Amendment_6_Drawings.pdf

PDF 4 MB Posted

Attached to
Renovate Hangar 885 Federal contract opportunity
Solicitation number
W9136418B5000
Issued by
Department of the Army Ohio Army National Guard

About this file

drawing

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Hangar 885, newest first.
File Type Posted
Bid_Opening_Sign_In_W91364-18-B-5000.pdf PDF
Final_Bid_Opening_DOC_Abstract_of_offers_18B5000.pdf PDF
Amendment_6_RFI_Questions-Answers-July_20_2018.pdf PDF
W91364-18-B-5000-0006.pdf PDF
26_2500_-_ENCLOSED_BUS_ASSEMBLIES.PDF PDF
W91364-18-B-5000-0005.pdf PDF
Amendment_4_RFI_Questions-Answers-July_17_2018.pdf PDF
Amendment_4_Civil_-_C300_Site_Plan.pdf PDF
Amendment_4_ARCH_-_7.17.2018.pdf PDF
Amendment_4_HVAC_-_7.17.2018.pdf PDF
Amendment_4_ELEC_-_7.17.2018.pdf PDF
ANGETL_15-01-03,_Fire_Prot_Design_Policy.pdf PDF
Amendment_4_drawing_narrative.pdf PDF
W91364-18-B-5000-0004.pdf PDF
321216_-_ASPHALT_PAVING.pdf PDF
323113_-_CHAIN_LINK_FENCES_AND_GATES.pdf PDF
W9136418B5000-Amendment_0003.pdf PDF
OH1180099_7-06-2018_Franklin_County.pdf PDF
RFI_Questions-Answers-July_13,_2018.pdf PDF
Pre-Bid_Conference_Renovate_Hangar_-6_Jul_18-_18B5000.pdf PDF
885F_1981Reno.pdf PDF
885S_1981Reno.pdf PDF
W9136418B5000-Amendment_0002.pdf PDF
885A_1981Reno.pdf PDF
RFI__Answer-July_10,_2018.pdf PDF
885H_1981Reno.pdf PDF
885S_1953.pdf PDF
885E__1981Reno.pdf PDF
6JUL18_885_Site_Visit_Sign_In_Sheet.pdf PDF
OH118_6-15-2018-Franklin.pdf PDF
W9136418B5000_Hangar_885_Survey_Reports_and_Sampling_Data.pdf PDF
W91364-18-B-5000_Amendment_0001_RENOVATE_BLDG_885.pdf PDF
RFI_Answers-July_7,_2018.pdf PDF
27JUN18_Site_Visit_Docs.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_02-IFB_Part_3_of_3.pdf PDF
NLZG102008_RenovateHangar885_specifications_Vol_01-IFB.pdf PDF
SECTION_013100_Govt_Specific_Addendum.pdf PDF
W91364-18-B-5000_RENOVATE_BLDG_885.pdf PDF
18B5000_-_JA_Manaco_Fire_Alarm_System.pdf PDF
18B5000_JA_Project_Mates.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_02-IFB_Part_1_of_3_.pdf PDF
W9136418B5000-_RFI_template.pdf PDF
NLZG102008_RenovateHangar885_specifications_Vol_02-IFB.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_02-IFB_Part_2_of_3.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_01-IFB.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROXIMATE OVERALL DIMENSION

428' - 8"

A P

P R

O X

IM

A

T E

O V

E R

A L L D

IM

E

N S

IO

N

ROOF BELOW TO REMAIN

ROOF BELOW TO REMAIN

ROOF BELOW TO REMAIN

ROOF EDGE FLASHING TO BE

REMOVED AND REPLACED AFTER

ROOF HAS BEEN REPLACED.

TYPICAL ON ENTIRE ROOF. SEE

PHOTOS OF EXISTING CONDITIONS

DEMOLITION ROOF PLAN LEGEND

EXISTING PENTHOUSE LOUVERS

TO REMAIN

EXISTING LOUVER PENTHOUSES TO BE

DEMOLISHED. PENTHOUSES ARE

APPROXIMATELY 7' TALL AND WEIGH 250

LBS. COORDINATE WITH MECHANICAL

EXISTING LIGHTS TO BE DEMOLISHED,

MOUNTING STRUCTURE TO REMAIN.

COORDINATE WITH ELECTRICAL

ROOF MEMBRANE AND INSULATION

TO BE REMOVED DOWN TO

STRUCTURAL DECK

EXHAUST FANS TO BE REMOVED. DECK

TO BE COVERED WITH NEW TO MATCH

EXISTING, INFILL INSULATION TO MATCH

EXISTING AND ROOF WITH NEW.

COORDINATE WITH MECHANICAL

EXTERIOR ROOF REPLACEMENT GENERAL NOTES

A. SCOPE OF EXTERIOR ROOF WORK IS ESSENTIALLY A LIKE FOR LIKE REPLACEMENT OF

EXISTING MEMBRANCE ROOF AND INSULATION WITH THE EXCEPTION THAT THE NEW ROOF

IS A WHITE MEMBRANE ROOF. DECKING AND STRUCTURE TO REMAIN UNLESS DAMAGED

AND NEED REPLACEMENT.

B. EDGE ROOF FLASHING TO BE REMOVED AND REPLACED.

C. BLOCKING TO BE REPLACED.

D. SCOPE ALSO TO INCLUDE TEAR OFF INSULATION, NAILERS, FLASHINGS, ETC.

E. ROOF REPLACEMENT DESCRIBED ON THIS SHEET IS ONLY FOR THE MAIN HANGAR SHELL

BUILDING EXTERIOR ROOF. OTHER ROOFING WORK DESCRIBED ELSEWHERE.

F. FIELD SURVEYS WERE NOT CONDUCTED BY THE AE TEAM FOR THE EXTERIOR ROOF.

CONTRACTOR SHOULD FIELD VERIFY EXISTING CONDITIONS TO GRASP THE SCOPE. SEE

PICTURES OF EXISTING CONDITIONS ON SHEET AD141.

G. SEE PROJECT MANUAL FOR MORE INFORMATION.

N A

B

C

D

E

F

PROJECT

CLIENT

CONSULTANT

CONSULTANTS

REGISTRATION

ISSUE/REVISION

KEY PLAN

SHEET NUMBER

SHEET TITLE

CLIENT PROJECT NUMBER

L a s t P lo tt e d

F ile n a m e

Printed on ___% Post-Consumer Recycled Content Paper

A R

C H

E x

P ro je c t M a n a g e m e n t In it ia ls

D e s ig n e r:

C h e c k e d

A p p ro v e d

123456

A

B

C

D

E

6 5 4 3 2 1

100% DESIGN SET

Ohio Air National Guard 7370 Minuteman Way

Columbus, Ohio 43217

614.492.4459 tel www.goang.com

AECOM

277 W. Nationwide Blvd.

Columbus, Ohio 43215

614.464.4500 tel www.aecom.com

A

B

C

D

E

FE

N

T R

A N

C E

S

ID

E

A

IR

S

ID

E

/2

/2

:2

:3

A

M C

P ro g ra m F ile s \A u to d e s k \P ro je c ts

\6

H a n g a r8

A a n d re w .h u b e r.

rv t

Rickenbacker ANG Base, Renovate Hangar 885

P#60443615

ROOF DEMOLITION PLAN -

EXTERIOR

AD141

P#NLZG102008

A H

/B S

A H

/B S

B S

01.13.2017

0 8 16 324

1/16" = 1'-0"AD141

1 ROOF DEMOLITION PLAN - EXTERIOR

I/R DATE DESCRIPTION

1 17 JULY 2018 AMENDMENT 4

2 20 JULY 2018 AMENDMENT 6

NOT TO SCALEAD141

2 EXISTING ROOF PHOTOS

APPROXIMATE OVERALL DIMENSION

428' - 8"

A P

P R

O X

IM

A

T E

O V

E R

A L L D

IM

E

N S

IO

N

37' - 8"

37' - 8"

ROOF BELOW TO REMAIN

ROOF BELOW TO REMAIN

ROOF BELOW TO REMAIN

PREFABRICATED

CANOPY ROOF BELOW

NEW MEMBRANE ROOF AND R30

INSULATION

EXTERIOR ROOF PLAN LEGEND

NEW LOUVER PENTHOUSES IN PLACE OF

REMOVED PENTHOUSES. INTENDED TO BE A

"LIKE FOR LIKE" REPLACEMENT.

NEW LED LIGHTS IN EXISTING MOUNTING

STRUCTURE.

EXTERIOR ROOF REPLACEMENT GENERAL NOTES

A. SCOPE OF EXTERIOR ROOF WORK IS ESSENTIALLY A LIKE FOR LIKE REPLACEMENT OF

EXISTING MEMBRANCE ROOF AND INSULATION WITH THE EXCEPTION THAT THE NEW ROOF

IS A WHITE MEMBRANE ROOF. DECKING AND STRUCTURE TO REMAIN UNLESS DAMAGED

AND NEED REPLACEMENT.

B. EDGE ROOF FLASHING TO BE REMOVED AND REPLACED.

C. BLOCKING TO BE REPLACED.

D. SCOPE ALSO TO INCLUDE TEAR OFF INSULATION, NAILERS, FLASHINGS, ETC.

E. ROOF REPLACEMENT DESCRIBED ON THIS SHEET IS ONLY FOR THE MAIN HANGAR SHELL

BUILDING EXTERIOR ROOF. OTHER ROOFING WORK DESCRIBED ELSEWHERE.

F. FIELD SURVEYS WERE NOT CONDUCTED BY THE AE TEAM FOR THE EXTERIOR ROOF.

CONTRACTOR SHOULD FIELD VERIFY EXISTING CONDITIONS TO GRASP THE SCOPE. SEE

PICTURES OF EXISTING CONDITIONS ON SHEET AD141.

G. SEE PROJECT MANUAL FOR MORE INFORMATION.

N A

B

C

D

E

F

PROJECT

CLIENT

CONSULTANT

CONSULTANTS

REGISTRATION

ISSUE/REVISION

KEY PLAN

SHEET NUMBER

SHEET TITLE

CLIENT PROJECT NUMBER

L a s t P lo tt e d

F ile n a m e

Printed on ___% Post-Consumer Recycled Content Paper

A R

C H

E x

P ro je c t M a n a g e m e n t In it ia ls

D e s ig n e r:

C h e c k e d

A p p ro v e d

123456

A

B

C

D

E

6 5 4 3 2 1

100% DESIGN SET

Ohio Air National Guard 7370 Minuteman Way

Columbus, Ohio 43217

614.492.4459 tel www.goang.com

AECOM

277 W. Nationwide Blvd.

Columbus, Ohio 43215

614.464.4500 tel www.aecom.com

A

B

C

D

E

FE

N

T R

A N

C E

S

ID

E

A

IR

S

ID

E

/2

/2

:2

:3

A

M C

P ro g ra m F ile s \A u to d e s k \P ro je c ts

\6

H a n g a r8

A a n d re w .h u b e r.

rv t

Rickenbacker ANG Base, Renovate Hangar 885

P#60443615

ROOF PLAN - EXTERIOR

A141

P#NLZG102008

A H

/B S

A H

/B S

B S

01.13.2017

0 8 16 324

1/16" = 1'-0"A141

1 ROOF PLAN - EXTERIOR

I/R DATE DESCRIPTION

1 17 JULY 2018 AMENDMENT 4

2 20 JULY 2018 AMENDMENT 6

File details come from the government source that posted it.