RFI as of July 13, 2018

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Hangar 885, newest first.
File Type Posted
Final_Bid_Opening_DOC_Abstract_of_offers_18B5000.pdf PDF
Bid_Opening_Sign_In_W91364-18-B-5000.pdf PDF
26_2500_-_ENCLOSED_BUS_ASSEMBLIES.PDF PDF
W91364-18-B-5000-0006.pdf PDF
Amendment_6_RFI_Questions-Answers-July_20_2018.pdf PDF
Amendment_6_Drawings.pdf PDF
W91364-18-B-5000-0005.pdf PDF
W91364-18-B-5000-0004.pdf PDF
321216_-_ASPHALT_PAVING.pdf PDF
323113_-_CHAIN_LINK_FENCES_AND_GATES.pdf PDF
Amendment_4_ELEC_-_7.17.2018.pdf PDF
ANGETL_15-01-03,_Fire_Prot_Design_Policy.pdf PDF
Amendment_4_drawing_narrative.pdf PDF
Amendment_4_RFI_Questions-Answers-July_17_2018.pdf PDF
Amendment_4_Civil_-_C300_Site_Plan.pdf PDF
Amendment_4_ARCH_-_7.17.2018.pdf PDF
Amendment_4_HVAC_-_7.17.2018.pdf PDF
OH1180099_7-06-2018_Franklin_County.pdf PDF
W9136418B5000-Amendment_0003.pdf PDF
6JUL18_885_Site_Visit_Sign_In_Sheet.pdf PDF
885H_1981Reno.pdf PDF
885S_1953.pdf PDF
885E__1981Reno.pdf PDF
885S_1981Reno.pdf PDF
W9136418B5000-Amendment_0002.pdf PDF
885A_1981Reno.pdf PDF
RFI__Answer-July_10,_2018.pdf PDF
Pre-Bid_Conference_Renovate_Hangar_-6_Jul_18-_18B5000.pdf PDF
885F_1981Reno.pdf PDF
RFI_Answers-July_7,_2018.pdf PDF
W91364-18-B-5000_Amendment_0001_RENOVATE_BLDG_885.pdf PDF
W9136418B5000_Hangar_885_Survey_Reports_and_Sampling_Data.pdf PDF
OH118_6-15-2018-Franklin.pdf PDF
27JUN18_Site_Visit_Docs.pdf PDF
NLZG102008_RenovateHangar885_specifications_Vol_02-IFB.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_02-IFB_Part_2_of_3.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_01-IFB.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_02-IFB_Part_3_of_3.pdf PDF
NLZG102008_RenovateHangar885_specifications_Vol_01-IFB.pdf PDF
SECTION_013100_Govt_Specific_Addendum.pdf PDF
W91364-18-B-5000_RENOVATE_BLDG_885.pdf PDF
18B5000_-_JA_Manaco_Fire_Alarm_System.pdf PDF
18B5000_JA_Project_Mates.pdf PDF
NLZG102008_RenovateHangar885_Full_Drawing_Set_Vol_02-IFB_Part_1_of_3_.pdf PDF
W9136418B5000-_RFI_template.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W91364-18-B-5000 Renovate Hangar 885

Rickenbacker ANGB, Columbus OH

July 13, 2018

RFI 0001: Section 122413 Roller Window Shades, Part 2 – Products, 2.01 Manually Operated Shades with Double Rollers. Could you please clarify which windows get Manually Operated Shades with Double Rollers? They are not marked on the Drawings

-Not answered yet

RFI 0002: Specification Section 028220 paragraph 1.03D states, “This specification is based on an Asbestos Survey of the site conducted by AECOM in October 2015. Laboratory test results are on file and may be obtained for review and are attached to this specification.”

The referenced Asbestos Survey conducted by AECOM does not appear to be included with any of the RFP documents. Please provide this survey.

Answer: The Asbestos and Lead survey is attached: Titled: W91364185000 Hangar 885 Survey Reports and Sampling Data.

RFI 0003: Section 010000 paragraph 17.11 describes the requirement to have all employees complete the AT Level I Awareness Training. The website link in paragraph 17.12.1 does not work. How long does this training take and are there any costs associated with the training?

Answer: The correct URL for AT Level I Training is: http://jko.jten.mil/courses/atl1/launch.html it is an on-line course. There is no cost associated with taking the course.

RFI 0004: Specification Section 028220 paragraph 1.05 says, “The total quantity of ACM and/or contaminated materials shall be field verified by the Asbestos Removal Contractor during the Pre-bid walkthrough. If the Asbestos Removal Contractor finds any perceived conflict, error, omission, or discrepancy in the Contract Documents, the Asbestos Removal Contractor shall submit a written request for an interpretation or clarification prior to the Bid Opening as specified in Division One of the Contract Documents. The Asbestos Removal Contractor shall not, at any time after the Bid Opening, be compensated for a claim alleging insufficient data, incomplete Contract Documents, or incorrectly-assumed conditions regarding the amount or nature of Work, if no request for interpretation was made by the Asbestos Removal Contractor prior to the Bid Opening. “

It is an impossibility of performance to expect us to catch any errors in the government provided design / scope of the hazardous material abatement work by making a short visual inspection during the site visit to the facility. In addition we cannot tell by a visual inspection if a building material is hazardous or not.

That determination can only be made after destructive field sampling and laboratory testing. Even if we could make a determination of whether a building material was hazardous by looking at it, there may still be hazardous materials hidden above ceilings, behind walls, underground, etc.

Please remove the paragraph noted above from the contract documents and confirm that bidding contractors should assume the only hazardous material that we are to include in our bid is the hazardous material specifically noted to be removed and that any additional hazardous material that may be discovered after award will be treated as a differing site condition.

Answer: The Hazardous Material and Environmental Survey was issued as a response to RFI-0002

Revise Specification Section 028220 paragraph 1.05 to read as follows: "The Hazardous Material and Environmental Survey indicates all areas in the building where suspected asbestos containing materials (ACM) were tested. Therefore, all impacted ACM within the renovation or demolition area should be http://jko.jten.mil/courses/atl1/launch.html removed and disposed of in accordance with Federal, State, and local regulations, prior to disturbance.

ACM not impacted within the renovation or demolition do not require removal as a part of this project.

ACM that are discovered during construction and required removal but are not indicated in the construction documents, specifications or noted in the Hazardous Material and Environmental Survey that was issued as a response to RFI-0002, will be treated as a differing site condition."

RFI 005- Please provide As-Built drawings for existing building.

Answer: The hanger underwent a large scale renovation in 1981. Those drawings are included which show how the additions were constructed.

These drawings do not show the thickness of the existing concrete floors in the building. The concrete floor thickness throughout the building is 14 inches thick.

Following drawings/documents are attached:

885S_1981Reno 885S_1953 885H_1981Reno 885F_1981Reno 885E_1981Reno 885A_1981Reno

RFI 006: Sheet A-102E shows what appears to be casework on the east wall of Room 158. However, there is no elevation detail provided in this room. Please clarify what casework is required on the east wall of Room 158.

-Not Answered yet

RFI 007: 1. Do we remove the existing EPDM membrane or leave it in place?

2. Please clarify the type and thickness of new insulation desired.

3. There’s a referral to fabric backed membrane in the specifications. Is “fleeceback” membrane the desired product to be used?

4. Are the interior roofs included in the scope of the project? If so, what is the scope?

5. Should attachment patterns be FM standards?

-Not Answered Yet

RFI 008: Specification 27 00 00 | Drawing E001

How many data cables are required at each type of data location as identified in the symbol legend (i.e.

white triangle, black triangle, camera, TV, etc) on drawing E001? See attached Div27 symbol legend for reference.

-Not Answered Yet

RFI 009: Sheet MD103-E is listed in the drawing index on sheet G001 but it is not included in the drawings. Please provide sheet MD103-E.

-Not Answered Yet

RFI 010: Specification 232300 Refrigeration Piping Can pre-charged and pre-insulated line sets be utilized between indoor branch controllers and indoor fan coils to reduce mechanical cost.

Answer: No, Follow refrigeration specification section 232300 and Section 2.09 of specification section 238136. Line sets must be robust.

RFI 011: Specification 211313 Fire Suppression #1. Sections A. B, and C Risers are isolated and severed at riser location in Corridor C11 (A101) To what extent are these risers to be re-worked?

#2 Sections A, B. C .D & E, the back lines providing protection above existing office space. have been severed and may sprinklers removed or broken. To what extent are these to be reconnected?

#3 Sections A. B, C, D, & E, all existing sprinklers are "Old Style" and are Standard Response. Are all of these sprinklers to be changed out to "Quick Response"? If so what is the weight limitations on the concrete deck above A, B & C in order to access the sprinklers in these locations #4 Existing High Bay sprinkler piping in all 6 areas are required to be internally inspected and flushed if obstructions are found. Has this inspection been performed if so is there documentation.

#5 We were unable to access the FOAM storage and Riser room located in section D. Access is needed to determine if existing storage tank is capable of providing adequate concentrate to the added square footage in sections C and F #6 The current Foam discharge fans have non-monitored ball valves to isolate the fans Are these to be changed to code compliant valves?

#7. The existing location of the Foam test connection is located inside the building and will become inaccessible after construction of the new office space. Should this be relocated?

-Not Answered Yet

RFI 012: Note 1 on sheet S101 says the existing floor construction, unless noted otherwise, consists of a 10" thick concrete slab on grade. In the Government's response to previous RFI 005, it was stated the concrete floor thickness throughout the building is 14" thick. Please confirm the thickness of the existing concrete slab on grade for bidding purposes.

Answer: Previous saw cutting has indicated that the thickness of the concrete can vary from 10" to 14".

There are no records of where the concrete thickness changes. For planning purposes, plan on having to saw cut and demo concrete that is 14" thick

RFI 013: Section 016000, Product Requirements; Section 012500, Substitution Procedures

The restrictive procedures for product selection and substitutions in the referenced sections will unnecessarily and significantly restrict competition and will increase the cost of the project to the Ohio National Guard. We suggest and request that these sections be eliminated and adopt standard “Or Equal” provisions for all products be added to the RFP.

Answer: Delete Sections 016000 and 012500 from the specifications. Contractor may provide products that are "Equals" to the basis of design product listed in the individual specifications. Equal products must meet or exceed the specifications listed. The products/materials will be approved/disapproved during the submittal process by the Contracting Officer at the advice of the Contracting Officer Representative (COR) once the construction contract has been awarded.

The only sole source items are: Monaco Fire Suppression System and Project Mates Software (Justifications and Approvals are provided on FBO).

RFI 014: The drawings on sheet A601 show the sign types and there is no mention of frames needed for these signs. In the specs on page 3 of section 101423.13 mentions that frames are needed for signs.

Please inform if frames are required or not required for signs.

-Not Answered Yet

RFI 015: Page 63 of 66 of the RFP, Section 28 Safety Assurance, 28.1 Directs us to the USACE 385-1-1 Manual. 385-1-1 Section 01.A.17 states that the contractor is to employ a full time SSHO depending on job complexity, size and any other pertinent factors.

Please confirm that 1 full time SSHO is required for the project.

Answer: This project is not run or managed by the USACE. NO FULL TIME SSHO IS REQUIRED FOR

THIS PROJECT.

However, contract must comply with all OSHA regulations and safety requirements as a part of this project. The USACE Manual is listed for reference purposes.

RFI 016: Specs, Section 014000 Quality Requirements, 1.06.B.1: Project quality-control manager may also serve as Project superintendent.

Please confirm that the Project Superintendent may dual hat and serve as the Quality Control Manager for this $10-25 million dollar project.

Is the Quality Control Manager required to have a current USACE CQM Training Certificate?

Is there any specific training, experience, or other requirements for the Project Superintendent and Quality Control Manger?

Answer: Correct. As stated in section 014000-1.06.B the project superintendent may serve as the quality control manager. This project is not a USACE project. No USACE training certificates are required for individuals nor are there any other training or experience requirements for the project superintendent or the QCM. However, all job personnel require Anti-Terrorism Level I Awareness Training (On-line course).

RFI 017: Specs, Section 015000 Temporary Facilities and Controls, Part 2, 2.10 Materials, A.2 Where not located over existing pavement, utilize soil installation of post, or galvanized steel bases are acceptable in soil. Prints C100 Temporary Chain Link Fence Detail; Post are to be driven directly into the ground.

Please provide direction for installation of temp fencing post on soil. Are galvanized steel bases on top of soil acceptable or do the post need driven into the ground? Print shows 6' fence, specs state 8'. Please clarify.

Answer: Galvanized bases are acceptable instead of directly installing in the soil.

Additionally. Instead of this detail, contractor may provide "Rental style" chain link fencing systems instead of more permanent chain link fence as shown in the detail. Panel type rental fencing with still must be galvanized mesh but the requirement for 2-3/8" and 4" fence post are not required. Panel stands can be used in both concrete and grass area. Sandbags shall be provided as required to ensure protection from high winds. Privacy screen shall not be provided.

Minimum fence height is 6 ft.

RFI: 018: Prints A601 - Basis of Design Finish Material Legend Shows Plastic Laminate for counter tops - Wilsonart Windswept Pewter 4795-60 Prints A402 - All casework details show Solid Surface Countertops.

Specs include Section 123661.16 Solid Surface Countertops Please clarify if Plastic Laminate or Solid Surface Countertops are required. If sold surface countertops are required, please provide Manufacturer and Color.

-Not Answered Yet

RFI 019: Specifications do not include sections for Asphalt nor Permanent Fencing.

Please provide.

-Not answered yet

RFI 020: Plumbing Fixture Change (Issued by Government)

Answer: Sheet P501 Plumbing Fixture Schedule: Change Fixture L-1 to have built in soap dispenser. Change fixture model number to 9024.014EC. Provide with Bobrick B-8226 Stainless Steel Deck Mounted 20 oz. Liquid Soap Dispenser or equal. Delete pop up drain and provide McQuire flat grid strainer or equal.

RFI 021: Upon reviewing Amendment 0001, 0002, and 0003 on FBO, I have found only two SF 30s. Per FBO, Amendment 0002 appears to be the same as Amendment 0001 and Amendment 0003 appears to be Amendment 0002 per the SF 30. Please confirm the amount of amendments, and the effective dates of those Amendments.

Additionally, I found instructions for hand-carried bids but not mailing instructions. Please confirm the mailing address we should use to submit the bid, as well as the names of the individuals we should place attention to on the mailing address. Thanks for your time.

Answer: The Amendments will be on the SF 30. Amendment 001 on the FBO site should not of been labeled Amendment 001.

Here are the amendments that must be acknowledged to date:

Amendment 001-Issued on July 5, 2018 Amendment 002-Issued on July 10, 2018 Amendment 003-Issued on July 13, 2018

Mail Bids To:

121st ARW Rickenbacker ANG Base ATTN: MSgt Curt Deck-MSC/W94136418B5000 7370 Minute Man Way, Bldg. 875 Columbus OH 43217.

RFI 022: Addendum 2 changes the issued by from 121 OH Air National Guard at Rickenbacker at 7370 Minuteman Way to USPFO for Ohio at 2811 Dublin-Granville. Please clarify if the bids are still due at Rickenbacker at 7370 Minuteman Way or 2811 Dublin-Granville Rd.

Answer: The “issued by” office has nothing to do with the bid opening:

The Bid Opening Location has not changed. Bid Opening will be held at the location in the IFB:

121st Air Refueling Wing, Rickenbacker ANG Base, 7370 Minute Man Way, Bldg. 875, Room 190, Columbus OH 43217.

RFI 023: Specification 081113 Hollow Metal Doors and Frames, paragraph 1.03.B says, “Blast Resistant Door Assembly: An assembly of hollow metal door, steel frame and finish hardware, tested and approved as an assembly of components, capable of meeting ASTM F2927 and UFC 01-010.01 performance criteria for a 55 psf, 3 second force and achieve Damage Level Category II or better.

This information is an ASTM F2248 3 second duration design load. ASTM F2248 is used to calculate an equivalent 3-second duration equivalent design load to design blast glazing used in windows and vision lights only. It is not applicable to doors. A charge weight and standoff distance is required to determine the design blast load for the door.

In order to price blast doors, we need a charge weight, standoff distance, and level of protection. A damage category of II, as stated in the RFP, is a medium level of protection. The vast majority of UFC projects are for a low level of protection / damage category III.

There appears to be no indication as to which doors will require a UFC blast door. Please clarify which doors need to comply with the UFC requirements for blast resistant door assemblies and provide the charge weight, standoff distance, and level of protection for each individual blast door.

-Not Answered Yet

RFI 024: In the comments column of the door schedule on sheet A602, openings 129 and 203 both reference a “SCIF lock”. Are these rooms required to meet SCIF requirements? Please clarify, as this impacts multiple trades and could be a significant cost impact.

-Not Answered Yet

RFI 025: Sheet A001 defines certain wall types as having specific STC ratings. However, there is nothing on the door schedule indicating any doors are required to meet specific STC requirements. Are any door openings required to be STC rated? If so, is any field testing of STC assemblies required?

-Not Answered Yet

RFI 026: The door schedule on A602 shows opening 108 getting a new door in an existing frame, and hardware set #11. The comment in the door schedule says, “New door and hardware in existing frame”.

Hardware set #11 only consists of a new cylinder. Is all other existing hardware to be removed and reused on the new door? This door connects to a dark room. Are any special seals required to control light? Please confirm hardware set #11 is the correct hardware set for opening 108.

The door schedule on A602 shows opening 109 getting a new door in an existing frame, and hardware set #11. The comment in the door schedule says, “New door and hardware in existing frame”. Hardware set #11 only consists of a new cylinder. Is all other existing hardware to be removed and reused on the new door? This is a door into an Xray room. Is this door required to be lead lined? If so, what thickness of lead is required? Please confirm hardware set #11 is the correct hardware set for opening 108. And confirm if they new door has any special requirements.

The door schedule on A602 shows opening 111 getting a new door, a new frame, and hardware set #11.

However, the comment in the door schedule says, “New key cylinder in existing door, hardware”. Please clarify if opening 111 is getting a new door and frame, and what hardware set is required for this opening.

-Not Answered Yet

RFI 027: Specification section 081113 Hollow Metal Doors and Frames, paragraph 2.03.B.2.e says, “Core: manufacturer’s standard kraft-paper honeycomb, polystyrene, polyurethane, polyisocyanurate, mineral-board, or vertical steel-stiffener core at manufacture’s discretion.” Paragraph 2.08.B.1 says, “Steel Stiffened Door Cores: Provide minimum thickness .026-inch steel vertical stiffeners of same material as face sheets extending full height…”

Please confirm if the door cores are allowed to be a standard honeycomb core or are they required to be steel stiffened.

RFI 028: Several subcontractors (MEP) have requested and additional week to complete their proposals. Respectfully request bid date be extended to 27 July.

Answer: As of July 13, 2018 the Bid Opening Date will not be extended.