APPROXIMATE OVERALL DIMENSION
428' - 8"
A P
P R
O X
IM
A
T E
O V
E R
A L L D
IM
E
N S
IO
N
ROOF BELOW TO REMAIN
ROOF BELOW TO REMAIN
ROOF BELOW TO REMAIN
ROOF EDGE FLASHING TO BE
REMOVED AND REPLACED AFTER
ROOF HAS BEEN REPLACED.
TYPICAL ON ENTIRE ROOF. SEE
PHOTOS OF EXISTING CONDITIONS
DEMOLITION ROOF PLAN LEGEND
EXISTING PENTHOUSE LOUVERS
TO REMAIN
EXISTING LOUVER PENTHOUSES TO BE
DEMOLISHED. PENTHOUSES ARE
APPROXIMATELY 7' TALL AND WEIGH 250
LBS. COORDINATE WITH MECHANICAL
EXISTING LIGHTS TO BE DEMOLISHED,
MOUNTING STRUCTURE TO REMAIN.
COORDINATE WITH ELECTRICAL
ROOF MEMBRANE AND INSULATION
TO BE REMOVED DOWN TO
STRUCTURAL DECK
EXHAUST FANS TO BE REMOVED. DECK
TO BE COVERED WITH NEW TO MATCH
EXISTING, INFILL INSULATION TO MATCH
EXISTING AND ROOF WITH NEW.
COORDINATE WITH MECHANICAL
EXTERIOR ROOF REPLACEMENT GENERAL NOTES
A. SCOPE OF EXTERIOR ROOF WORK IS ESSENTIALLY A LIKE FOR LIKE REPLACEMENT OF
EXISTING MEMBRANCE ROOF AND INSULATION WITH THE EXCEPTION THAT THE NEW ROOF
IS A WHITE MEMBRANE ROOF. DECKING AND STRUCTURE TO REMAIN UNLESS DAMAGED
AND NEED REPLACEMENT.
B. EDGE ROOF FLASHING TO BE REMOVED AND REPLACED.
C. BLOCKING TO BE REPLACED.
D. SCOPE ALSO TO INCLUDE TEAR OFF INSULATION, NAILERS, FLASHINGS, ETC.
E. ROOF REPLACEMENT DESCRIBED ON THIS SHEET IS ONLY FOR THE MAIN HANGAR SHELL
BUILDING EXTERIOR ROOF. OTHER ROOFING WORK DESCRIBED ELSEWHERE.
F. FIELD SURVEYS WERE NOT CONDUCTED BY THE AE TEAM FOR THE EXTERIOR ROOF.
CONTRACTOR SHOULD FIELD VERIFY EXISTING CONDITIONS TO GRASP THE SCOPE. SEE
PICTURES OF EXISTING CONDITIONS ON SHEET AD141.
G. SEE PROJECT MANUAL FOR MORE INFORMATION.
N A
B
C
D
E
F
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/2
/2
:2
:3
A
M C
P ro g ra m F ile s \A u to d e s k \P ro je c ts
\6
H a n g a r8
A a n d re w .h u b e r.
rv t
Rickenbacker ANG Base, Renovate Hangar 885
P#60443615
ROOF DEMOLITION PLAN -
EXTERIOR
AD141
P#NLZG102008
A H
/B S
A H
/B S
B S
01.13.2017
0 8 16 324
1/16" = 1'-0"AD141
1 ROOF DEMOLITION PLAN - EXTERIOR
I/R DATE DESCRIPTION
1 17 JULY 2018 AMENDMENT 4
2 20 JULY 2018 AMENDMENT 6
NOT TO SCALEAD141
2 EXISTING ROOF PHOTOS
APPROXIMATE OVERALL DIMENSION
428' - 8"
A P
P R
O X
IM
A
T E
O V
E R
A L L D
IM
E
N S
IO
N
37' - 8"
37' - 8"
ROOF BELOW TO REMAIN
ROOF BELOW TO REMAIN
ROOF BELOW TO REMAIN
PREFABRICATED
CANOPY ROOF BELOW
NEW MEMBRANE ROOF AND R30
INSULATION
EXTERIOR ROOF PLAN LEGEND
NEW LOUVER PENTHOUSES IN PLACE OF
REMOVED PENTHOUSES. INTENDED TO BE A
"LIKE FOR LIKE" REPLACEMENT.
NEW LED LIGHTS IN EXISTING MOUNTING
STRUCTURE.
EXTERIOR ROOF REPLACEMENT GENERAL NOTES
A. SCOPE OF EXTERIOR ROOF WORK IS ESSENTIALLY A LIKE FOR LIKE REPLACEMENT OF
EXISTING MEMBRANCE ROOF AND INSULATION WITH THE EXCEPTION THAT THE NEW ROOF
IS A WHITE MEMBRANE ROOF. DECKING AND STRUCTURE TO REMAIN UNLESS DAMAGED
AND NEED REPLACEMENT.
B. EDGE ROOF FLASHING TO BE REMOVED AND REPLACED.
C. BLOCKING TO BE REPLACED.
D. SCOPE ALSO TO INCLUDE TEAR OFF INSULATION, NAILERS, FLASHINGS, ETC.
E. ROOF REPLACEMENT DESCRIBED ON THIS SHEET IS ONLY FOR THE MAIN HANGAR SHELL
BUILDING EXTERIOR ROOF. OTHER ROOFING WORK DESCRIBED ELSEWHERE.
F. FIELD SURVEYS WERE NOT CONDUCTED BY THE AE TEAM FOR THE EXTERIOR ROOF.
CONTRACTOR SHOULD FIELD VERIFY EXISTING CONDITIONS TO GRASP THE SCOPE. SEE
PICTURES OF EXISTING CONDITIONS ON SHEET AD141.
G. SEE PROJECT MANUAL FOR MORE INFORMATION.
N A
B
C
D
E
F
PROJECT
CLIENT
CONSULTANT
CONSULTANTS
REGISTRATION
ISSUE/REVISION
KEY PLAN
SHEET NUMBER
SHEET TITLE
CLIENT PROJECT NUMBER
L a s t P lo tt e d
F ile n a m e
Printed on ___% Post-Consumer Recycled Content Paper
A R
C H
E x
P ro je c t M a n a g e m e n t In it ia ls
D e s ig n e r:
C h e c k e d
A p p ro v e d
123456
A
B
C
D
E
6 5 4 3 2 1
100% DESIGN SET
Ohio Air National Guard 7370 Minuteman Way
Columbus, Ohio 43217
614.492.4459 tel www.goang.com
AECOM
277 W. Nationwide Blvd.
Columbus, Ohio 43215
614.464.4500 tel www.aecom.com
A
B
C
D
E
FE
N
T R
A N
C E
S
ID
E
A
IR
S
ID
E
/2
/2
:2
:3
A
M C
P ro g ra m F ile s \A u to d e s k \P ro je c ts
\6
H a n g a r8
A a n d re w .h u b e r.
rv t
Rickenbacker ANG Base, Renovate Hangar 885
P#60443615
ROOF PLAN - EXTERIOR
A141
P#NLZG102008
A H
/B S
A H
/B S
B S
01.13.2017
0 8 16 324
1/16" = 1'-0"A141
1 ROOF PLAN - EXTERIOR
I/R DATE DESCRIPTION
1 17 JULY 2018 AMENDMENT 4
2 20 JULY 2018 AMENDMENT 6