø EXHAUST DUCT
THROUGH CAP.
2 NEW HVLV FANS. INSTALLATION OF FANS SHALL BE BY THE FAN
MANUFACTURER. FAN MANUFACTURER RESPONSIBLE FOR ALL
INSTALLATION DETAILS AND INVESTIGATION FOR INSTALLATION TO
CONCRETE CAP. HVAC CONTRACTOR TO FACILITATE COORDINATION
WITH FAN MANUACTURER AND ALL DISCIPLINES.
3 SUPPORT DOCK DOOR HEATERS FROM WALL WITH WALL BRACKET PER
MANUFACTURERS RECOMMENDATIONS.
4 MAINTAIN EXISTING OVEN B-VENT FLUE THROUGH CAP AND EXTERIOR.
COORDINATE LOCATION WITH OWNERS PIECE OF EQUIPMENT.
5 UNIT HEATER MOUNTED AT 12' AFF WITH WALL BRACKET.
6 EXHAUST DUCT THROUGH CAP WITH GRILLE AT UNDERSIDE OF DECK.
7 A SLIDING TRACK MOUNTED 3'X2' OVERHEAD CANOPY EXHAUST HOOD
WITH 10"Ø FLEXIBLE HOSE CONNECTION BY MONOXIVENT.COORDINATE
FINAL LOCATION WITH CONTRACTING OFFICER AND SOLVENT
EQUIPTMENT. 10"Ø EXHAUST DUCT UP THROUGH CAP. SEE DETAIL 1 ON
SHEET M604.
8 SUPPLY DUCT THROUGH CAP WITH GRILLE AT UNDERSIDE OF DECK.
9 LOCATE HVLV CONTROLLER WITH CONTRACTING OFFICER. FAN SHALL
BE INTEGRATED INTO THE FIRE ALARM CONTROL PANEL.
10 ROUTE 10" AL-29-4C DOUBLE WALL EXHAUST THROUGH CONCRETE CAP
TO AN EXTERIOR WALL CAP, FLASH AND SEAL WEATHERTIGHT. SEE
DETAIL 6 ON SHEET M601 FOR CAP DETAIL. EXHAUST DUCT SHALL BE 3'
ABOVE CAP.
11 SUSPEND UNITS APPROXIMATELY 12' AFF.
12 EXHAUST FAN CONTROLLER.
13 ALL EXHAUST DUCTWORK SHALL BE FULLY WELDED.
MH101-C SHEET NOTES
A REFER TO DUCT CONSTRUCTION DETAILS ON SHEET M601 FOR
DUCTWORK INSTALLATION REQUIREMENTS (INCLUDING DAMPERS AND
DN E&E Maintenance
E&E
Avionics
Office
Stair
S2
Test Room
E&E Office
Secure Room
Office
CUH1
HP3-C
HP4-D
MATCHLINE: SEE 1/ MH101-B
MATCHLINE: SEE 1/ MH101-E
L
K
J
M
S2-8ø
R2
R1
FC21-C
S1-12x8
(TYP. OF 3)
10ø
EF5
S1-12x8
(TYP. OF 4)
FC22-C
FC23-C
S2-8ø 225 S2-8ø
S2-8ø
R1
R1R1
S7-14x12
S7-10x8
S7-12x10
S7-14x12
22x14
18x12
S7-6x6
S7-6x6
10ø EA UP
14x14S7-6x6
12x10 6x6
16x12
18x18 EA UP
10x814x14
E4-12x10
18x12
BS5 - C
12x12
10x822x22 x x
12x10
12x12
10ø
8x8
23 1A1B
EDH1
22x10
E4-12x10
12x10
AC1
N D
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:3
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
FIRST FLOOR HVAC PLAN - AREA D
MH101-D
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MH101-D
1 FIRST FLOOR HVAC PLAN - AREA D
KEY NOTES
1 SET OUTDOOR HEAT PUMP UNITS ON A CONCRETE PAD WITH A 24
INCH ELEVATED STEEL PLATFORM TO PREVENT SNOW DRIFT.
2 10"X8" EXHAUST DUCT. DOWN WALL IN LOCATION SHOWN WITH 6"x6"
HIGH AND LOW EXHAUST INLETS AT 2'0" AFF AND 12'0"AFF. LEAVE
END OPEN AND COVER WITH A BIRDSCREEEN. SECURE DUCTWORK
TO WALL PER SMACNA RECOMMENDATIONS. BALANCE EACH TO
160CFM.
3 14"X8" EXHAUST DUCT. DOWN WALL IN LOCATION SHOWN WITH 6"x6"
HIGH AND LOW EXHAUST INLETS AT 2'0" AFF AND 12'0"AFF. LEAVE
END OPEN AND COVER WITH A BIRDSCREEEN. SECURE DUCTWORK
TO WALL PER SMACNA RECOMMENDATIONS. BALANCE EACH TO
310CFM.
4 ROUTE DUCTWORK TIGHT TO STRUCTURE.
5 18"X 12" EXHAUST DUCT TO SECOND FLOOR ALONG OUTER WALL.
6 22" X 14" SUPPLY DUCT TO SECOND FLOOR ALONG OUTER WALL.
7 A SLIDING TRACK MOUNTED 3'X2' OVERHEAD CANOPY EXHAUST
HOOD WITH 10"Ø FLEXIBLE HOSE CONNECTION BY
MONOXIVENT.COORDINATE FINAL LOCATION WITH CONTRACTING
OFFICER AND SOLVENT EQUIPTMENT. 10"Ø EXHAUST DUCT UP
THROUGH CAP. SEE DETAIL 1 ON SHEET M604.
8 10" EXHAUST DUCT UP EXTERIOR WALL. TERMINATE DUCTWORK 15
FEET ABOVE DOUBLE DOORS. ALL EXTERIOR DUCTWORK TO BE
STAINLESS STEEL. SUPPORT DUCTWORK WITH STAINLESS STEEL
WALL BRACKETS TO EXTERIOR WALL. TERMINATE WITH GOOSENECK
PARALLEL TO WALL.
9 22" X 22" SUPPLY DUCT UP.
10 SUSPEND UNITS APPROXIMATELY 12' AFF.
11 SECURE PENETRATION, SEE DETAIL 5 ON SHEET M603 FOR
REQUIREMENTS.
12 EXHAUST FAN CONTROLLER.
13 ALL EXHAUST DUCT SHALL BE FULLY WELDED.
MH101-D SHEET NOTES
A REFER TO DUCT CONSTRUCTION DETAILS ON SHEET M601 FOR
DUCTWORK INSTALLATION REQUIREMENTS (INCLUDING DAMPERS AND
Secure Room
Men's
Women's
Supply
IT
AMU Open Office
Maintenance Hangar
Corridor
C15
Stair
S3
Debrief
Corridor
C16
CUH1
CUH1
CUH1
MATCHLINE: SEE 1/ MH101-D
CUH1
H
G
F
E
D
Flight Chiefs
Janitor
FC27-C
FC28-C
FC29-C
FC30-D
S3-6x6
S2-8ø
10x10
S2-8ø
S2-8ø 200 S2-8ø
8x8
R1
R1
R1
14x14 x
8x8
20ø 16ø
12ø
S4-10ø
(TYP. OF 6)
S4-8ø
(TYP. OF 3)
S2-8ø
14x12
R1
R1
12ø
8x8
8x8
22x14
18x12
S7-6x6
S7-6x6
S7-8x8 300S7-8x8
S7-12x10 400 S7-10x10 x
22x14
10x10
S7-8x6
8x6
T1 T1
T1
T1
18x12
E4-12x12
8x8
14x12
E4-12x12
BS6 - C
HT
E6-8x8
SD
23 1A1B
EDH2
8x8
E6-8x8
N
E
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:3
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
FIRST FLOOR HVAC PLAN - AREA E
MH101-E
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MH101-E
1 FIRST FLOOR HVAC PLAN - AREA E
KEY NOTES
1 10"X 10" TRANSFER DUCT.
2 22" X 14" SUPPLY DUCT TO SECOND FLOOR ALONG OUTER WALL.
3 DUCT DETECTOR FURNISHED BY ELECTRICAL CONTRACTOR AND
INSTALLED BY HVAC CONTRACTOR. DUCT DETECTOR SHALL
SHUTDOWN UNIT UPON SENSING SMOKE. COORDINATE WITH FIRE
ALARM CONTRACTOR.
4 PROVIDE AND LOCATE WITH CONTRACTING OFFICER HVAC
EMERGENCY SHUTOFF SWITCH PER D.O.D. ANTITERRORISM
STANDARDS FOR BUILDINGS AT THIS APPROXIMATE LOCATION
SHOWN ON PLAN. EMERGENCY SHUTOFF SWITCH SHALL SHUTDOWN
ALL HVAC AIR HANDLING EQUIPMENT AND CLOSE OUTSIDE AIR
DAMPERS. SEE DETAIL 6 ON M602.
5 DDC TEMPERATURE AND HUMIDITY SENSORS TIED INTO THE BAS.
6 SECURE PENETRATION, SEE DETAIL 5 ON SHEET M603 FOR
REQUIREMENTS.
7 SUSPEND UNITS APPROXIMATELY 12' AFF.
MH101-E SHEET NOTES
A REFER TO DUCT CONSTRUCTION DETAILS ON SHEET M601 FOR
DUCTWORK INSTALLATION REQUIREMENTS (INCLUDING DAMPERS AND
D
AMXS Chief
Supply
Consult
EMF Chief
Counseling
Women
Plans & Sch.
QA
Analysis
MOC
Secure Briefing
CRF Chief
First Sgt
First Sgt
MOF Chief
EF1
M401
L
K
10 6 5 4
J
H
G
C
B
M
F
E
D
A
L4
L2
AHU1
AHU2
AHU3
L6A
FC10-B
FC11-B
FC12-B
EF6
L8
L7
EF7
EF8
EF4
FC13-B
FC14-B
FC15-B
FC17-B
FC16-B
L5
Conference / Standup Room
Maint. Officers
RH1
M402
23789 1A1B1D 1C
M402
MATCHLINE: SEE 1/ MH101-B
MATCHLINE: SEE 1/ MH101-A
MATCHLINE: SEE 1/ MH101-C
MATCHLINE: SEE 1/ MH101-B
MATCHLINE: SEE 1/ MH101-D
MATCHLINE: SEE 1/ MH101-E
N A
B
C
D
E
F
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:4
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
SECOND FLOOR HVAC PLAN -
OVERALL
MH102
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 8 16 324
1/16" = 1'-0"MH102
1 SECOND FLOOR HVAC PLAN - OVERALL
MATCHLINE: SEE 1/ MH102-B
L
K
10 6 5
J
H
M
OA
EA
60x60 x
AHU1
48x46 32x30 x
L2
EF4
22x20
L4
60x60
SD
14x14
44x4448x46
44x44
7891D 1C
12x10
12x10
16x14
N A
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:4
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
SECOND FLOOR HVAC PLAN -
AREA A
MH102-A
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MH102-A
1 SECOND FLOOR HVAC PLAN - AREA A
KEY NOTES
1 EXISTING 96"X 48" OUTSIDE AIR INTAKE OPENING. FIELD VERIFY EXISTING
SIZE. INSTALL NEW LOUVER WITH INSULATED SHEET METAL PLENUM.
INSTALL BIRDSCREEN BEHIND LOUVER. SEE DETAIL 3 ON SHEET M601.
2 34"X 34" OPENING THROUGH CAP.
3 32"X 32" OPENING THROUGH CAP.
4 REUSE EXISTING 44"X 44" OPENING THROUGH CAP.
5 SET AHU ON STRUCTURAL STEEL WITH RUBBER ISOLATION PADS.
6 14"X 14" OPENING THROUGH CAP.
7 16"X 16" OPENING THROUGH CAP.
8 48" X 48" EXHAUST PLENUM BEHIND LOUVER. INSTALL STAINLESS STEEL
BIRD SCREEN. LOUVER SHALL OCCUPY SPACE AT EXISTING WINDOWS.SEE
DETAIL 3 ON SHEET M601.
9 DUCT DETECTOR FURNISHED BY ELECTRICAL CONTRACTOR AND
INSTALLED BY HVAC CONTRACTOR. DUCT DETECTOR SHALL SHUTDOWN
UNIT UPON SENSING SMOKE. COORDINATE WITH FIRE ALARM
CONTRACTOR.
10 PROVIDE CLEANOUT AND ACCESS DOOR AT THE BOTTOM OF WELDING
EXHAUST DUCT.
11 SUPPLY AND EXHAUST FAN VFD'S MOUNTED TO UNISTRUT SUPPORTS.
PROVIDE AND INSTALLED BY HVAC CONTRACTOR, WIRED BY THE
ELECTRICAL CONTRACTOR.
12 ROUTE 10" AL-29-4C DOUBLE WALL EXHAUST FLUE THROUGH EXTERIOR
WALL TO A WALL CAP. FLASH AND SEAL WEATHERTIGHT. PROVIDE A SOOT
CLEANOUT AND CONDENSATE DRAIN TEE AT THE BOTTOM OF THE STACK.
ROUTE CONDENSATE PIPE THROUGH CONDENSATE NEUTRALIZER TO
DRAIN.SEE DETAIL 6 ON SHEET M601 FOR CAP DETAIL.
13 ROUTE 10" AL-29-4C DOUBLE WALL EXHAUST THROUGH CONCRETE CAP TO
AN EXTERIOR WALL CAP, FLASH AND SEAL WEATHERTIGHT. SEE DETAIL 6
ON SHEET M601 FOR CAP DETAIL. EXHAUST DUCT SHALL BE 3' ABOVE CAP.
14 PROVIDE FIRE DAMPER AT PENETRATION THROUGH CAP. SEE DETAIL 9 ON
SHEET M603.
15 ALL EXHAUST DUCT SHALL BE FULLY WELDED.
MH102-A SHEET NOTES
A REFER TO DUCT CONSTRUCTION DETAILS ON SHEET M601 FOR
DUCTWORK INSTALLATION REQUIREMENTS (INCLUDING DAMPERS AND
TURNING VANE REQUIREMENTS).
B SEE DETAIL 8 ON SHEET M602 FOR DUCTWORK SUPPORTS ON THE CAP.
Electrical Closet
EF1
EA
OA
MATCHLINE: SEE 1/ MH102-A
MATCHLINE: SEE 1/ MH102-C
10 6 5
H
G
F
E
D
12x12
14x12
12x10 16x14
12x12
16x16
14x12
12x12
14x12
12x12
10x10
FC17-B
FC16-B
FC15-B
FC14-B
FC13-B
FC12-BFC11-BFC10-B
AHU3
AHU2
EA
L7
OA
60x60
L5
L6A
22x10
26x1428x28
16x16
30x30 32x14
32x14
30x30
30x30
44x24 x x x x x x
12x10
10x10
12x12 14x14
10x8
12x12 8x8
10x10 10x10
22x10
BS4 - B
13 13
131313
RH1
SD
SD
16x16 L6B
OA
10x12
10x8
8x10
12x10
20x20
10ø20x20
60x60
7891D 1C
N
B
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:4
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
SECOND FLOOR HVAC PLAN -
AREA B
MH102-B
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MH102-B
1 SECOND FLOOR HVAC PLAN - AREA B
KEY NOTES
1 EXSISTING 158"X 52" OUTSIDE AIR INTAKE OPENING. FIELD VERIFY
EXISTING SIZE. INSTALL NEW LOUVER WITH INSULATED SHEET METAL
PLENUM. INSTALL BIRDSCREEN BEHIND LOUVER. SEE DETAIL 3 ON SHEET
M601.
2 SET AHU ON STRUCTUAL STEEL WITH RUBBER ISOLATION PADS.
3 54"X 54" INSULATED OUTSIDE AIR INTAKE PLENUM BEHIND NEW LOUVER.
INSTALL STAINLESS STEEL BIRDSCREEN. COORDINATE FINAL LOCATION
WITH EXISTING STRUCTURE.SEE DETAIL 3 ON SHEET M601.
4 30"X 30" EXHAUST PLENUM BEHIND NEW LOUVER. INSTALL STAINLESS
STEEL BIRDSCREEN. COORDINATE FINAL LOCATION WITH EXISTING
STRUCTURE.
5 12"X 12" EXHAUST PENETRATION THROUGH CAP.
6 SEE SHEET MH101-B FOR CONTINUATION.
7 AIR COMPRESSOR EXHAUST HOOD ON ROOF WITH 14" CURB, FLASH AND
SEAL WEATHERTIGHT.SEE DETAIL 8 ON SHEET M603.
8 NEW LOUVERS BEING INSTALLED TO REPLACE WINDOWS. INSTALL
INSULATED BLANK-OFF PANELS BEHIND ALL UNUSED PORTIONS OF
LOUVERS. SEE ARCHITECTURAL DRAWINGS FOR SIZE.SEE DETAIL 3 ON
SHEET M601.
9 DUCT DETECTOR FURNISHED BY ELECTRICAL CONTRACTOR AND
INSTALLED BY HVAC CONTRACTOR. DUCT DETECTOR SHALL SHUTDOWN
UNIT UPON SENSING SMOKE. COORDINATE WITH FIRE ALARM
CONTRACTOR.
10 NEW DDC CONTROL PANELS.
11 SUPPLY AND EXHAUST FAN VFD'S MOUNTED TO UNISTRUT SUPPORTS.
PROVIDE AND INSTALLED BY HVAC CONTRACTOR, WIRED BY THE
ELECTRICAL CONTRACTOR.
12 ROUTE 10" AL-29-4C DOUBLE WALL EXHAUST FLUE THROUGH EXTERIOR
WALL TO A WALL CAP. FLASH AND SEAL WEATHERTIGHT. PROVIDE A SOOT
CLEANOUT AND CONDENSATE DRAIN TEE AT THE BOTTOM OF THE STACK.
ROUTE CONDENSATE PIPE THROUGH CONDENSATE NEUTRALIZER TO
DRAIN.SEE DETAIL 6 ON SHEET M601 FOR CAP DETAIL.
13 PROVIDE FIRE DAMPER AT PENETRATION THROUGH CAP. SEE DETAIL 9 ON
SHEET M603.
14 VENTILATION EXHAUST FAN ON ROOF WITH 14" CURB. FLASH AND SEAL
WEATHERTIGHT. SEE DETAIL 7 ON SHEET M603.
MH102-B SHEET NOTES
A REFER TO DUCT CONSTRUCTION DETAILS ON SHEET M601 FOR
DUCTWORK INSTALLATION REQUIREMENTS (INCLUDING DAMPERS AND
TURNING VANE REQUIREMENTS).
D
MATCHLINE: SEE 1/ MH102-B
10 6 5
C
B
D
A
OA
EF6
EF7
EF8
L8
10ø
10ø
36x2442x30
12x12 12ø x x x x
42x30
38x14
30x28 20x20
42x24
12ø8x8
10x10
18x16
20x20
38x14
12øEXHAUST ABOVE
SD
EA
48x24
60x60
8x8
10ø
1110ø
7891D 1C
AHU3
N
C
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:5
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
SECOND FLOOR HVAC PLAN -
AREA C
MH102-C
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MH102-C
1 SECOND FLOOR HVAC PLAN - AREA C
KEY NOTES
1 22"X 22" OPENING THROUGH CAP.
2 12" X 12" OPENING THROUGH CAP.
3 42"X 24" OPENING THROUGH CAP.
4 REUSE EXISTING 144"X 24" OPENING THROUGH WALL. INSTALL NEW
LOUVER WITH SHEET METAL PLENUM SIZED AS SHOWN. PROVIDE
INSULATED BLANK-OFF PANEL BEHIND UNUSED PORTIONS OF LOUVER.
INSTALL BIRDSCREEN BEHIND LOUVER. CONNECT EXHAUST DUCTS TO
PLENUM.SEE DETAIL 3 ON SHEET M601.
5 REUSE A PORTION OF EXISTING 38"X 38" OPENING THROUGH CAP. FIELD
VERIFY ACTUAL SIZE. ROUTE 38"X 16" EXHAUST DUCTWORK THROUGH
EXISTING OPENING. REMAINDER OF OPENING TO BE INFILLED. REFER TO
ARCHITECTURAL AND STRUCTURAL DRAWINGS.
6 8"X 8" OPENING THROUGH CAP.
7 18"X 18" OPENING THROUGH CAP WITH MOTOR OPERATED DAMPER.
8 REUSE EXISTING 36"X 24" OPENING THROUGH CAP.
9 ROUTE 10" AL-29-4C DOUBLE WALL EXHAUST FLUE THROUGH EXTERIOR
WALL TO A WALL CAP. FLASH AND SEAL WEATHERTIGHT. PROVIDE A
SOOT CLEANOUT AND CONDENSATE DRAIN TEE AT THE BOTTOM OF THE
STACK. ROUTE CONDENSATE PIPE THROUGH CONDENSATE
NEUTRALIZER TO DRAIN.SEE DETAIL 6 ON SHEET M601 FOR CAP DETAIL.
10 ROUTE 10" AL-29-4C DOUBLE WALL EXHAUST THROUGH CONCRETE CAP
TO AN EXTERIOR WALL CAP, FLASH AND SEAL WEATHERTIGHT. SEE
DETAIL 6 ON SHEET M601 FOR CAP DETAIL. EXHAUST DUCT SHALL BE 3'
ABOVE CAP.
11 PROVIDE FIRE DAMPER AT PENETRATION THROUGH CAP. SEE DETAIL 9
ON SHEET M603.
12 10"X 10" OPENING THROUGH CAP.
13 FAN MOUNTED ON CAP. SEE DETAIL 5 ON SHEET M601.
14 REUSE EXISTING 48" X 24" OPENING THROUGH CAP.
15 ALL EXHAUST DUCT SHALL BE FULLY WELDED.
16 MAINTAIN MINIMUM 6' CLEAR WALKING PATHWAY FOR MAINTANCE
WORKER.
MH102-C SHEET NOTES
A REFER TO DUCT CONSTRUCTION DETAILS ON SHEET M601 FOR
DUCTWORK INSTALLATION REQUIREMENTS (INCLUDING DAMPERS AND
TURNING VANE REQUIREMENTS).
Supply
CRF Chief
EMF Chief
AMXS Chief
First Sgt
First Sgt
MOF Chief
MATCHLINE: SEE 1/ MH102-E
L
K
J
H
M
R1 R110x10
14x14
12x10
10x8
10x10
S7-6x6
S7-6x6
R1
S7-6x6
R1 R1
R28ø
14x14 x
8x8
10x10
8x8
10x10 8x8
8x8
10x10
8x8
R1
R1
R1
R1
S7-6x6
S7-6x6
S7-6x6
S7-6x6
S7-6x6
S7-6x6
10x10
S4-10ø
S4-8ø
(TYP. OF 4)
14ø
10ø
E4-10x10
18x18 EA UP/DN
30x18
30x18
T
H
Maint. Officers
Consult
Conference / Standup Room
10ø EA
10x10
16x16
S4-8ø
S4-8ø
S4-8ø
S4-8ø
S4-8ø
S4-8ø
S4-8ø
S4-8ø
16ø
S4-8ø
S4-8ø
S12-6x4 35 6ø
S12-6x4
23 1A1B
Corridor
C21
N D
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:5
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
SECOND FLOOR HVAC PLAN -
AREA D
MH102-D
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MH102-D
1 SECOND FLOOR HVAC PLAN - AREA D
KEY NOTES
1 DUCTWORK UP TO FC24-D.
2 DUCTWORK UP TO FC25-D.
3 DUCTWORK UP TO FC26-D.
4 TRANSITION FROM 16"X 10" TO 16"Ø AT CAP.
5 10"X 10" OUTSIDE AIR SUPPLY DUCT UP.
6 18"X 12" EXHAUST DUCT DOWN TO FIRST FLOOR.
7 EXHAUST DUCT UP THROUGH CAP.
8 22" X 22" SUPPLY DUCT DOWN TO FIRST FLOOR.
9 30"X 18" OUTSIDE AIR DUCT UP ALONG WALL TO THIRD FLOOR.
10 DDC TEMPERATURE AND HUMIDITY SENSORS TIED INTO THE BAS.
11 10" EXHAUST DUCT UP EXTERIOR WALL. TERMINATE DUCTWORK 15
FEET ABOVE DOUBLE DOORS. ALL EXTERIOR DUCTWORK TO BE
STAINLESS STEEL. SUPPORT DUCTWORK WITH STAINLESS STEEL
WALL BRACKETS TO EXTERIOR WALL. TERMINATE WITH GOOSENECK
PARALLEL TO WALL.
MH102-D SHEET NOTES
A REFER TO DUCT CONSTRUCTION DETAILS ON SHEET M601 FOR
DUCTWORK INSTALLATION REQUIREMENTS (INCLUDING DAMPERS AND
Secure Briefing
MOC
QA
Plans & Sch.
Women
Counseling
Analysis
Men
MATCHLINE: SEE 1/ MH102-D
H
G
F
E
D
QA Office
MOC Secure
S4-8ø
(TYP. OF 3)
14x10
S7-8x6
R1
R1
8x6
8x6
14x10
S2-8ø
S4-8ø
(TYP OF 4)
14x10
S7-8x8
S7-6x6
S7-8x6
S7-6x6
S2-8ø
S7-6x6
S2-6ø
14x10
R1
R1 R1
R1
8x8
S2-8ø x
30x18
E4-8x8
E4-8x8
8x10 T1
T1 T1
T1
S2-8ø
E6-6x6
R1
S2-8ø
S7-6x6
S7-8x8
S7-8x6
14x10
S4-8ø
(TYP. OF 3)
R1 R1
Storage
8x8
16x14
12x14
14x12
S4-8ø
(TYP OF 3)
10x10
8x8
14x12
23 1A1B
Corridor
C20
N
E
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:5
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
SECOND FLOOR HVAC PLAN -
AREA E
MH102-E
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MH102-E
1 SECOND FLOOR HVAC PLAN - AREA E
KEY NOTES
1 DUCTWORK UP TO FC35-D.
2 DUCTWORK UP TO FC34-D.
3 DUCTWORK UP TO FC33-D.
4 10"X 10" TRANSFER DUCT.
5 EXHAUST DUCT UP THROUGH CAP.
6 18"X 12" EXHAUST DUCT DOWN TO FIRST FLOOR.
7 SECURE PENETRATION, SEE DETAIL 5 ON SHEET M603 FOR
REQUIREMENTS.
8 DUCTWORK UP TO FC31-D.
9 DUCTWORK UP TO FC32-D.
MH102-E SHEET NOTES
A REFER TO DUCT CONSTRUCTION DETAILS ON SHEET M601 FOR
DUCTWORK INSTALLATION REQUIREMENTS (INCLUDING DAMPERS AND
x x
MATCHLINE: SEE 1/ MH103-E
AHU4
L
K
5 4
J
H
M
14x14 FC24-D
10x10
FC26-D
16x16
FC25-D
14x14
16x16
10x10
16x16
16x16
22x14
22x14
30x30
18x18
18x18
28x28
30x18
BS7 - D
10x10 EA
28x28
8x8
8x8
SD
22x22
28x28
10x10
23 1A1B
M402
N D
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:0
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
THIRD FLOOR HVAC PLAN - AREA
D
MH103-D
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MH103-D
1 THIRD FLOOR HVAC PLAN - AREA D
KEY NOTES
1 10"x 10" OUTSIDE AIR SUPPLY DUCT DOWN TO SECOND FLOOR.
2 18"X 18" DOWN ALONG WALL TO FIRST FLOOR.
3 SET AHU ON STRUCTURAL STEEL WITH RUBBER ISOLATION PADS.
4 TRANSITION 22"X 14" EXHAUST DUCT TO 18"X 12" ALONG WALL IN
VERTICAL AFTER TAKE-OFF.
5 DUCT DETECTOR FURNISHED BY ELECTRICAL CONTRACTOR AND
INSTALLED BY HVAC CONTRACTOR. DUCT DETECTOR SHALL
SHUTDOWN UNIT UPON SENSING SMOKE. COORDINATE WITH FIRE
ALARM CONTRACTOR.
6 SUPPLY AND EXHAUST FAN VFD'S MOUNTED TO UNISTRUT SUPPORTS.
PROVIDE AND INSTALLED BY HVAC CONTRACTOR, WIRED BY THE
ELECTRICAL CONTRACTOR.
7 ROUTE 10" AL-29-4C DOUBLE WALL EXHAUST FLUE THROUGH
EXTERIOR WALL TO A WALL CAP. FLASH AND SEAL WEATHERTIGHT.
PROVIDE A SOOT CLEANOUT AND CONDENSATE DRAIN TEE AT THE
BOTTOM OF THE STACK. ROUTE CONDENSATE PIPE THROUGH
CONDENSATE NEUTRALIZER TO DRAIN.SEE DETAIL 6 ON SHEET M601
FOR CAP DETAIL.
8 PROVIDE FIRE DAMPER AT PENETRATION THROUGH CAP. SEE DETAIL 9
ON SHEET M603.
9 22"X 22" SUPPLY DUCT DOWN IN CHASE.
10 NEW DDC CONTROL PANELS.
11 COORDINATE DUCTWORK WITH RAILING MANUFACTURER.
MH103-D SHEET NOTES
A REFER TO DUCT CONSTRUCTION DETAILS ON SHEET M601 FOR
DUCTWORK INSTALLATION REQUIREMENTS (INCLUDING DAMPERS AND
TURNING VANE REQUIREMENTS).
MATCHLINE: SEE 1/ MH103-D
5 4
H
G
F
E
D
FC31-D
FC32-D
FC33-D
FC34-D FC35-D
L10
L9
14x10
14x12 RA DN
14x10 SA DN
14x12 RA DN
14x10 SA DN
10ø x x
14x10 SA DN
14x12 RA DN
8x8 RA DN
8ø SA DN 10x10 RA DN
8ø SA DN
20x10
12x10
SUPPLY DUCT
ABOVE SUPPLY
DUCT
14x10
8x8 EA DN8x8 EA DN 6x6
16x14
47x13
8x8 RA DN
8ø SA DN
12x14 RA DN
8x8 RA DN
10ø SA DN
BS8 - D
4 4
5 5 5
5 5
14x12
10x10 RA
23 1A1B
N
E
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/1 /2
:2
:0
P
M C
R e v it L o c a l\
H a n g a r8
M n ic k lo a s .h a ll@ a e c o m
.c o m .r v t
Rickenbacker ANG Base, Renovate Hangar 885 P#60443615
THIRD FLOOR HVAC PLAN - AREA
E
MH103-E
Client Project #
C h e c k e r
D e s ig n e r
A p p ro v e r
12.19.2017
0 4 8 162
1/8" = 1'-0"MH103-E
1 THIRD FLOOR - HVAC PLAN - AREA E
KEY NOTES
1 54"X 54" OUTSIDE AIR INTAKE PLENUM BEHIND NEW LOUVER. INCLUDE
STAINLESS STEEL BIRDSCREEN. COORDINATE FINAL LOCATION WITH
STRUCTURE.SEE DETAIL 3 ON SHEET M601.
2 30"X 30" OUTSIDE AIR INTAKE PLENUM BEHIND NEW LOUVER. INCLUDE
STAINLESS STEEL BIRDSCREEN. COORDINATE FINAL LOCATION WITH
STRUCTURE.SEE DETAIL 3 ON SHEET M601.
3 NEW LOUVERS BEING INSTALLED TO REPLACE WINDOWS. INSTALL
INSULATED BLANK-OFF PANELS BEHIND ALL UNUSED PORTIONS OF
LOUVERS. SEE ARCHITECTURAL DRAWINGS FOR SIZE.SEE DETAIL 3 ON
SHEET M601.
4 SECURE PENETRATION, SEE DETAIL 5 ON SHEET M603 FOR
REQUIREMENTS.
5 PROVIDE FIRE DAMPER AT PENETRATION THROUGH CAP. SEE DETAIL 9
ON SHEET M603.
MH103-E SHEET NOTES
A REFER TO DUCT CONSTRUCTION DETAILS ON SHEET M601 FOR
DUCTWORK INSTALLATION REQUIREMENTS (INCLUDING DAMPERS AND
TURNING VANE REQUIREMENTS).
DN
DN
L
K
10 6 5 4
J
H
G
C
B
M
F
E
D
A
HP1-A
HP2-B
HP3-C
HP4-D
FC01-A
FC02-A
BS1 - A
FC03-A
FC04-A
BS3 - A
FC18-A
FC19-A
FC06-A BS2 - A FC05-A
FC07-A FC08-A
FC09-A
FC20-B
FC30-D
FC29-C
FC28-C
BS6 - C
FC27-C
BS5 - C
FC23-C
FC22-C
FC21-C
23789 1A1B1D 1C
MATCHLINE: SEE 1/ MH101-B
MATCHLINE: SEE 1/ MH101-A
MATCHLINE: SEE 1/ MH101-C
MATCHLINE: SEE 1/ MH101-B
MATCHLINE: SEE 1/ MH101-D
MATCHLINE: SEE 1/ MH101-E
N A
B
C
D
E
F
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.